DREDGING FOR CHANNEL REALIGNMENT OF WEST COLYELL CREEK IN LIVINGSTON PARISH
NAME OF APPLICANT: Livingston Parish Government, c/o ELOS Environmental, LLC, Attn: Rob Van Vrancken, 43177 East Pleasant Ridge Road, Hammond, Louisiana 70403.
LOCATION OF WORK: West Colyell Creek, Section 34; 3, 10, T- 6S and 7S, R3E, between US Hwy 190 on the north side and Buddy Ellis Road on the south end crossing under I-12 at its midpoint near Walker, Louisiana, in Livingston Parish, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, dredge, and deposit material to create access and make hydrologic improvements to a section of West Colyell Creek, which includes channel realignment and bottom shaping for increased drainage efficiency. Approximately 48,470 cubic yards of native material will be dredged and redeposited with excess material being place in a non-wetland location off site. The proposed project is approximately 2.4 miles long and will temporarily impact approximately 9.2 acres of “other waters of the U.S.” Approximately 0.6 acre of forested wetlands adjacent to the creek will be cleared for temporary access and approximately 0.63 acre of forested wetlands will be permanently cleared and filled to complete the project.
The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
June 26, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 701118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2016-00437-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
160623-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
DREDGING FOR CHANNEL REALIGNMENT OF WEST COLYELL CREEK IN
LIVINGSTON PARISH
NAME OF APPLICANT: Livingston Parish Government, c/o ELOS Environmental, LLC,
Attn: Rob Van Vrancken, 43177 East Pleasant Ridge Road, Hammond, Louisiana 70403.
LOCATION OF WORK: West Colyell Creek, Section 34; 3, 10, T- 6S and 7S, R3E,
between US Hwy 190 on the north side and Buddy Ellis Road on the south end crossing
under I-12 at its midpoint near Walker, Louisiana, in Livingston Parish, within the Lake
Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached
drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, dredge, and deposit material to create access and make hydrologic
improvements to a section of West Colyell Creek, which includes channel realignment and
bottom shaping for increased drainage efficiency. Approximately 48,470 cubic yards of
native material will be dredged and redeposited with excess material being place in a nonwetland location off site. The proposed project is approximately 2.4 miles long and will
temporarily impact approximately 9.2 acres of "other waters of the U.S." Approximately 0.6
acre of forested wetlands adjacent to the creek will be cleared for temporary access and
approximately 0.63 acre of forested wetlands will be permanently cleared and filled to
complete the project.
2
The applicant stated that they have designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable. Any further reduction
would limit usage of the property and, therefore deem the project impracticable. As
compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind
wetland credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
3
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed
activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
4
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department
of Natural Resources.
For JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
P.O.B.
30°29'05.794" N
90°53'34.558" W
LIVINGSTON PARISH
LOCKHEART
190
VICINITY MAP
N.T.S.
WALKER
WEST COLYELL CREEK
LIMITS OF CONSTRUCTION
WEST COLYELL CREEK
INTERSTATE
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-VM01.dwg
12
P.O.T.
30°27'12.496" N
90°53'22.741" W
0
SECTION 34 T-6-S, R-3-E
SECTION 3,10 T-7-S, R-3-E
3000'
6000'
SCALE: 1" = 3000'
VICINITY MAP
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
12/2016
DWG. No.
1
REV.
P.O.B.
30°29'05.794" N
90°53'34.558" W
CEDAR LN.
190
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX01.dwg
MAGNOLIA DR.
PINE ST.
MATCHLINE SEE DWG. NO.3
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
# MVN
0
2016-00437-SQ
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
2
REV.
P.O.B.
30°29'05.794" N
90°53'34.558" W
190
11
0'
14
CEDAR LN.
0'
PINE ST.
TOP OF BANK
AREA SUMMARY
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP01.dwg
SECTION 34
T-6-S,
R-3-E
MAGNOLIA DR.
15' TEMPORARY
CONSTRUCTION AREA
CREEK TOE
WEST COLYELL CREEK
SECTION 3, 10
T-7-S,
R-3-E
110'
140'
LEGEND
MATCHLINE SEE DWG. NO.3a
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
2a
REV.
MAGNOLIA DR.
MATCHLINE SEE DWG. NO. 2
D
CAR ENNIS
LTU
ND
R.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX02.dwg
COLYELL DR.
MATCHLINE SEE DWG. NO. 4
LEGEND
# MVN
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
2016-00437-SQ
0
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
3
REV.
MATCHLINE SEE DWG. NO. 2a
NO WORK AT
BRIDGE CROSSING
120'
150'
15' TEMPORARY
CONSTRUCTION AREA
TOP OF BANK
CREEK TOE
MAGNOLIA DR.
WEST COLYELL CREEK
AREA SUMMARY
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
SECTION 34
T-6-S,
R-3-E
SECTION 3, 10
T-7-S,
R-3-E
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
130
'
100
COLYELL DR.
'
D
CAR ENNIS
LTU
ND
R.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP02.dwg
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
LEGEND
MATCHLINE SEE DWG. NO. 4a
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
3a
REV.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX03.dwg
MATCHLINE SEE DWG. NO. 3
MATCHLINE SEE DWG. NO. 5
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
# MVN
0
2016-00437-SQ
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
4
REV.
MATCHLINE SEE DWG. NO. 3a
125
155
'
'
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
15' TEMPORARY
CONSTRUCTION AREA
TOP OF BANK
CREEK TOE
WEST COLYELL CREEK
AREA SUMMARY
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP03.dwg
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
125'
SECTION 34
T-6-S,
R-3-E
155'
LEGEND
SECTION 3, 10
T-7-S,
R-3-E
MATCHLINE SEE DWG. NO. 5a
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
4a
REV.
MATCHLINE SEE DWG. NO. 4
INTERSTATE
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX04.dwg
12
MATCHLINE SEE DWG. NO. 6
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
# MVN
0
2016-00437-SQ
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
5
REV.
MATCHLINE SEE DWG. NO. 4a
120'
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
150'
INTERSTATE
12
NO WORK AT
BRIDGE CROSSING
15' TEMPORARY
CONSTRUCTION AREA
TOP OF BANK
CREEK TOE
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
WEST COLYELL CREEK
AREA SUMMARY
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
130'
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP04.dwg
160'
SECTION 34
T-6-S,
R-3-E
LEGEND
SECTION 3, 10
T-7-S,
R-3-E
MATCHLINE SEE DWG. NO. 6a
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
5a
REV.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX05.dwg
MATCHLINE SEE DWG. NO. 5
MATCHLINE SEE DWG. NO. 7
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
# MVN
0
2016-00437-SQ
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
6
REV.
MATCHLINE SEE DWG. NO. 5a
'
120
'
150
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
15' TEMPORARY
CONSTRUCTION AREA
TOP OF BANK
CREEK TOE
WEST COLYELL CREEK
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
AREA SUMMARY
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP05.dwg
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
SECTION 34
T-6-S,
R-3-E
0'
SECTION 3, 10
T-7-S,
R-3-E
12
0'
15
LEGEND
MATCHLINE SEE DWG. NO. 7a
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
6a
REV.
MATCHLINE SEE DWG. NO. 6
BUDDY E
LLIS RD.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-EX06.dwg
P.O.T.
30°27'12.496" N
90°53'22.741" W
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS
# MVN
0
2016-00437-SQ
300'
600'
SCALE: 1" = 300'
EXISTING SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
7
REV.
MATCHLINE SEE DWG. NO. 6
15' TEMPORARY
CONSTRUCTION AREA
TOP OF BANK
TEMPORARY WATER
CROSSING TO BE
REMOVED AFTER
CONSTRUCTION
130
'
100
'
CREEK TOE
WEST COLYELL CREEK
BUDDY E
LLIS RD.
P.O.T.
30°27'12.496" N
90°53'22.741" W
AREA SUMMARY
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-SP06.dwg
TOTAL PROJECT AREA = 88.1 ACRES
TOTAL WETLAND AREA = 11.4 ACRES
DREDGE = 17816 CU.YD.
FILL = 4305 CU. YD.
TOTAL NON-WETLAND AREA = 76.70 ACRES
DREDGE = 142750 CU. YD.
FILL = 34490 CU. YD.
TOTAL OTHER WATERS OF THE U.S. = 9.2 ACRES
DREDGE = 40066 CU. YD.
FILL = 9681 CU. YD.
SECTION 34
T-6-S,
R-3-E
SECTION 3, 10
T-7-S,
R-3-E
LEGEND
LIMITS OF CONSTRUCTION
OTHER WATERS OF THE U.S.
WETLANDS TO REMAIN
WETLANDS TO BE PERMANENTLY IMPACTED = 0.63 TOTAL ACRES OF PROJECT
0
300'
600'
WETLANDS TO BE TEMPORARILY IMPACTED = 0.6 TOTAL ACRES OF PROJECT
SCALE: 1" = 300'
CENTERLINE OF PROPOSED CREEK
PROPOSED SITE PLAN
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
7a
REV.
MAINTENANCE /
MAINTENANCE /
CONSTRUCTION AREA CONSTRUCTION AREA
TOP BANK VARIES (95'-140')
15'
15'
TO MATCH EXISTING GRADE
PROJ. WEST
COLYELL CREEK
ES
TO
2:
1
RI
VA
O.H.W.
S
RI
E
VA
1
2:
15'
TO
1.5'- 4'
1
3:
1
3:
NATURAL GROUND
NATURAL GROUND
O.L.W.
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-TS01.dwg
EXISTING GROUND
VARIES
(30'-40')
TYPICAL SECTION
N.T.S.
TYPICAL SECTION
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
8
REV.
MAINTENANCE /
MAINTENANCE /
CONSTRUCTION AREA CONSTRUCTION AREA
TOP BANK VARIES (95'-140')
15'
15'
TO MATCH EXISTING GRADE
EXISTING
WEST
COLYELL CREEK
PROJ. WEST
COLYELL CREEK
ES
TO
2:
1
RI
VA
O.H.W.
S
RI
E
VA
1
2:
15'
TO
1.5'- 4'
1
3:
1
3:
NATURAL GROUND
NATURAL GROUND
O.L.W.
EXISTING GROUND
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-TS02.dwg
NATIVE SOILS
VARIES
(30'-40')
TYPICAL SECTION
N.T.S.
TYPICAL SECTION
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
9
REV.
PIPE SIZE TO BE CONTRACTOR
DETERMINED, 18" MIN. REQ'D
3:1 / 2:1 SIDE SLOPES
CREEK TOP OF BANK
SELECT NATIVE FILL
EXISTING GROUND
3:1 / 2:1 SIDE SLOPES
TEMPORARY CONSTRUCTION
CROSSING, CONTRACTOR
MAY USE TIMBER MATS
CREEK BANK
R:\2011\11373 - Colyell Drainage Project\Enviornmental\Cad\11373C-TS03.dwg
CREEK BOTTOM
TYPICAL TEMPORARY CREEK CROSSING SECTION
N.T.S.
NOTE: PIPE AND ADDITIONAL FILL TO BE REMOVED
AFTER CONSTRUCTION OF CREEK IS COMPLETE
TYPICAL SECTION
DRAINAGE PROJECT
WEST COLYELL CREEK
LIVINGSTON PARISH
DRAWN BY: CHECKED BY: APPR. BY:
AER
JPO
KTB
DATE:
1/2017
DWG. No.
10
REV.