The 24.59 mile, 12-inch diameter pipeline crosses into the Aransas Pass and Galveston Fairways, beginning at Galveston Area (GA) Block 255 and continues in an easterly direction into to High Island (HI) Block 206, Offshore, Texas

Full Public Notice Project Plans Project Description: The project site is located in the Gulf of Mexico. The 24.59 mile, 12-inch diameter pipeline crosses into the Aransas Pass and Galveston Fairways, beginning at Galveston Area (GA) Block 255 and continues in an easterly direction into to High Island (HI) Block 206, Offshore, Texas. The project can be located on the U.S.G.S. quadrangle map titled: THE JETTIES, Texas.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas