TIME EXTENSION REQUEST FOR THE CONSTRUCTION OF THE KANSAS LANE CONNECTOR IN OUACHITA PARISH
NAME OF APPLICANT: City of Monroe, c/o Louisiana Department of Transportation and Development, P.O. Box 94245, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: The project is located between the existing Kansas Lane at US Highway 80 (Desiard Street) and Forsythe Avenue, in Sections 21, 28, 37, 38, 39, 40, 41 and 42 of Township 18 North, Range 14 East, in Ouachita Parish, Monroe, Louisiana, as shown on the enclosed drawings (Latitude 32° 32’ 08” N, Longitude 92° 03’ 45” W). This project is located in the Ouachita River watershed basin within the Lower Quachita USGS Catalog Unit 08040207.
CHARACTER OF WORK: The applicant has requested a time extension to the Department of the Army authorization to clear, grade, excavate and deposit fill and/or aggregate material to construct a new 2.6 mile four lane roadway. The proposed project would impact approximately 16.7 acres of jurisdictional wetlands and 0.9 acre of “other waters of the US”. Approximately 16,233 cubic yards of earthen fill and aggregate material would be hauled in and deposited in jurisdictional wetlands to achieve required grade elevation. Although project construction has not commenced, the applicant has completed a compensatory mitigation plan that included restoration of 51 acres of forested wetlands on a Louisiana Department of Wildlife and Fisheries Wildlife Management Area
JOINT PUBLIC NOTICE
June 19, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2099
Project Manager
Stephen Pfeffer
stephen.d.pfeffer@usace.army.mil
MVK 2000-01263
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170614-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been sent to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
TIME EXTENSION REQUEST FOR THE CONSTRUCTION OF THE KANSAS LANE
CONNECTOR IN OUACHITA PARISH
NAME OF APPLICANT: City of Monroe, c/o Louisiana Department of Transportation and
Development, P.O. Box 94245, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: The project is located between the existing Kansas Lane at US
Highway 80 (Desiard Street) and Forsythe Avenue, in Sections 21, 28, 37, 38, 39, 40, 41
and 42 of Township 18 North, Range 14 East, in Ouachita Parish, Monroe, Louisiana, as
shown on the enclosed drawings (Latitude 32° 32' 08" N, Longitude 92° 03' 45" W). This
project is located in the Ouachita River watershed basin within the Lower Quachita USGS
Catalog Unit 08040207.
CHARACTER OF WORK: The applicant has requested a time extension to the
Department of the Army authorization to clear, grade, excavate and deposit fill and/or
aggregate material to construct a new 2.6 mile four lane roadway. The proposed project
would impact approximately 16.7 acres of jurisdictional wetlands and 0.9 acre of "other
waters of the US". Approximately 16,233 cubic yards of earthen fill and aggregate material
would be hauled in and deposited in jurisdictional wetlands to achieve required grade
elevation. Although project construction has not commenced, the applicant has completed
a compensatory mitigation plan that included restoration of 51 acres of forested wetlands
on a Louisiana Department of Wildlife and Fisheries Wildlife Management Area as well as
2
purchase of credits from a mitigation bank.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension
of time in which to comment on the proposed work by writing or e-mailing the Corps of
Engineers Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Branch Chief will review the request and the requestor will be
promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the
address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
3
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
A cultural resources survey for the project was prepared and provided to the Louisiana
State Preservation Officer (SHPO) in May 2004. The possibility exists that the proposed
work may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of the notice are being sent to the State Archeologist and
State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and
U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that
the proposed activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to n/a acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosures
WETLAND DELINEATION SITE SUMMARY TABLE
State Project No. 700-37-0110
Federal Aid Project No. HP-T021(018)
Kansas Lane
Monroe, Ouachita Parish, Louisiana
Sites 1 - 7
Station
Site
1
2
3
4
5
6
7
Total Impacts (Acres)
Wetlands
Other Waters
Type
Start
End
110+80
118+20
-0.813 (B)
BD, PS
149+75
175+40
7.806
-BLH
180+00
192+65
3.350
-BLH
206+70
206+76
-0.020 (C)
IS
209+00
210+50
0.108
-BLH
211+50
228+20
3.956
0.046 (C)
BLH, HW,IS
228+95
229+05
0.02
-BLH
15.24
0.899
Totals
Legend: BLH Bottomland Hardwood; BD Bayou Desiard;
PS Perennial Stream; IS Intermittent Stream;
HW- HerbaceousWetland; (C) Culvert; (B) Bridge