INSTALLATION OF TWO 12-INCH PIPELINES AND THREE WELLS FOR TRANSPORT AND STORAGE OF NATURAL GAS IN ASCENSION AND ST. JAMES PARISHES

NAME OF APPLICANT: Bridgeline Holdings, L.P., c/o SWCA Environmental Consultants, Attn: Jason Byrd, 5745 Essen Lane, Suite 105, Baton Rouge, Louisiana 70810 LOCATION OF WORK: Near the intersection of Hwy 61 and Interstate-10, approximately 4 miles south of Sorrento, Louisiana, in Ascension and St. James Parishes, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070204), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, excavate, deposit fill, and horizontally directional drill (HDD) for the installation and maintenance of a right of way and two (2) 12-inch natural gas pipelines 4.2 miles in length. The applicant also plans to drill three (3) wells to move brine and use space for temporary storage of natural gasoline and butane for the Marathon Facility in Garyville, Louisiana. Approximately 67,310 cubic yards of native earthen fill material will be excavated and redistributed on site and approximately 52,921 cubic yards of hauled in gravel and sand will be placed to complete the project. Approximately 8.5 acres of forested and herbaceous wetlands will be permanently impacted, approximately 10.2 acres of forested wetlands will be permanently converted to herbaceous wetlands, and approximately 8.2 acres of herbaceous wetlands and “other waters of the U.S.” will be temporarily impacted. The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the basin of impact.

JOINT PUBLIC NOTICE August 7, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 701118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1301 Project Manager Neil T. Gauthier Neil.T.Gauthier@usace.army.mil MVN 2015-02562-CM

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC 170801-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. INSTALLATION OF TWO 12-INCH PIPELINES AND THREE WELLS FOR TRANSPORT AND STORAGE OF NATURAL GAS IN ASCENSION AND ST. JAMES PARISHES NAME OF APPLICANT: Bridgeline Holdings, L.P., c/o SWCA Environmental Consultants, Attn: Jason Byrd, 5745 Essen Lane, Suite 105, Baton Rouge, Louisiana 70810. LOCATION OF WORK: Near the intersection of Hwy 61 and Interstate-10, approximately 4 miles south of Sorrento, Louisiana, in Ascension and St. James Parishes, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070204), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, excavate, deposit fill, and horizontally directional drill (HDD) for the installation and maintenance of a right of way and two (2) 12-inch natural gas pipelines 4.2 miles in length. The applicant also plans to drill three (3) wells to move brine and use space for temporary storage of natural gasoline and butane for the Marathon Facility in Garyville, Louisiana. Approximately 67,310 cubic yards of native earthen fill material will be excavated and redistributed on site and approximately 52,921 cubic yards of hauled in gravel and sand will be placed to complete the project. Approximately 8.5 acres of forested and herbaceous wetlands will be permanently impacted, approximately 10.2 acres of forested wetlands will be permanently converted to herbaceous wetlands, and approximately 8.2 acres of herbaceous wetlands and "other waters of the U.S." will be

2 temporarily impacted. The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the basin of impact. The comment period for the Department of Army will close in 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will

3 be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and State Historic Preservation Officer. Our initial finding is that the proposed work would not affect any species, nor affect any habitat designated as critical to the survival and recovery of such species, listed as endangered by the U.S. Department of Commerce. Our initial finding is that the proposed work would not affect any species, nor affect any habitat designated as critical to the survival and recovery of such species, listed as endangered by the U.S. Department of Interior. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity would have no effect on any listed species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of up to 0 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

4 The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch

Project Location

_ ^

PROJECT BEGIN LAT: 30° 9' 53.136" N LONG: 90° 47' 49.89" W

Ascension Parish

WITHIN COASTAL BOUNDARY ZONE

PROPOSED PIPELINE

PROJECT END LAT: 30° 8' 5.500" N LONG: 90° 47' 0.110" W

Saint James Parish

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

Proposed Pipeline Coastal Zone Boundary

VICINITY MAP ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Parish Boundary

¨

JDB MS

Drawn By: Approved By: Submittal Date: Revision # - Date: SWCA Project No: Page:

6/8/2015 11/3/2016 34907 1 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

0

1,250

2,500

5,000 Feet

File Path: S:\Projects\34907 - Sorrento Lateral\MAPS\NR\MXD\Sorrento Lateral LDNR Plan Vicinity.mxd

3

4

5

7

6

8

10

9

11

12 15 13 16 14

17 18 19 20

21 22 23

24

25 26 27 28

29

30 31 32 33 34 35

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

SHEET INDEX ASCENSION PARISH AND ST. JAMES PARISH, LOUISIANA

Proposed Pipeline INDEX Map Sheet Coastal Zone Boundary Maurepas WMA

0

¨

0.125 0.25

Drawn By: Approved By:

JDB MS

Submittal Date: Revision # - Date:

6/8/2015 11/3/2016

SWCA Project No: Page:

34907 2 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

0.5

0.75

1

Miles

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\NR\MXD\Sorrento Lateral LDNR Plan Vicinity Index.mxd

A

WET01_Open Water Proposed Crossing

ty

H/L 626

WET01_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.000 ac. TEMP Impacts: 1.932 ac.

Ch ev

ron

BEGIN PROJECT Lat: 30° 9' 53.136" N Long: 90° 47' 49.896" W X: 3,450,257.80 feet Y: 605,806.46 feet

op er

Tie-in Point to Existing Motiva Brine

WET01_PFO Forested Wetland Proposed Impact PERM Impacts: 0.474 ac. TEMP Impacts: 0.568 ac.

PUSH/LAY 1626'

!

MATCHLINE A1

oa d

Pr

Te xa co R

A'

O L D

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Prop. Timber Mats

Emergent Wetland Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

R I V E R

Drawn By: Approved By:

¨

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

N E W

25

50

6/28/2016 11/4/2016 3

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MAT CHL I NE

WET01_PFO Forested Wetland Proposed Impact PERM Impacts: 0.474 ac. TEMP Impacts: 0.568 ac.

Propose d 12" M

otiva Bri ne

Connec

ev Ch

tion

n ro

o Pr

MATCHLINE B1

A1

A

ty

r pe

240'

=

Fresh Water Well #1

A'

PUSH/LAY 1626' WET01_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.000 ac. TEMP Impacts: 1.932 ac.

O L D N E R I V E W R

O

SORRENTO LATERAL PIPELINE PROJECT PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

R

I V

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

N

E

E

W

R

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Scrub-Shrub Wetland Pond

Stream

Facilities

JDB MS/JP

Submittal Date: Revision # - Date:

Forested Wetland

¨

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

Legend

L

D

1 inch = 100 feet 0

25

50

SWCA Project No: Sheet:

6/28/2016 11/4/2016 4

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

Chevro n Prop erty

Proposed Temporary Timber matting WET01_PFO Forested Wetland Proposed Impact PERM Impacts: 0.474 ac. TEMP Impacts: 0.568 ac.

50'

Proposed 12" Brine from B-2 & K-4 to Pump Suction 240'

E IN L H

B1

Fresh Water Well #1

Enlink B-2

!

=

C AT M

MATCHLINE C1

PIPE RACK 4389'

Exis ting

Acc

ess R

oad

O

WET01_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.000 ac. TEMP Impacts: 1.932 ac.

L

R

I V

D N

E

E

R

W

Proposed 12" nC4 Pumps Chevron K-6

!

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

JDB MS/JP

25

50

6/28/2016 11/4/2016 5

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

I NE C CHL MAT

1

Proposed 12" nC4 to K-4 Cavern (HP)

Brine Water to B-2 Cavern for Saturation Proposed 12" Brine from K-4 Cavern to Pump Suction Proposed 12" nC4 Line in from Pipeline

Existing Acce

ss Road

MATCHLINE D1

PIPE RACK 4389'

Chevron K-4

!

WET01_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.000 ac. TEMP Impacts: 1.932 ac.

ps Pum n C4 " 2 1 osed Prop Chevron K-6 !

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 6

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

p Su

WET02_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.456 ac. TEMP Impacts: 0.993 ac.

Proposed 12" nC4 Line out to Pipeline 200' 45'

70'

MATCHLINE G1

Option with B-1 in Gas Service/Product

Proposed Temporary Timber Matting

69' 66'

51'

PIPE RACK 4389'

MATCHLINE E1

Chevron K-4

!

MATCHLINE D1

WET01_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.000 ac. TEMP Impacts: 1.932 ac.

Existing Access Road

! !A A

Existing Railroad Existing Road

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEMP Impacts: 1.194 ac.

ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

! A

OPEN CUT 174' 2 Pipes Co-located

PLAN VIEW

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway

ARCHAELOGICAL SIT 836'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

Proposed Temporary Timber Matting

0' 0.492" N 47' 15.908" W

SORRENTO LATERAL PIPELINE PROJECT

Legend

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 7

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

PIPE RACK 4389'

ed T er M

MATCHLINE F1

as S

Impa

MATCHLINE E1

Prop 56 a 93 a

g 12

WET02_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.456 ac. TEMP Impacts: 0.993 ac.

Chevron S-4 !

Existing Access Road

200'

Proposed 12" Fresh Water Feed to Pumps (Line #3)

Proposed Brine Line Option #1 (Line #2)

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 8

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

Option with B-1 in Gas Service/ Fresh Water Feed to B-2

Proposed 12" Fresh Water Connecting Line at B-1 Existing 12" Natural Gas Line WET02_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.456 ac. TEMP Impacts: 0.993 ac. MATCHLINE F1

WB03_Open Water Proposed Crossing

g stin Exi

PIPE RACK 4389'

Fresh Water Well #2

=

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEMP Impacts: 1.194 ac.

Access Road

Enlink B-1

WET02_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.456 ac. TEMP Impacts: 0.993 ac. 200'

!

Proposed Temporary Timber Matting

100'

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 9

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

Proposed Tem porary Tim ber M atting

t

OPEN CUT 174' 2 Pipes Co-located

Proposed Tem porary Tim ber M atting

ARCHAELOGICAL SITE HDD 836' 2 Pipes Co-located

Proposed 12" nC4 Line in from Pipeline

! !A A

200'

51'

Proposed 12" Brine Disposal & Brine Customers

70'

MATCHLINE G1

Proposed 12" nC4 Line out to Pipeline

66'

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEM P Im pacts: 1.194 ac.

MATCHLINE H1

Existing Access Road

69'

Drill Entry Lat: 30° 10 ' 0.492" N Long: 90° 47 ' 15.908" W Drill Entry Lat: 30° 10' 0.506" N Long: 90° 47' 15.556" W

MATCHLINE D1

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOU ISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placem ent Prop. Right of W ay Prop. Tem p W orkspace Prop. Add'l Tem p Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Tim ber M ats

Em ergent W etland Forested W etland

Scrub-Shrub W etland Pond

Stream

Facilities

¨

PERM Im pacts: 0.000 ac.

45'

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEM P Im pacts: 1.194 ac.

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 10

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File P ath : N :\P ro jec t F ile s\03 49 0 7 - So rren to L ate ra l\M ap s\L D N R \S o rren to La tera l L D N R Pla n Vie w _9 -7-1 6.m x d

B

Chevron P roperty

MATCHLINE I1

Proposed Tem porary Tim ber M atting

PUSH/LAY 4940' 2 Pipes Co-located

55'

Brin

!

!A ! A

nC4

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEM P Im pacts: 1.194 ac.

E xisting A ccess Road

MATCHLINE H1

Drill E xit Lat: 30° 9 ' 52.256 " N Long: 90° 47 ' 15.596 " W

Brine Tie-In to E xxon

Proposed 12" Brine Disposal & Brine Custom ers

200'

Highway 3140

OPEN CUT 50'

B'

Drill E xit Lat: 30° 9 ' 52.242" N Long: 90° 47 ' 15.948" W

WET02_PFO Forested Wetland Proposed Im pact PERM Im pacts: 2.814 ac. TEM P Impacts: 1.194 ac.

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOU ISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placem ent Prop. Right of W ay Prop. Tem p W orkspace Prop. Add'l Tem p Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Tim ber M ats

Em ergent W etland Forested W etland

Scrub-Shrub W etland Pond

Stream

Facilities

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 11

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File P ath : N :\P ro jec t F ile s\03 49 0 7 - So rren to L ate ra l\M ap s\L D N R \S o rren to La tera l L D N R Pla n Vie w _9 -7-1 6.m x d

Fo RM Imp PE P

G~

WET07_PFO Forested Wetland Proposed Impact PERM Impacts: 2.119 ac. TEMP Impacts: 0.703 ac.

PUSH/LAY 2072'

B'

Highway 3

WB12_PUB Proposed Crossing

140

Road

ustomers

MATCHLINE J1

eC sal & Brin rine Dispo

Existing Access

I1 INE MATCHL

Property

orary ng

~ENTERGY HIGHLINE CROSSIN

Chevron

Y PUSH/LA ' 0 4 49 o-located 2 Pipes C

B

WET02_PFO Forested Wetland Proposed Impact PERM Impacts: 2.814 ac. TEMP Impacts: 1.194 ac.

Proposed Temporary Timber Matting WET07_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac.. TEMP Impacts: 0.246 ac.

WET07_PFO Forested Wetland Proposed Impact PERM Impacts: 2.119 ac. TEMP Impacts: 0.703 ac.

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

! A

Existing Railroad Existing Road

Prop. Timber Mats

Emergent Wetland Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Drawn By: Approved By:

¨

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway

RGY HIGHLINE CROSSING ~

SORRENTO LATERAL PIPELINE PROJECT

Legend

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 12

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

E NT

i ist Ex ng Ac a Ro ss ce d

B s PU ros 2_ d C 1 e WB pos Pro

A

PUSH/LAY 2072'

Highway

TC MA

IN HL

.

ing

3140

Proposed 12" Line to Brine Disposal #3

Higthway 3140

A'

NT

~E ER GY GH HI E LIN CR SIN

OS

y rar t ac po m g e tin mp I T d ed at se os po ber M op o r r P P Tim d ac.. . EM lan c _P Wet : 0.0 46 a 7 ct 0 nt cts .2 T pa 0 Im WE erge Impa cts: d e Em RM mpa os rop ac. PE MP I P FO tland .119 ac. TE _P 2 07 d We cts: .703 T 0 WE reste Impa cts: Fo RM mpa PE MP I TE

MATCHLIN E K1

mp

1 EJ G ~

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

Stream

Facilities

JDB MS/JP

Submittal Date: Revision # - Date:

¨

dI

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 13

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

WB13_Perennial Proposed Crossing

A IN E K1 MATCHL

PUSH/LAY 2072'

70'

40 Higthway 31 109'

150'

Proposed Temporary Timber Matting WET07_PFO Forested Wetland Proposed Impact PERM Impacts: 2.119 ac. TEMP Impacts: 0.703 ac.

A'

200'

8

200'

Proposed Brine Disposal Well #3

198'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

Stream

Facilities

JDB MS/JP

Submittal Date: Revision # - Date:

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 14

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MA TC H

LI N

E

L1

Ch evr

ed

MA TC H

LIN E

I1

PU 494 SH/LA Y 2 P 0' ipe sC o-l oca t

on P

rop erty

UG S La WET02_PFO ter act Imp osed al Prop land Wet Forested ac. 4 2.81 : PERM Impacts TEMP Impacts: 1.194 ac.

Sp oil

om

oa d

GY H R

ng

EC

Ac

ce s

sR

IG HL IN OS S

isti

PU S 20 H/L 72 AY '

ING

Ex

140

~E

ay 3

NT ER

Hig hw

WE Fo T02 PE rest _PF TE RM ed W O MP Im etl Im pac and pa ts: cts 2.8 Prop : 1 14 os WE .19 a ed Fo T07 Im 4 a c. pa c. PE rest _PF ct TE RM ed W O MP Im etl Im pac and pa ts: cts 2.1 Prop : 0 19 os .70 ac ed Im 3a . pa c. ct

~

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD W BoreBEntry/Exit Pr 12_ op Pit P Bore os UB ed Waterway

C

ros Existing Railroad Existing Road

sin g

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Scrub-Shrub Wetland Pond

Stream

Facilities

JDB MS/JP

Submittal Date: Revision # - Date:

Forested Wetland

SWCA Project No: Sheet:

¨

Legend

Pr SORRENTO LATERAL op o Tim sed PIPELINE PROJECT be Tem WE r M po att rar Em T07 ing y PE erg _PE PLAN VIEW e TE RM nt W M MP Im etl ASCENSION PARISH AND ST JAMES IPARISH, an mp pactLOUISIANA WE ac s: 0 d Pr t T s Fo 07 : 0 .0 a opos .24 c.. ed PE reste _PF 6a Im O R d

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 15

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MATCHLINE M1

MATCHLINE L1

Spoil Existing A ccess R

Proposed Temporary Timber Matting

oad

WET03_PFO Forested Wetland Proposed Impact PERM Impacts: 6.185 ac. TEMP Impacts: 1.150 ac.

SING~

GHLINE CROS

SORRENTO LATERAL PROJECT

PIPELINE WB12_PUB Proposed Crossing

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW

ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

¨

act

PUSH/LAY 4940' 2 Pipes Co-located

UGS Lateral

~ENTERGY HI

ct

WET03_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac. TEMP Impacts: 2.102 ac

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 16

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

B'

MATCHLINE N1

MATCHLINE M1

PUSH/LAY 4940' 2 Pipes Co-located

WET03_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac. TEMP Impacts: 2.102 ac

UGS Lateral

Proposed Temporary Timber Matting

WET03_PFO Forested Wetland Proposed Impact PERM Impacts: 6.185 ac. TEMP Impacts: 1.150 ac.

180' 189'

Proposed Brine Disposal Well #1

193'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 17

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

Ope 2

Wat

8

B

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

WET03_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac. TEMP Impacts: 2.102 ac

B' MATCHLINE O1

MATCHLINE N1

UGS Lateral

PUSH/LAY 4940' 2 Pipes Co-located

U

Proposed Temporary Timber Matting

d Te er M 180'

Open Cut 225'

189'

B

8

Brine Water

WET03_PFO Forested Wetland Proposed Impact PERM Impacts: 6.185 ac. TEMP Impacts: 1.150 ac.

Proposed Brine Disposal Well #1

P T

193'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

Scrub-Shrub Wetland Pond

Stream

Facilities

1 inch = 100 feet 0

25

50

JDB MS/JP

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

6/28/2016 11/4/2016 18

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

PUSH/LAY 4940' 2 Pipes Co-located

MATCHLINE P1

INE O1 MATCHL

WET03_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac. TEMP Impacts: 2.102 ac UGS Lateral

mpo attin

PUSH/LAY 225'

Proposed Temporary Timber Matting 235'

188'

8

WET03_PFO Forested Wetland Proposed Impact PERM Impacts: 6.185 ac. TEMP Impacts: 1.150 ac.

Proposed Brine Disposal Well #2

199'

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

B

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 19

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

U

UGS Lateral

MATCHLINE Q1

A

Drill Exit I-10 Lat: 30° 9' 5.828" N Long: 90° 47' 22.020" W

UGS Lateral

PUSH/LAY 4940'

! A

cate

Drill Entry I-10 Lat: 30° 9' 1.630" N Long: 90° 47' 23.746" W

! A

MATCHLINE P1

WET03_PEM Emergent Wetland Proposed Impact PERM Impacts: 0.0 ac. TEMP Impacts: 2.102 ac

8

235'

172'

Û

Proposed Brine Disposal Well #2

A SSIIAANN AN EE I I U U O LL O ZZO ON SSTTAALL A A O CC O

WET03_PFO Forested Wetland Proposed Impact PERM Impacts: 6.185 ac. TEMP Impacts: 1.150 ac.

A'

I-10

PUSH/LAY 225'

Û

I-10 HDD 450'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 20

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

E

R

MATCHLINE Q1

I

PUSH/LAY 2347'

! A

UGS Lateral

WET05_PEM Emergent Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.0 ac.. TEMP Impacts: 1.339 ac.

MATCHLINE R1

Drill Entry I-10 Lat: 30° 9' 1.630" N Long: 90° 47' 23.746" W

R

O L

D

V

N

E

W

10 H 50'

40'

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

I-10

WET05_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.839 ac. TEMP Impacts: 2.955 ac.

172'

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 21

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

PUSH/LAY 2347'

A'

UGS Lateral

WET05_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.839 ac. TEMP Impacts: 2.955 ac.

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

A

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

SORRENTO LATERAL PIPELINE PROJECT

MATCHLINE S1

MATCHLINE R1

WET05_PEM Emergent Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.0 ac.. TEMP Impacts: 1.339 ac.

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 22

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MATCHLINE T1

Drill Exit Hwy 61 Lat: 30° 8' 39.918" N Long: 90° 47' 33.039" W

PUSH/LAY 2347'

UGS Lateral

! A

A'

MATCHLINE S1

t

WET05_PEM Emergent Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.0 ac.. TEMP Impacts: 1.339 ac.

WET05_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 0.839 ac. TEMP Impacts: 2.955 ac.

A

130'

230'

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 23

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

WB rop

PF We t ne cts: ts:

ral

75'

U1

83'

Drill Exit Hwy 61 Lat: 30° 8' 39.918 "N Long: 90° 47' 33.039 "W

MA T CH LIN E

US

Hig

hwa y

61

B A Y O U C O N W A Y

ate SL G U

A

N

118'

Y

U

W

WB07_Perennial Proposed Crossing

O

89'

A

Y

227'

Dril lE

C

B

! " A

! A

P 23

O

MATCHLINE T1

62'

130' 66'

! A

HWY 61 HDD 650'

163'

WB07_Perennial Proposed Crossing

125'

Drill Entry Hwy 61 Lat: 30° 8' 34.243" N Long: 90° 47' 36.412" W

70' 230'

245'

94'

WET06_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 1.025 ac. TEMP Impacts: 1.085 ac.

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland Forested Wetland

¨

SORRENTO LATERAL PIPELINE PROJECT

Legend

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

Scrub-Shrub Wetland Pond

JDB MS/JP

1 inch = 100 feet 0

25

50

6/28/2016 11/4/2016 24

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

P 07_ s opo

Y HW ' 650

UG S

La te r

H 61

al

DD

US Highway 61

83'

ial enn ng Per rossi C 07_ WB posed Pro

Y

A

O

U

75'

W

N

y 61 Hw 3" N try 4 "W 4.2 l En Dril 0° 8' 3 36.412 3 ' Lat: 90° 47 g: Lon

UG SL ate

89'

94'

!A

MATCHLINE V1

118'

ral

WET06_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 1.025 ac. TEMP Impacts: 1.085 ac.

MATCHLINE U1

e 1 o a For stal Z acts: .085

C

O

B

A

Y

62'

227'

WB08_PUB Proposed Crossing

!A " OPEN CUT 150'

Proposed Temporary Timber Matting 245' 163'

Drill Entry Enterprise Facility Lat: 30° 8' 33.494" N Long: 90° 47' 36.082" W

Existing Railway

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 25

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

ral

MATCHLINE W1

MATCHLINE V1

UG SL ate

UGS Lateral

WETLAND HDD 4253'

WET06_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 1.025 ac. TEMP Impacts: 1.085 ac.

Existing Railway

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 26

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MATCHLINE X1

MATCHLINE W1

US Highway 61

UGS Lateral

A

UGS Lateral

WETLAND HDD 4253'

WET06_PFO Forested Wetland Proposed Impact Coastal Zone Only PERM Impacts: 1.025 ac. TEMP Impacts: 1.085 ac. ite Un

d

n La

d

Co

o Pr

rty pe

Existing Railway

~Maurepas WMA~

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

! A

Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

h

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway

50

6/28/2016 11/4/2016 27

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

Pa r is

SORRENTO LATERAL PIPELINE PROJECT

Legend

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

MATCHLINE X1

US Highway 61

PP MM AA W W Û SS SS AA AA PP MM EE W W RR UU AA Û MM

UGS Lateral

d ite Un

n La

d

Co

P

p ro

ty er

WETLAND HDD 4253'

NO CLEARING OF VEGETATION ABOVE HDD/BORES WITHIN MAUREPAS WMA IMPACTS: 0.0 ac.

~Maurepas WMA~

epa

Louisiana and Arkansas Railway

sP

PLAN VIEW

ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

me

Pa r is

h

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

a ri

sh

SORRENTO LATERAL PIPELINE PROJECT

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Louisiana and Arkansas Railway Drawn By: JDB

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Approved By:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

MS/JP

Submittal Date: Revision # - Date:

50

6/28/2016 11/4/2016 28

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

TAL NT: ASC

osed nsion # P2

MATCHLINE Z1

Marathon Pipeline

xit 0° 8 90° 54,6 ,953

GO WIT 0 ac

e e Pipelin Enterpris

WETLAND HDD 4253'

NO CLEARING OF VEGETATION ABOVE HDD/BORES WITHIN MAUREPAS WMA IMPACTS: 0.0 ac.

l el Sh

~Maurepas WMA~

lin pe Pi

e

ns ce s A

n io

e lin pe i P

e pa

Louisiana and Arkansas Railway Louisiana and Arkansas Railway

SORRENTO LATERAL PIPELINE PROJECT

5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Enterprise Pipelines Prop. Pipe Rack Prop. Spoil Placement Prop. RightPipeline of Way Texaco Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 29

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

PROPOSED 50' X 70' MAIN LINE BLOCK VALVE COASTAL USE PERMIT: P20150393 APPLICANT: ASCENSION PIPELINE LLC PROJECT: ASCENSION PIPELINE PROJECT

WET06_PEM Emergent Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 0.338 ac.

Proposed Tie-in to Proposed Ascension Pipeline Project (CUP# P2015393)

Z1 MATCHLINE

Marathon Pipeline

Enterprise Pipeline NO CLEARING OF VEGETATION ABOVE HDD/BORES WITHIN MAUREPAS WMA IMPACTS: 0.0 ac.

line se Pipe Enterpri

Ascension Pipeline

54'

!A "

70'

WETLAND HDD 4253'

l el Sh

lin pe i P

e

on si n ce As

e in el ip

100'

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac.

P

~M a ure pa s Sw am p WM A~

MATCHLINE A2

Marathon Pipeline

Drill Exit Lat: 30° 8' 5.491" N Long: 90° 47' 0.118" W X: 3,454,680.13 feet Y: 594,953.92 feet

150'

Proposed Temporary Timber Matting

300'

2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393 NET TEMP Impacts: 4.182 ac.

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Prop. Timber Mats Existing Foreignand Arkansas Emergent Wetland Railway Louisiana Pipeline Forested Wetland Prop. HDD Bore Entry/Exit Scrub-Shrub Wetland Bore Pit Pond Waterway Stream Existing Railroad Existing Road

Facilities

Drawn By: Approved By:

¨

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 30

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

Marathon Pipeline MATCHLINE B2

MATCHLINE A2

Enterprise Pipeline Ascension Pipeline

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac.

100'

2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393

Proposed Temporary Timber Matting

NET TEMP Impacts: 4.182 ac.

~M a ure pa s Sw am p WM A~

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Louisiana and Arkansas Railway

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 31

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

Marathon Pipeline MATCHLINE C2

MATCHLINE B2

Enterprise Pipeline Ascension Pipeline

Proposed Temporary Timber Matting

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac. 2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393 NET TEMP Impacts: 4.182 ac.

~M a ure pa s Sw am p WM A~

nsas Railway

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 32

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

Marathon Pipeline MATCHLINE D2

MATCHLINE C2

Enterprise Pipeline

Ascension Pipeline

ary

Proposed Temporary Timber Matting

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac. 2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393 NET TEMP Impacts: 4.182 ac.

~M a ure pa s Sw am p WM A~

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Louisiana an Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 33

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

Marathon Pipeline MATCHLINE E2

MATCHLINE D2

Enterprise Pipeline

Ascension Pipeline

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac.

Proposed Temporary Timber Matting

2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393 NET TEMP Impacts: 4.182 ac. ~M a ure pa s Sw am p WM A~

Louisiana and Arkansas Railway

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 34

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

US Highway 61

END PROJECT Lat: 30° 7' 34.68" N Long: 90° 46' 19.62" W X: 3,458,246.45 feet Y: 591,862.05 feet

MATCHLINE E2

Marathon Pipeline Enterprise Pipeline

Ascension Pipeline

Proposed Temporary Timber Matting

WET06_PFO Forested Wetland Proposed Impact Maurepas WMA PERM Impacts: 0.000 ac. TEMP Impacts: 6.440 ac. 2.258 ac. Previously Permitted: Ascension Pipeline Project CUP# P20150393 NET TEMP Impacts: 4.182 ac.

~M a ure pa s Sw am p WM A~

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

PLAN VIEW ASCENSION PARISH AND ST JAMES PARISH, LOUISIANA

Legend

Prop. Pipeline Prop. HDD Prop. Road Bore Prop. Pipe Rack Prop. Spoil Placement Prop. Right of Way Prop. Temp Workspace Prop. Add'l Temp Workspace

! A

Prop. Block Valve Existing Foreign Pipeline Prop. HDD Bore Entry/Exit Bore Pit Waterway Existing Railroad Existing Road

Drawn By: Approved By:

Prop. Timber Mats

Emergent Wetland

¨

Forested Wetland

Scrub-Shrub Wetland Pond

Stream

Facilities

Submittal Date: Revision # - Date:

SWCA Project No: Sheet:

1 inch = 100 feet 0

25

JDB MS/JP

50

6/28/2016 11/4/2016 35

034907 OF 49

Coord. System: NAD 1983 StatePlane Louisiana South FIPS 1702 Feet

100

150

200 Feet

File Path: N:\Project Files\034907 - Sorrento Lateral\Maps\LDNR\Sorrento Lateral LDNR Plan View_9-7-16.mxd

SUMMARY OF IMPACTS TO WETLANDS

SUMMARY OF CUT AND FILL

BORE PIT DIMENSIONS

SUMMARY OF CONSTRUCTION TYPE

Drawn By:

SORRENTO LATERAL PIPELINE PROJECT 5745 Essen Lane, Suite 105 Baton Rouge, Louisiana 70810 (225) 663-3830 phone (225) 663-3831 fax www.swca.com

JP/PJ 6/28/2016

Submittal Date: Revision # - Date:

11/03/2016 034907

SWCA Project No: Sheet:

ASCENSION PARISH AND ST JAMES PARISH, LA

JDB

Approved By:

36

OF

49

VARIES - 40' TO 250'

PROPOSED BORE ENTRY

VARIES

PROPOSED BORE EXIT

PROPOSED 12" PIPELINE

TYPICAL WATERWAY CROSSING WITH HDD SITES

VARIES - 40' TO 250'

NORMAL GROUND

PERMANENT EASEMENT

VARIES HDD ENTRY OR EXIT

CL PROPOSED 12" PIPELINE 30'

30'

PERMANENT EASEMENT

NO SCALE

TYPICAL HDD WORKSITE NO SCALE

SORRENTO LATERAL PIPELINE PROJECT

SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL WATERBODY/HDD CROSSING METHODS

NO

REVISION

DATE

DATE: 06/30/2016

SCALE: N.T.S.

DRAWN BY: LG

SWCA JOB NO: 34907

SHEET NO: 37 OF 49

CHECKED BY: CF

*NOTE: 1. EXISTING PIPE RACK WILL BE REPLACED WITH NEW STRUCTURE AND EXISTING FOOTINGS WILL BE USED TO MINIMIZE IMPACTS 2. PIPE RACK MAY CONTAIN MULITPLE EXISTING AND PROPOSED PIPES

SORRENTO LATERAL PIPELINE PROJECT

SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL PIPE RACK

NO

REVISION

DATE

DATE: 6/20/16

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 38 OF 49

CHECKED BY: CF

TYPICAL A - A' 60'-75' 30'-45'

DELINEATED WETLAND AREA

30'

TEMPORARY SPOIL

3' 5' 5'

5' PROPOSED 12" PIPELINE

NATURAL GROUND

4'

5' 3'

45' TEMPORARY R.O.W.

30' PERMANENT R.O.W.

60'-75' CONSTRUCTION R.O.W.

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL OPEN CUT / PUSH METHOD FOR CONSTRUCTION ROW PLAN AND PROFILE VIEW OF WETLAND AREAS

NO

REVISION

DATE

DATE: 08/11/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 39 OF 49

CHECKED BY: CF

TYPICAL B - B' 90'

3

6

WORKING SIDE

DELINEATED WETLAND AREA

TEMPORARY SPOIL

6'-8' 3'-5'

8'-10'

10'-12'

NATURAL GROUND

4'

PROPOSED 12" PIPELINES

5' 6'-8'

5

6 PERMANENT R.O.W.

3 TEMPORARY R.O.W.

90' CONSTRUCTION R.O.W.

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL OPEN CUT / PUSH METHOD FOR CONSTRUCTION ROW PLAN AND PROFILE VIEW OF WETLAND AREAS

NO

REVISION

DATE

DATE: 08/11/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 40 OF 49

CHECKED BY: JP

EXISTING OVERHEAD ENTERGY HIGH VOLTAGE TRANSMISSION LINE

WORKING SIDE

TEMPORARY SPOIL

4-5'

3-5'

20'-30'

*SEE NOTE

5'-10' 7' PROPOSED 12" PIPELINE

30'-60' TEMPORARY R.O.W.

NATURAL GROUND

6' 3'-8'

* NOTE All construction activities will maintain a twenty (20) foot safety clearance from any overhead wire, guy wire or structure of Entergy's high voltage transmission lines except when crossing under the higher voltage transmission lines where a thirty (30) foot clearance is to be maintained.

30' PERMANENT R.O.W.

60'-90' CONSTRUCTION R.O.W.

NO ADDITIONAL TEMP R.O.W. WILL BE NEEDED FOR CONSTRUCTION WITHIN ENTERGY'S TRANSMISSION LINE RIGHT-OF-WAYS OTHER THAN AS SHOWN ABOVE

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL PROFILE VIEW OPEN CUT / PUSH METHOD FOR CONSTRUCTION ROW CROSSING OF ENTERGY TRANSMISSION LINE RIGHTS-OF-WAY

REVISION

NO

1

DATE

8/12/16

PLAN VIEW PAGE 12, 13 & 15

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 41 OF 49

CHECKED BY: CF

60'-90'

30'-60' EXISTING GUY WIRE

EXISTING ENTERGY TRANSMISSION R.O.W.

EXISTING TRANSMISSION TOWER

20'-30'

EXISTING OVERHEAD ENTERGY HIGH VOLTAGE TRANSMISSION LINES

*SEE NOTE

* NOTE All construction activities will maintain a twenty (20) foot safety clearance from any overhead wire, guy wire or structure of Entergy's high voltage transmission lines except when crossing under the higher voltage transmission lines where a thirty (30) foot clearance is to be maintained.

NO ADDITIONAL TEMP R.O.W. WILL BE NEEDED FOR CONSTRUCTION WITHIN ENTERGY'S TRANSMISSION LINE RIGHT-OF-WAYS OTHER THAN AS SHOWN ABOVE

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL PLAN VIEW OPEN CUT / PUSH METHOD FOR CONSTRUCTION ROW CROSSING OF ENTERGY TRANSMISSION LINE RIGHTS-OF-WAY

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 42 OF 49

CHECKED BY: CF

70'

Proposed 10' Wide Gate Field Located For Best Connection To The Access Road

Proposed Chain Link Fence

50'

PLAN

Proposed Rock Fill

Existing Ground

8.0' 2.5'

MAIN LINE BLOCK VALVE (MLBV) TYPICAL

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

TYPICAL MAIN LINE VALVE (MLV)

NO

REVISION

DATE

DATE: 8/25/2015

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 43 OF 49

CHECKED BY: MS

PLAN VIEW PAGE 20

SORRENTO LATERAL PIPELINE PROJECT

SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

I-10 HDD

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 44 OF 49

CHECKED BY: MS

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

WETLAND BORE

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 45 OF 49

CHECKED BY: MS

SORRENTO LATERAL PIPELINE PROJECT

SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

HWY 61 HDD

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 46 OF 49

CHECKED BY: MS

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

WETLAND HDD

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 47 OF 49

CHECKED BY: MS

SORRENTOLATERTAL PIPELINE PROJECT ARCHAELOGICAL SITE HDD SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 48 OF 49

CHECKED BY: MS

NOTES: 1.

AS-BUILT DRAWINGS SHALL BE SUBMITTED WITHIN 30 DAYS OF COMPLETION OF THIS PROJECT TO THE LOUISIANA DEPARTMENT OF NATURAL RESOUCES, COASTAL MANAGEMENT DIVISION, P.O. BOX 44487, BATON ROUGE, LA 70804-4487 AND TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF CONSERVATION, PIPELINE DIVISION, P.O. BOX 94275, BATON ROUGE, LA. 70804-4487.

2.

IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020), A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

3.

CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 60 TO 90 FEET WIDE CONSISTING OF 30 TO 60 FEET OF PERMANENT.

4.

EASEMENT AND 30 FEET OF TEMPORARY WORKSPACE IN NON-WETLAND AREAS.

5.

THE SAME LAYOUT APPLIES WHETHER CONSTRUCTION R.O.W. DOES OR DOES NOT ABUT A FOREIGN R.O.W.

6. 7.

LOWER-IN PIPE, INSTALL TRENCH BREAKERS AT WETLAND EDGES AS DIRECTED BY THE COMPANY INSPECTOR. BACKFILL IMMEDIATELY ON COMPLETION OF CONSTRUCTION. REMOVE ANY TIMBER RIPRAP OR EQUIPMENT MATS FROM WETLANDS UPON COMPLETION OF CONSTRUCTION.

8.

RESTORE GRADE TO NEAR PRE-CONSTRUCTION TOPOGRAPHY AND REPLACE TOPSOIL, WHERE SALVAGED, WITHOUT A CROWN OVER THE TRENCH.

9.

THE PIPELINE WILL HAVE A MINIMUM OF SIX (6) FEET OF COVER WHEN CROSSING ANY OF ENTERGY'S TRANSMISSION LINE RIGHT-OF-WAYS.

10.

ALL CONSTRUCTION ACTIVITIES WILL MAINTAIN A TWENTY (20) FOOT SAFETY CLEARANCE FROM ANY OVERHEAD WIRE, GUY WIRE OR STRUCTURE OF ENTERGY'S HIGH VOLTAGE TRANSMISSION LINES EXCEPT WHEN CROSSING UNDER THE HIGHER VOLTAGE TRANSMISSION LINES WHERE A THIRTY (30) FOOT CLEARANCE IS TO BE MAINTAINED.

11.

TEMPORARY PLACEMENT OF SPOIL WITHIN ENTERGY'S TRANSMISSION LINES RIGHT-OF-WAY WILL NOT EXCEED FIVE (5) FOOT IN HEIGHT AND WILL BE MARKED WITH HIGHLY VISIBLE BARRIER.

12.

NO EQUIPMENT OR PERSONNEL WILL BE ALLOWED TO BE ON THE TEMPORARY SPOIL STACKED WITHIN ENTERGY'S TRANSMISSION LINES RIGHT-OF-WAY.

13.

WETLAND IMPACTS THAT OVERLAP WITH THE PREVIOUSLY PERMITTED ASCENSION PIPELINE PROJECT (CUP# P20150393) WERE NOT INCLUDED IN THE IMPACT CALCULATIONS FOR THIS PROJECT.

SORRENTO LATERAL PIPELINE PROJECT SWCA ENVIRONMENTAL CONSULTANTS 5745 ESSEN LANE, SUITE 105 BATON ROUGE, LOUISIANA 70810

GENERAL COMMENTS

NO

REVISION

DATE

DATE: 6/20/2016

SCALE: N.T.S.

DRAWN BY: JDB

SWCA JOB NO: 34907

SHEET NO: 49 OF 49

CHECKED BY: MS

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas