Proposed Upgrades to Pickwick Landing Dam at Tennessee River Mile 206.8, Hardin County, Tennessee (Pickwick Dam South Embankment Seismic Upgrade Project)
Public Notice No. 17-15
Nashville District
Application No. LRN-2017-00187
Please address all comments to: Nashville District Corps of Engineers,
Regulatory Branch, 3701 Bell Road,
Nashville, TN 37214 (Attn: Lisa R. Morris)
SUBJECT: Proposed Upgrades to Pickwick Landing Dam at Tennessee River Mile 206.8, Hardin County, Tennessee (Pickwick Dam South Embankment Seismic Upgrade Project)
TO ALL CONCERNED: The project described below has been submitted for a Department of the Army (DA) permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (CWA). Before a permit can be issued, certification must be provided by the Tennessee Department of Environment and Conservation (TDEC) Division of Water Resources pursuant to Section 401(1) (1) of the CWA, that applicable state water quality standards will not be violated by the work.
APPLICANT: Tennessee Valley Authority
Attn: John Kammeyer
1101 Market Street, LP, 5D
Chattanooga, TN 37402
LOCATION: Tennessee River Mile 206.6, Pickwick Lake, Hardin County, Tennessee. Lat: 35.063523, Lon: -88.246762.
DESCRIPTION: TVA is proposing upgrades to the south embankment of the Pickwick Landing Dam to improve performance of the dam during and following a large earthquake, should one occur. To buttress the structure:
Upstream side (Pickwick Lake Side) of the South Embankment: Riprap and crushed stone would be placed on the upstream side of the embankment. Approximately 439,150 cubic yards fill would be placed below the ordinary high water mark elevation of 414’, extend 568’ into the lake, and displace approximately 14.7 acres of open water reservoir. In order to prevent the new underwater fill from being a navigation hazard, a riprap berm would be constructed on top of the fill (to provide a physical and visual barrier for boaters. The navigation berm would have a top elevation 420’, which is approximately 6’ above the ordinary high water mark elevation of 414’.
Downstream side of the South Embankment: Structural fill material (sand, gravel, silt, and clay) would be placed into wetlands and stream channels on the downstream side (Kentucky Lake side) of the embankment. Wetlands 003 (1.3 acres) and 004 (0.8 acres) would be completely filled and Wetland 001would have a permanent loss of 0.1 acres and temporary impacts to 0.1 acres. W002 would have temporary impacts to 0.5 acres. Impacts at W001 are required in order to maintain a cleared 50’ right-of-way, along the toe of the constructed buttress, for vehicular access and long-term monitoring. Temporary impacts at W001 is from right-of-way clearing. In addition, the fill would require the encapsulation of approximately 656 linear feet of perennial stream channel and
loss of approximately 2.2 acres of wetlands, as shown in Table 1. Approximately 130 linear feet of Stream 7 and 526 linear feet of Stream 8 would be encapsulated. Each of these streams are man-made and are part of the toe drain system of the dam to carry seepage away from the toe.
TVA proposes to initiate construction in late 2017 and conclude in late 2021. TVA would continue normal operations of the Pickwick Dam during construction. General plans of the work are attached.
Table 1: Locations, Proposed Wetland and Stream Impacts, and Compensatory Mitigation
Location Information Mitigation Description
Feature Name
Total Existing Area
Permanent Loss
Temporary Impact
Credits
Mitigation Type
Wetland 001
2.7 ac.
0.1 ac.
0.1 ac.
0.2 (2:1)
TMF1
Wetland 002
8.1 ac.
-
0.5 ac.
-
Wetland 003
1.3 ac.
1.3 ac.
-
2.6 (2:1)
TMF
Wetland 004
0.8 ac.
0.8 ac
-
0.16 (2:1)
TMF
Total
2.2 ac.
4.4 advanced wetland mitigation credits
Stream 7
encapsulation
130 LF
-
130
TSMP2
Stream 8
encapsulation
526 LF
-
526
TSMP
Total
656 LF
656 stream ILF credits
Open Water
Pickwick Reservoir
14.7 ac.
-
N/A
Total Open Water Loss
14.7 ac.
1 Tennessee Mitigation Fund (Lower Tennessee River Service Area, - Beech River watershed, 06040001)
2 Tennessee Stream Mitigation Program (In-Lieu Fee, Lower Tennessee Service Area)
COMPENSATORY MITIGATION: According to the application, TVA has reserved and proposes to mitigate, in the Lower Tennessee service area, for permanent wetland and stream losses as follows:
Mitigation Bank Credit Purchase: Prior to initiating the authorized work in waters of the U.S., the permittee is proposing to purchase 4.4 mitigation bank credits from the Tennessee Mitigation Fund Mitigation Bank.
In-Lieu Fee Program (ILF) Credit Purchase: Prior to initiating the authorized work in waters of the U.S., the Permittee is proposing to purchase 656 stream ILF credits from the Tennessee Stream Mitigation Program ILF.
TVA does not propose compensatory mitigation for the loss of open water.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based on information submitted in the project application, the applicant has designed the project site to minimize impacts to waters of the U.S. by minimizing the amount of riprap and other filling activities to the amount necessary to stabilize the south embankment.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must
be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by Administrator Environmental Protection Agency under authority of Section 404(b)(1) of the CWA (40 CFR Part 230).
SOLICITATION OF COMMENTS: The U.S. Corps of Engineers (USACE) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, and general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are also used
to determine the need for a public hearing and determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to afinal decision concerning issuance or denial of the requested DA Permit.
USACE/TVA MEMORANDUM OF UNDERSTANDING (MOU) FOR TVA WORK: For activities of TVA for which a DA permit is requested or required, USACE’s and TVA’s Memorandum of Understanding designates TVA as the lead Federal Agency for the coordination and conduct of all environmental reviews required for compliance under the National Environmental Policy Act, including Section 7 of the Endangered Species Act (ESA) and Section 106 of the Historic Preservation Act.
ENDANGERED/THREATENED SPECIES: With respect to Section 7 of the ESA, TVA provided (with their application) their determinations and previous coordination with the U.S. Fish and Wildlife Service (USFWS) on the subject project. In a letter dated October 27, 2016, USFWS concurred with TVA’s findings and indicated TVA had fulfilled its obligations pursuant to Section 7 of the ESA.
HISTORIC AND CULTURAL RESOURCES: With respect to Section 106 of the Historic Preservation Act, TVA provided (with their application) their determinations and documentation of previous consultation with the Tennessee Historical Commission and other consulting parties on the subject project. By letter dated June 26, 2016, the Tennessee Historical Commission concurred with TVA’s determination that no historic properties eligible for listing in the National Register of Historic Places would be impacted.
OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals are required for the work including:
Water Quality Certification that applicable water quality standards are not violated by the process from TDEC pursuant to Section 401 (a)(1) of the CWA is required for the proposed project.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for hearings shall state, with particularity, the reasons for holding a hearing.
If you received this notice by mail and wish to view all of the attachments, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Lisa Morris, at 615-369- 7504, or email lisa.r.morris@usace.army.mil, and reference Public Notice 17-15.
COMMENT PERIOD: Written statements received in this office on or before July 21, 2017, will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Regulatory Branch, Attn: Lisa Morris, at the above address, telephone 615-369-7504.
/s/
Timothy Wilder
Chief, West Branch
Regulatory Division
Nashville District Corps of Engineers