Proposed discharge of fill material into waters of the U.S. to facilitate the realignment and widening of SR 35 (US 411), from SR 92/Dickey Road to Grapevine Hollow Road, located near Chestnut Hill, within Jefferson County, Tennessee.

Public Notice No. 17-14 Nashville District Application No. LRN-2007-02348 Date: June 12, 2017; Expires: July 12, 2017

Please address comments to: Nashville District Corps of Engineers, Regulatory Division

3701 Bell Road, Nashville, Tennessee 37214-2660 SUBJECT: Proposed discharge of fill material into waters of the U.S. to facilitate the realignment and widening of SR 35 (US 411), from SR 92/Dickey Road to Grapevine Hollow Road, located near Chestnut Hill, within Jefferson County, Tennessee.

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) for the discharge of fill material into waters of the United States. Before a permit can be issued, certification must be provided by the State of Tennessee, pursuant to Section 401 (a)(1) of the CWA, that applicable water quality standards will not be violated. By copy of this notice, the applicant hereby applies for the required certification.

APPLICANT: Tennessee Department of Transportation

505 Deaderick Street, Suite 900, J.K. Polk Building Nashville, Tennessee 37243

LOCATION: The 2.58 mile project is located along a new alignment, north of the existing State Route (SR) 35 (US 411). The project begins at SR 92, near the intersection with Dickey Road, and ends at the recently widened section of SR 35, near the intersection with Norton Road, located near Chestnut Hill, within Jefferson County, Tennessee. Waters of the U.S. proposed for impact include

Clear Creek, unnamed tributaries to Clear Creek, and unnamed wetlands.

PROJECT DESCRIPTION: The Tennessee Department of Transportation (TDOT) proposes to realign and widen SR-35, at the above described location in Jefferson County, Tennessee. The project would be built on new alignment, due to constraints with the existing alignment, which prevents widening. The new alignment would consist of two different sections. The first section, running from SR

92/Dickey Road to approximately 1,000 feet west of Norton Road, would be comprised of four – 12 feet wide travel lanes (two in each direction), a 12 feet wide continuous left turn lane, 12 feet wide shoulders (10 feet stabilized) with guardrail as needed within a varying width right-of-way. The second section, from approximately 1,000 feet west of Norton Road to the recently widened

section of SR 35 east of Norton Road, would consist of varying width depressed median with four – 12 foot wide travel lanes (two in each direction), a 12 foot wide left turn lane (near Norton Road), and 6 feet wide inner shoulders (4 feet stabilized) and 12 feet wide outer shoulders (10 feet stabilized) with guardrail as needed within varying width right-of-way. The total proposed length of roadway construction and improvements equals 2.58 miles. The estimated time for completing this project is two years. The project scope includes all associated drainage improvements. In order to facilitate the project, the discharge of fill material is proposed within ten (10) ephemeral streams, eight (8) intermittent or perennial streams at nine (9) discrete locations, and five (5) wetlands. A total of 5,480 linear-feet of streams (1.05 acres) and a total of 2.80 acres of wetland would be permanently impacted by the proposed discharge of fill material. A complete set of project drawings for this public notice is located at: http://www.lrn.usace.army.mil/Media/Public-Notices/

PURPOSE AND NEED: According to the project application, the primary purpose of the proposed project is to improve an inefficient route. The existing roadway is two lanes, which are operating at a Class F Level of Service as defined by the American Association of State Highway and Transportation Officials (AASHTO). Class F Level of Service is the worst possible traffic flow rating and is

characterized by forced or breakdown flow, with a road in a constant traffic jam. To improve the operational functionality of the route, additional lanes are needed. Along with operational efficiency improvements, the selected alternative would also improve safety,

local and regional accessibility, and correct existing geometric and route deficiencies.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: According to the applicant, efforts were made during the planning and design phases of this project to avoid impacts to waters of the U.S. to the extent practicable, and to minimize impacts that were not avoidable. Mitigation for these impacts has been proposed on the project site, where practicable. The applicant has examined several alternatives to the proposed project. According to the applicant, widening the existing roadway was not an option due to various constraints such as residences, churches, businesses, and topography. Three build alternatives along with a “No Action” alternative were considered. Of the three build alternatives, TDOT’s preferred alignment was chosen because it avoided an eligible archaeological site and requires less maintenance of traffic during construction. The “No Action” alternative is not proposed by TDOT,

since it does not address the operational efficiency of the roadway.

To minimize impacts to streams and wetlands, steeper roadway side slopes of 3:1 and 2:1 are used, where practicable. Impacts to streams are further minimized by relocating streams, rather than complete elimination, which will allow maintenance of flow through the impacted areas. According to the applicant, bottomless culverts and bridges were considered in order to minimize impacts to aquatic features; however, these structures were not used because of the lack of bedrock near the stream bottoms. The existing and proposed topography around the streams made the use of bottomless culverts or bridges cost ineffective and more costly than standard culverts.

To minimize erosion and avoid sediment release into waters of U.S., three phases of construction are designed and included in the construction plans. Only 50 acres of land disturbance are allowed at a time and all in-water construction activities will be done in the dry and separated from flowing water, to the maximum extent practicable. Standard Best Management Practices will be

utilized to reduce erosion and sedimention.

COMPENSATORY MITIGATION: To compensate for unavoidable permanent impacts to 5,480 linear-feet of streams, the applicant proposes off-site permittee-responsible compensatory mitigation at Hall Branch and Clear Creek, located on the Bush Brothers & Company property, near Chestnut Hill, in Jefferson County, Tennessee. The compensatory mitigation site is located in close proximity to the SR 35 improvement project, within the same HUC-8 watershed. Mitigation activities are to include re-establishment, rehabilitation, and enhancement of approximately 5,060 linear-feet of degraded stream channel. TDOT states that the proposed re-

establishment, rehabilitation, and enhancement activities at Hall Branch and Clear Creek will generate more compensatory mitigation than needed for the current SR 35 project; thus, TDOT proposes to utilize any excess mitigation for the next section of future corridor improvements to SR 35. TDOT does not propose compensatory mitigation for impacts to the following ephemeral streams: EPH-17 (189 linear-feet of impact), EPH-18 (198 linear-feet of impact), EPH-25 (312 linear feet- of impact), and EPH-32 (255 linear-feet of impact). TDOT states that encapsulation and stream loss is less than 300 linear-feet for each of these streams, therefore these present a minimal adverse effect, and no mitigation is proposed. The U.S. Army Corps of Engineers (USACE) is currently reviewing the applicant’s permittee responsible compensatory mitigation plan for Hall Branch and Clear Creek.

To compensate for unavoidable permanent impacts to 2.80 acres of wetland, the applicant proposes debiting, at a 2:1 ratio, 5.59 acres from available wetland credits at the Lick Creek Wetland Mitigation Bank, located in Greene County, Tennessee.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based onan evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion,

recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental

Protection Agency, under authority of Section 404(b)(1) of the CWA(40 CFR Part 230).

SOLICITATION OF COMMENTS: The USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed road improvement and widening project. In accordance with the Council on Environmental Quality (40 CFR 1500-1508) and USACE regulations (Engineer Regulation (ER) 200-2-2, dated 1988) for implementing National Environmental Policy Act (NEPA), this document serves as a scoping letter to notify the public of the proposed action and affording the public the opportunity to participate. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

HISTORIC AND CULTURAL RESOURCES:

An archaeological survey was conducted for the SR 35 corridor, which included this roadway project.From the survey, a site was identified within the project corridor as potentially eligible for listing in the National Register of Historic Places. The chosen alternative avoids the site. The State Historic Preservation Office (SHPO) requested additional coordination providing proof that the project is avoiding the site. The follow up coordination was submitted to SHPO on 16 February 2017.

A historic architecture assessment was conducted by TDOT for this project in November 1999 and resurveyed in December 2015. The assessments identified a cultural resource eligible for listing in the National Register of Historic Places: the Hill-Hance House. In 2003, a Memorandum of Agreement (MOA) was signed by representatives of TDOT, the SHPO, and the Federal Highway Administration with measures including changing the alignment of the proposed roadway and leaving a hill slope with dense trees to avoid and minimize impacts to the Hill-Hance House. The SHPO reviewed the assessments and concluded, on 27 January 2016, that the project as proposed will not adversely affect this resource.

USACE invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. After receipt of comments from this public notice, USACE will evaluate potential impacts and consult with the SHPO and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate. Copies of this public notice are being provided to the SHPO and American Indian Tribes. This public notice serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended.

ENDANGERED/THREATENED SPECIES REVIEW: The applicant completed an Endangered Species Act (ESA) records review, by searching the TDEC Division of Natural Areas, Endangered Species Database, on 21 October 2014 and 17 February 2017. Additionally, the applicant conducted ESA field reviews in November 2014. Accordingly, effects determinations were made by the applicant for each species. The field review, records review, and accompanying effects determinations provide documentation of

the potential effects of the project on endangered and threatened federally listed species within the action area. Listed species potentially located within a four-mile radius of the project site include:

Species Nomenclature

Federal Status

Mussels

Appalachian elktoe (Alasmidonta raveneliana)

Endangered

Mammals

Indiana bat (Myotis sodalis)

Endangered

Northern long-eared bat (Myotis septentrionalis)

Threatened

There is no critical habitat designated within the project area.

The above described ESA documentation was provided to the USFWS for consultation. In order to determine the presence of bats, a mist netting survey was performed 4-10 June 2015 at three sites along the project. The survey netted 24 bats, none of which were listed species. The survey information was provided to the U.S. Fish and Wildlife Service (USFWS) on 24 October 2015. On 9

November 2017, the USFWS concurred with TDOT’s determination of “not likely to adversely affect” for the Indiana bat and northern long-eared bat based on the negative survey results. The USFWS also wrote “we are unaware of any federally listed species that would be impacted…the requirements of Section 7 of the ESA are fulfilled.”

OTHER APPROVALS: Water Quality Certification from Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 (a)(1) is required for the proposed project. Other federal, state, and/or local approvals may be required for the proposed work.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the administrative record and will be considered in the determination. Any response to this notice should be directed to William Worrall, Nashville District Corps of Engineers, Regulatory Division, at the above address, at 615-369-7500, or via email:

william.e.worrall@usace.army.mil.

Joshua W. Frost

Chief, Technical Services Branch Regulatory Division

Public Notice # 17-14, File # LRN-2007-02348

Page 1 of 50

Public Notice # 17-14, File # LRN-2007-02348

STR-19 Individual ARAP Individual 404 Section 26a

WWC-32/EPH-32 Individual 404

WTL-9 Individual ARAP Individual 404 STR-10 Individual ARAP Individual 404 Section 26a

Matchline See Sheet 2

STR-12 (2nd Impact) Individual ARAP Individual 404 Section 26a

STR-13 & WWC-33/EPH-33 Individual ARAP Individual 404

WTL-14 Individual ARAP Individual 404

STR-11 Individual ARAP Individual 404

WWC-34/EPH-34 Individual 404

WWC-25/EPH-25 Individual 404

WWC-17/EPH-17 WWC-18/EPH-18 Individual 404 Begin Project Sta. 249+15.00

STR-17 Individual ARAP Individual 404 Section 26a

WTL-10 Individual ARAP Individual 404

STR-15 Individual ARAP Individual 404

WWC-21/EPH-21 Individual 404 WTL-7 Individual ARAP Individual 404

STR-12 Individual ARAP Individual 404 Section 26a

STR-14 Individual ARAP Individual 404

CHESTNUT HILL, TN QUADRANGLE 164-NE APPLICATION BY: TENNESSEE DEPARTMENT OF TRANSPORTATION PIN: 101401.02 Project #: 45007-1212-04 SR 35 (US 411), from SR 92/Dickey Road to Grapevine Hollow Road Jefferson County Near: Chestnut Hill, Tennessee

Sheet 1 of 2

0

2,000

4,000

6,000

8,000 Feet

Copyright: © 2013 National Geographic Society

Page 2 of 50

Public Notice # 17-14, File # LRN-2007-02348

WWC-38/EPH-38 Individual 404

End Project Sta. 385+45.68

Matchline See Sheet 1

WTL-16 Individual ARAP Individual 404 WWC-39/EPH-39 Individual 404 WWC-37/EPH-37 Individual 404

CHESTNUT HILL, TN QUADRANGLE 164-NE APPLICATION BY: TENNESSEE DEPARTMENT OF TRANSPORTATION PIN: 101401.02 Project #: 45007-1212-04 SR 35 (US 411), from SR 92/Dickey Road to Grapevine Hollow Road Jefferson County Near: Chestnut Hill, Tennessee

Sheet 2 of 2

0

2,000

4,000

6,000

8,000 Feet

Copyright: © 2013 National Geographic Society

Page 3 of 50

Perennial Stream

Sta.259+97.00Lt.to 263+06.00Rt.(SR35)

Sta.261+85.00Rt.to WWC21/ 263+31.00Rt.(SR35) EPH21

2b

2c

Ephemeral Stream

Ephemeral Stream

Sta.22+43.00Rt.to WWC18/ 24+32.00Lt.(SR92) EPH18

1b

STR10

Ephemeral Stream

Feature Jurisdictional Name Determination

Sta.24+03.00Lt.to WWC17/ 25+45.00Lt.(SR92) EPH17

Stationing

1a

Location #

35.9308°

35.9308°

Latitude

N/A

35.9323°

TN06010107029T 35.9323° _1200

N/A

N/A

WaterbodyID

LocationInformation

83.3479°

83.3488°

83.3537°

83.3525°

Longitude

0.008

0.009

0.266

0.010

Stream Relocation

Stream Relocationand Encapsulation

Encapsulation, streamloss andriprapin channel

Complete channelloss dueto roadwayfill

Y

1272cyofconcrete forreinforced concreteboxbridge. 85cyofclass'C'rip rapimbeddedatthe inletandoutletof proposedRCBB.85 cyofexistingstream bedtoberemoved toplacetheriprap. 12.2cyoffillfor streamloss.Total fillis1369.2cy.

Page 4 of 50

Page1of5

Y

Y

230cyofclass'B'rip rapimbeddedinthe relocatedstream. 230cyofexisting soiltoberemoved toplacetheriprap. 6cyofconcretefor culvertand endwalls.Totalfillis 236cy.

5.7cyoffillfor streamloss.

Y

263cyofclass'B'rip rapimbeddedinthe relocatedstream. 263cyofexisting soiltoberemoved toplacetheriprap. 1.3cyoffillfor streamloss.Total fillis264.3cy

154

527

198

189

Total Impact Existing Acreage Corps BriefImpact FillVolumesbelow Impact toWaters Notification Description OHW(cy.) Stream oftheUS (Y/N) Length (ac.) (ft.)

ImpactDescription

FEATURESUMMARYTABLE:

0

516

212

142

Total Proposed Impact Stream Length(ft.)

MitigationDescription

0

82

124

142

0

404

0

0

154

11

0

0

0

415

0

0

39

415

0

0

InKind Stream TotalCompensatory Encapsul. MitigationCredits Stream Length Length@ Needed Replace. Losses@ 1.0Ratio Length 1.0Ratio Corpsof (ft.) TDEC (ft.) (ft.) Engineers

(SummaryTableStreamsFEATURES)

WWC21/EPH21 connectstoSTR10 andWTL9sothe impactsare cumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

Cumulativeimpactsto WWC17/EPH17and WWC18/EPH18are lessthan300linear feetsomitigationnot required.

LocationSpecific Miscellaneous Comments

Comments

Public Notice # 17-14, File # LRN-2007-02348

Ephemeral Stream

Sta.314+56.00Lt.to WWC32/ 313+63.00Rt.(SR35) EPH32

STR13& Intermittent& Sta.321+29.00Lt.to WWC33/ Ephemeral 320+59.00Rt.(SR35) EPH33 Stream

3

5

6a

Feature Jurisdictional Name Determination

Ephemeral Stream

Stationing

Sta.281+02.00Rt.to WWC25/ 281+34.00Rt.(SR35) EPH25

Location #

N/A

N/A

N/A

WaterbodyID

LocationInformation

35.9359°

35.9358°

35.9345°

Latitude

83.3292°

83.3322°

83.3424°

Longitude

0.035

0.014

Encapsulation andriprapin channel

0.021

Encapsulation

Encapsulation andchannel loss

Y

Y

18.5cyofconcrete forreinforced concretepipeand endwalls.7.4cyof class'B'riprap imbeddedatthe outletofthe proposedRCP.7.4 cyofexistingground willberemovedto placeriprap.Total fillis25.9cy.

14.4cyofconcrete forreinforced concretepipeand endwall.0.7cyof class'B'riprap imbeddedatthe inletoftheproposed RCP.0.7cyof existingstreambed willberemovedto placeriprap.Total fillis15.1cy.

Page2of5

Y

10.2cyofconcrete forreinforced concretepipeand endwalls.8.4cyof class'B'riprap imbeddedatthe inletandoutletof theproposedRCP. 8.4cyofexisting streambedtobe removedtoplacerip rap.0.7cyoffillfor streamloss.Total fillis19.3cy.

282

255

312

Total Impact Existing Acreage Corps BriefImpact FillVolumesbelow Impact toWaters Notification Description OHW(cy.) Stream oftheUS (Y/N) Length (ac.) (ft.)

ImpactDescription

FEATURESUMMARYTABLE:

390

285

292

Total Proposed Impact Stream Length(ft.)

0

0

0

InKind Stream Replace. Length (ft.)

282

0

0

0

0

0

124

0

0

164

0

0

Stream TotalCompensatory Encapsul. MitigationCredits Length Length@ Needed Losses@ 1.0Ratio 1.0Ratio Corpsof (ft.) TDEC (ft.) Engineers

MitigationDescription

(SummaryTableStreamsFEATURES)

STR13andWWC 33/EPH33connectto STR12sotheimpacts arecumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

Encapsulationand streamlossisless than300linearfeetso mitigationisnot required.

Encapsulationand streamlossisless than300linearfeetso mitigationisnot required.

LocationSpecific Miscellaneous Comments

Comments

Public Notice # 17-14, File # LRN-2007-02348

Page 5 of 50

STR12

STR14

Stationing

Sta.32+73.00Rt.to 33+69.00Lt.(SR35)

Sta.328+40.00Lt.to 326+94.00Rt.(SR35)

Sta.331+41.00Lt.to WWC34/ 331+84.00Rt.(SR35) EPH34

6b

6c

7a

Ephemeral Stream

Intermittent Stream

Perennial Stream

Feature Jurisdictional Name Determination

Location # Latitude

N/A

N/A

35.9364°

35.9350°

TN06010107029T 35.9348° _1250

WaterbodyID

LocationInformation

83.3259°

83.3276°

83.3335°

Longitude

0.035

0.059

Encapsulation andriprapin channel

Channelloss

0.080

Encapsulation andriprapin channel

Y

Y

27.8cyofconcrete forreinforced concretepipeand endwalls.15.6cyof class'B'riprap imbeddedatthe outletofthe proposedRCP.15.6 cyofexistingstream bedwillberemoved toplaceriprap. Totalfillis43.4cy.

2cyoffillforstream loss.

Page3of5

Y

50.3cyofconcrete forreinforced concretepipeand energydissipator. 11.1cyofclass'B' riprapimbeddedat theinletofthe proposedRCP.11.1 cyofexistingstream bedwillberemoved toplaceriprap. Totalfillis61.4cy.

106

259

248

Total Impact Existing Acreage Corps BriefImpact FillVolumesbelow Impact toWaters Notification Description OHW(cy.) Stream oftheUS (Y/N) Length (ac.) (ft.)

ImpactDescription

FEATURESUMMARYTABLE:

0

290

249

Total Proposed Impact Stream Length(ft.)

0

0

0

0

266

219

106

0

0

0

266

219

27

266

219

InKind Stream TotalCompensatory Encapsul. MitigationCredits Stream Length Length@ Needed Replace. Losses@ 1.0Ratio Length 1.0Ratio Corpsof (ft.) TDEC (ft.) (ft.) Engineers

MitigationDescription

(SummaryTableStreamsFEATURES)

WWC34/EPH34 connectstoSTR15so theimpactsare cumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

LocationSpecific Miscellaneous Comments

Comments

Public Notice # 17-14, File # LRN-2007-02348

Page 6 of 50

STR15

STR17

STR12

Sta.333+18.00Lt.to 331+69.00Rt.(SR35)

Sta.341+98.00Lt.to 341+95.00Rt.(SR35)

Sta.352+09.00Lt.to 350+43.00Rt.(SR35)

7b

8

9b

Perennial Stream

Perennial Stream

Intermittent Stream

Feature Jurisdictional Name Determination

Stationing

Location #

35.9375°

35.9355°

Latitude

TN06010107029T 35.9387° _1250

NotAssessed

N/A

WaterbodyID

LocationInformation

83.3198°

83.3226°

83.3259°

Longitude

0.036

0.088

0.091

Encapsulation andriprapin channel

Encapsulation, streamloss andriprapin channel

Encapsulation, streamloss andriprapin channel

Page 7 of 50

Y

Y

38.6cyofconcrete forreinforced concretepipeand endwalls.25cyof class'B'riprap imbeddedatthe outletofthe proposedRCP.25cy ofexistingstream bedwillberemoved toplaceriprap. 18.7cyoffillfor streamloss.Total fillis82.3cy.

191.5cyofconcrete forreinforced concretepipeand energydissipator. 7.3cyofclass'B'rip rapimbeddedatthe outletoftheenergy dissipator.7.3cyof existingstreambed willberemovedto placeriprap.9.3cy offillforstreamloss. Totalfillis208.1cy.

Page4of5

Y

21.2cyofconcrete forreinforced concretepipeand endwalls.7.8cyof class'B'riprap imbeddedatthe outletofthe proposedRCP.7.8 cyofexistingstream bedwillberemoved toplaceriprap.1.2 cyoffillforstream loss.Totalfillis30.2 cy.

330

268

261

Total Impact Existing Acreage Corps BriefImpact FillVolumesbelow Impact toWaters Notification Description OHW(cy.) Stream oftheUS (Y/N) Length (ac.) (ft.)

ImpactDescription

FEATURESUMMARYTABLE:

320

254

258

Total Proposed Impact Stream Length(ft.)

MitigationDescription

0

0

0

313

215

230

10

14

3

323

229

233

323

229

233

InKind Stream TotalCompensatory Encapsul. MitigationCredits Stream Length Length@ Needed Replace. Losses@ 1.0Ratio Length 1.0Ratio Corpsof (ft.) TDEC (ft.) (ft.) Engineers

(SummaryTableStreamsFEATURES)

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

Streamimpactswillbe offsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

LocationSpecific Miscellaneous Comments

Comments

Public Notice # 17-14, File # LRN-2007-02348

N/A

Ephemeral Stream

Ephemeral Stream

Sta.365+08.00Lt.to WWC38/ 365+39.00Rt.(SR35) EPH38

Sta.365+50.00Rt.to WWC39/ 370+98.00Lt.(SR35) EPH39

STR11 (Unnamed Sta.306+23.00Lt.to Intermittent tributary 308+07.00Rt.(SR35) Stream toClear Creek)

10c

10d

11

N/A

Ephemeral Stream

N/A

N/A

NotAssessed

Sta.364+44.00Rt.to WWC37/ 364+44.00Rt.(SR35) EPH37

Perennial Stream

10b

STR19

10a

WaterbodyID

Sta.27+20.00Rt.to 27+89.00Lt.(Fine HollowRoad) Sta.360+36.00Lt.to 365+29.00Lt.(SR35)

Feature Jurisdictional Name Determination

Stationing

Location #

LocationInformation

35.9369°

35.9401°

35.9406°

35.9398°

35.9397°

Latitude

83.3346°

83.3153°

83.3158°

83.3156°

83.3189°

Longitude

0.028

1.053

ProjectTotals:

0.039

0.007

0.004

0.223

Culvert replacement

Channelloss

Channelloss

Channelloss

Encapsulation, stream relocation, streamloss andriprapin channel

Y

Y

4.3cyoffillfor streamloss.

84.9cyoffillfor streamloss.

Page 8 of 50

Page5of5

2617

Y

Y

5.6cyoffillfor streamloss.

Nonewfillsince proposedculvertis beingplacedinsame locationasexisting

Y

44.9cyofconcrete forreinforced concretepipe.63.3 cyofclass'B'riprap imbeddedatthe outletsofthe proposedRCPs.63.3 cyofexistingstream bedwillberemoved toplaceriprap.51 cyoffillforstream loss.Totalfillis 159.2cy.

5,480

562

573

103

44

809

Total Impact Existing Acreage Corps BriefImpact FillVolumesbelow Impact toWaters Notification Description OHW(cy.) Stream oftheUS (Y/N) Length (ac.) (ft.)

ImpactDescription

FEATURESUMMARYTABLE:

4,529

562

0

52

0

707

Total Proposed Impact Stream Length(ft.)

MitigationDescription

710

0

0

52

0

310

2,250

0

0

0

0

321

1,068

0

573

51

44

102

2,232

0

0

0

0

423

2,504

0

143

13

11

423

InKind Stream TotalCompensatory Encapsul. MitigationCredits Stream Length Length@ Needed Replace. Losses@ 1.0Ratio Length 1.0Ratio Corpsof (ft.) TDEC (ft.) (ft.) Engineers

(SummaryTableStreamsFEATURES)

Replacingexisting culvertwithproposed culvert.Nonew impactstostream.

WWC39/EPH39 connectstoSTR19so theimpactsare cumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

WWC38/EPH38 connectstoSTR19so theimpactsare cumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

WWC37/EPH37 connectstoSTR19so theimpactsare cumulatedforall features.The combinedimpactsare greaterthan300ft.so mitigationisrequired.

Wherepossible,in kindstream replacementwillbe used.Streamimpacts willbeoffsetby rehabilitatingClear CreekandHallBranch siteonBushBrothers property.

LocationSpecific Miscellaneous Comments

Comments

Public Notice # 17-14, File # LRN-2007-02348

Feature Name

WTL7 WTL9 WTL10 WTL14 WTL16

Location#

2a 2d 4 9a 10e

35.9316° 35.9324° 35.9356° 35.9388° 35.9408°

Latitude

1.550 0.673 0.024 0.292 0.257 2.796

ProjectTotals:

Longitude

WETLANDSUMMARYTABLE:

4512.0

2501.0 1086.0 39.0 471.0 415.0 0.000

0.000 0.000 0.000 0.000 0.000

Page1of1

2.796

1.550 0.673 0.024 0.292 0.257 5.59

3.10 1.35 0.05 0.58 0.51

LickCreek LickCreek LickCreek LickCreek LickCreek

WetlandMitigationBankName

MitigationDescription Impact VolumeofFill Temporary Permanent WetlandDebit Acreageto basedon1ft. Wetland WetlandImpact (ac.)(@2:1 Watersof depth(cubic ImpactArea Area(ac.) ratio) theUS(ac.) yards) (ac.)

83.3496° 83.3469° 83.3341° 83.3200° 83.3137°

LocationInformation

(SummaryTableWTLsONLY)

LocationSpecific MiscellaneousComments

Comments

Public Notice # 17-14, File # LRN-2007-02348

Page 9 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 10 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 11 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 12 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 13 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 14 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 15 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 16 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 17 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 18 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 19 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 20 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 21 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 22 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 23 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 24 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 25 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 26 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 27 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 28 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 29 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 30 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 31 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 32 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 33 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 34 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 35 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 36 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 37 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 38 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 39 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 40 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 41 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 42 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 43 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 44 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 45 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 46 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 47 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 48 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 49 of 50

Public Notice # 17-14, File # LRN-2007-02348

Page 50 of 50

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas