Transcontinental Gas Pipeline Company abandon 4613

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to decommission-in-place an existing pipeline segment number 4613.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to decommission-in-place an existing pipeline segment number 4613. The applicant states that due to the depth of the pipeline below the seafloor, removal would cause significant disturbance and ecological damage to the sea bottom and removal of the line introduces unnecessary safety risks to the dive and removal crew. In accordance with the Bureau of Safety and Environmental Enforcement 30 CFR 250.1750 pipeline decommissioning requirements, the applicant proposes to: 1. Disconnect from previously serviced platform and subsea tie-in connection; 2. Flush by pigging, and filling with seawater to equalize the line pressure; 3. Plug each end of the pipeline; and 4. Confirm depth of cover at the pipeline ends, and cover endpoints with protective concrete mats.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas