In order to maintain deep water access to its commercial marine repair facility, Marine Hydraulics International proposes maintenance dredging to a depth of -38.14 feet at mean low water. The location of the existing berthing area is located in Norfolk, on the Elizabeth River, at approximate location latitude 36.8617 and longitude -76.3125. Approximately 85,000 cubic yards of material will be mechanically dredged, placed in scow barges, and transported to the Craney Island Dredged Material Management Area and deposited in the Rehandling Basin.

The District Commander has received a joint application for Federal and State permits as described below: APPLICANT Marine Hydraulics International, Inc. Attention: Mr. Louis Pfingst 543 Indian River Road Norfolk, Virginia 23523 WATERWAY AND LOCATION OF THE PROPOSED WORK: The project is located in the Elizabeth River, a tributary to Hampton Roads, at the Marine Hydraulics International (MHI) facility. The street address for MHI is 1215 Warrington Avenue, Norfolk, VA; the approximate location of the dredging is on each side of the pier at latitude 36.8617 and longitude -76.3125. PROPOSED WORK AND PURPOSE: In order to maintain deep water access to its commercial marine repair facility, the applicant proposes to maintenance dredge to a depth of -38.14 feet Mean Low Water approximately 15.6 acres of berthing area. All material is subaqueous and will be mechanically dredged, placed in scow barges, transported to the Craney Island Dredged Material Management Area (CIDMMA) and deposited in the Rehandling Basin. To restore the berths to the previously permitted depths, about 85,000 cubic yards of material will be dredged and deposited in the Rehandling Basin. The applicant has requested a new maintenance dredging volume of up to 85,000 cubic yards every 5 years to maintain the berths to the permitted depths. This is a maintenance dredging project and impacts will be minimized by only performing maintenance dredging as site conditions warrant and by limiting the dredging footprint and depths to previously permitted quantities. In addition to the required Department of the Army permit, the applicant must obtain a Virginia Water Protection Permit/401 certification from the Virginia Department of Environmental Quality assuring that applicable laws and regulations pertaining to water quality are not violated and a permit from the Norfolk Wetlands Board. Project drawings are attached. AUTHORITY: Permits are required pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia. FEDERAL EVALUATION OF APPLICATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. The decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments. All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing. The District Commander will then decide if a hearing should be held. Preliminary review indicates that: (l) no environmental impact statement will be required; (2) after conducting the NAO ESA Project Review Process, no listed/proposed/candidate species and/or designated/proposed critical habitat under the Endangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended) will be adversely affected. There may be an effect to listed/proposed/candidate species and/or designated/proposed critical habitat under the Endangered Species Act of 1973 and the Official Species List and Species Conclusion Table is attached for review and comment by Fish and Wildlife Service and the National Oceanic and Atmospheric Administration, Protected Resources Division; and (3) no known properties eligible for inclusion or included in the National Register of Historic Places are in or near the permit area, or would likely be affected by the proposal. Additional information might change any of these findings. For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Tidewater, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia Coastal Zone Management Program (VCP) and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). We have not received a certification from the applicant prior to publication of this public notice. It is the applicant’s responsibility to submit a consistency certification to the Office of Environmental Impact Review for concurrence or objection and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found here: http://www.deq.virginia.gov/Programs/EnvironmentalImpactReview/FederalConsistencyReviews.aspx#cert. For more information or to obtain a list of the enforceable policies of the VCP, contact the Department of Environmental Quality, Office of Environmental Impact Review at (804) 698-4330 or e-mail: bettina.sullivan@deq.virginia.gov or john.fisher@deq.virginia.gov. The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Elizabeth River contains Essential Fish Habitat (EFH) for several life stages of twelve species including windowpane flounder, bluefish, Atlantic butterfish, summer flounder, black sea bass, king mackerel, Spanish mackerel, cobia, red drum, dusky shark, sandbar shark, and Atlantic angel shark. The habitat which this project would affect consists of deep water subaqueous bottom which has been periodically maintenance dredged. The proposed project is described in Proposed Work and Purpose, above. The Essential Fish Habitat may be impacted by temporary increases in turbidity due to dredging and also by the removal of benthic species within the dredge footprint. The turbidity should gradually improve after each dredging event is completed, and the benthic community may become re-established several months after each dredge cycle. Our assessment of the project leads us to a preliminary determination that it will not have a substantial adverse effect on EFH and therefore expanded EFH consultation is not required. Our rationale for this preliminary determination is based on the expected short-term nature of the direct impacts caused by the proposed work and the absence of vegetated wetlands, submerged aquatic vegetation and anadromous fish spawning habitat. Based on comments from the National Marine Fisheries Service in response to this public notice, further EFH consultation may be necessary. COMMENT PERIOD: Comments on this project should be in writing and can be sent by either email to george.a.janek@usace.army.mil or by regular mail, addressed to the Norfolk District, Corps of Engineers (ATTN: CENAO-WR-R, George Janek), 803 Front Street, Norfolk, Virginia 23510-1011, and should be received by the close of business on August 7, 2017. PRIVACY & CONFIDENTIALITY: Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers. Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential. If you have any questions about this project or the permit process, contact George Janek at 757-201-7135.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas