Time Extension and Permit Modification to Install Four Storage Tanks, Containment Berms and Construction Laydown Areas, Garyville, St. John The Baptist Parish, Louisiana
NAME OF APPLICANT: Marathon Petroleum Corporation, c/o EDI Environmental Attn: Ben
Summerlin, 1279 Atteberry Rd Eunice, LA 70535
LOCATION OF WORK: Project site is located at the Marathon Garyville Refinery in St. John The
Baptist Parish, Louisiana, as shown on the attached drawings.
Hydrologic Unit Code: 08070204- Lower Mississippi Region Location: Latitude: 30.058628 Longitude:
-90.60845.
CHARACTER OF WORK: The applicant proposes to install four storage tanks, containment berms
and construction laydown areas within approximately 2.04 acres of jurisdictional wetlands and 1.03
acres of jurisdictional other waters of the US. The applicant has proposed the use of an approved
mitigation bank to offset any unavoidable impacts to jurisdictional wetlands.
JOINT PUBLIC NOTICE
August 7, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch (OD-SE)
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2041
Benjamin.C.Sherman@usace.army.mil
Project Manager
Benjamin Sherman
Permit Application Number
MVN 2007-00815 ES
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170724-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Time Extension and Permit Modification to Install Four Storage Tanks, Containment Berms
and Construction Laydown Areas, Garyville, St. John The Baptist Parish, Louisiana
NAME OF APPLICANT: Marathon Petroleum Corporation, c/o EDI Environmental Attn: Ben
Summerlin, 1279 Atteberry Rd Eunice, LA 70535
LOCATION OF WORK: Project site is located at the Marathon Garyville Refinery in St. John The
Baptist Parish, Louisiana, as shown on the attached drawings.
Hydrologic Unit Code: 08070204- Lower Mississippi Region Location: Latitude: 30.058628 Longitude:
-90.60845.
CHARACTER OF WORK: The applicant proposes to install four storage tanks, containment berms
and construction laydown areas within approximately 2.04 acres of jurisdictional wetlands and 1.03
acres of jurisdictional other waters of the US. The applicant has proposed the use of an approved
mitigation bank to offset any unavoidable impacts to jurisdictional wetlands.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
-2request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered inc luding
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work at this time. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation
Officer regarding potential impacts to cultural resources.
The New Orleans District has determined that the project will not affect any endangered species
based on the Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office.
Our initial finding is that the proposed work would not affect any species, nor affect any habitat
designated as critical to the survival and recovery of such species, listed as endangered by the U.S.
Department of Commerce.
-3This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.0 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
Site Location
Copyright:© 2013 National Geographic Society, i-cubed
I
Marathon Petroleum Corporation
Garyville, Louisiana
MPLX Tank Farm Permit
Site Location Map
St. John the Baptist Parish
0
6,000
12,000
24,000
Feet
Created:
Approved:
Date:
Dwg No.:
JCB/AM 10.3
JBS
05/20/2017
16-545-06
Figure 1
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
Construction
Laydown
Area
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
250 Gas
Oil
}
}
}
}
}
}
}
}
}
}
}
Construction
Laydown
Area
}
}
}
250 Gas
Oil
}
}
}
}
}
}
}
}
200
Natural
Gasoline
}
}
}
}
}
}
}
}
200
Natural
Gasoline
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
Feet
}
500
}
250
}
125
I
}
0
}
}
Legend
Proposed Tank Locations
Proposed Containment Berms
Limits of Construction
}
}
}
Construction
Laydown
Area
}
}
}
}
}
}
}
Marathon Petroleum Corporation
Garyville, Louisiana
MPLX Tank Farm Permit
Plan View Proposed Development
St. John the Baptist Parish
Created:
Approved:
Date:
Dwg No.:
JCB/AM 10.3
JBS
05/20/2017
16-545-07
Figure 2
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
Construction
Laydown
Area
}
}
}
}
}
250 Gas
Oil
}
}
}
}
}
}
}
Construction
Laydown
Area
}
}
}
}
}
250 Gas
Oil
}
}
}
}
}
}
}
}
}
}
200 Natural
Gasoline
}
}
}
}
}
}
200 Natural
Gasoline
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
Feet
}
500
}
250
}
125
}
I
}
0
}
}
Legend
Limits of Construction
Wetlands to be Filled (2.03 ac.)
Nonwetland Waters to be Filled (0.66 ac.)
Proposed Containment Berms
Proposed Tank Locations
}
Construction
Laydown
Area
Marathon Petroleum Corporation
Garyville, Louisiana
MPLX Tank Farm Permit
Plan View Wetland Detail
St. John the Baptist Parish
Created:
Approved:
Date:
Dwg No.:
JCB/AM 10.3
JBS
05/20/2017
16-545-08
Figure 3
DP1 P
30.05878 N
90.61114 W
DP2
P
DP3
P
DP4 P
Legend
P
Data Points
Projject Area (65.92
Project
(65.92 ac.)
Non-Wetland
N
on-W
Wettlland
dW
Waters
aters (1.03 a
ac.)
Potential Wetland (2.03 ac.))
Uplands (62.87 ac.)
0
200
400
800
Fee
e
Feet
I
Marathon Petroleum Corporation
Garyville, Louisiana
Wetland Delineation
Potential Wetlands Map
St. John the Baptist Parish
Created:
Approved:
Date:
Dwg No.:
JCB/AM 10.3
JBS
05/18/2017
16-545-03
Figure 3