The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application to expand an existing Costco warehouse and parking, which would result in permanent impacts to approximately 1.17 acres of wetlands adjacent to the Unnamed tributary of the East Gallatin River. This notice is to inform interested parties of the proposed activity and to solicit comments.

The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application to expand an existing Costco warehouse and parking, which would result in permanent impacts to approximately 1.17 acres of wetlands adjacent to the Unnamed tributary of the East Gallatin River. This notice is to inform interested parties of the proposed activity and to solicit comments.

PUBLIC NOTICE Omaha District

Application No: NWO-2016-01879-MTH Applicant: Costco Wholesale Corporation Waterway: Unnamed wetland Issue Date: May 26, 2017 Expiration Date: June 24, 2017 30 DAY NOTICE Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application to expand an existing Costco warehouse and parking, which would result in permanent impacts to approximately 1.17 acres of wetlands adjacent to the Unnamed tributary of the East Gallatin River. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Peter Kahn Costco Wholesale Corporation 999 Lake Drive Issaquah, Washington 98027 LOCATION: The approximately 3.5-acre project site is located on and near the unnamed wetland, within Section 35, Township 1 S, Range 5 E, Latitude 45.712562°, Longitude 111.072843°, Gallatin County, Montana. There is approximately 18 linear feet of the Un-named drainage, and 1.17 acres of wetlands within the project area. PROJECT DESCRIPTION: The proposed project will involve constructing a 24,000 square foot (sf) addition on the north side of the existing warehouse, constructing a 24-foot wide fire lane to the north of the new building addition and constructing an additional 112,200 sf of parking space to the north of the existing parking area. The expansion of the existing infrastructure will require filling in existing storm water pond and permanently impacting 1.17 acres of wetland and approximately 18 linear feet of existing channel that has a defined bed and bank.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 2

Action ID: NWO-2016-01879-MTH

To construct the new additions the existing channel will be redirected into a new drainage channel that will be constructed along the western and the northern project limits. The new channel will be approximately four feet wide and approximately 490 linear feet long. The applicant's preferred alternative would result in permanent impacts to 1.17 acres of wetlands. This alternative would result in any temporary impacts. The applicant's stated project purpose is to expand the current warehouse to meet the public demands. The attached drawings provide additional project details. ADDITIONAL INFORMATION: Alternatives. The applicant has provided information concerning the following project alternatives: Alternative 1: No action. Through the no action alternative, the Costco facility would continue as it currently does, not meeting capacity for the current business demand. The "No Build Alternative" would not meet the purpose and need of the project. Alternative 2, New location alternative: Costco considered constructing a new warehouse and parking lot at a new, larger location. While this alternative would meet the purpose and need of the project, it was dropped, and a new location never determined. The new location would likely have been agricultural fields or undeveloped land, which would have likely involved greater impacts than what was considered under Alternatives 2 and 3. Because it was determined to be more cost effective to use the vacant property north of the existing Costco facility, this alternative was not considered further. Alternative 3, Full Site Build-Out: A separate commercial building and parking area could be constructed on this parcel. This alternative would meet the purpose and need of the project; however, it would impact additional wetlands (all 1.41. acres would be impacted), and it was determined that developing this site would not be economically feasible. The storm piping costs to divert the unnamed drainage were extensive, and once the watercourse setbacks and building setbacks required by the city of Bozeman were applied, there was limited developable property. Costco decided not to evaluate this alternative further, and determined it was best to keep this section of the project site as green space for wetlands and a watercourse as described in Alternative 4. Alternative 4, Site build out with greenspace (preferred alternative): The proposed project will involve constructing a 24,000 square foot (sf) addition on the north side of the existing warehouse, constructing a 24-ot wide fire lane to het north of the new building addition and constructing an additional 112,200 sf of parking space to the north of the existing parking area. The expansion of the existing infrastructure will require filling in existing storm water pond and permanently impacting 1.17 acres of wetland and approximately 18 linear feet of existing channel that has a defined bed and bank. To construct the new additions the existing channel will be redirected into a new drainage channel that will be constructed along the western and the northern project limits. The new channel will be approximately four feet wide and approximately 490 linear feet long.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 3

Action ID: NWO-2016-01879-MTH

Mitigation: To satisfy the mitigation requirements to offset 1.17 acres of wetland (0.66 acre of emergent wetland and 0.51 acre of scrub-shrub wetland), credits will be purchased within the same watershed at the Upper Missouri River mitigation bank. OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The Montana Department of Environmental Quality hereby incorporates this public notice as its own public notice and procedures by reference thereto. HISTORIC PROPERTIES: The Corps is lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and has completed a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Omaha District's initial review, based on currently available information, indicates there are no recorded properties within the permit area. It has been determined that the project will have little likely effect properties listed. ENDANGERED SPECIES: The proposed activity has no effect on Federally-listed endangered or threatened species or their critical habitat. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 4

Action ID: NWO-2016-01879-MTH

The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Timothy McNew at Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626, by email at Timothy.M.McNew@usace.army.mil, or telephone at (406) 441-1375. Please refer to identification number NWO-2016-01879-MTH in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: 2 figure

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 5

Action ID: NWO-2016-01879-MTH

Fig 1: Location of Project

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 6

Action ID: NWO-2016-01879-MTH

Figure 2: Concept plan for expansion of existing Costco warehouse

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas