PROPOSED FLOODGATE IN BAYOU PETITE CAILLOU IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 2503 Petroleum Drive, Suite 110, Houma, Louisiana 70363 LOCATION OF WORK: In Bayou Petit Caillou on the upstream side from the existing floodgate in Section 94, T19S-R18E, near Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attacheddrawings (Latitude 29.387417 N, Longitude -90.617414 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to construct and maintain a floodgate adjacent to an existing floodgate. The construction of the new floodgate will create a lock system to provide continuous access to marine vessels passing through the area when the downstream floodgate is closed. It will prevent the flooding of habitable regions in the upper Bayou Petite Caillou watershed due to seasonal tides from the Gulf of Mexico, rainfall or storm events, hurricanes or from incidental storm surges. The proposed project will involve the excavating approximately 24,200 cubic yards of material. A coffer dam will be placed around the sector gate located in the center of the channel. A temporary by-pass channel will be constructed in order to maintain the navigability of the channel while the floodgate is under construction. It is anticipated that the proposed action will impact approximately 0.63 acres of waterbottoms. It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable.

JOINT PUBLIC NOTICE 17 June 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1588 Project Manager Glenn E. Dobson Jr. glenn.e.dobson@usace.army.mil MVN-2017-00716-CC

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC # 170712-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. PROPOSED FLOODGATE IN BAYOU PETITE CAILLOU IN TERREBONNE PARISH NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 2503 Petroleum Drive, Suite 110, Houma, Louisiana 70363. LOCATION OF WORK: In Bayou Petit Caillou on the upstream side from the existing floodgate in Section 94, T19S-R18E, near Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.387417 N, Longitude -90.617414 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to construct and maintain a floodgate adjacent to an existing floodgate. The construction of the new floodgate will create a lock system to provide continuous access to marine vessels passing through the area when the downstream floodgate is closed. It will prevent the flooding of habitable regions in the upper Bayou Petite Caillou watershed due to seasonal tides from the Gulf of Mexico, rainfall or storm events, hurricanes or from incidental storm surges. The proposed project will involve the excavating approximately 24,200 cubic yards of material. A coffer dam will be placed around the sector gate located in the center of the channel. A temporary by-pass channel will be constructed in order to maintain the navigability of the channel while the floodgate is under construction. It is anticipated that the proposed action will impact approximately 0.63 acres of waterbottoms.

2 It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. The comment period for the Department of Army will close in 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

3 The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and the State Historic Preservation Officer. The New Orleans District has determined that the proposed project is located in waters known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that with the inclusion of the Standard Manatee Conditions for In-Water Activities, proposed work is not likely to adversely affect the West Indian Manatee. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0.63 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

4 The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosures

N

HOUMA

Project Location VICINITY MAP SCALE: N.T.S.

REVISIONS No.

Date

N

PRELIMINARY

HW Y5 6

PROJECT LOCATION

Description

PROJECT LOCATION

HW Y 56

DUSTIN M. MALBROUGH 36779

U.S. Department of Agriculture, Service Center Agencies 1999

Project number Date Designed by Drawn by Checked by Checked by

15,000'

0'

15,000'

30,000'

30,000'

Plot Date

39130-1032 MARCH 2017 LJD MAC, JJS MAC LJD April 18, 2017

REVISIONS No.

Description

Date

PRELIMINARY DUSTIN M. MALBROUGH 36779

Project number Date Designed by Drawn by Checked by Checked by Plot Date

39130-1032 MARCH 2017 LJD MAC, JJS MAC LJD April 18, 2017

PROPOSED LEVEE C

B

PROPOSED SECTOR GATE

REVISIONS

A No.

Description

Date

EXISTING SECTOR GATE

BAYOU PETIT CAILLOU

PROPOSED FENDER

PRELIMINARY PROPOSED LEVEE DUSTIN M. MALBROUGH 36779

BOUDREAUX CANAL ROAD

Project number Date Designed by Drawn by Checked by

PROPOSED SITE PLAN 50'

0'

50'

100'

Checked by

150'

Plot Date

39130-1032 MARCH 2017 LJD MAC, JJS MAC LJD April 18, 2017

EXCAVATION

BY-PASS CHANNEL

D

REVISIONS No.

Description

Date

EXISTING SECTOR GATE

BAYOU PETIT CAILLOU

PROPOSED COFFER DAM

PRELIMINARY

PROPOSED SECTOR GATE

DUSTIN M. MALBROUGH 36779

BOUDREAUX CANAL ROAD

PROPOSED SITE PLAN - TEMPORARY BYPASS 39130-1032

Project number

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

PROPOSED SITE PLAN W/ TEMPORARY BYPASS 50'

0'

50'

100'

150'

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

04

STAGING AREA BY-PASS CHANNEL

REVISIONS No.

Description

Date

EXISTING SECTOR GATE

EXCAVATION

BAYOU PETIT CAILLOU

PROPOSED COFFER DAM

PRELIMINARY DUSTIN M. MALBROUGH 36779

BOUDREAUX CANAL ROAD

PROPOSED SITE PLAN - STAGING AND DREDGING 39130-1032

Project number

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

50'

0'

50'

100'

MAC

Checked by

PROPOSED SITE PLAN W/ BYPASS

LJD

Checked by

150'

April 18, 2017

Plot Date

05

REVISIONS No.

Description

Date

PRELIMINARY DUSTIN M. MALBROUGH 36779

PROPOSED LOCK PLAN 39130-1032

Project number

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

PROPOSED LOCK PLAN

April 18, 2017

Plot Date

SCALE: 1/32" = 1'-0"

06

REVISIONS No.

Description

Date

PRELIMINARY DUSTIN M. MALBROUGH 36779

PROPOSED LOCK - TEMPORARY FENDERING SCALE: 1" = 60'-0"

PROPOSED LOCK TEMPORARY FENDERING 39130-1032

Project number

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

07

-15 10

-10

-5

0

5

10

15 10

REVISIONS No.

5

5

0

0

Description

Date

PRELIMINARY DUSTIN M. MALBROUGH 36779

-5

-5 -15

-10

-5

0

5

10

15

TYPICAL LEVEE SECTION

SECTIONS

VERTICAL SCALE 0'

5'

0'

5'

39130-1032

Project number

HORIZONTAL SCALE

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

08

WEST

-200 -180 -160 -140 -120 -100 20

EAST

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

200 20

15

15

10

10

5

5

0

0

-5

-5

REVISIONS No.

Description

Date

PRELIMINARY DUSTIN M. MALBROUGH 36779

-10

-15 -200 -180 -160 -140 -120 -100

-10

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

-15 200

SECTIONS A

EXISTING GROUND 39130-1032

Project number

VERTICAL SCALE

MARCH 2017

Date

5'

0'

5'

10'

15'

25'

0'

25'

50'

75'

HORIZONTAL SCALE

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

09

-200

-180

-160

-140

-120

-100

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

200

REVISIONS 20

15

15

10

10

5

5

0

0

-5

-5

-10

-10

-15

-15

No.

Description

Date

EAST

WEST

20

PRELIMINARY DUSTIN M. MALBROUGH 36779

-200

-180

-160

-140

-120

-100

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

200

PROPOSED LOCK

B

SECTIONS

VERTICAL SCALE 15'

0'

15'

30'

3'

30'

0'

30'

60'

90'

39130-1032

Project number

HORIZONTAL SCALE

MARCH 2017

Date

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

10

WEST

-200 -180 -160 -140 -120 -100 20

EAST

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

200 20 REVISIONS

15

15

10

10

5

5

0

0

No.

Description

Date

PRELIMINARY -5

-5

-10

-10

-15 -200 -180 -160 -140 -120 -100

-80

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

DUSTIN M. MALBROUGH 36779

-15 200 SECTIONS

C

EXISTING GROUND 39130-1032

Project number

VERTICAL SCALE

MARCH 2017

Date

5'

0'

5'

10'

15'

25'

0'

25'

50'

75'

HORIZONTAL SCALE

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

11

-40

-20

0

20

40

20

20

15

15

10

10

5

5

0

0

-5

-5

REVISIONS Description

Date

WEST

EAST

No.

PRELIMINARY DUSTIN M. MALBROUGH 36779

-10

-10

-15

-15 -40

-20

0

20

40 SECTIONS

D

TEMPORARY BYPASS CHANNEL 39130-1032

Project number

VERTICAL SCALE

MARCH 2017

Date

8'

0'

8'

16'

24'

20'

0'

20'

40'

60'

HORIZONTAL SCALE

LJD

Designed by

MAC, JJS

Drawn by

MAC

Checked by

LJD

Checked by

April 18, 2017

Plot Date

12

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas