Home

New Orleans District

Run scraper

Terrebonne Parish Consolidated Government HANSON CANAL NEAR BAYOU BLACK pump

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED PUMPING STATION, ACCESS ROAD, AND TIE-IN LEVEES ALONG HANSON CANAL NEAR BAYOU BLACK IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 2503 Petroleum Drive, Suite 110, Houma, Louisiana 70363 LOCATION OF WORK: Hanson Canal, near Bayou Black in Section 34, T17S-R16E, near Houma, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.602094 N, Longitude -90.860436 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to construct and maintain a pumping station, a swing gate and tie-in levees in and adjacent to the Hanson Canal to pump the water from Bayou Black which is one of the drainage channels for Chacahoula-Gibson watershed area. The project also includes the removal of an old tainter gate along with dredging of the existing drainage canal. An access road from the east side of the pump station is also proposed in the project. Approximately 24,000 cubic yards of material will be excavated and used on site as fill. Additionally, 1,180 cubic yards of concrete, crushed stone and rock will be hauled in for the construction of the access roads and tie-in levees. It is anticipated that the proposed action will impact approximately 5.8 acres of wetlands due to the construction of the access roads and tie-in levees. It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The alternative of selecting of Hanson Canal for the construction of a pump station is the most feasible as it is the only canal that can connect the water flowing into Bayou Black to Intracoastal Waterway which flows into the Gulf of Mexico. Also, the area between Bayou Black and Intracoastal Waterway are freshwater marshlands. Construction of a canal would lead to additional wetland impacts over a large area which would not be economically feasible. The applicant will compensate for unavoidable wetland impacts by purchasing credits from an approved mitigation bank.

JOINT PUBLIC NOTICE 24 July 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1588 Project Manager Glenn E. Dobson Jr. glenn.e.dobson@usace.army.mil MVN-2017-00843-CC

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC # 170713-03

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. PROPOSED PUMPING STATION, ACCESS ROAD, AND TIE-IN LEVEES ALONG HANSON CANAL NEAR BAYOU BLACK IN TERREBONNE PARISH NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 2503 Petroleum Drive, Suite 110, Houma, Louisiana 70363. LOCATION OF WORK: Hanson Canal, near Bayou Black in Section 34, T17S-R16E, near Houma, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.602094 N, Longitude -90.860436 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to construct and maintain a pumping station, a swing gate and tie-in levees in and adjacent to the Hanson Canal to pump the water from Bayou Black which is one of the drainage channels for Chacahoula-Gibson watershed area. The project also includes the removal of an old tainter gate along with dredging of the existing drainage canal. An access road from the east side of the pump station is also proposed in the project. Approximately 24,000 cubic yards of material will be excavated and used on site as fill. Additionally, 1,180 cubic yards of concrete, crushed stone and rock will be hauled in for the construction of the access roads and tie-in levees. It is anticipated that the proposed action will impact approximately 5.8 acres of wetlands due to the construction of the access roads and tie-in levees.

2 It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. The alternative of selecting of Hanson Canal for the construction of a pump station is the most feasible as it is the only canal that can connect the water flowing into Bayou Black to Intracoastal Waterway which flows into the Gulf of Mexico. Also, the area between Bayou Black and Intracoastal Waterway are freshwater marshlands. Construction of a canal would lead to additional wetland impacts over a large area which would not be economically feasible. The applicant will compensate for unavoidable wetland impacts by purchasing credits from an approved mitigation bank. The comment period for the Department of Army will close in 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

3 The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and the State Historic Preservation Officer. The New Orleans District has determined that the proposed project is located in waters known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that with the inclusion of the Standard Manatee Conditions for In-Water Activities, proposed work is not likely to adversely affect the West Indian Manatee. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0 acres of EFH. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

4 The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosures

1

Project Location VICINITY MAP SCALE: N.T.S.

REVISIONS No.

Description

Date

PROJECT LOCATION

APPROX. 12

MILES

HOUMA

1

500'

0'

500'

1000'

1500'

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by Checked by Checked by

VICINITY MAP 6000'

0'

6000'

12000'

Plot Date

18000'

DMM MAC,JJS DMM MAC June 23, 2017

EXISTING LEVEE

PROPOSED ACCESS ROAD (15' WIDE) REVISIONS No.

BLAKEMAN CT.

182 HWY

CK U BLA BAYO

EXISTING TAINTER GATE STRUCTURE TO BE REMOVED

PROPOSED TOP BANK OF CHANNEL

Description

Date

PROPOSED DRAINAGE CANAL

PROPOSED STAGING AREA ACCESS ROAD

PROPOSED 350'x100' STAGING AREA

PROPOSED PUMP STATION

EXISTING LEVEE

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

OVERALL SITE PLAN

PROPOSED ACCESS ROAD (1,023') DREDGING AND GRADING ( 4.8 ACRES) LEVEE AND ACCESS ROAD EMBANKMENT (1.9 ACRES) STAGING AREA

150'

0'

150'

300'

Checked by

450'

Plot Date

DMM MAC,JJS DMM MAC June 23, 2017

SHEET 2 SHEET 3 PROPOSED ACCESS ROAD (15' WIDE)

REVISIONS

BLAKEMAN CT.

No.

Description

Date

182 HWY

CK U BLA BAYO

EXISTING TAINTER GATE STRUCTURE TO BE REMOVED

PROPOSED DRAINAGE CANAL PROPOSED STAGING AREA ACCESS ROAD

PROPOSED TOP BANK OF CHANNEL

ENLARGED SITE PLAN Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

LEGEND

DMM

Checked by

PROPOSED SITE PLAN

PROPOSED ACCESS ROAD 100'

0'

100'

200'

MAC

Checked by

300'

June 23, 2017

Plot Date

DREDGING AND GRADING LEVEE AND ACCESS ROAD EMBANKMENT STAGING AREA

03

SHEET 2 SHEET 3

PROPOSED ACCESS ROAD (15' WIDE)

PROPOSED PUMP STATION 5 - 60" PUMPS

REVISIONS No.

Description

Date

PROPOSED LEVEE TIE-IN

PROPOSED LEVEE TIE-IN

PROPOSED STAGING AREA ACCESS ROAD

PROPOSED DRAINAGE CANAL

PROPOSED 350'x100' STAGING AREA

ENLARGED SITE PLAN Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

LEGEND

DMM

Checked by

PROPOSED SITE PLAN

PROPOSED ACCESS ROAD 100'

0'

100'

200'

MAC

Checked by

300'

June 23, 2017

Plot Date

DREDGING AND GRADING LEVEE STAGING AREA

04

PROPOSED ACCESS ROAD (15' WIDE)

PROPOSED LEVEE TIE-IN PROPOSED PUMP STATION 5 - 60" PUMPS

REVISIONS No.

Description

Date

20.00

PROPOSED ALIGNMENT

PRELIMINARY PROPOSED LEVEE TIE-IN DUSTIN M. MALBROUGH 36779

PROPOSED DRAINAGE CANAL PROPOSED DRAINAGE CANAL TOP OF BANK

PUMP STATION SITE PLAN Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

LEGEND

DMM

Checked by

MAC

Checked by

PROPOSED ACCESS ROAD

ENLARGED SITE PLAN

June 23, 2017

Plot Date

DREDGING AND GRADING 25' LEVEE

0'

25'

50'

75'

05

SHEET 5 SHEET 6

11+00

10+00

9+00

7+00

8+00

EXISTING DRAINAGE CANAL (TO BE DREDGED)

6+00

5+00

4+00

3+00

2+00

1+00

0+00

EXISTING TAINTER GATE STRUCTURE TO BE REMOVED

CK U BLA BAYO

REVISIONS No.

Description

Date

PROPOSED TOP BANK OF DRAINAGE CANAL PROPOSED DRAINAGE CANAL

LEGEND

PROPOSED STAGING AREA ACCESS ROAD AREA DREDGED / GRADED 75'

STAGING AREA

0'

75'

150'

225'

9+83

9+00

8+00

7+00

6+00

5+00

4+00

3+00

2+00

1+00

0+00

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

30

30

25

25 EXISTING TAINTER GATE STRUCTURE TO BE REMOVED

20 15

20 15

BAYOU BLACK DRIVE

10

10

BAYOU BLACK

5

EXISTING CHANNEL BOTTOM MHW +2.3'

-5

5

MLW +0.5'

0

0 -5

EL. -7.0'

-10

-10 PROPOSED CHANNEL BOTTOM

-15

-15

9+83

9+00

8+00

7+00

6+00

5+00

4+00

3+00

2+00

-25 1+00

-20

-25 0+00

-20

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

VERTICAL SCALE MATERIAL DREDGED

15'

0'

75'

0'

Checked by

15'

30'

45'

75'

150'

225'

HORIZONTAL SCALE

Plot Date

DMM MAC,JJS DMM MAC June 23, 2017

SHEET 6 SHEET 7

PROPOSED RIP RAP PROPOSED PUMP STATION 5-60" PUMPS

PROPOSED DRAINAGE CANAL

LEGEND

PROPOSED TOP BANK OF DRAINAGE CANAL AREA DREDGED / GRADED PROPOSED STAGING AREA ACCESS ROAD

STAGING AREA

22+00

20+00

19+00

18+00

17+00

16+00

15+00

14+00

13+00

12+00

11+00

PROPOSED LEVEE TIE-IN

21+00

SHEET 5 SHEET 6

9+00

10+00

PROPOSED ACCESS ROAD (15' WIDE)

REVISIONS No.

Description

Date

PROPOSED LEVEE TIE-IN

PROPOSED 350'x100' STAGING AREA 75'

0'

75'

150'

225'

20+66

20+00

19+00

18+00

17+00

16+00

15+00

14+00

13+00

12+00

11+00

9+83

10+00

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

30

30 PROPOSED PUMP STATION

25

25

20

20

15

15

10

10 EXISTING CHANNEL BOTTOM

5

5

MHW +2.3'

MLW +0.5'

0

0

-5

-5 EL. -9.0'

-10

-10 EL. -13.5'

-15

-15 PROPOSED CHANNEL BOTTOM

20+66

20+00

19+00

18+00

17+00

16+00

15+00

14+00

13+00

12+00

11+00

-25 9+83

-20

-25 10+00

-20

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by Checked by

VERTICAL SCALE LEGEND MATERIAL DREDGED

15'

0'

75'

0'

Checked by

15'

30'

45'

75'

150'

225'

HORIZONTAL SCALE

Plot Date

DMM MAC,JJS DMM MAC June 23, 2017

23+89

23+00

22+00

21+00

SHEET 6 SHEET 7

PROPOSED LEVEE TIE-IN

REVISIONS No.

75'

0'

75'

150'

Description

Date

225'

23+89

23+00

22+00

21+00

20+66

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

30

30

25

25

20

20

15

15

10

10

EXISTING CHANNEL BOTTOM

5

5

MHW +2.3'

MLW +0.5'

0

0

-25 23+89

-20

-25 23+00

-15

-20

22+00

-10

-15

21+00

-5

-10

20+66

-5

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by Checked by

VERTICAL SCALE 15'

0'

15'

30'

45'

Checked by Plot Date

75'

0'

75'

150'

HORIZONTAL SCALE

225'

DMM MAC,JJS DMM MAC June 23, 2017

1+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

WEST

0+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

3+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

WEST

2+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

5+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

WEST

4+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

7+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

WEST

6+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

9+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

WEST

8+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

11+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

10+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

13+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

12+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

15+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

14+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

17+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

16+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

19+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

18+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

21+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

20+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

23+00.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

REVISIONS No.

Description

Date

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

20

30

40

50

60

70

80

90

100

110

120

130

140

150

EAST

-150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

20

10

10

0

0

WEST

22+00.00

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

REVISIONS No.

Description

Date

23+25.00

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150 20

10

10

0

0

WEST

EAST

-150 -140 -130 -120 -110 -100 20

-10

-10

-20

-20 -150 -140 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by

LEGEND

Checked by

- EXISTING GROUND

Checked by

VERTICAL SCALE

Plot Date

- WATER

10'

0'

10'

20'

30'

- AREA DREDGED

20'

0'

20'

40'

60'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

REVISIONS No.

Description

Date

PUMP STATION PLAN AND ELEVATION PUMP STATION PLAN SCALE: 1/32" = 1'-0"

Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

DMM

Checked by

MAC

Checked by

June 23, 2017

Plot Date

22

REVISIONS No.

Description

Date

MHW +2.3' MLW +0.5'

PUMP STATION PLAN AND ELEVATION Project number

39130-1020

Date

MAY 2017 DMM

Designed by

PUMP STATION ELEV.

Drawn by

SCALE: 1/16" = 1'-0"

Checked by

MAC,JJS DMM MAC

Checked by

June 23, 2017

Plot Date

23

A PROPOSED ACCESS ROAD (15' WIDE)

REVISIONS No.

LEGEND

Description

Date

PROPOSED STAGING AREA ACCESS ROAD PROPOSED ACCESS ROAD (1,346') DREDGING AND GRADING

PROPOSED 350'x100' STAGING AREA

LEVEE STAGING AREA

LEVEE ACCESS ROAD PLAN 75'

0'

75'

150'

225'

ACCESS ROAD PLAN AND SECTION

A

Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

DMM

Checked by

MAC

Checked by

June 23, 2017

Plot Date

24

30

60

50

40

30

20

10

0

-10

-20

-30

-40

-50

-60 30

20

10

10

0

0

-10

-10

SOUTH

NORTH

20

REVISIONS No.

-20 60

50

40

30

20

10

0

-10

-20

-30

-40

-50

-20 -60

-30

-40

-50

-60 30

Description

Date

LEVEE TIE-IN TYPICAL SECTION - WEST VERTICAL SCALE 1'

0'

1'

2'

3'

1'

0'

1'

2'

3'

-10

-20

HORIZONTAL SCALE

30

60

50

40

30

20

10

0

20

10

10

0

0

-10

-10

EAST

WEST

20

-20 60

50

40

30

20

10

0

-10

-20

-30

-40

-50

-20 -60

Project number

39130-1020

Date

MAY 2017

Designed by Drawn by Checked by

LEGEND

LEVEE TIE-IN TYPICAL SECTION - EAST

Plot Date

- EXISTING GROUND - EARTHEN FILL

Checked by

VERTICAL SCALE 1'

0'

1'

2'

3'

1'

0'

1'

2'

3'

HORIZONTAL SCALE

DMM MAC,JJS DMM MAC June 23, 2017

-40

-30

-20

-10

10

0

20

30

40

20

20

REVISIONS No.

10

10

0

0

-10

Description

Date

-10 -40

-30

-20

0

-10

10

20

30

40

EXISTING LEVEE TYPICAL SECTION 5'

0'

5'

10'

15'

EXISTING LEVEE TYPICAL SECTION Project number

39130-1020

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

DMM

Checked by

MAC

Checked by

June 23, 2017

Plot Date

26

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas