The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by the Montana Department of Transportation (MDT) to establish a mitigation bank to provide compensatory mitigation for impacts associated with transportation projects within Watershed #3 - Lower Clark Fork River Basin.
The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by the Montana Department of Transportation (MDT) to establish a mitigation bank to provide compensatory mitigation for impacts associated with transportation projects within Watershed #3 - Lower Clark Fork River Basin.
PUBLIC NOTICE
Omaha District
Application No: NWO-2013-02095-MTH
Applicant: Montana Department of Transportation (MDT)
Waterway: Watershed #3 Lower Clark Fork River Basin
Issue Date: May 31, 2017
Expiration Date: June 30, 2017
30 DAY NOTICE
Helena Regulatory Office 10 West 15th Street, Suite 2200 Helena, MT 59626-9705
PUBLIC NOTICE
FOR MDT's ESTABLISHMENT OF A MITIGATION BANK SUBMITTED
TO U.S. ARMY CORPS OF ENGINEERS,
in cooperation with the Interagency Review Team (IRT)
SUBJECT: The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a
request by the Montana Department of Transportation (MDT) to establish a mitigation
bank to provide compensatory mitigation for impacts associated with transportation
projects within Watershed #3 - Lower Clark Fork River Basin. This notice may also be
viewed at the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx
Description of Proposed Project: The Montana Department of Transportation (MDT) is
the sponsor of this aquatic resource mitigation bank to provide compensatory mitigation
for both stream and wetland impacts associated with transportation projects within
Watershed # 3 Lower Clark Fork River basin.
MDT's restoration goals and objectives within the Richardson Family Ranch site are:
1. Restore approximately 2,073 linear feet of Six Mile Creek by:
a. Removing 57 feet of steel culvert and installing step pools for fish
passage at the Upper Stream Segment,
b. Stabilize streambanks and create floodplains within a 776-foot reach of
the Middle Stream Segment, and
c. Restore natural channel geometry and sinuosity to approximately 1200
linear feet within the channelized Lower Stream Segment.
2. Restoring natural stream functions by lowering and widening floodplain areas,
installing woody debris and rock habitat structures;
3. Removal of a man-made pond and its water diversion structures to recreate
floodplain wetlands adjacent to the new stream corridor;
4. Improve wildlife and fisheries habitat along the entire reach of Sixmile Creek on
this property;
5. Reconnect upstream fish passage on Sixmile Creek with removal of perched
culvert;
6. Create approximately 24,164 stream and riparian credits for the stream
restoration component;
7. Create between 7 to 9 wetland credit acres through:
a. The creation of approximately 6.45 acres of depressional emergent and
riparian emergent/scrub/shrub wetlands;
b. Re-establishment of 0.78 acres of wetlands in restored sections of
floodplain;
c. Preservation of 1.01 acres of existing scrub/shrub wetlands in the middle
stream segment;
d. Establishment of a 100-foot buffer totaling 2.5 credit acres around the
restored floodplain and depressional wetlands due to steepness of
surrounding topography and adjacent land uses.
Location: The proposed activity is located on land owned by MDT located within Section
26, Township 15 North, Range 22 West, Missoula County, Montana (near Latitude:
47.03375, Longitude: -114.35275).
Purpose: The purpose of the proposed project is to establish a compensatory mitigation
site for use by MDT for transportation projects within Watershed #3 - Lower Clark Fork
River Basin requiring compensatory mitigation in accordance with Section 404 of the
Clean Water Act and Section 10 of the Rivers and Harbors Act.
Background: The Corps requires compensatory mitigation as a permit condition for
stream or wetland losses that are determined to have greater than minimal adverse
effects. The goal of mitigation is to replace the physical, chemical, and biological
functions of these waters of the U.S. The mitigation banking and In Lieu Fee concepts
were established to provide alternatives to applicant-provided mitigation and ease the
regulatory burden of mitigating permitted impacts to waters of the U.S.
Mitigation: This will be a compensatory mitigation site that will help offset impacts
from projects authorized by the Corps. There is no requirement for compensatory
mitigation required by the establishment of this bank.
401 Water Quality Certification: The establishment of the bank will not require 401
water quality certification. Further activities requiring a Section 404 or Section 10 Permit
would require 401 certification will be addressed by any permits required to develop the
site.
Cultural Resources: The Corps of Engineers, Omaha District will comply with the
National Historic Preservation Act of 1966, as amended. We have checked the National
Register of Historic Places and its current supplements, and there are no known National
Register sites in the vicinity; however, we will evaluate input by the State Historic
Preservation Office and the public in response to this public notice, and we may conduct
or require a reconnaissance survey of the permit area to check for unknown historic or
prehistoric properties, if warranted.
2
Threatened / Endangered Species: In compliance with the Endangered Species Act, a
determination of effect will be made for the described action. In order to complete our
evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service
and other interested agencies and individuals which also make up the Interagency
Review Team.
Evaluation Factors: The decision whether to approve the proposal will be based on an
evaluation of the overall proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The
benefits which reasonably may be expected to accrue from the proposed activity must be
balanced against any reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered. This Public Notice allows the public to
provide comments or concerns about the project which will be considered before a final
decision is made.
Comments: The Corps of Engineers is soliciting comments from the public; Federal,
state, and local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments received
will be considered by the Corps to determine whether to approve, modify, or deny this
proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other
public interest factors. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity. All Public
Notice comments will be considered public information and will be subject to review by
the applicant.
Any person may request, in writing and within the comment period specified in this notice,
that a public hearing be held for the purpose of gathering additional information.
Requests for public hearings must be identified as such and shall state specifically the
reasons for holding a public hearing and what additional information would be obtained.
The request for public hearing must be submitted in writing to the U.S. Army Corps of
Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. If it is
decided that additional information is required and that a public hearing should be held,
interested parties will be notified of the date, time and location.
Any interested party (particularly officials of any town, city, county, state, or Federal
agency; Indian tribe; or local association whose interests may be affected by the work) is
invited to submit to this office written facts, arguments, or objections on or before the
expiration date listed on the front of this notice. Any agency or individual having an
objection to the proposal should specifically identify it as an objection with clear and
specific reasons. Comments, both favorable and unfavorable, will be accepted, made a
part of the record and will receive full consideration in subsequent actions on this
proposal. All replies to the public notice should be addressed to the U.S. Army Corps of
Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. Please
reference the Application Number found on the first page of this notice in any
correspondence. Robert Cole, telephone number (406) 441-1363, may be contacted
3
for additional information. You may e-mail comments to:
Robert.H.Cole@usace.army.mil.
Comments postmarked after the expiration date of this Public Notice, or received by fax
or email after the expiration date of this Public Notice, will not be considered. Comments
left on our voicemail system will not be considered.
Statutory Authorities: This proposal is intended to provide compensatory mitigation
opportunities for Department of Army permits issued under the provisions of Section 404
of the Clean Water Act and Section 10 of the Rivers and Harbors Act.
Attachment: Richardson Family Ranch Prospectus
4
Montana Department of Transportation
Richardson Family Ranch Aquatic Resource Mitigation Bank Site Prospectus
STPX 0032(084) UPN # 7997001
A. ADMINISTRATIVE
Note: This project development and design is near completion (in cooperation with relevant
agencies) and therefore this Prospectus presents detail that would not normally be included in
this document.
· Identify the Sponsor
The Montana Department of Transportation (MDT) is the sponsor of this aquatic resource
mitigation bank to provide compensatory mitigation for both stream and wetland impacts
associated with transportation projects within Watershed # 3 Lower Clark Fork River basin
(Figure 1 Watershed District Map).
Richardson
Family Mitigation
Site
Figure # 1 Montana Watershed District Map
Bank Contact:
Montana Department of Transportation
Attn: Bill Semmens, Environmental Resources Section Supervisor
2701 Prospect Avenue
Helena, MT 59620-1001
Phone: 406-444-7227 / e-mail: bsemmens@mt.gov
Page 1 of 17
· Qualifications of Bank Sponsor
The Montana Department of Transportation has been developing aquatic resource mitigation
since 1989 and has developed approximately 55 sites ranging in size from ½ acre to 300 acres.
MDT is considered a state-wide leader in wetland and stream restoration within Montana, and
has a well-defined wetland and stream monitoring program. MDT also has developed dedicated
District funding programs for the purposes of monitoring and maintaining these aquatic resource
mitigation sites. Monitoring reports for many of these aquatic resource mitigation sites can be
found at these websites:
http://www.mdt.mt.gov/publications/brochures/wetland_mitigation.shtml
and http://www.mdt.mt.gov/publications/brochures/stream-mitigation.shtml
· Type of Bank
This will serve as an Aquatic Resource Mitigation Bank for both stream and wetland credits
within Watershed #3, Lower Clark Fork.
· Project Goals and Objectives
MDT's restoration goals and objectives within the Richardson Family Ranch site are:
1. Restore approximately 2,073 linear feet of Six Mile Creek by:
a. Removing 57 feet of steel culvert and installing step pools for fish passage at the
Upper Stream Segment,
b. Stabilize streambanks and create floodplains within a 776-foot reach of the
Middle Stream Segment, and
c. Restore natural channel geometry and sinuosity to approximately 1200 linear feet
within the channelized Lower Stream Segment.
2. Restoring natural stream functions by lowering and widening floodplain areas, installing
woody debris and rock habitat structures;
3. Removal of a man-made pond and its water diversion structures to recreate floodplain
wetlands adjacent to the new stream corridor;
4. Improve wildlife and fisheries habitat along the entire reach of Sixmile Creek on this
property;
5. Reconnect upstream fish passage on Sixmile Creek with removal of perched culvert;
6. Create approximately 24,164 stream and riparian credits for the stream restoration
component;
7. Create between 7 to 9 wetland credit acres through:
a. The creation of approximately 6.45 acres of depressional emergent and riparian
emergent/scrub/shrub wetlands;
b. Re-establishment of 0.78 acres of wetlands in restored sections of floodplain;
c. Preservation of 1.01 acres of existing scrub/shrub wetlands in the middle stream
segment;
d. Establishment of a 100-foot buffer totaling 2.5 credit acres around the restored
floodplain and depressional wetlands due to steepness of surrounding topography
and adjacent land uses.
Page 2 of 17
· Needs and Feasibility of the Project
MDT had been looking for potential aquatic mitigation sites within the Watershed #3 (WS#3) to
meet US Army Corps of Engineers (Corps) regulatory requirements concerning a watershed
approach to compensatory mitigation.
The Richardson property provides the qualities necessary for developing a successful aquatic
resource mitigation project, including: the majority of the Sixmile Creek on the property has
been channelized and could be restored to a natural condition; re-establishment of the Sixmile
Creek floodplain; removal of an old culvert in Sixmile Creek on the northern border of the
mitigation site that acts as a fish passage barrier; preservation of an existing high quality riparian
scrub/shrub area along a portion of the upper section of Sixmile Creek on this property; and due
to the degraded channelized stream corridor there is an opportunity to re-establish natural
riparian scrub/shrub and emergent wetland ecosystems as well as to establish wetlands elsewhere
within the property. MDT's ownership of the property will provide for the protection of two
historic buildings, cultural resources relating to Native American usage of the area, and remnants
of a historic transportation corridor (US10, Old Yellowstone Trail). MDT owns surface water
rights from Sixmile Creek that can be used for creating wetlands and helping to ensure water is
available for instream use. Therefore, based upon the variety of cultural and ecological attributes
within the site, it was determined to have an excellent potential as an aquatic restoration site.
· Nature of Real Estate Interests
This 68-acre property consists of two parcels and is owned in fee title by the Montana
Department of Transportation as provided within Certificate of Survey # 4794, Parcels 1 and 2,
in Missoula County, Montana.
B. TECHNICAL
· Location and Size of Bank
The proposed Richardson Family Aquatic Resource Mitigation project is located within
Missoula County, Montana, approximately 6 miles northwest of the City of Missoula to the north
of the Interstate 90 corridor near the town of Huson. This 68-acre MDT owned property was
acquired in fee title in 2013. The legal description is Section 26 (NW1/4NW1/4) of Township
15 North, Range 22 West and Certificate of Survey # 4794 Parcels 1 & 2, Missoula County
(See Figure 2): Project Location Map, Figure 3: Project Site Map). The site is situated at
Latitude: 47° 2' 1.5" and Longitude: -114° 21' 9.9".
Page 3 of 17
· Baseline Conditions
o
Bank Property & Surrounding Properties Land Use:
The proposed Richardson Mitigation Bank is in an area that has a large number of platted rural
residential and agricultural properties (See Figure #4). Most of the platted parcels range in size
between 10 and 25 acres, with several larger parcels to the south, and north of the bank. Some of
these properties have been cleared for agriculture, but the majority contain native forest with
mature coniferous trees such as Ponderosa pine, lodgepole pine and Douglas fir. To the north of
the site is the former Ward Ranch, which is protected from future development by a Rocky
Mountain Elk Foundation conservation easement. This ranch contains a resident elk herd that is
sometimes found within the proposed bank site. To the south of the proposed bank site is I-90
and the Clark Fork River corridors. Across the Clark Fork River are Federal Lands under the
auspices of the US Forest Service's Lolo National Forest. The restoration of the landscape
within the Richardson Family Ranch property is compatible with the goals of maintaining a
natural ecosystem for wildlife and for future development of a wildlife corridor to connect the
natural areas to the north and south of the I-90 corridor.
o
Existing Richardson Ranch Site Conditions:
The Richardson Ranch project area occurs at an approximate elevation of 3,200 feet and is
within the Bitterroot-Frenchtown Valley Level IV ecoregion and the Middle Rockies Level III
ecoregion (McGrath et al. 2002). These valleys are typically composed of floodplains, terraces,
hills, fans, riparian forests, and wetlands (McGrath et al. 2002). According to the NRCS
(2013a), soils in the project area are primarily silty clay loams in the south-eastern third of the
project area, and a mix of silt loam and gravelly loam in the steeper western half of the project
area.
Page 4 of 17
Page 5 of 17
The topography of the project area generally slopes toward the center of the property where
Sixmile Creek is located, and then south towards I-90. Sixmile Creek drains from north to south
and eventually exits the property through a culvert under I-90 before flowing into the Clark Fork
River.
The project area is dominated by an irrigated hayfield /pasture covering almost three quarters of
the project area (Figure 3). Two forested tracts composed of Douglas fir/ponderosa pine trees
can be found in the northwest and southwest corners of the property (See Figure 3). Sixmile
Creek bisects the project area, which can be divided into three distinct segments; Upper, Middle,
and Lower. The Upper segment begins at the northern property boundary, where Six Mile creek
is conveyed through a culvert under the northern property access road. This culvert was installed
on a steep incline that results as a barrier for fish migrating upstream. The Middle segment in
the northern half of the property contains a relatively natural sinuous channel bordered by a
narrow active floodplain containing a mix of upland fields and some woody tree/shrub riparian
bank areas that are elevated above the stream channel. In the southern half of the project area,
the Lower segment has been straightened and is generally more incised with relatively little
floodplain connectivity and minimal shrub cover (Figure 3).
The property has been used as pasture and grass hay production in the recent past. Upon
acquisition by MDT, those hay fields have been leased for haying by a local ranch and will be
hayed annually until the project is constructed. Vegetation within these pastures is primarily
smooth brome and other non-native pasture grasses such as timothy and orchard grass.
The Richardson Family Ranch previously contained a modern residence and several historic
outbuildings on the southern end of the property adjacent to the I-90 corridor. The house and
some out buildings were removed from the site in the spring of 2016, while two historic
outbuildings remain in place.
Eight existing wetlands occur along the Sixmile Creek corridor, on this property. These wetlands
occur: upstream of the northern property access road across Sixmile Creek: around a small manmade pond on the southern end of the project site; within an irrigation ditch that runs along the
eastern edge of the property; several seep areas on the down-gradient side of the irrigation ditch;
and in several low-lying floodplain areas through the middle segment of Sixmile Creek (See
Figure 3)
Page 6 of 17
Page 7 of 17
o
Water Rights
When MDT acquired the Richardson property in 2013 both domestic and irrigation water rights
were included as part of that purchase. The surface water rights for the property (DNRC #76M
15970) are for surface water diversions from Sixmile Creek totaling 376 acre-feet of water with a
period of diversion of April 15th to October 24th. The maximum flow rate for this surface water
diversion is limited to 1.52 cubic feet per second. MDT will make a change of use application for
fisheries conservation and wetland development once MDT calculates the quantity of water
necessary for the development and maintenance of wetland cells 1 and 2. As MDT anticipates
using a portion of surface water from Sixmile Creek for the wetland cells, with the remaining
water right quantity to be left in-stream and dedicated for fisheries conservation under MDT's
name on Sixmile Creek.
· Proposed Type and Conditions of Debiting Wetlands/Streams
Wetlands:
A total of eight wetlands covering approximately 1.82 acres were identified and delineated
within the project area (See Table 1 & Figure 3). The majority of the wetlands are considered
palustrine emergent and riverine wetlands. Dominant herbaceous plants observed in wetlands
included reed canary grass, beaked sedge, Nebraska sedge, and large-leaf avens. Wetland shrub
species observed included thin-leaved alder, red-osier dogwood, hawthorn and willow. Most the
Page 8 of 17
wetlands found within the project area were classified as Category III & IV wetlands. One
Category I wetland was identified at the northern end of the project area upstream of the access
road grade and culvert (WET-6).
Table 1: Wetland Community Areas
Wetlands
Identification
Cowardin
MWAM Wetland
HGM^^
and MWAM** Classification
Functional
Size
Classification
Assessment
(USFWS)++
Class**
(Acres)
Area
WET 1
(AA-6)
PEM & OW
WET 2
(AA-4)
PEM
WET 3
(AA-3)
PEM
WET 4
(AA-3)
WET 5
(AA-4)
PEM
PEM
Slope
III
WET 6
(AA-5)
PEM, PSS
Riverine
I
WET 7
(AA-1, AA-2)
PEM, PSS
Depressional
III
0.26
Slope
III
0.11
Riverine
IV
0.03
Riverine
IV
0.01
0.10
0.06
Riverine
III
0.95
PEM
Riverine
IV
WET 8
(AA-3)
Total Wetland Areas:
0.30
1.82
General Description of
Wetland Area
Wetland fringe around manmade pond and open water
area.
Seep wetland that occurs near
eastern boundary at toe of
slope from irrigation ditch.
Wetland area between Sixmile
Creek and irrigation ditch,
seeping from culvert pipe from
ditch.
Wetland area between Sixmile
Creek and irrigation ditch,
seeping from culvert pipe from
ditch.
Seep wetland from irrigation
ditch above WET 4.
Wetland located upstream of
road crossing at northern
property boundary associated
w Sixmile Creek.
Long linear fringe wetland
along Sixmile Creek and in the
floodplain.
Wetland occurring within the
man-made irrigation ditch that
traverses the eastern boundary
of the property and through
southern developed portion of
the site.
** Functional Class using MDT's Montana Wetland Assessment Method (Berglund and McEldowney 2008). Category I =
highest functionality, Category IV = lowest functionality.
++ USFWS wetland classes follow Cowardin et al. 1979. PEM = palustrine emergent; PSS = palustrine scrub-shrub.
^^ Hydrogeomorphic (HGM) wetland classes follow Smith et al. 1995.
Page 9 of 17
Streams:
Sixmile Creek is a tributary within Watershed # 3 Lower Clark Fork River basin. Historically
this stream meandered through the property, but was straightened and channelized to
accommodate hay and livestock production. Sixmile Creek has a drainage area that encompasses
approximately 23 square miles or 14,700 acres. The land use within this area is a combination of
rural residential, farmland, wetlands and forested areas. Most the watershed falls within National
Forest areas associated with the Lolo National Forest administered by the district Ranger Station
in Huson.
· Proposed Assessment Method, Description of Physical Improvements to Produce Credits
Wetland Crediting:
The proposed project is anticipated to develop 7 to 9 acres of wetland mitigation credits,
resulting from a combination of preservation, creation, and restoration within the site (See Table
# 2).
Table 2: Determination of Wetland Credits
Wetland Mitigation
Acreage
Ratio +
Credit Acres
Proposed Creation Establishment
6.45
1 to 1
6.45
Proposed Restoration (Re- establishment) 0.78
1.5 to 1
0.52
Preservation
1.01
4 to 1
0.25
Upland Buffer (100 feet)*
12.76
5 to 1
1.30
Open Water (stream& pond)"
0.41
Temporary Project Impacts^
0.41
0.00
Permanent Project Impacts
0.09
0.09
Total Mitigation Acreage
21.49
8.43
* Assuming a standard 100-foot upland buffer around the perimeter of the wetlands
preserved, restored and created within the site due to steepness of slopes.
"Open water areas are defined within Table # 3.
^ Temporary impacts will be restored as part of the stream floodplain restoration.
+ Ratios utilized are from Column A of the Montana Regulatory Program Wetland
Compensatory Mitigation Ratios April, 2005.
MDT proposes to create approximately 6.4 acres of new wetlands by developing about 3 acres of
seasonal depressional wetlands in the existing hayfield to the east of the creek; and close to 3.4
acres of new wetlands within the expanded floodplain areas throughout the Lower Channel
portion of Sixmile Creek. Critical to the establishment of the wetlands within this site is the
development of a vegetated upland buffer. The buffer will be established to protect the new
wetlands. Due to the adjacent land uses and the steepness of the upland areas adjacent to the
wetlands and stream corridor, a 100-foot buffer is proposed.
Page 10 of 17
Overall, it is anticipated that the site will provide MDT with approximately 8.43 wetland credit
acres that can be utilized to offset wetland impacts associated with transportation projects within
Watershed # 3 Lower Clark Fork River basin. These proposed mitigation credits will need to
be approved by the Corps Montana Regulatory Office and the mitigation Interagency Review
Team (IRT) before MDT can utilize these credits for off-setting project related unavoidable
impacts to wetlands in accordance with Section 404 (b.1.) guidelines.
It is anticipated that with the removal of the existing pond and the plugging of the old stream
channel, approximately 0.42 acres of open water will be permanently impacted by the project.
However, with the construction of the new longer stream channel and removal of the culvert on
Sixmile Creek, approximately 0.55acres of open water will be re-established. The anticipated
net result is that an additional 0.13 acres of open water will be created because of this restoration
project.
Stream Crediting:
Debits: Five areas along the Sixmile Creek channel are anticipated to be impacted by the
proposed restoration project. Four (4) stream bank treatments are proposed for rehabilitating
eroding streambanks in the "Middle Channel" section of the project. This rehabilitation may
include utilizing willow blankets and cuttings to stabilize the stream banks and modifying
portions of the streambanks along incised channels to reestablish floodplains. Several channel
plugs will be installed in the existing stream channel to divert water into the new Sixmile Creek
channel located in the "Lower Channel" section. No debits will occur in the "Upper Channel"
section as this is 100% restoration based upon the removal of the culvert at this location.
Page 11 of 17
Table #4: Sixmile Creek Restoration Debits
STREAM SECTIONS OF SIX MILE CREEK
MIDDLE CHANNEL
Factor
Stream Type
Stream Status
Existing
Condition
Dominant
Impact
Cumulative
Impact
Location of
Mitigation
Comparative
Stream Order
of Mitigation
Type
of Legal
Site
Protection
for
Mitigation
Site
Sum of
Factors (SFi)
Linear Feet
Impact*
(LFi)
Mitigation
Timing
SFi X LFi X
Mitigation
Timing
LOWER CHANNEL
Bank
Bank
Treatment Channel Treatment # Old Six
Bank Treatment
#2 (Sta.
Plug # 1 3 (Sta.
Mile
Bank Treatment # 5 downstream
7+62 to
(Sta.
9+08 to
Creek #4 - 2nd Channel
end of new
8+60)
10+14)
9+49)
Channel Plug(Sta.17+00) channel(Sta.26+10)
0.60
0.25
0.60
0.25
0.60
0.25
0.60
0.25
0.60
0.25
0.60
0.25
0.25
0.25
0.25
0.25
0.25
0.00
0.20
0.20
0.20
0.25
0.25
0.00
0.00
0.00
2.50
0.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.18
2.18
2.18
4.48
2.23
1.98
80.00
23.00
41.3
1,017.00
20.00
27.00
1.25
1.25
1.25
1.25
1.25
1.25
217.50
62.53
112.54
5688.84
55.63
66.66
Total Debits = (SFi x LFi x Mitigation Timing) = 6,203.70
Credits:
Stream credits will be achieved at three locations along Sixmile Creek (See Figure # 5, Tables 5a
& 5b). Two channel segments will be obliterated and new channels constructed at the Upper
Channel and Lower Channel portions of Sixmile Creek. In the Upper Channel segment, a
culvert is to be removed and a new stream channel constructed to replicate a natural stream
system and to allow for fish passage to the upstream sections of Sixmile Creek watershed. In the
Lower Channel Segment, a new sinuous stream channel with a lower accessible floodplain areas
will to be constructed to replace the existing man-made channelized stream lacking floodplain
connection. In the Middle Channel Area, much of the area will remain undisturbed, but high
terraces adjacent to the stream will be lowered to create new floodplains that will allow for more
frequent flooding, and eroding banks will be stabilized with natural habitat features including
willow blankets, tree/shrub plantings, and root wads. Floodplains to be re-created as part of this
project will include natural features, such as woody plantings (trees/shrubs), topographic relief
for water storage and sediment retention, woody debris in the form of logs and root-wads, and
seeded with native riparian grasses, sedges and herbaceous plant species.
Page 12 of 17
Table #5a: Stream Restoration Credit Table
FACTORS
a
b
c
d
e
Upper Channel Upper Channel Middle
Middle
/ West Bank
/ East Bank
Channel - WB Channel - EB
Buffer Width
Remove Disturbance to Riparian
Fence
Bufferaround Buffer
Re-vegetate Riparian Buffer
Micro Topography in Floodplain
1.00
0.50
0.00
0.85
0.50
1.00
0.50
0.00
0.85
0.50
1.00
0.50
0.00
0.90
0.00
1.00
0.50
0.00
0.90
0.00
f Addition of Woody Debris in
Floodplain
g Management of Invasive Species
h Removal of Riprap below ordinary
High Water
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
1.00
0.10
0.10
1.00
1.00
6.85
97.00
664.45
1.00
1.00
6.85
97.00
664.45
0.00
1.00
4.50
665.00
2992.50
0.00
1.00
4.50
774.00
3483.00
i Removal of Floodplain Fill (Berms or
Impervious Materials)
j Restoration of Channel Morphology
Total Sum of Factors (SFm) a-j
Linear Feet Impact* (LFm)
SFm x LFm
Table #5b: Stream Restoration Credit Table
FACTORS
a
Buffer Width
b
Remove Disturbance to Riparian Buffer
c
Fence around Buffer
d
Re-vegetate Riparian Buffer
e
Micro Topography in Floodplain
f
Addition of Woody Debris in Floodplain
g
Management of Invasive Species
h Removal of Riprap below ordinary High Water
i Removal of Floodplain Fill (Berms or Impervious Materials)
j
Restoration of Channel Morphology
Total Sum of Factors (SFm) a-j
Linear Feet Impact* (LFm)
SFm x LFm
Lower Channel
/East Bank
1.00
0.50
0.00
0.90
0.50
0.50
0.50
1.00
1.00
1.00
6.90
1,635.00
11281.50
Total Stream and Riparian Credits = (Sfm x LFm x RM) = 30,367.40
Page 13 of 17
Lower Channel
/West Bank
1.00
0.50
0.00
0.90
0.50
0.50
0.50
1.00
1.00
1.00
6.90
1,635.00
11281.50
Page 14 of 17
Total Stream Credits Developed
Using the Corps 2013 Montana Stream Mitigation Procedure for the proposed project, the
following stream debit and credit estimates were calculated. The anticipated project will result
in approximately 24,164 net stream and riparian credits.
Debits
A
6,204
Credit
B
30,367
Linear Ft
1,208
Total Debits
= Stream and Riparian Debits (to be determined)
Linear Ft
4,903
Total Credits
=Stream and Riparian Credits (to be determined)
· Proposed Crediting and Debiting Methodology
Wetlands within the property were delineated using the Western Mountains, Valleys, and Coast
Regional Supplement for Montana as it relates to the 1987 Corps of Engineers Wetlands
Delineation Manual (Environmental Laboratory, January 1987). This methodology will be
utilized to demarcate the area of wetland development within the site for the purposes of
determining future wetland mitigation credits. To assess the quality of the exiting wetlands
within this site, the Montana Wetland Assessment Methodology (J. Berglund & R.
McEldowney, 2008) was utilized. The most current version of the Montana Stream Mitigation
Procedure (MTSMP) was utilized to quantify estimated adverse impacts (debits) associated
with the anticipated restoration activities, and to determine the estimated compensatory
mitigation (credits) for each restored segment of Sixmile Creek within the Richardson Ranch
Aquatic Resource Mitigation Bank.
C. OPERATION
·
Proposed Bank Service Area
This bank will serve as mitigation for stream and wetland impacts associated with transportation
projects within Watershed # 3, Lower Clark Fork River Basin of the Missoula District (See
Figure 6). Ecologically, this restoration site has been long sought by natural resource agencies
for stream restoration efforts, and MDT's proposed project fits in with the watershed goals of
those agencies. The restoration of Sixmile Creek is an important part of the overall effort by
MFWP and the USFWS to restore spawning connectivity to the Lower Clark Fork River for
species such as Westslope Cutthroat (Oncorynchus clarkia lewisi) and the Federally - protected
Bull Trout (Salvelinus confluentus). Restoration of the Sixmile Creek wetlands, floodplains and
riparian corridors will assist in providing mitigation credits that are geographically and
ecologically similar and proximate to where anticipated impacts are occurring along
transportation corridors in WS # 3 within the Missoula District.
Page 15 of 17
· Proposed Monitoring and Contingency Plans
The Richardson aquatic resource mitigation site will be monitored in accordance with the MDT's
Standard Monitoring Protocols for both wetlands and streams that will be incorporated into the
Richardson Family Ranch Banking application for this project. The site will be monitored for a
minimum of 5 years or longer as determined by the US Army Corps of Engineers.
Adaptive management will be carried out by MDT, should any corrective actions be necessary
following construction of the mitigation site. If corrective actions are deemed necessary, MDT
Page 16 of 17
will coordinate with the Corps to implement project specific adaptive management, and/or
corrective procedures. Funding for adaptive management will be obtained through the annual
MDT Missoula District Wetland Program funds.
· Proposed Long-Term Management Plan
The intent of this project is to develop a natural ecosystem that will require little long term
maintenance and management. MDT as fee title owners will provide long term maintenance and
management as needed for the site (i.e. weed control, re-planting woody vegetation, vegetation
management, and fence repairs), which will also include financial assurances for project success
over the long term.
Upon the determination that this aquatic resource mitigation site has fully achieved these
performance standards, MDT personnel will continue to inspect the site regularly to determine
whether maintenance activity is required. These anticipated maintenance activities may include,
but are not limited to fence repair, vegetation management, and noxious weed control.
Funding for the long-term maintenance of this mitigation site is provided through an annual
funding allocation within the State Transportation Improvement Program (STIP) designated as
the Missoula District Wetland Program (STPX-STWD 0002).
·
Permits Needed for Construction of the Bank:
o US Army Corps of Engineers - Section 404 Clean Water Act, Nationwide Permit # 27
o Montana Fish, Wildlife and Parks - Stream Protection Act 124 Authorization
o Montana Department of Environmental Quality Section 401 of the Clean Water Act
Certification and Section 318 Short Term Water Quality Standard for Turbidity.
o Missoula County Floodplain Administrator Floodplain Permit
o MT Department of Natural Resources and Conservation Beneficial Water Use Permit
Page 17 of 17