MAINTENANCE DREDGING IN TERREBONNE PARISH
NAME OF APPLICANT: Talos Energy, 500 Dallas Street, Suite 200, Houston, Texas 77002.
LOCATION OF WORK: Within the Terrebonne Basin (HUC 08090302); in Lake Pelto, approximately 29 miles southwest of Chauvin, Louisiana, in Terrebonne Parish.
CHARACTER OF WORK: The applicant has requested authorization to dredge an area to allow access to the existing Caillou Boca Tank Battery Facility. Currently, the facility is almost inaccessible by barge due to shoaling. The site will be accessed via existing channels. Approximately 90,800 cubic yards of native material will be dredged and placed at the current marsh elevation of +2.5 feet NAVD88 to create back barrier marsh behind Whiskey Island. Approximately 9.4 acres of non-vegetated water bottoms will be dredged and approximately 18.7 acres of water bottoms will be filled at heights conducive to marsh creation. No impacts to vegetated wetlands are proposed.
No compensatory mitigation is anticipated. Should compensatory mitigation be
required, the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.
It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable.
JOINT PUBLIC NOTICE
June 5, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Jamie Crowe
Jamie.M.Crowe@usace.army.mil
Permit Application Number
MVN 2010-02959 CO
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170526-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[ X ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
MAINTENANCE DREDGING IN TERREBONNE PARISH
NAME OF APPLICANT: Talos Energy, 500 Dallas Street, Suite 200, Houston, Texas
77002.
LOCATION OF WORK: Within the Terrebonne Basin (HUC 08090302); in Lake Pelto,
approximately 29 miles southwest of Chauvin, Louisiana, in Terrebonne Parish.
CHARACTER OF WORK: The applicant has requested authorization to dredge an
area to allow access to the existing Caillou Boca Tank Battery Facility. Currently, the
facility is almost inaccessible by barge due to shoaling. The site will be accessed via
existing channels. Approximately 90,800 cubic yards of native material will be dredged
and placed at the current marsh elevation of +2.5 feet NAVD88 to create back barrier
marsh behind Whiskey Island. Approximately 9.4 acres of non-vegetated water bottoms
will be dredged and approximately 18.7 acres of water bottoms will be filled at heights
conducive to marsh creation. No impacts to vegetated wetlands are proposed.
No compensatory mitigation is anticipated. Should compensatory mitigation be
required, the applicant proposes to purchase wetland credits from a Corps approved
mitigation bank located in the watershed.
It is presumed that the applicant has designed the project to avoid and minimize
direct and secondary adverse impacts to the maximum extent practicable. Any further
reduction would limit usage of the property and, therefore function deeming the project
impracticable.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed, so as to be
received before or by the last day of the comment period. Letters concerning the Corps
of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. The application for this proposed project is on
file with the Louisiana Department of Environmental Quality and may be examined
weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of
costs of reproduction. Individuals or parties may request an extension of time in which
to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days. Letters concerning the
Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of this notice are being sent to the State Archeologist
and State Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
The New Orleans District has determined that the proposed project is located in
waters known to be utilized by the west Indian manatee (Trichechus manatus) and
determined that the proposed activity is not likely to adversely affect the species,
provided the Standard Manatee Conditions for In-Water Activities are included in any
authorization from this office. This determination is based on the Standard Local
Operating Procedure for Endangered Species of Louisiana (SLOPES), dated October
22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and Wildlife
Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of 30 acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
For: John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
PIPELINE ROUTE AND END OF VEGETATION DEPICTED
Revised 4/18/17
VEGETATION
PLANNED DREDGE PIPELINE ROUTE
TOLERANCE FOR PIPE MOVEMENT
End of Vegetation
Revised 4/18/17