You can copy from here when filling out the rest of the page.
The applicant proposes to retain impacts associated with the decommissioning in place and removal of a 6-inch-diameter pipeline.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to retain impacts associated with the decommissioning in place and removal of segments of a 6-inch-diameter pipeline. The entire length of the pipeline was flushed and capped. The segment of the pipeline located within the Aransas Fairway was then removed by pulling and jetting where necessary. The applicant proposes to leave the segments located on either side of the Aransas Fairway decommissioned in place at approximately 3 feet below the mudline.