Home

Galveston District

Run scraper

Freeport LNG Development

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Freeport LNG Development (FLNG) have requested a modification to their existing Department of the Army permit to include maintenance dredging of the entire FLNG Basin (both Dock 1 and Dock 2) with offshore disposal in the Freeport Maintenance ODMDS.

Full Public Notice Project PlansDraft EnvironmentalReportSediment Analysis Freeport LNG Development (FLNG) have requested a modification to their existing Department of the Army permit to include maintenance dredging of the entire FLNG Basin (both Dock 1 and Dock 2). Dredging will be conducted via a hydraulic cutter head dredge and/or mechanical clamshell dredge to excavate the material that will be directly loaded to a dump scow barge. The barge will be transported to the Freeport Harbor Maintenance ODMDS where the material will be dumped. Each maintenance dredging cycle is expected to take 3 months to complete. Submittals to evaluate effects of dredging and disposal of dredge material will be conducted, as required by Section 103 of the MPRSA. FLNG has estimated that the initial maintenance dredge cycle will remove approximately 1,200,000 cubic yards. Subsequent maintenance dredge cycles will occur annually and are estimated to remove approximately 500,000 cubic yards.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas