You can copy from here when filling out the rest of the page.
The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application from Southeast Metro Stormwater Authority (SEMSWA) proposing channel stabilization along 3,000 linear feet of Piney Creek and 400 linear feet of Piney Creek Hollow Park stormwater outlet, which would result in permanent impacts to approximately 0.758 acre of streambed and 1.513 acres of wetlands adjacent to Piney Creek. This notice is to inform interested parties of the proposed activity and to solicit comments
SEMSWA is proposing channel improvements along 3,000 linear feet of Piney Creek and 400 linear feet of the Piney Creek Hollow Park stormwater outlet. Concurrent with channel improvements, SEMSWA is also proposing trail access improvements, modifications to an existing culvert, and widening of the existing stormwater channel.
PUBLIC NOTICE
US Army Corps
of Engineers
Omaha District
REPLY TO:
U.S. Army Corps of Engineers
Denver Regulatory Office
9307 South Wadsworth Blvd
Littleton, CO 80128-6901
Application No:
Project:
Applicant:
Waterway:
Issue Date:
Expiration Date:
NWO-2016-00602-DEN
Piney Creek at the Ranches Phase 2
Southeast Metro Stormwater Authority
Piney Creek
May 26, 2017
June 25, 2017
30 DAY NOTICE
PUBLIC NOTICE
FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of
the Army permit application from Southeast Metro Stormwater Authority (SEMSWA), c/o ERO
Resources, Attn: Jenelle Kreutzer, 1842 Clarkson Street, Denver, CO 80128. Permits are issued under
Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material
in the nation's waters.
Summary
SEMSWA is proposing channel improvements along 3,000 linear feet of Piney Creek and 400 linear
feet of the Piney Creek Hollow Park stormwater outlet. Concurrent with channel improvements,
SEMSWA is also proposing trail access improvements, modifications to an existing culvert, and widening
of the existing stormwater channel.
Location
The project area includes Piney Creek and the Piney Creek Hollow Park stormwater outlet channel,
located at approximately 39.602702oN, -104.770610oW, in Sections 21 and 22, Township 5 South, Range
66 West, of the 6th Principal Meridian in Arapahoe County, Colorado.
Description of work
The proposed project includes stream channel improvements along Piney Creek and its
associated floodplain to reduce the risk of flooding to the adjacent property owners; reduce
velocities and erosive properties of the creek that would improve the quality of the aquatic,
1
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
wetland, and riparian habitat within project area; and restore the channel geometry and
ecological processes to promote a resilient and sustainable stream system through time.
Concurrent with the Piney Creek channel improvements, the proposed project includes trail and
access improvements within the Ranches portion of the project area that would address public
safety by providing landowners a safe way to access their property on both sides of the creek. In
addition, public safety concerns would be addressed along the Piney Creek Hollow Park
stormwater outlet channel by improving an existing culvert that conveys stormwater flows from
the stormwater management facility to Piney Creek and by creating a wider and more stable
channel to convey stormwater and flood flows to Piney Creek. The following sections discuss
the proposed activities in more detail.
Piney Creek Channel Improvement Activities: The Piney Creek improvements include
channel grading, riprap bank protection treatments, and void-filled channel-lined sections that
would create appropriately sized riffle lengths, pool lengths, and pool-to-pool spacing within the
channel that would reduce flow velocities and erosive properties of the channel and would
maintain the existing 100-year floodplain elevation.
Within most of the Ranches portion of the project area, the channel would be reshaped and
the channel invert elevation would be lowered a maximum of 10 feet to achieve a consistent
slope of 0.20 percent throughout the project area. This would be accomplished by grading and
realigning the channel to create a bottom width of 12 feet with 3:1 side slopes. A 36-inch-thick
layer of Type H void-filled rock channel lining would be installed along portions of the channel
to maintain a stable longitudinal channel slope. The rock in the proposed structures would vary
in size and would consist of riprap that would be void-filled with well-graded granular materials
and fines. No grout or concrete would be placed in the structures. The width and length of the
structures would vary based on the channel geometry in which they are located and would
include a change in channel elevation between 0.5 feet and 2.0 feet across each structure. These
structures are conducive to the broad channel geometry and would promote wetland and riparian
vegetation establishment and passage of aquatic organisms. The side slopes would be laid back
to a 3:1 slope with a 24-inch-thick layer of Type M soil riprap and buried with 6 inches of
topsoil, blanketed with erosion-control mat, and vegetated with various combinations of native
vegetation.
To stabilize the channel within the downstream portions of Piney Creek, four grade-control
structures would be installed and only minimal grading would occur within the existing low-flow
channel to achieve a consistent 0.2 percent slope. Two of the four structures would be grouted
boulder cross vane structures installed within the downstream portion of the Ranches reach.
These two structures would be 1 foot high and would consist of 36- to 48-inch grouted boulders
and Type M soil riprap. The grout placed within the structure would be the minimum necessary
to stabilize the boulders and would allow for sediment to accumulate within the voids. A 24inch-thick layer of Type M soil riprap would be placed across the channel for a distance of 10
feet upstream and downstream of the cross vane structures and for varying widths around the
2
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
structures along the channel banks. The structures would vary from 9 to 45 feet wide and would
be about 35 feet long.
Approximately 200 feet downstream of the Ranches reach, a 2-foot-high grouted boulder
drop structure integrated with a flow monitoring station would be installed within the Piney
Creek channel. The flow meter would be housed within a 10-foot-wide concrete slab that would
be constructed across the channel along the upstream side of the grouted boulder drop structure.
To prevent scouring around the flow meter and drop structure, a 24-inch-thick layer of Type M
soil riprap would be placed across the channel for a distance of 10 feet upstream and 20 feet
downstream of the structure. The structure would be 60 feet wide and 49 feet long. A 9-inchwide Type PZ-22 sheet pile cutoff wall with a concrete cap would be installed near the upstream
end of the structure, extending across the creek into the adjacent uplands. The concrete cap
would only be installed in areas where the sheet pile extends outside of the grouted boulders.
The channel banks on both sides of the channel would be laid back to a 4:1 slope with a 24-inchthick layer of Type M soil riprap for a distance of about 385 feet upstream and downstream of
the drop structure. A 6-inch layer of topsoil would be placed over the soil riprap, blanketed with
erosion-control mat, and vegetated with various combinations of native vegetation.
At the downstream end of the project area, a concrete check structure with buried soil riprap
would be installed across the channel and at the invert elevation of the existing channel bottom.
A 24- to 36-inch-thick layer of Type M soil riprap would be placed across the channel for a
distance of 10 feet upstream and downstream of the buried 2-foot-thick concrete cutoff wall. At
the confluence with the Piney Creek Hollow Park stormwater outlet channel, Piney Creek makes
an abrupt turn to the south around the baseball field. Grouted riprap bank protection is present
and is being undermined along the western bank of Piney Creek in this location. To repair and
stabilize the bank, a 24-inch-thick layer of Type M grouted riprap would be installed below the
row of scoured boulders for about 60 feet.
Channel improvements along Piney Creek would directly impact 0.669 acre of streambed
and 0.693 acre of wetlands. It is anticipated that an additional 0.013 acre of wetlands abutting
Piney Creek in the project area would dry up and be indirectly impacted as a result of the channel
grading and lowering activities. No temporary impacts would be associated with the channel
improvement activities along Piney Creek.
Piney Creek Trail and Access Improvements: Secondary to the channel improvement
activities, two equestrian trail crossings of Piney Creek, two concrete low-water trail crossings,
and a construction and maintenance access road through a large wetland complex within the
Vasey property are proposed. The downstream equestrian trail crossing would replace an
existing Arapahoe Parks and Recreation District equestrian crossing. The new equestrian trail
crossings would consist of grading back the channel banks to a 4:1 slope and installing 6-footlong, 6-inch diameter green treated fir logs spaced 3 to 4 feet up each side of the channel banks.
3
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
The logs would be anchored into the ground with a minimum of 2 notched anchor posts per step
to a minimum of 3 feet below the surface.
Two concrete low-water trail crossing would be installed within the Ranches reach. One of
the trail crossings would consist of an 8-foot-wide concrete low-water crossings with concrete
cutoff walls located on the upstream and downstream ends of the structure. A 24-inch-thick
layer of Type M soil riprap would be placed across the channel for a distance of 10 feet upstream
and 10 feet downstream of the structures. The structure would be 66 feet wide and 38 feet long.
The concrete cutoff walls would span 66 feet across the active floodplain to stabilize the channel
and reduce local scour from larger flood events. The second concrete low-water trail crossing
would consist of a 12-foot-wide concrete low-water crossings with concrete cutoff walls located
on the upstream and downstream ends of the structure. A 24-inch-thick layer of Type M soil
riprap would be placed across the channel for a distance of 10 feet downstream of the structure
and one row of grouted boulders would be install across the channel at the upstream side of the
crossing. Installing the equestrian trail and concrete low-water trail crossings would
permanently impact 0.012 acre of the Piney Creek streambed and 0.010 acre of wetlands.
The Vasey property is located in the upstream portion of the project area along the west side
of Piney Creek. During construction, the property would be used for construction access and
staging. The temporary construction access road would cross two sections of a large cattaildominated wetland. The temporary access road would be 25 feet wide and consist of Class 6
Road base. Following construction, 15 feet of the 25-foot-wide access road would remain
permanently for the property owner to access the eastern portion of the property. To help convey
surface water flows, a 40-foot-long piece of 18-inch high-density polyethylene (HDPE) with
flared end sections would be installed in the westernmost wetland area under the access road.
Constructing the access road and installing the HDPE culvert would permanently impact 0.082
acre of wetlands.
Piney Creek Hollow Park Stormwater Outlet Improvement Activities: Additional project
activities that would improve flood water conveyance, functionality of existing infrastructure,
and public safety include replacing the failing culvert and retaining walls where the Piney Creek
Hollow Park stormwater outlet channel enters the Piney Creek floodplain from the upstream
stormwater management facility. These activities include grading a wider and more stable
channel to convey stormwater and flood flows along the tributary to Piney Creek and
constructing a new channel from an existing stormwater outlet to Piney Creek.
Proposed improvements to the stormwater outlet structure and culvert include removing the
existing retaining walls along the banks of the tributary and extending the existing 54-inch
reinforced concrete pipe for a distance of about 21 feet downstream of the structure and
installing a concrete headwall and wing walls at the downstream end of the new pipe. To protect
the new outlet structure, a 24-inch-thick layer of Type M soil riprap would be installed across the
width of the channel and for a distance of 44 feet downstream of the structure. To improve
4
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
floodwater conveyance along the Piney Creek Hollow Park stormwater outlet channel to Piney
Creek, the existing channel would be reshaped and the channel invert elevation would be
lowered between 6 and 18 inches deep to achieve a consistent slope of 0.20 percent and promote
positive drainage. This would be accomplished by grading the channel to create a bottom width
of 6 feet with 3:1 side slopes along about 280 linear feet of the tributary. The side slopes would
be blanketed with erosion-control mat and revegetated.
Another smaller stormwater outlet structure occurs within the large wetland complex along
the north side of the Piney Creek Hollow Park stormwater outlet in the project area (Figure 3a).
The outlet structure is buried with sediment and is not able to convey stormwater flows to the
Piney Creek Hollow Park stormwater outlet channel, and ultimately to the Piney Creek channel,
as originally intended. To return functionality to the outlet structure and safely convey
stormwater flows to Piney Creek, a new 6-foot-wide by 130-foot-long channel would be
constructed through the wetlands. The side slopes would be laid back to a maximum of a 3:1
slope, blanketed with erosion-control mat, and revegetated.
Channel improvements along the Piney Creek Hollow Park stormwater outlet and its
structures would directly impact 0.072 acre of streambed and 0.491 acre of wetlands. It is
anticipated that an additional 0.004 acre of streambed and 0.160 acre of wetlands abutting the
Piney Creek Hollow Park stormwater outlet channel would dry up and be indirectly impacted as
a result of the channel grading and lowering activities. No temporary impacts would be
associated with the channel improvement activities along Piney Creek Hollow Park stormwater
outlet.
Piney Creek Hollow Park Stormwater Outlet Access Improvements: Secondary to the
channel improvement activities along the Piney Creek Hollow Park stormwater outlet, a
permanent maintenance access road would be installed along the north side of the lowered
channel section. The maintenance access road would be 12 feet wide and excavated down to a
depth between 30 and 36 inches so that the final surface elevation of the road would match the
existing ground surface. The road would consist of a 50/50 blend of 4-inch Ballast material and
Class 4 aggregate base course. In addition, 36-inch boulders would be installed every 25 feet on
alternating sides of the access road to define the limits of the road. The boulders would be
buried a minimum of 18-inches with 1-foot extending above the road elevation. Installing the
Piney Creek Hollow Park stormwater outlet maintenance road would permanently impact 0.001
of streambed and 0.064 acre of wetlands. No temporary impacts would be associated with
installing the maintenance access road.
Purpose
For purposes of definition under Section 404, the basic project purpose is channel stabilization. The
overall project purpose is to conduct stream channel improvements along Piney Creek and its floodplain to
address safety concerns associated with flood conveyance through the project area, protect existing
infrastructure and private property, and improve fluvial geomorphic and ecological processes that would
promote a resilient and sustainable stream system over time.
5
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
Impacts and Mitigation
The project would result in permanent impacts along approximately 3,000 linear feet of Piney Creek
and 400 linear feet of the Piney Creek Hollow Park stormwater outlet channel, to include approximately
0.758 acre of streambed and 1.513 acre of wetlands. Compensatory mitigation for permanent wetland
impacts is proposed through the purchase of 1.513 acres of credits from a Corps approved mitigation bank.
*********************
The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry Creek
Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in
accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will
express the State's opinion that the operations undertaken by the applicant will not result in a violation of
applicable water quality standards. For further information, please contact the Colorado Water Quality
Control Division, (303) 692-3500.
In compliance with the Endangered Species Act, a preliminary determination has been made that the
described work will not adversely affect species designated as threatened or endangered or adversely affect
critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S.
Fish and Wildlife Service and other interested agencies and individuals.
The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of
1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input by
the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may
conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if
warranted.
The decision whether to issue a permit will be based on an evaluation of the probable impacts including
cumulative impacts of the proposed activity on the public interest. That decision will reflect the national
concern for both protection and utilization of important resources. The benefits which reasonably may be
expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the cumulative effects thereof;
among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of
the work on the public interest will include application of the guidelines promulgated by the Administrator,
Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part
230).
The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to determine
whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are
used to assess impacts on endangered species, historic properties, water quality, general environmental
effects, and other public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
6
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive
full consideration in subsequent actions on this application. Any agency or individual having an objection
to the work should identify it as an objection with clear and specific reasons. All replies to the public notice
should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South
Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Ellison
Koonce at (303) 979-4120 or by email at ellison.a.koonce@usace.army.mil or visit the Denver
Regulatory Office web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx
The District Engineer will consider requests for holding a public hearing, for the purpose of gathering
additional information. Before the expiration date of this notice, anyone may request, in writing, that a
public hearing be held. Requests for a public hearing should state specifically the reasons for holding a
public hearing, and what additional information would be obtained. Should the District Engineer decide that
additional information is required and a public hearing should be held, interested parties will be notified of
the date, time and location.
Comments received after the close of business on the expiration date of this public notice will not
be considered.
7
Project: Piney Creek at the Ranches Phase 2
Waterway: Piney Creek
Corps File No: NWO-2017-00602-DEN
Applicant: SEMSWA
smoky Hiii Villa ge
..
0 r odo Dr
,,.,
Pawers Pl
1-.,·,, Dr
Hiiis
At Pin ey
Cree k
Ir
"c
Park '
Vi ew
Knoll sI
~
r
c}
~t :imo
~
Ou1 n'-r, f
I
·ry P t
1>
Dora c1 0 p.~
o·>
,.r
Kinc1
B ·rt
l'I
"''
r
I> ""
I
I
r
Id. Or
r h ~ r d Rr/
I
;:
u
I~
,,~
I "' n
If
.....,.
I_
<,,
~-
j
l l1 (t .-1
I
~
I·
t" u0
'>
~
...I
I
""<>
Or hord
I ~
d
P in o ~1
L
(/)
;i:
c
"c
"
...
a.
!i
i:
,,.
t/l
E
~~
~
.,
ri
' ' " f\y
E Ar p. h<>e I
tr ,,
"~
~
Pin e)'
Creek
Ranches
'Y,..
""'<>..
"'u· "'
~
.,.
P ~Q kv 1
;;;
~
%......
I'
t Eu
~
'1.1,. ,,,
l
,,i
t/l
"
I
"' ,,
I
Ill
l)i
~ t/1
c
?'?l.
I
· t.hJU
·' "
c
~
\!)
4J
f F Ir Or
I .
gr
,..,, "
II)
I
II)
n
:>
0
I
~ l ~k
o tl O<
"'
~
..
tr r
: c,
\ cl p l
""
··
C
.!!
,'I?
9. "o,
(/)
.."
I"
<-"'
"""'tt,,.~
0,.
I
!i-·'
I
llo fJ I
.$'Pin ey
"'e
r ek
Ir
I
"
u@.J
?:
11
Ill
E Ar p hoe Rd
Rel
F.~
G
Ill
'0->
o!>l>ll
1-
·;:
Pi
"'c
w
c
'>
I c
'·
I"
B.ennett
u
"
"
c
tz,
~
..J
I
Estanc,1a 1
I
"'
I
I
"'!J
I
~
u'°
I/)
!
f/J
in t Pl
s Pl
E
e d du Av
_,Elizabeth
Piney Creek at the Ranches - Phase 2
c:J Project Area
c:J Survey Area
Sections 21 and 22, T5S, R66W; 6th PM
UTM NAO 83 : Zone 13N; 519694mE, 4383688mN
Latitude, Longitude: 39 .602 702N, 104.770610°W
USGS Parker, CO Quadrangle
Arapahoe County, Colorado
N
0
750
1,500
~~~""'iiiiiiiiiiiiiiiiiiiiii· Feet
A
Figure 1
Vicinity Map
Prepared for: UOFCO
File: 6099 Phase 2 F~ure l.mxd(GS)
Mo1ch 10, 2017
Porlions of lhls d ocument Include intellectual prope rty of ESRI ond its licen so rs ond ote used herein under license . Copyright {{I 2014 ESRI and ih licemors. A!I rights reserved .
ERO
ERO Resources Corp.
Image Source: Google Earth©, October 2015
Piney Creek at the Ranches - Phase 2
_____.. Flow Direction
·-'- _ _!
Project Area
Survey Area
- - Parcel Boundary
Stream bed
0
Ordinary High Water
Marie (0.981 ac)
$2>
Wetland (3.872 ac)
0
Indirect Ordinary High Wafer Mark Impact (0.004 ac)
Direct Ordinary High Water Mark Impact (0.740 ac)
~
~
~
~
Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)
Figure 3a
Proposed Impacts
Direct Wetland Impact (1.338 ac)
Indirect Wetland Impact (0.174 ac)
N
Phase 1 Direct Wetland Impact (0.001 ac)
0
60
120
~~~""'!iiiiiiiiiiiiiiiiiiiiiiiiiiiiilFeet
A
Prepared for: UDfCD
file: 6099 Phase 2 figures 3o-3e.mxd (GS)
Morch 15, 2017
ERO
ERO Resources Corp.
Image Source : Google Earth©, October 2015
Piney Creek at the Ranches - Phase 2
---+ Flow Direction
0
·-'- _ .!
0
Wetland (3 .872 ac)
f2>
Indirect Ordinary High Water Mark Impact (0.004 ac)
c:::::J Project Area
Survey Area
- - Parcel Boundary
Stream bed
Ordinary High Water
Mark (0.981 ac)
Direct Ordinary High Water Mark Impact (0.7 40 ac)
~
Phase l Direct Ordinary High Water Mark Impact (0.014 ac)
f'2>
Direct Wetland Impact (l .338 ac)
2}i
~
Indirect Wetland Impact (0.174 ac)
N
Phase l Direct Wetland Impact (0.001 ac)
0
60
120
~~~!"liiiiiiiiiiiiiiiiiiiiiiiiiiiiii
Feet
A
Figure 3b
Proposed Impacts
Prepared for: UDFCD
File: 6099 Phase 2 figures 3a-3e.mxd (GS)
March 15, 2017
ERO
ERO Resources, Corp.
Image Source : Google Earth©, October2015
Piney Creek at the Ranches - Phase 2
____... Flow Direction
·--
Project Area
'- _ ~ Survey Area
0
0
Ordinary High Water
Mari< (0 .981 ac)
th
Indirect Ordinary High Water Mark Impact (0.004 ac)
Direct Ordinary High Water Mark Impact (0.740 ac)
- - Parcel Boundary
Stream bed
Wetland (3.872 ac)
fl:>
fl:>
y...._
Direct Wetland Impact (1.338 ac)
~
Phase 1 Direct Wetland Impact (0.001 ac)
Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)
LP Indirect Wetland Impact (0.174 ac)
0
60
N
120
~~~"""iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilFeet
I
Figure 3c
Proposed Impacts
A
Prepared far: UDfCD
file: 6099 Phase 2 figures 3a-3e.rnxd (GS)
March 15, 2017
ERO
ERO Resourc.s Co
Image Source: Google Earth©, Octobe r 2015
Piney Creek at the Ranches - Phase 2
____. Flow Direction
LJ Project Area
·--,.!
L _
Survey Area
-
Parcel Boundary
-
Stream bed
B
12>
Ordinary High Water
Mark (0.981 ac)
Wetland (3.872 ac)
Direct Ordinary High Water Mark Impact (0.740 ac)
'lb
Indirect Ordinary High Water Mark Impact (0.004 ac)
~
~
Phase 1 Direct Ordinary High Water Mark Impact (0 .014 ac)
8'
Indirect Wetland Impact (0.174 ac)
£!,
Figure 3d
Proposed Impacts
Direct Wetland Impact (1.338 ac)
N
Phase 1 Direct Wetland Impact (0.001 ac)
0
60
120
~~~""iiiiiiiiiiiiiiiiiiii·Feet
A
Preparedfar: UDFCD
File: 6099 Phase 2 F~ures 3a-3e.mxd (GS)
March15, 2017
ERO
ERO Resources Corp.
Image Source: Google Earth©, October 2015
·-'- _ ,.!
Survey Area
- - - Parcel Boundary
Stream bed
0
0
Ordinary High Water
Mark (0.981 ac)
Wetland (3 .872 ac)
Direct Ordinary High Water Mark Impact (0.740 ac)
fl>
Indirect Ordinary High Water Mark Impact (0.004 ac)
fl,
Phase 1 Direct Ordinary High Water Mark Impact (0.014 ac)
Z2>
__,.,-...,_
Direct Wetland Impact (1 .338 ac)
0>
Phase 1 Direct Wetland Impact (0.001 ac)
Figure 3e
Proposed Impacts
Indirect Wetland Impact (0.17 4 ac)
0
60
N
120
~~~5iiiiiiiiiiiiiiiiiiiiiiii1Feet
A
Prepored for: UDFCD
File: 6099 Phase 2 Figures 3o-3e.mxd (GS)
Morch 15, 2017
ERO
ERO Resources Corp.