APPLICANT: Clay County, Missouri

PROJECT LOCATION: In Smithville Lake, Clay County, Missouri.

ACTIVITY: The applicant proposes to place riprap along a total of 7,050 feet of the shoreline of Smithville Lake, for the purpose of bank stabilization.

APPLICANT: Clay County, Missouri PROJECT LOCATION: In Smithville Lake, Clay County, Missouri. ACTIVITY: The applicant proposes to place riprap along a total of 7,050 feet of the shoreline of Smithville Lake, for the purpose of bank stabilization.

PUBLIC NOTICE Permit No. NWK-2017-00874 Issue Date: June 20, 2017 Expiration Date: July 11, 2017

US Army Corps of Engineers Kansas City District

21-Day Notice ______________________________________________________________________________ This public notice is issued jointly with the Missouri Department of Natural Resources, Water Pollution Control Program. The Department of Natural Resources will use the comments to this notice in deciding whether to grant Section 401 water quality certification. Commenters are requested to furnish a copy of their comments to the Missouri Department of Natural Resources, P.O. Box 176, Jefferson City, Missouri 65102. APPLICANT: Clay County, Missouri 1 Courthouse Square Liberty, Missouri 64068 PROJECT LOCATION (As shown on the attached drawings): In Smithville Lake, Clay County, Missouri, with specific sites located at: Site 32 ...Section 19, Township 53 North, Range 32 West .......[39.3940, -94.5305] Site 33 ...Section 20, Township 53 North, Range 32 West .......[39.3906, -94.5284] Site 34 ...Section 18, Township 53 North, Range 32 West .......[39.4013, -94.5326] Site 36 ...Sections 7-8, Township 53 North, Range 32 West ....[39.4138, -94.5280] Site 46 ...Section 5, Township 53 North, Range 32 West .........[39.4281, -94.5261] Site 55 ...Section 8, Township 53 North, Range 32 West .........[39.4224, -94.5238] Site 56 ...Section 8, Township 53 North, Range 32 West .........[39.4205, -94.5249] Site 57 ...Section 8, Township 53 North, Range 32 West .........[39.4197, -94.5275] USGS Quad: Smithville, MO. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). ACTIVITY (As shown on the attached drawings): PROPOSED: The applicant proposes to place riprap along a total of 7,050 feet of the shoreline of Smithville Lake, for the purpose of bank stabilization. The proposed activity will occur at 8 sites around the lake. Riprap will be placed approximately 5 feet thick and 6-8 feet high. The applicant plans to place the riprap without any excavation, and by backing dump trucks directly to the shoreline in the proposed areas. WETLANDS/AQUATIC HABITAT: A total of 7,050 feet of the shoreline of Smithville Lake (at normal pool elevation).

APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC RESOURCES: As stated by the applicant: "The placement of riprap rock on the Smithville Lake shoreline will use existing or improvised routes on the County lease during times of limited park usage. This rock is the most cost effective and efficient method to protect infrastructure and prevent erosion." ADDITIONAL INFORMATION: Additional information about this application may be obtained by contacting Mr. Colin C. Smalley, Regulatory Specialist, Kansas City Regulatory Office, 601 East 12th Street, Kansas City, Missouri 64106. All comments to this public notice should be directed to the above address, or to Mr. Smalley by phone at 816-389-3846 or by email at colin.c.smalley@usace.army.mil. CULTURAL RESOURCES: Kansas City District will comply with the National Historic Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic Places and the Federal Register and no property listed in the Register or proposed for listing is located in the permit area. The Smithville Lake area has been the subject of extensive archeological survey(s). No recorded archaeological sites are within the project area, and the proposed activity does not involve any excavation and will result in increased stability for the land in this area. Accordingly, we have made a preliminary determination that the project will not affect any historic properties. However, we will evaluate input by the State Historic Preservation Officer, Tribal Historic Preservation Officer(s) (or Tribe-designated representative[s]) and the public in response to this public notice. ENDANGERED SPECIES: In compliance with the Endangered Species Act (ESA), a preliminary determination has been made that the described work is within the range of the gray bat (Myotis grisescens), the Indiana bat (M. sodalis), and the northern long-eared bat (M. septentrionalis), and that there is no critical habitat for any listed species within the project area. We have also made a preliminary determination that the project may affect, but is not likely to adversely affect, the above-listed bat species. A letter requesting informal consultation under Section 7 of the ESA will be sent under separate cover to the U.S. Fish and Wildlife Service. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this public notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of dredged or fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. This public notice serves as an application to the state in which the discharge site is located for certification of the discharge. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will not violate applicable water quality standards. PUBLIC INTEREST REVIEW: The decision to issue a permit will be based on an evaluation of the probable impact including the cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may

be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs and, in general, the needs and welfare of the people. The evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COMMENTS: This notice is provided to outline details of the above-described activity so this District may consider all pertinent comments prior to determining if issuance of a permit would be in the public interest. Any interested party is invited to submit to this office written facts or objections relative to the activity on or before the public notice expiration date. Comments both favorable and unfavorable will be accepted and made a part of the record and will receive full consideration in determining whether it would be in the public interest to issue the Department of the Army permit. Copies of all comments, including names and addresses of commenters, may be provided to the applicant. Comments should be mailed to the address shown on page 2 of this public notice. PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this public notice, that a public hearing be held to consider this application. Such requests shall state, with particularity, the reasons for holding a public hearing.

SITE LOCATION MAP 94.56° W

94.54° W

94.52° W

94.5° W

39.44° N

94.58° W

SITE

39.42° N

SITE SITE

SITE

SITE SITE

39.4° N

SITE SITE SITE

39.38° N

Date: 19-Jun-2017 | Drawn By: CCS | File: P:\OD-R_ORM-RAMS-Corresp\NWK-2017\00874\GIS\2017-06-13_SiteLoc_Map_2017-00874.mxd

SITE

0

2,000

4,000

8,000

Feet PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 1 OF 6 20 JUNE 2017

USGS The National Map: National Boundaries Dataset, National Elevation Dataset, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; U.S. Census Bureau - TIGER/Line; HERE Road Data

-

U.S. Army Corps of Engineers Kansas City District

Plan View Map (Crows Creek) 94.536° W

94.534° W

94.532° W

94.53° W

94.528° W

94.526° W

94.524° W

Site 33 300 feet

Site 33 300 feet

0 150 300

600

900

1,200 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Feet PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 2 OF 6 20 JUNE 2017

-

U.S. Army Corps of Engineers Kansas City District

39.394° N

Site 32 310 feet

39.392° N

Site 32 240 feet

39.39° N

Date: 20-Jun-2017 | Drawn By: CCS | File: P:\OD-R_ORM-RAMS-Corresp\NWK-2017\00874\GIS\2017-06-19_Site_Maps_2017-00874.mxd

39.396° N

39.398° N

Site 34 2100 feet

39.4° N

39.402° N

94.538° W

Plan View Map (Camp Branch A Loop) 94.528° W

94.526° W

94.524° W

39.416° N

94.53° W

39.412° N

Date: 20-Jun-2017 | Drawn By: CCS | File: P:\OD-R_ORM-RAMS-Corresp\NWK-2017\00874\GIS\2017-06-19_Site_Maps_2017-00874.mxd

39.414° N

Site 36 2000 feet

0

150

300

600 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Feet PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 3 OF 6 20 JUNE 2017

-

U.S. Army Corps of Engineers Kansas City District

Plan View Map (Sailboat Cove) 94.526° W

94.524° W

39.428° N

Site 46 350 feet

39.426° N

Date: 20-Jun-2017 | Drawn By: CCS | File: P:\OD-R_ORM-RAMS-Corresp\NWK-2017\00874\GIS\2017-06-19_Site_Maps_2017-00874.mxd

39.43° N

94.528° W

0

150

300

600 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Feet PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 4 OF 6 20 JUNE 2017

-

U.S. Army Corps of Engineers Kansas City District

Plan View Map (Dead Tree Cove) 94.526° W

94.524° W

94.522° W

39.424° N

94.528° W

39.42° N

Site 56 500 feet Site 57 500 feet

0

150

300

600 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Feet PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 5 OF 6 20 JUNE 2017

-

U.S. Army Corps of Engineers Kansas City District

39.418° N

Date: 20-Jun-2017 | Drawn By: CCS | File: P:\OD-R_ORM-RAMS-Corresp\NWK-2017\00874\GIS\2017-06-19_Site_Maps_2017-00874.mxd

39.422° N

Site 55 450 feet

I

'

High Water Mark

Normal Pool Level

Normal Pool elevation is located at the base of each cut bank. High Water Mark is shown at 6' above normal pool. The rip rap will be placed 5 feet thick at the base and the length shown on the map. The height of each rock structure will vary from 6 - 8 feet high.

PERMIT NO. NWK-2017-00874 CLAY COUNTY, MISSOURI BANK STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 6 OF 6 20 JUNE 2017

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas