RESIDENTIAL SUBDIVISION IN ASCENSION PARISH
NAME OF APPLICANT: DR Horton Gulf Coast, c/o Hydrik, Attn: Michael Henry, 2323 LA Hwy 190 East, Suite 2, Hammond, Louisiana 70401.
LOCATION OF WORK: Near Black Bayou, Section 32, T8S-R3E, approximately 2.5 miles east of Airline Hwy on Hornsby Rd., in Prairieville, Louisiana, in Ascension Parish, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill to construct and maintain a 44 lot residential subdivision (Reese’s Landing Subdivision) with appurtenances and utilities. The subdivision will include homes, driveways, greenspace, sidewalks, two storm water detention ponds, and ingress egress. Approximately 20,000 cubic yards of native earthen material, will be redistributed achieve required grade elevation requirements. The proposed project is situated on an approximately 18-acre tract that has been determined contain approximately 1.1 acres of herbaceous pasture wetlands and 0.27 acre of other waters of the US. All 1.1 acres of wetlands would be used in construction of the subdivision. Approximately 0.2 acre of other waters of the U.S. will be relocated onsite.
A Preliminary analysis has determined that the proposed project would directly impact approximately 1.1 acres of herbaceous pasture wetlands and 0.2 acre of other waters of the U.S.
The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
July 17, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 701118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN-2016-01494-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
170609-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
RESIDENTIAL SUBDIVISION IN ASCENSION PARISH
NAME OF APPLICANT: DR Horton Gulf Coast, c/o Hydrik, Attn: Michael Henry, 2323 LA
Hwy 190 East, Suite 2, Hammond, Louisiana 70401.
LOCATION OF WORK: Near Black Bayou, Section 32, T8S-R3E, approximately 2.5 miles
east of Airline Hwy on Hornsby Rd., in Prairieville, Louisiana, in Ascension Parish, within
the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the
attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, grade, excavate, and deposit fill to construct and maintain a 44 lot
residential subdivision (Reese's Landing Subdivision) with appurtenances and utilities.
The subdivision will include homes, driveways, greenspace, sidewalks, two storm water
detention ponds, and ingress egress. Approximately 20,000 cubic yards of native earthen
material, will be redistributed achieve required grade elevation requirements. The
proposed project is situated on an approximately 18-acre tract that has been determined
contain approximately 1.1 acres of herbaceous pasture wetlands and 0.27 acre of other
waters of the US. All 1.1 acres of wetlands would be used in construction of the
subdivision. Approximately 0.2 acre of other waters of the U.S. will be relocated onsite.
2
A Preliminary analysis has determined that the proposed project would directly impact
approximately 1.1 acres of herbaceous pasture wetlands and 0.2 acre of other waters of
the U.S.
The applicant stated that they have designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable. Any further reduction
would limit usage of the property and, therefore deem the project impracticable. As
compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind
wetland credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
3
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed
activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
4
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department
of Natural Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
LA
42
Ba
LA
k
Blac
6
0
ANNA BELLE DR
PARKER PLACE
LACEY LN
44
RD
JAMES
CAUSEY
RD
LA
44
5
Bla
ck
HYDRIK
Wetlands - GIS - Flood Control
LA
DR
929
SHEREE
AIKENS
929
933
ASCENSION
PARISH
ACADIA DR
BUD
BROUSSARD
RD
LA
RD
RD
32
PATTY
JO
LN
LA
DAME
DR
ABBY
S BUD
BROUSSARD
31
MEGAN
LN
NATALIE
LN
GREGG
DR
ALLEMAN LN
RD
REBECCA
LN
HORNSBY
LN
30°18'38.82" N
90°56'20.18" W
AL DR
RD
WEST
SITE
MEADOWBROOK
TILLOTSON
RD
RD
QUAIL CRE EK AV
RD
PARKER
GALVEZ
GARDENS
RD
PARKER
u
930
PRAIRIEVILLE
PRIMARY
SCHOOL
yo
LA
929
BRAUD
RD
u
LA
HUNTER'S
TRACE W
y
dd
29
WINBORNE BLVD
30
PRAIRIEVILLE
FIRE RESCUE
STATION NO. 31
FOUNTAINBLEAU
42
DR
LA
WWW.HYDRIK.COM
LEGEND:
30°18'39.77" N, 90°56'20.23"W
(985)429-0333
1682C
12-8-2016
1
B
RESIDENTIAL
DEREK STEWART
16473 PARKER PL
PRAIRIEVILLE, LA 70769
326'
30°18'41" N
90°56'20" W
SEC. 32
SEC. 31
PO
TE N
DE
FOREST
PARKER PLACE EST.
9191 SIEGEN LN, STE III-B
BATON ROUGE, LA 70810
2093'
30 29 28 27
44 43 42 41 40 39 38 37 36 35 34 33 32 31
FLOOD ZONE "X"
REESE'S CROSSING DR
18.05 AC
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
PROPOSED DETENTION PONDS
TOTAL AREA = 1.72 ACRES
GREENSPACE = 5.34 ACRES
WETLANDS TO BE IMPACTED
VIA CLEARING & FILLING 1.01 ACRE
WETLANDS IMPACTED VIA
EXCAVATION / DETENTION POND =
0.09 ACRE
TOTAL PROPOSED LOTS 44
20'
DETENTION
POND
8
ELEVATION / LINE
TOTAL JURISDICTIONAL WETLANDS = 1.10 ACRE
93'
LA HWY 929
FLOOD ZONE TRANSITION
25'
20'
THIS SITE IS LOCATED IN FLOOD ZONES A & X
PER FEMA FLOOD INSURANCE RATE MAPS
COMMUNITY PANELS NUMBERS:
22005C 0040E & 22005C 0045E, DATED 8-16-2007.
INE
PIP
15'
234'
HORNSBY RD
OTHER WATERS OF THE U.S. TO
REMAIN UNDISTURBED
197 LIN. FT. / 0.07 AC.
DEVELOPMENT PERIMETER
OD
FLO "A"
E
ZON
EXISTING
OTHER WATERS
OF THE U.S.
RESIDENTIAL
EXISTING
OTHER WATERS
OF THE U.S.
TO BE RELOCATED
OTHER WATERS OF THE U.S. TO BE
RELOCATED 586 LIN. FT. / 0.2 AC.
OTHER WATERS OF THE U.S.
NEW LOCATION 560 LIN. FT. / 0.2 AC.
EL
551'
PIP
DRAINAGE FLOW - POST-DEVELOPMENT
ZONE
ZONE
CL
6 7
E
IN
EL
R/W
A
15'
3 4 5
RESIDENTIAL
2643'
BRANDON DUFERN
16502 HWY 929
PRAIRIEVILLE, LA 70769
FOREST
A
1 2
DANIEL JOHNSON
16487 PARKER PL
PRAIRIEVILLE, LA 70769
DRAINAGE FLOW - PRE-DEVELOPMENT
30°18'38" N
90°55'50" W
ND
TI O
N
LEGEND:
B
CHRISTY HERSCHLAG
16467 PARKER PL
PRAIRIEVILLE, LA 70769
RELOCATED
OTHER WATERS
OF THE U.S.
30°18'39.77" N, 90°56'20.23" W
DEVIN MOORE
16438 HWY 929
PRAIRIEVILLE, LA 70769
HYDRIK
JAKE CROCHET
16410 HWY 929
PRAIRIEVILLE, LA 70769
Wetlands - GIS - Flood Control
WWW.HYDRIK.COM
(985)429-0333
HWY. R/W LINE
30°18'39" N
90°56'20" W
100'
1682C
0'
2
200'
12-8-2016
135'
5' AV DEPTH 3'
3'
1'
PROPERTY LINE
SECTION B-B
POND SECTION
*
C
*
NOTE: LOT DEPTH VARIES
136'
AREA TO BE
EXCAVATED
15'
HOME
C
*
DRIVEWAY
1'
21.0'
HOME FOUNDATION
1FT ABOVE B.F.E.
SECTION C-C
136'
25'
PL
PROPOSED GRADE
PL
EXIST.
GROUND
DEVELOPMENT BOUNDARY
ELEVATION - N.G.V.D
PL
77'
TYPICAL LOT LAYOUT
25'
20'
DRIVEWAY
DRAINAGE TO STREET
DRAINAGE TO STREET
WETLANDS TO BE
FILLED / GRADED
PL
SEE FIGURE 4
FOR STREET PROFILE
DETAIL
SECTION A-A
LOT / STREET CROSS SECTION
NOTE:
ELEVATIONS SHOWN HEREON
ARE RELATIVE TO N.G.V.D. '29
20'
10'
0'
25'
R/W
DRIVEWAY
ELEVATION N.G.V.D
15'
PL
PROPOSED
GRADE
DEVELOPMENT
BOUNDARY
STREET
R/W
PROPOSED
GRADE
CL
DEVELOPMENT
BOUNDARY
30°18'39.77" N, 90°56'20.23"W
50'
75'
100'
HYDRIK
Wetlands - GIS - Flood Control
WWW.HYDRIK.COM
(985)429-0333
= PROPOSED FILL
= PROPOSED CONC. SLAB
= DRAINAGE FLOW POST-DEVELOPMENT
1682C
12-8-2016
3
TYPICAL STREET SECTION
HYDRIK
Wetlands - GIS - Flood Control
WWW.HYDRIK.COM
(985)429-0333
1682C
12-8-2016
4