You can copy from here when filling out the rest of the page.
APPLICANT: Missouri Department of Conservation
PROJECT LOCATION: The project is located in and adjacent to the Grand River at the Fountain Grove Conservation Area in Section 1, Township 56 north, Range 22 west, Livingston County, Missouri.
ACTIVITY: Fountain Grove Wetland Renovation Phase II – The Missouri Department of Conservation proposes to construct a new intake structure and pump station upstream of their existing pump station on the Grand River.
APPLICANT: Missouri Department of Conservation
PROJECT LOCATION: The project is located in and adjacent to the Grand River at the Fountain Grove Conservation Area in Section 1, Township 56 north, Range 22 west, Livingston County, Missouri.
ACTIVITY: Fountain Grove Wetland Renovation Phase II – The Missouri Department of Conservation proposes to construct a new intake structure and pump station upstream of their existing pump station on the Grand River
PUBLIC NOTICE
Permit No. NWK-2017-00627
Issue Date: July 18, 2017
Expiration Date: August 8, 2017
US Army Corps
of Engineers
Kansas City District
21-Day Notice
______________________________________________________________________________
This public notice is issued jointly with the Missouri Department of Natural Resources, Water
Pollution Control Program. The Department of Natural Resources will use the comments to this
notice in deciding whether to grant Section 401 water quality certification. Commenters are
requested to furnish a copy of their comments to the Missouri Department of Natural Resources,
P.O. Box 176, Jefferson City, Missouri 65102.
APPLICANT: Missouri Department of Conservation
2901 West Truman Blvd.
Jefferson City, Missouri 65102
PROJECT LOCATION (As shown on the attached drawings): The project is located in and
adjacent to the Grand River at the Fountain Grove Conservation Area in Section 1, Township 56
north, Range 22 west, Livingston County, Missouri.
USGS Quad: MO Fountain Grove
[Latitude: N 39.691787 / Longitude: W -93.323926]
AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344).
ACTIVITY (As shown on the attached drawings): PROPOSED: Fountain Grove Wetland
Renovation Phase II The Missouri Department of Conservation (MDC) proposes to construct
a new intake structure and pump station upstream of their existing pump station on the Grand
River. The new pump station and associated components described below are the final steps
of renovation of the Fountain Grove Conservation Area, which are being completed under the
Golden Anniversary Wetland Initiative. The described work will facilitate transport of water
from the river to managed wetland habitats and replace outdated infrastructure at the
conservation area. The major components of the project are: 1) construct a pump station with
three electric variable speed drive motors on the river bank 800 feet upstream from the existing
pump station; 2) install a 48 inch gravity-flow intake pipe from the new pump to the river;
3) place sheet piling with riprap slope along the bank for stabilization at the intake location;
4) construct a maintenance road, pad and drain at the intake for maintenance purposes;
5) construct a rock let-down structure to stabilize the eroding bankline; 6) install an outlet pipe
and construct two new levees leading to the new pump station, with the removal of the levee
leading to the existing pump station; and 7) install a 48 inch drain and discharge apron to allow
interior water outflow after flood events.
Approximately 674 cubic yards of excavation, 7,171 cubic yards of soil, 1,042 cubic yards of
gravel, 103 cubic yards of concrete, and 1,353 cubic yards of shot rock will be discharged
riverward of the ordinary high water mark (Corps of Engineers' designated jurisdiction limits in
waters of the U.S.) to install all riverward features of this project (i.e. rock let-down structure,
maintenance road and culvert, intake structure, sheet piling, wetland drain and discharge apron).
The following table shows all of the proposed project impacts both riverward and landward of
the ordinary high water mark.
The project purpose beyond infrastructure upgrades, is to install an electric pump and intake at a
new location where the river thalweg has migrated over time (thalweg defined as the lowest
points along the length of the riverbed). In addition, replacing the existing diesel pump with a
variable speed electric pump will allow for better management of wetlands on the refuge and
consideration of ecological flow of the Grand River.
WETLANDS/AQUATIC HABITAT IMPACTS:
APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND
COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC
RESOURCES: Relocating the intake structure upstream on the Grand River will reduce or
possibly eliminate the required maintenance excavation at the existing intake. Sheet piling and
riprap at the new pump site will stabilize the eroding riverbank and stabilize the path of the river
current. The variable speed pump will allow altering the amount of water that will be received
from the river based on its ecological flow regime. MDC proposes to compensate for wetland
impacts through permittee-responsible mitigation efforts on state owned property. Efforts to
compensate for wetland impacts will include removing an existing levee and restoring wetlands
within its footprint. In addition, a creative borrow area will be established within a potential
farmed wetland to enhance the site by ending man-induced impacts and providing greater
hydrologic connection to the Grand River.
ADDITIONAL INFORMATION: Additional information about this application may be
obtained by contacting Mr. James Ptacek, Missouri State Regulatory Office, 515 East High
Street, Suite 202, Jefferson City, Missouri 65102. Mr. Ptacek may also be reached by telephone
at 816-389-3834 or email to james.a.ptacek@usace.army.mil. All comments to this public notice
should be directed to the above address.
CULTURAL RESOURCES: Kansas City District will comply with the National Historic
Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic
Places and the Federal Register and no property listed in the Register is located in the permit
area. However, the State Historic Preservation Officer (SHPO) has determined that the Fountain
Grove Conservation Area original boundary, is eligible for inclusion in the National Register of
Historic Places. The SHPO reviewed the project in 2008 and determined that the proposed
renovation will have no adverse effect on the historic fabric of Fountain Grove, provided that
photographs be taken of the boundary structures and a narrative history of Fountain Grove be
developed. MDC has complied with the SHPO's request for those documentations. We will
evaluate additional input by the SHPO, Tribal Historic Preservation Officers (or Tribe designated
representative) and the public in response to this public notice, and we may conduct or require a
reconnaissance survey of the permit area to check for unknown historic properties, if warranted.
ENDANGERED SPECIES: We have obtained a species list from the U.S. Fish & Wildlife
Service's IPaC website of known federally threatened or endangered species that may occur
within the project area. In compliance with the Endangered Species Act, a preliminary
determination has been made that the described work may affect, but is not likely to adversely
affect the following designated species: the Gray Bat (Myotis grisescens), the Indiana Bat
(Myotis sodalis), and the Pallid Sturgeon (Scaphirhynchus albus), or adversely affect critical
habitat. We have also made a preliminary determination that the described work may affect, but
will not cause prohibited take on the Northern long-eared bat (Myotis septentrionalis), per the
4(d) rule. This determination is based on the scope of work occurring within the action area. The
U.S. Fish and Wildlife Service has concurred with our preliminary determinations. In order to
complete our evaluation of this activity, additional comments are solicited from the U.S. Fish
and Wildlife Service and other interested agencies and individuals.
FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this public notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of dredged or fill material must be certified by the appropriate state
agency as complying with applicable effluent limitations and water quality standards. This
public notice serves as an application to the state in which the discharge site is located for
certification of the discharge. The discharge must be certified before a Department of the Army
permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will
not violate applicable water quality standards.
PUBLIC INTEREST REVIEW: The decision to issue a permit will be based on an evaluation
of the probable impact including the cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefits which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors which may
be relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural
values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs and, in general, the needs and welfare of the
people. The evaluation of the impact of the activity on the public interest will include
application of the guidelines promulgated by the Administrator, Environmental Protection
Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of
Engineers is soliciting comments from the public; Federal, state, and local agencies and officials;
Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are used in preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used
to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
COMMENTS: This notice is provided to outline details of the above-described activity so this
District may consider all pertinent comments prior to determining if issuance of a permit would
be in the public interest. Any interested party is invited to submit to this office written facts or
objections relative to the activity on or before the public notice expiration date. Comments both
favorable and unfavorable will be accepted and made a part of the record and will receive full
consideration in determining whether it would be in the public interest to issue the Department of
the Army permit. Copies of all comments, including names and addresses of commenters, may
be provided to the applicant. Comments should be mailed to the address shown on page 3 of this
public notice.
PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this
public notice, that a public hearing be held to consider this application. Such requests shall state,
with particularity, the reasons for holding a public hearing.
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 1 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 2 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 3 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 4 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 5 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 6 OF 7
18 JULY 2017
PERMIT NO. NWK-2017-627
MISSOURI DEPARTMENT OF CONSERVATION
INTAKE STRUCTURE AND PUMP STATION
GRAND RIVER
LIVINGSTON COUNTY, MISSOURI
SHEET 7 OF 7
18 JULY 2017