The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Seil Mitigation Site, which will provide wetland compensation credits in the Souris River Basin RSA. The Site is located 7 miles east, 2 miles south, 1 mile west and ½ mile south of Rugby, North Dakota in the SE¼ of Section 23, Township 156 Noth, Range 72 West, Pierce County, North Dakota. [Lat: 48.317704°N Long: -99.873349°W]
The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Seil Mitigation Site, which will provide wetland compensation credits in the Souris River Basin RSA. The Site is located 7 miles east, 2 miles south, 1 mile west and ½ mile south of Rugby, North Dakota in the SE¼ of Section 23, Township 156 Noth, Range 72 West, Pierce County, North Dakota. [Lat: 48.317704°N Long: -99.873349°W]
Public Notice
Subject:
Action ID:
Public Notice of Prosed ILF Mitigation Site
NWO-2017-01124-BIS
Comments Period: August 7 September 6, 2017
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a site
plan submitted by Ducks Unlimited (DU) for the Seil Mitigation Site. The purpose of this public
notice is to solicit comments on the plan from the public; Indian Tribes; Federal, state and local
agencies/officials; and other interested parties. Participation is encouraged to assist the Corps
in making a reasonable decision to accept, modify or reject the plan. All comments must be
postmarked by September 6, 2017. This notice is to inform interested parties of the
proposed activity and to solicit comments.
IN-LIEU FEE PROGRAM: The Corps approved the Ducks Unlimited, Inc. North Dakota
Aquatic Resource In-Lieu Fee Program Instrument on March 5, 2014 (Program). It was
established in accordance with the implementing regulations of the Compensatory Mitigation
for Losses of Aquatic Resources; Final Rule found at 33 CFR Part 332, which was published in
the Federal Register on April 10, 2008. The Program is used to satisfy compensatory
mitigation requirements for Department of the Army permits issued under Section 404 of the
Clean Water Act (33 USC 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33
USC 403). It allows for DU to accept mitigation responsibility in any of the six regional service
areas (RSA) in North Dakota and establishes a time frame for fulfilling their mitigation
obligations.
SPONSOR:
Ducks Unlimited, Inc.
Great Plains Regional Office
Attn: Trent Hieb
2525 River Road
Bismarck, North Dakota 58503
MITIGATION SITE PLAN: The Seil Mitigation Site is located approximately 7 miles east, 2
miles south, 1 mile west, and ½ mile south of Rugby, North Dakota in the SE ¼ of Section 23,
Township 156 North, Range 72 West, Pierce County, North Dakota. [Lat: 48.317704° N; Long:
-99.873349°W] Credits established will be used to offset wetland impacts in the Souris River
Basin Regional Service Area. Ratios contained in the Wetland Mitigation Banking in North
Dakota - Interagency Guidance for Mitigation Bank Sponsors were used to estimate the
number of credits the site will yield upon plan implementation. DU estimates the 62.08 acre
site will yield 27.11 credits. Details of the proposed Seil Mitigation Site can be viewed and
downloaded from the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
If you do not have access to the internet or wish to obtain a printed copy of the site plan,
please contact the project manager listed below.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
3319 University Drive, Bismarck, ND 58504-6640
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.
CENWO-OD-R-ND
Page 2
Action ID: NWO-2017-01124-BIS
HISTORIC PROPERTIES: National Historic Preservation Act of 1966 ["NHPA"]: (54 USC
306108) The Omaha District is reviewing a proposed site plan only at this time. If the plan is
approved, or approved with modifications, DU would be responsible for obtaining permits, if
necessary, prior to construction. At that time, physical disturbance of the site will occur. The
Corps will comply with the NHPA and amendments and the procedures set forth in 33 CFR,
Appendix C if the site is approved. We will evaluate input by Indian Tribes and any interested
parties in response to this public notice. The Corps preliminary determination is that the
project will have `No Effect' on historic or cultural properties.
ENDANGERED SPECIES: Endangered Species Act of 1973 ["ESA"]: (16 USC 1531, et.
Seq.) As stated above, the Omaha District is reviewing a proposed site plan only at this time.
If the plan is approved, or approved with modifications, DU would be responsible for obtaining
permits, if necessary, prior to construction. The proposed site is within the known ranges of
the endangered Whooping crane (Grus americanis) and Gray wolf (Canis lupus). It is also
within the known ranges of the threatened Piping plover (Caradrius melodus), Dakota skipper
(Hesperia dacotae), Rufa red knot (Calidris canutus rufa) and Northern long-eared bat (Myotis
septentrionalis). Critical habitat for the Piping plover has been identified in the County. The
Corps has made a preliminary determination that the project will have `No Effect' on the
species listed or critical habitat.
SUBMITTING COMMENTS: Anyone whose interests may be affected by this proposal is
invited to submit favorable or unfavorable written comments by September 6, 2017 to the office
listed below:
Toni Erhardt, Project Manager
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
Email: CENWO-OD-RND@usace.army.mil
Please note that all comment letters received are subject to release to the public through the
Freedom of Information Act. If you have questions or need additional information please
contact the applicant or the Corps' project manager Toni Erhardt at the email above, the
address below or by telephone at (701) 255-0015 X 2003.
REQUEST TO POSTMASTERS: Please post this notice in a conspicuous place until the
expiration date specified at the top of page one.
NOTICE TO EDITORS: This notice is provided for your use in developing news stories only.
No payment for publication will be provided.
Attachment: Mitigation Plan
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx
SEIL IN-LIEU FEE
WETLAND MITIGATION PLAN
Prepared by:
Ducks Unlimited, Inc.
2525 River Road
Bismarck, ND 58503
May 2017
Table of Contents
1. Project Objectives
1
2. Site Selection Criteria
1
3. Baseline Information
1
4. Conceptual Design and Work Plan
2
5. Credit Determination Methodology
2
6. Maintenance Plan
3
7. Performance Standards
3
8. Monitoring Requirements
4
9. Adaptive Management Plan
4
10. Long-Term Management Plan
5
11. Site Protection Instruments
5
12. Financial Assurances
5
13. References
5
Tables
Table 1 Credit Determinations
Table 2 Credit Release Schedule
Figures
Figure 1 Location Map
Figure 2 Land Cover
Figure 3 Easement Boundary
Figure 4 Scope and Effect Report (To Be Submitted)
Figure 5 Design Concept
1. PROJECT OBJECTIVES
Ducks Unlimited (DU) is proposing the Seil In-Lieu Fee (ILF) Mitigation Site under the
DU North Dakota ILF Mitigation Instrument. The goal of this ILF site is to establish high
quality wetland mitigation credits in the Souris River Basin service area. Objectives to
accomplish this goal include restoration of wetland hydrology, restoration of native
wetland and upland vegetation communities, preservation of exiting wetlands, and long
term management and site protection mechanisms to ensure the wetlands and surrounding
natural areas endure as a sustainable resource into the future.
2. SITE SELECTION CRITERIA
DU performed an extensive search for appropriate properties within the Souris River
Service Area (Figure 1). The Seil property presented an opportunity to restore, enhance,
and protect prairie pothole wetland basins. In addition to restoring the wetland basin, the
parcel is large enough to re-establish an upland grass community, adding habitat
connectivity between existing and restored wetland areas. By choosing an existing basin
that has been drained and used for agriculture, the opportunity for a successful restoration
of high functioning wetland basins is increased.
3. BASELINE INFORMATION
The Seil Mitigation Site is located in Pierce County in the Souris River Service Area
(Figure 1). The proposed mitigation project area is located in the Northern Glaciated
Plains ecoregion, which is characterized by a flat to gently rolling landscape composed of
glacial drift and high concentrations of temporary and seasonal wetlands (Figure 2). This
is also the Prairie Pothole Region, a crucially important waterfowl breeding habitat in
North America (Gilbert et al. 2006). For thousands of years, this vast expanse of wetlands
and prairie habitats has supported the largest densities of breeding waterfowl in North
America. However, since European settlers first arrived, conversion of these prairies for
agricultural purposes has been extensive. Millions of acres of grasslands and wetlands
have been converted to annually tilled crops.
The site is located 7 miles east, 2 miles south, 1 mile west, and ½ mile south of Rugby,
ND within the SE ¼ of Section 23, T156 N R72 W (Figure 3). The site consists of a 62
acre cultivated field embedded with manipulated and undisturbed wetlands. The former
grasslands and wetlands on the property were converted to row crop agriculture many
years ago. The approximately 27-acre wetland on the eastern portion of the mitigation
parcel (Wetland 1) has been hydrologically modified with a surface ditch flowing
towards the southeast (Figure 5). The site receives runoff from a fairly large contributing
watershed of over 1,500 acres, entering the site from the northwest.
DU performed a preliminary site visit during the summer of 2016 and determined
Wetland 1 to be fully drained based on ground observations. A formal scope and effect
analysis and wetland delineation will be completed by May 2017 and corresponding
acreages will be refigured accordingly. Existing vegetation in most of the site is of poor
-1-
quality due to farming practices. However, approximately 10 acres of former CRP land in
the northwest corner of the site remains in vegetated cover. The site is also located in
close proximity to two separate USFWS Waterfowl Production Areas (WPA's), located
1/2 mile northwest and 1/2 mile southeast of the site, among a number of others in the
immediate area. Additionally, the property is adjacent to a large habitat complex of
USFWS wetland easements, and within 3 miles of Pleasant Lake National Wildlife
Refuge.
Restoration of grassland and wetlands on the Seil Mitigation Site will increase the
amount of protected habitat in this landscape, creating an ecologically valuable patch of
habitat in close proximity to other nearby resources. The project will also retain water in
a previously drained area, improving overall water quality and watershed function.
4. CONCEPTUAL DESIGN AND WORK PLAN
The primary mitigation strategy for the Seil Mitigation Site will be to restore wetland
hydrology to Wetland 1. In addition, existing wetlands will be placed into perpetual
protection and all remaining cultivated upland areas will be seeded to diverse native
vegetation and managed according to the appropriate conservation easement.
Construction of the project will be completed by the contractor in association with a DU
construction manager. Typical equipment will include scrapers, bulldozers, trucks, and
compaction equipment. The primary source of water for the wetlands will be surface
water runoff, which is typical of the prairie pothole region. Additional details are
provided below.
Wetland 1
Wetland hydrology will be restored to Wetland 1 through excavation and raising the
outlet elevation of the drainage ditch that flows southeast. Additional site research such
as wetland delineation, scope and effect, and topographic survey will be utilized to verify
design specifications.
Vegetation Improvements
The site will be seeded with native grass and forbs representative of the local grassland
community. Shallow wetland plant communities and deeper areas of the wetlands will
rely on revegetation by existing wetland seed bank. If deemed necessary, wetland seeding
may also be considered as a suitable management tool.
5. CREDIT DETERMINATION METHODOLOGY
Credits will be determined using the mitigation ratios from Table 1 in the North Dakota
mitigation guidance (NDIRT 2010). Table 1 below shows the initial credit estimates for
the Seil Mitigation Site project. Estimates will be modified based on results of wetland
delineation, scope and effect, and topographic survey. Acreages for restored wetlands are
based on initial site investigations and preliminary engineering estimates. Wetland 1 is
estimated to be fully drained and is expected to generate restoration credits at a 1:1 ratio.
Estimated enhancement credits were determined by using a 5:1 ratio for restored
-2-
grasslands within a 50-foot buffer surrounding the predicted wetland boundaries. A 20:1
credit ratio was applied to additional restored grasslands outside the 50-foot buffer.
Overall, the project should result in approximately 27 wetland credits. Credits will be
released based on project milestones and monitoring results (Table 2).
Table 1: Projected Credits
AREA
Wetland 1
Intact Wetlands
50ft Wetland Buffer
Upland Buffer
Total
ACRES
24.35
2.26
5.05
30.42
METHOD
Restoration
Preservation
Enhancement
Enhancement
RATIO
1:1
10:1
5:1
20:1
CREDITS
24.35
0.23
1.01
1.52
62.08
-
-
27.11
Table 2: Credit Release Schedule
%
Criteria
Released
Mitigation Plan approved, 15%
Site Specific Agreement
recorded, financial
account established
Construction Complete
15%
st
1 year Monitoring
10%
nd
2 Year Monitoring
15%
3rd Year Monitoring
20%
th
4 Year Monitoring
10%
5th Year Monitoring
15%
Credits
Released
4.07
Total
Released
4.07
15%
4.07
2.7
4.07
5.42
2.7
4.07
8.14
10.84
14.91
20.33
23.03
27.11
30%
40%
55%
75%
85%
100%
% Complete
6. MAINTENANCE PLAN
The wetland basin is fairly shallow and should be well-vegetated. This reduces the
impacts of erosion due to wave action, etc. Constructed ditch plugs, embankments,
excavations, and fill areas will have gradual slopes to minimize erosion due to moving
water. If applicable, and as determined in the final design plans, erosion control blankets
will be installed in certain areas to minimize erosion until vegetative cover can be
established. DU will monitor the site to determine if maintenance is required and
implement maintenance activities to correct any issues.
7. PERFORMANCE STANDARDS
Historical wetland basins (as determined in the forthcoming wetland delineation report)
that are restored within the project area should meet the criteria of soils, hydrology and
-3-
vegetation as found in the 1987 Corps of Engineers Wetland Delineation Manual. Based
on the proposed depths, the wetland fringe should be expected to be seasonal in nature
while the deeper interior could be considered more semi-permanent. The shallower
portions could be expected to develop emergent and possibly some submerged vegetation
while the deeper portion may stay partially open water and develop submerged aquatic
vegetation. Of course, the condition of the wetlands will be based entirely on hydroperiod. Given the dynamic nature of the North Dakota climate with dramatic swings from
extremely wet to extremely dry, it should be expected these wetlands follow the typical
wetland cycle based on the given climatic conditions at the time.
The 50' wetland buffer should meet a minimum 90% canopy cover. The remaining
upland cover outside the buffer zone but within the easement boundary shall exceed a
70% canopy cover.
The easement area can be hayed after July 15 or grazed according to FWS grassland
easement policy, or other alternately utilized conservation easement stipulations. In
addition, all noxious weeds within the easement area will be in compliance of the policy
set forth by the Pierce County Weed Control Board.
8. MONITORING REQUIREMENTS
DU will monitor the Seil Mitigation Site for a period of five years starting with the first
growing season after completion of construction. Monitoring will consist of delineating
wetland boundaries based on hydrology and vegetation criteria in the Great Plains
Regional Supplement to the Corps' Delineation Manual (USACE 2010). Transects will
be established in the first year and repeated in following years to show changes in
vegetation and hydrology. Sample points with photos will be taken along transects at
changes in vegetation community. Additional photo points will be established at various
other locations showing overall site vegetative development. DU will submit annual
monitoring reports to USACE no later than January 31 of the following year describing
the conditions of the site. The report will include information sufficient to determine
status of achieving performance standards. The report will include a map depicting
wetland boundaries, photo/sample points, and any relevant observation points or areas of
concern or management needs.
9. ADAPTIVE MANAGEMENT PLAN
Adaptive management will be carried out by DU, should corrective actions be deemed
necessary during annual monitoring. Actions will be taken to maintain the success and
viability of the wetland mitigation site. Management activities may include, but not
limited to; haying, grazing, weed spraying, planting/seeding, prescribed fire, hydrological
modifications, or other management activities as needed. All management activities will
be reported to USACE in annual monitoring reports.
-4-
10. LONG-TERM MANAGEMENT PLAN
Long-term management and maintenance will be provided by DU, its heirs, assigns or
successors; unless the easement lands are transferred to a state or federal resource
management agency or this responsibility is contractually conveyed to another person,
subject to approval by USACE. In addition, as a conservation easement will be placed on
the property and the easement holder will have authority to monitor and maintain the
integrity of the easement under their easement program guidelines. The long-term
management phase will be initiated upon certification of the Seil Mitigation Site. The
goal of the long-term management is to foster the long term viability of the project's
wetlands and upland habitats. DU will also designate a financial endowment sizeable
enough to assure site viability into the future.
11. SITE PROTECTION INSTRUMENTS
Ducks Unlimited, Inc. and a private individual (current landowner) have agreed in
principal to sign a Site Specific Agreement (SSA) for the 62 +/- acre mitigation parcel
(Figure 3). As part of the SSA, said individual has agreed to sign a conservation
easement. The preferred easement will be enrollment of the site into a perpetual wetland
and grassland combination conservation easement with USFWS. The easement will
perpetually protect against disturbance to the site by restricting land use. All activities on
the property are required to be consistent with the purposes of the easement, "to preserve
and protect in perpetuity fish and wildlife habitat". In the event that USFWS declines to
accept an easement, said landowner has agreed to a 99 year DU easement restricting
farming at the site, as stipulated in the SSA.
12. FINANCIAL ASSURANCES
DU is committed to funding the development of the project, including monitoring and
maintenance, with financial assurances. The financial assurances also include a
commitment to an endowment fund suitable in size to ensure the future viability of the
site which would be dedicated for long term management of the Seil Mitigation Site. The
endowment will be held by DU in an interest bearing account. The project development
costs, including the contingency and long-term management fund endowment, will be
funded by ILF credit sales in the Souris River Basin service area.
13. REFERENCES
Bryce, S.A., J.M. Omernik, D.E. Pater, M. Ulmer, J. Schaar, J. Freeouf, R. Johnson, P.
Kuck, and S.H. Azevedo. 1998. Ecoregions of North Dakota and South Dakota. (map
poster). U.S. Geological Survey, Reston, VA. Scale 1:1,500,000.
North Dakota Interagency Review Team (NDIRT) 2010. Wetland Mitigation Banking in
North Dakota. Interagency Guidance for Mitigation Bank Sponsors. 36 Pages.
-5-
N:\mitigation\ND\ND-552-2 NDILF_ Seil Mitigation Site\Mit_plan\Draft\Fig1_WatershedLocationMap.mxd
W
X
Legend
W
X
Seil ILF
North Dakota Counties
Devils Lake
Red River
Missouri South
Southwest Slope
Missouri North
Souris River
±
0
25
50
Miles
100
Figure 1
Project Location and Service Area
£
¤
2
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Mitigation Boundary
^
Project Site
^
.
Figure 2
Land Cover
T156 R72 S23 SE4
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Mitigation Boundary (65 Acres)
^
Project Site
^
.
Figure 3
Easement Boundary
T156 R72 S23 SE4
#1
23
24
156072
25
26
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Drain
Proposed Ditch Fill
Proposed Excavation Area - 24.35 Acres
Wetland Buffer 50ft - 5.05 Acres
Preservation Wetlands - 2.26 Acres
Upland Buffer - 30.42 Acres
^
Project Site
^
.
Figure 5
Design Concept