The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application from Southeast Metro Stormwater Authority (SEMSWA) proposing channel stabilization along 3,000 linear feet of Piney Creek and 400 linear feet of Piney Creek Hollow Park stormwater outlet, which would result in permanent impacts to approximately 0.758 acre of streambed and 1.513 acres of wetlands adjacent to Piney Creek. This notice is to inform interested parties of the proposed activity and to solicit comments

SEMSWA is proposing channel improvements along 3,000 linear feet of Piney Creek and 400 linear feet of the Piney Creek Hollow Park stormwater outlet. Concurrent with channel improvements, SEMSWA is also proposing trail access improvements, modifications to an existing culvert, and widening of the existing stormwater channel.

PUBLIC NOTICE US Army Corps of Engineers Omaha District

REPLY TO: U.S. Army Corps of Engineers Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901

Application No: Project: Applicant: Waterway: Issue Date: Expiration Date:

NWO-2016-00602-DEN Piney Creek at the Ranches Phase 2 Southeast Metro Stormwater Authority Piney Creek May 26, 2017 June 25, 2017

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from Southeast Metro Stormwater Authority (SEMSWA), c/o ERO Resources, Attn: Jenelle Kreutzer, 1842 Clarkson Street, Denver, CO 80128. Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material in the nation's waters. Summary SEMSWA is proposing channel improvements along 3,000 linear feet of Piney Creek and 400 linear feet of the Piney Creek Hollow Park stormwater outlet. Concurrent with channel improvements, SEMSWA is also proposing trail access improvements, modifications to an existing culvert, and widening of the existing stormwater channel. Location The project area includes Piney Creek and the Piney Creek Hollow Park stormwater outlet channel, located at approximately 39.602702oN, -104.770610oW, in Sections 21 and 22, Township 5 South, Range 66 West, of the 6th Principal Meridian in Arapahoe County, Colorado. Description of work

The proposed project includes stream channel improvements along Piney Creek and its associated floodplain to reduce the risk of flooding to the adjacent property owners; reduce velocities and erosive properties of the creek that would improve the quality of the aquatic, 1 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

wetland, and riparian habitat within project area; and restore the channel geometry and ecological processes to promote a resilient and sustainable stream system through time. Concurrent with the Piney Creek channel improvements, the proposed project includes trail and access improvements within the Ranches portion of the project area that would address public safety by providing landowners a safe way to access their property on both sides of the creek. In addition, public safety concerns would be addressed along the Piney Creek Hollow Park stormwater outlet channel by improving an existing culvert that conveys stormwater flows from the stormwater management facility to Piney Creek and by creating a wider and more stable channel to convey stormwater and flood flows to Piney Creek. The following sections discuss the proposed activities in more detail. Piney Creek Channel Improvement Activities: The Piney Creek improvements include channel grading, riprap bank protection treatments, and void-filled channel-lined sections that would create appropriately sized riffle lengths, pool lengths, and pool-to-pool spacing within the channel that would reduce flow velocities and erosive properties of the channel and would maintain the existing 100-year floodplain elevation. Within most of the Ranches portion of the project area, the channel would be reshaped and the channel invert elevation would be lowered a maximum of 10 feet to achieve a consistent slope of 0.20 percent throughout the project area. This would be accomplished by grading and realigning the channel to create a bottom width of 12 feet with 3:1 side slopes. A 36-inch-thick layer of Type H void-filled rock channel lining would be installed along portions of the channel to maintain a stable longitudinal channel slope. The rock in the proposed structures would vary in size and would consist of riprap that would be void-filled with well-graded granular materials and fines. No grout or concrete would be placed in the structures. The width and length of the structures would vary based on the channel geometry in which they are located and would include a change in channel elevation between 0.5 feet and 2.0 feet across each structure. These structures are conducive to the broad channel geometry and would promote wetland and riparian vegetation establishment and passage of aquatic organisms. The side slopes would be laid back to a 3:1 slope with a 24-inch-thick layer of Type M soil riprap and buried with 6 inches of topsoil, blanketed with erosion-control mat, and vegetated with various combinations of native vegetation. To stabilize the channel within the downstream portions of Piney Creek, four grade-control structures would be installed and only minimal grading would occur within the existing low-flow channel to achieve a consistent 0.2 percent slope. Two of the four structures would be grouted boulder cross vane structures installed within the downstream portion of the Ranches reach. These two structures would be 1 foot high and would consist of 36- to 48-inch grouted boulders and Type M soil riprap. The grout placed within the structure would be the minimum necessary to stabilize the boulders and would allow for sediment to accumulate within the voids. A 24inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10 feet upstream and downstream of the cross vane structures and for varying widths around the

2 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

structures along the channel banks. The structures would vary from 9 to 45 feet wide and would be about 35 feet long. Approximately 200 feet downstream of the Ranches reach, a 2-foot-high grouted boulder drop structure integrated with a flow monitoring station would be installed within the Piney Creek channel. The flow meter would be housed within a 10-foot-wide concrete slab that would be constructed across the channel along the upstream side of the grouted boulder drop structure. To prevent scouring around the flow meter and drop structure, a 24-inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10 feet upstream and 20 feet downstream of the structure. The structure would be 60 feet wide and 49 feet long. A 9-inchwide Type PZ-22 sheet pile cutoff wall with a concrete cap would be installed near the upstream end of the structure, extending across the creek into the adjacent uplands. The concrete cap would only be installed in areas where the sheet pile extends outside of the grouted boulders. The channel banks on both sides of the channel would be laid back to a 4:1 slope with a 24-inchthick layer of Type M soil riprap for a distance of about 385 feet upstream and downstream of the drop structure. A 6-inch layer of topsoil would be placed over the soil riprap, blanketed with erosion-control mat, and vegetated with various combinations of native vegetation. At the downstream end of the project area, a concrete check structure with buried soil riprap would be installed across the channel and at the invert elevation of the existing channel bottom. A 24- to 36-inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10 feet upstream and downstream of the buried 2-foot-thick concrete cutoff wall. At the confluence with the Piney Creek Hollow Park stormwater outlet channel, Piney Creek makes an abrupt turn to the south around the baseball field. Grouted riprap bank protection is present and is being undermined along the western bank of Piney Creek in this location. To repair and stabilize the bank, a 24-inch-thick layer of Type M grouted riprap would be installed below the row of scoured boulders for about 60 feet. Channel improvements along Piney Creek would directly impact 0.669 acre of streambed and 0.693 acre of wetlands. It is anticipated that an additional 0.013 acre of wetlands abutting Piney Creek in the project area would dry up and be indirectly impacted as a result of the channel grading and lowering activities. No temporary impacts would be associated with the channel improvement activities along Piney Creek. Piney Creek Trail and Access Improvements: Secondary to the channel improvement activities, two equestrian trail crossings of Piney Creek, two concrete low-water trail crossings, and a construction and maintenance access road through a large wetland complex within the Vasey property are proposed. The downstream equestrian trail crossing would replace an existing Arapahoe Parks and Recreation District equestrian crossing. The new equestrian trail crossings would consist of grading back the channel banks to a 4:1 slope and installing 6-footlong, 6-inch diameter green treated fir logs spaced 3 to 4 feet up each side of the channel banks. 3 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

The logs would be anchored into the ground with a minimum of 2 notched anchor posts per step to a minimum of 3 feet below the surface. Two concrete low-water trail crossing would be installed within the Ranches reach. One of the trail crossings would consist of an 8-foot-wide concrete low-water crossings with concrete cutoff walls located on the upstream and downstream ends of the structure. A 24-inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10 feet upstream and 10 feet downstream of the structures. The structure would be 66 feet wide and 38 feet long. The concrete cutoff walls would span 66 feet across the active floodplain to stabilize the channel and reduce local scour from larger flood events. The second concrete low-water trail crossing would consist of a 12-foot-wide concrete low-water crossings with concrete cutoff walls located on the upstream and downstream ends of the structure. A 24-inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10 feet downstream of the structure and one row of grouted boulders would be install across the channel at the upstream side of the crossing. Installing the equestrian trail and concrete low-water trail crossings would permanently impact 0.012 acre of the Piney Creek streambed and 0.010 acre of wetlands. The Vasey property is located in the upstream portion of the project area along the west side of Piney Creek. During construction, the property would be used for construction access and staging. The temporary construction access road would cross two sections of a large cattaildominated wetland. The temporary access road would be 25 feet wide and consist of Class 6 Road base. Following construction, 15 feet of the 25-foot-wide access road would remain permanently for the property owner to access the eastern portion of the property. To help convey surface water flows, a 40-foot-long piece of 18-inch high-density polyethylene (HDPE) with flared end sections would be installed in the westernmost wetland area under the access road. Constructing the access road and installing the HDPE culvert would permanently impact 0.082 acre of wetlands. Piney Creek Hollow Park Stormwater Outlet Improvement Activities: Additional project activities that would improve flood water conveyance, functionality of existing infrastructure, and public safety include replacing the failing culvert and retaining walls where the Piney Creek Hollow Park stormwater outlet channel enters the Piney Creek floodplain from the upstream stormwater management facility. These activities include grading a wider and more stable channel to convey stormwater and flood flows along the tributary to Piney Creek and constructing a new channel from an existing stormwater outlet to Piney Creek. Proposed improvements to the stormwater outlet structure and culvert include removing the existing retaining walls along the banks of the tributary and extending the existing 54-inch reinforced concrete pipe for a distance of about 21 feet downstream of the structure and installing a concrete headwall and wing walls at the downstream end of the new pipe. To protect the new outlet structure, a 24-inch-thick layer of Type M soil riprap would be installed across the width of the channel and for a distance of 44 feet downstream of the structure. To improve 4 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

floodwater conveyance along the Piney Creek Hollow Park stormwater outlet channel to Piney Creek, the existing channel would be reshaped and the channel invert elevation would be lowered between 6 and 18 inches deep to achieve a consistent slope of 0.20 percent and promote positive drainage. This would be accomplished by grading the channel to create a bottom width of 6 feet with 3:1 side slopes along about 280 linear feet of the tributary. The side slopes would be blanketed with erosion-control mat and revegetated. Another smaller stormwater outlet structure occurs within the large wetland complex along the north side of the Piney Creek Hollow Park stormwater outlet in the project area (Figure 3a). The outlet structure is buried with sediment and is not able to convey stormwater flows to the Piney Creek Hollow Park stormwater outlet channel, and ultimately to the Piney Creek channel, as originally intended. To return functionality to the outlet structure and safely convey stormwater flows to Piney Creek, a new 6-foot-wide by 130-foot-long channel would be constructed through the wetlands. The side slopes would be laid back to a maximum of a 3:1 slope, blanketed with erosion-control mat, and revegetated. Channel improvements along the Piney Creek Hollow Park stormwater outlet and its structures would directly impact 0.072 acre of streambed and 0.491 acre of wetlands. It is anticipated that an additional 0.004 acre of streambed and 0.160 acre of wetlands abutting the Piney Creek Hollow Park stormwater outlet channel would dry up and be indirectly impacted as a result of the channel grading and lowering activities. No temporary impacts would be associated with the channel improvement activities along Piney Creek Hollow Park stormwater outlet. Piney Creek Hollow Park Stormwater Outlet Access Improvements: Secondary to the channel improvement activities along the Piney Creek Hollow Park stormwater outlet, a permanent maintenance access road would be installed along the north side of the lowered channel section. The maintenance access road would be 12 feet wide and excavated down to a depth between 30 and 36 inches so that the final surface elevation of the road would match the existing ground surface. The road would consist of a 50/50 blend of 4-inch Ballast material and Class 4 aggregate base course. In addition, 36-inch boulders would be installed every 25 feet on alternating sides of the access road to define the limits of the road. The boulders would be buried a minimum of 18-inches with 1-foot extending above the road elevation. Installing the Piney Creek Hollow Park stormwater outlet maintenance road would permanently impact 0.001 of streambed and 0.064 acre of wetlands. No temporary impacts would be associated with installing the maintenance access road. Purpose For purposes of definition under Section 404, the basic project purpose is channel stabilization. The overall project purpose is to conduct stream channel improvements along Piney Creek and its floodplain to address safety concerns associated with flood conveyance through the project area, protect existing infrastructure and private property, and improve fluvial geomorphic and ecological processes that would promote a resilient and sustainable stream system over time.

5 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

Impacts and Mitigation The project would result in permanent impacts along approximately 3,000 linear feet of Piney Creek and 400 linear feet of the Piney Creek Hollow Park stormwater outlet channel, to include approximately 0.758 acre of streambed and 1.513 acre of wetlands. Compensatory mitigation for permanent wetland impacts is proposed through the purchase of 1.513 acres of credits from a Corps approved mitigation bank. ********************* The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. For further information, please contact the Colorado Water Quality Control Division, (303) 692-3500. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not adversely affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

6 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Ellison Koonce at (303) 979-4120 or by email at ellison.a.koonce@usace.army.mil or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

7 Project: Piney Creek at the Ranches Phase 2 Waterway: Piney Creek

Corps File No: NWO-2017-00602-DEN Applicant: SEMSWA

smoky Hiii Villa ge

..

0 r odo Dr

,,.,

Pawers Pl

1-.,·,, Dr

Hiiis At Pin ey Cree k

Ir

"c

Park ' Vi ew Knoll sI

~

r

c}

~t :imo

~

Ou1 n'-r, f I

·ry P t

1>

Dora c1 0 p.~

o·>

,.r

Kinc1

B ·rt

l'I

"''

r

I> ""

I I

r

Id. Or

r h ~ r d Rr/

I

;:

u

I~

,,~

I "' n If

.....,.

I_

<,,

~-

j

l l1 (t .-1

I

~

I·

t" u0

'>

~

...I

I

""<>

Or hord

I ~

d

P in o ~1

L

(/)

;i:

c

"c

"

...

a. !i

i:

,,.

t/l

E

~~

~

., ri

' ' " f\y

E Ar p. h<>e I

tr ,,

"~

~

Pin e)' Creek Ranches

'Y,..

""'<>..

"'u· "'

~

.,.

P ~Q kv 1

;;;

~

%......

I'

t Eu

~

'1.1,. ,,,

l

,,i

t/l

"

I

"' ,, I

Ill

l)i

~ t/1 c ?'?l.

I · t.hJU

·' "

c

~

\!)

4J

f F Ir Or

I .

gr

,..,, "

II)

I

II)

n

:> 0

I

~ l ~k

o tl O<

"'

~

..

tr r

: c,

\ cl p l

""

··

C

.!!

,'I?

9. "o,

(/)

.." I"

<-"'

"""'tt,,.~

0,.

I

!i-·'

I

llo fJ I

.$'Pin ey

"'e

r ek

Ir I

"

u@.J

?:

11

Ill

E Ar p hoe Rd

Rel

F.~

G Ill

'0-> o!>l>ll

1-

·;:

Pi

"'c

w

c

'>

I c

'· I"

B.ennett

u "

"

c

tz,

~

..J

I

Estanc,1a 1 I

"'

I I

"'!J

I

~

u'° I/)

!

f/J

in t Pl

s Pl

E

e d du Av

_,Elizabeth

Piney Creek at the Ranches - Phase 2

c:J Project Area c:J Survey Area

Sections 21 and 22, T5S, R66W; 6th PM UTM NAO 83 : Zone 13N; 519694mE, 4383688mN Latitude, Longitude: 39 .602 702N, 104.770610°W USGS Parker, CO Quadrangle Arapahoe County, Colorado

N 0

750

1,500

~~~""'iiiiiiiiiiiiiiiiiiiiii· Feet

A

Figure 1 Vicinity Map

Prepared for: UOFCO File: 6099 Phase 2 F~ure l.mxd(GS) Mo1ch 10, 2017

Porlions of lhls d ocument Include intellectual prope rty of ESRI ond its licen so rs ond ote used herein under license . Copyright {{I 2014 ESRI and ih licemors. A!I rights reserved .

ERO ERO Resources Corp.

Image Source: Google Earth©, October 2015

Piney Creek at the Ranches - Phase 2 _____.. Flow Direction

·-'- _ _!

Project Area Survey Area

- - Parcel Boundary Stream bed

0

Ordinary High Water Marie (0.981 ac)

$2>

Wetland (3.872 ac)

0

Indirect Ordinary High Wafer Mark Impact (0.004 ac)

Direct Ordinary High Water Mark Impact (0.740 ac)

~ ~ ~ ~

Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)

Figure 3a Proposed Impacts

Direct Wetland Impact (1.338 ac) Indirect Wetland Impact (0.174 ac)

N

Phase 1 Direct Wetland Impact (0.001 ac)

0

60

120

~~~""'!iiiiiiiiiiiiiiiiiiiiiiiiiiiiilFeet

A

Prepared for: UDfCD file: 6099 Phase 2 figures 3o-3e.mxd (GS) Morch 15, 2017

ERO ERO Resources Corp.

Image Source : Google Earth©, October 2015

Piney Creek at the Ranches - Phase 2

---+ Flow Direction

0

·-'- _ .!

0

Wetland (3 .872 ac)

f2>

Indirect Ordinary High Water Mark Impact (0.004 ac)

c:::::J Project Area Survey Area

- - Parcel Boundary Stream bed

Ordinary High Water Mark (0.981 ac)

Direct Ordinary High Water Mark Impact (0.7 40 ac)

~

Phase l Direct Ordinary High Water Mark Impact (0.014 ac)

f'2>

Direct Wetland Impact (l .338 ac)

2}i ~

Indirect Wetland Impact (0.174 ac)

N

Phase l Direct Wetland Impact (0.001 ac)

0

60

120

~~~!"liiiiiiiiiiiiiiiiiiiiiiiiiiiiii

Feet

A

Figure 3b Proposed Impacts

Prepared for: UDFCD File: 6099 Phase 2 figures 3a-3e.mxd (GS) March 15, 2017

ERO ERO Resources, Corp.

Image Source : Google Earth©, October2015

Piney Creek at the Ranches - Phase 2 ____... Flow Direction

·--

Project Area

'- _ ~ Survey Area

0 0

Ordinary High Water Mari< (0 .981 ac)

th

Indirect Ordinary High Water Mark Impact (0.004 ac)

Direct Ordinary High Water Mark Impact (0.740 ac)

- - Parcel Boundary Stream bed

Wetland (3.872 ac)

fl:> fl:> y...._

Direct Wetland Impact (1.338 ac)

~

Phase 1 Direct Wetland Impact (0.001 ac)

Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)

LP Indirect Wetland Impact (0.174 ac)

0

60

N 120

~~~"""iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilFeet

I

Figure 3c Proposed Impacts

A

Prepared far: UDfCD file: 6099 Phase 2 figures 3a-3e.rnxd (GS) March 15, 2017

ERO ERO Resourc.s Co

Image Source: Google Earth©, Octobe r 2015

Piney Creek at the Ranches - Phase 2 ____. Flow Direction

LJ Project Area

·--,.! L _

Survey Area

-

Parcel Boundary

-

Stream bed

B 12>

Ordinary High Water Mark (0.981 ac) Wetland (3.872 ac) Direct Ordinary High Water Mark Impact (0.740 ac)

'lb

Indirect Ordinary High Water Mark Impact (0.004 ac)

~ ~

Phase 1 Direct Ordinary High Water Mark Impact (0 .014 ac)

8'

Indirect Wetland Impact (0.174 ac)

£!,

Figure 3d Proposed Impacts

Direct Wetland Impact (1.338 ac)

N

Phase 1 Direct Wetland Impact (0.001 ac) 0

60

120

~~~""iiiiiiiiiiiiiiiiiiii·Feet

A

Preparedfar: UDFCD File: 6099 Phase 2 F~ures 3a-3e.mxd (GS) March15, 2017

ERO ERO Resources Corp.

Image Source: Google Earth©, October 2015

·-'- _ ,.!

Survey Area

- - - Parcel Boundary Stream bed

0 0

Ordinary High Water Mark (0.981 ac) Wetland (3 .872 ac) Direct Ordinary High Water Mark Impact (0.740 ac)

fl>

Indirect Ordinary High Water Mark Impact (0.004 ac)

fl,

Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)

Z2> __,.,-...,_

Direct Wetland Impact (1 .338 ac)

0>

Phase 1 Direct Wetland Impact (0.001 ac)

Figure 3e Proposed Impacts

Indirect Wetland Impact (0.17 4 ac)

0

60

N 120

~~~5iiiiiiiiiiiiiiiiiiiiiiii1Feet

A

Prepored for: UDFCD File: 6099 Phase 2 Figures 3o-3e.mxd (GS) Morch 15, 2017

ERO ERO Resources Corp.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas