REISSUANCE TO CLARIFY THE PERMITTING PROCESS: Falkirk Mining Company is seeking re-authorization of its mining operations at the Falkirk Mine in McLean County, North Dakota. Current operations are covered under the 2012 Nationwide Permits number 21, which expires on March 18, 2018. Mine Areas are located within East Permit (NAFK-8405) Townships 145 and 146 North, Range 82 and 81 West; Future Permit 7th Addition (NAFK-8405) Township 146 North, Range 82 West; West Permit (NAFK-87-05) Township 145 North, Range 82 West, Township 146 North, Range 82 West and Township 146 North, Range 83 West; and Riverdale Permit (NAFK-9503) Township 144 North, Range 83 West, Township 144 North, Range 84 West, Township 145 North, Range 82 West, Township 145 North, Range 83 West, Township 145 North, Range 84 West, Township 146 North, Range 83 West and Township 146 North, Range 84 West, all in McLean County, North Dakota. The mine area is approximately 50,251 acres, much of which is outside of Corps jurisdiction and in uplands. Mine operations are covered under North Dakota Public Service Commission (PSC) Permit Nos. NAFK-84-05 (East Permit); NAFK-8405 (Future 7th Addition); NAFK-8705 (West Permit; and NAFK-9503 (Riverdale Permit). Approximately 1,080.25 acres of wetlands and other waters have been identified in the mine area and will be filled as a result of mine operations. The PSC requires all wetlands impacted by mine operations be reconstructed. The mine plans are specifically designed to: insure no net loss of wetland acreage, minimize the farming hindrance wetlands create, and maximize the wetlands wildlife value. Currently Falkirk Mine is developing temporal mitigation sites.
REISSUANCE TO CLARIFY THE PERMITTING PROCESS: Falkirk Mining Company is seeking re-authorization of its mining operations at the Falkirk Mine in McLean County, North Dakota. Current operations are covered under the 2012 Nationwide Permits number 21, which expires on March 18, 2018. Mine Areas are located within East Permit (NAFK-8405) Townships 145 and 146 North, Range 82 and 81 West; Future Permit 7th Addition (NAFK-8405) Township 146 North, Range 82 West; West Permit (NAFK-87-05) Township 145 North, Range 82 West, Township 146 North, Range 82 West and Township 146 North, Range 83 West; and Riverdale Permit (NAFK-9503) Township 144 North, Range 83 West, Township 144 North, Range 84 West, Township 145 North, Range 82 West, Township 145 North, Range 83 West, Township 145 North, Range 84 West, Township 146 North, Range 83 West and Township 146 North, Range 84 West, all in McLean County, North Dakota. The mine area is approximately 50,251 acres, much of which is outside of Corps jurisdiction and in uplands. Mine operations are covered under North Dakota Public Service Commission (PSC) Permit Nos. NAFK-84-05 (East Permit); NAFK-8405 (Future 7th Addition); NAFK-8705 (West Permit; and NAFK-9503 (Riverdale Permit). Approximately 1,080.25 acres of wetlands and other waters have been identified in the mine area and will be filled as a result of mine operations. The PSC requires all wetlands impacted by mine operations be reconstructed. The mine plans are specifically designed to: insure no net loss of wetland acreage, minimize the farming hindrance wetlands create, and maximize the wetlands wildlife value. Currently Falkirk Mine is developing temporal mitigation sites.
PUBLIC NOTICE
Application No: NWO-2017-1364-BIS
Applicant:
Falkirk Mining Company
US Army Corps
of Engineers
Omaha District
Waterway:
Unnamed Wetlands
Activity:
Falkirk Mine
Issue Date:
August 14, 2017
Expiration Date: September 4, 2017
North Dakota Regulatory Office
3319 University Drive
NOTICE OF
PENDING PERMIT EVALUATION
21 Day Notice
Bismarck ND 58504
Introduction. The U.S. Army Corps of Engineers, North Dakota Regulatory Office is reissuing
this Public Notice on the Falkirk Coal Mine to clarify the permitting process. The Falkirk Coal
Mine was originally constructed in 1975 and began delivery of lignite coal to the Coal Creek
Station in 1978. Over the years, The U.S. Army Corps of Engineers has permitted the mining
activities through Nationwide 21 for Coal Mining Activities. Falkirk Coal Mine would then have
to re-apply for a new Nationwide verification letter every five years to continue operations.
Falkirk Coal Mine has applied and been issued numerous Nationwide 21 verification letters over
the years and is currently permitted through March 17, 2018. However, under the reissued
Nationwide Permit #21 for 2017, the total wetland and waters of the U.S. impacts are limited to
½ acre or less. The 2007 and 2012 Nationwide Permit #21 had no specified acreage limit. In
order to provide stability and alleviate long-term uncertainty in the Clean Water Act Section 404
permitting process, the Corps has determined that the issuance of a standard permit is in the
best interest of the general public. The standard permit will be issued for the life of the mining
operation.
Operations are anticipated to continue until the year 2045 and are located within Falkirk's East
Permit (NAFK-8405), West Permit (NAFK-8705), the Riverdale Permit (NAFK-9503) approved
by the North Dakota Public Service Commission. Also included is a future permit addition (7th
Addition) that will be added to Falkirk's East permit (NAFK-8405). The application is being
evaluated under Section 404 of the Clean Water Act [33 USC 1251, et seq.]. Section 404
regulates the discharge of dredged or fill material in waters of the United States.
·
·
PUBLIC NOTICE. The purpose of this public notice is to inform the public; Indian Tribes;
Federal, state and local agencies/officials; and other interested parties of a 15-day comment
period in which written comments in conjunction with the applicant's project may be
submitted to the US Army Corps of Engineers (Corps). Solicitation of comments regarding
impacts to endangered species, historic properties, water quality, general environmental
concerns and other public interest factors are discussed herein. Written comments must be
postmarked by September 4, 2017, prior to closure of the public notice administrative
record.
PUBLIC HEARING. Before the expiration date of this notice, anyone may request, in
writing, that a public hearing be held to consider this application. Requests shall specifically
state the reason(s) for holding a public hearing. The District Engineer shall determine
whether a hearing is necessary to obtain additional public interest information. If a public
hearing is warranted, interested parties will be notified of the time, date, and location.
Project Information.
The project site is located north of Washburn on State Highway 83 for approximately 7 miles;
PUBLIC NOTICE NWO-2017-1364-BIS
[Falkirk Mining Company, Falkirk Mine]
turn left onto 1st Street SW for approximately 2 miles; The Mine Areas are located within East
Permit (NAFK-8405) Townships 145 and 146 North, Ranges 82 and 81 West, of the 5th Principal
Meridian (P.M.); Future Permit 7th Addition (NAFK-8405) T146N, R82W; West Permit (NAFK8705) T145N, R82W, T146N, R82W and T146N, R83W; Riverdale Permit (NAFK-9503) T144N,
R83W, T144N, R84W, T145N, R82W, T145N, R83W, T145N, R84W, T146N, R83W and
T146N, R84W; McLean County, North Dakota.
Please Note, the Corps is neither funding nor constructing the proposed project and has
authority over only a very small percentage of the overall 50,251-acre project area. The
majority of the project will be outside of Corps jurisdictional lands and in uplands, which are not
regulated by Sections 404/10.
PROJECT PURPOSE. The applicant's stated project purpose is "to mine coal reserves from the
Hagel, Travis Creek, Coal Lake Coulee and Kinneman Creek Beds, to provide combustible fuel
to Great River Energy's, Coal Creek Station power plant and Spiritwood Station power plant to
produce electricity..." The Corps determined that the overall project purpose is to mine coal
reserves.
PROJECT DESCRIPTION. The applicant proposes to mine coal reserves from the Hagel,
Travis Creek, Coal Lake Coulee and Kinneman Creek Beds. The Falkirk Mine surface lignite
mining operations are anticipated to continue until the year 2045 and are located within Falkirk
Mining Company East Permit (NAFK-8405) approximately 8,777 acres, West Permit (NAFK8705) approximately 10,486 acres, the Riverdale Permit (NAFK-9503) approximately 29,310
acres approved by the North Dakota Public Service Commission. Also included is a future
permit addition (7th Addition) that will be added to Falkirk's East permit consisting of
approximately 1,678 acres. Approximately 1,080.25 acres of wetlands and other waters have
been identified within the mine areas and will be disturbed as a result of the mining activities.
Total acreage within the project area is approximately 50,251-acres. Corps jurisdiction on the
1,080.25-acres of wetlands/waters has yet to be determined. Falkirk Mine will use standard
surface mining techniques to extract coal from the proposed project area. Mining operations will
typically occur in the following sequence of eight events; surface water control (build
sedimentation ponds), suitable plant growth material (SPGM) removal, overburden removal,
coal removal, overburden replacement, final grading, SPGM replacement and revegetation.
SPGM will generally be removed by hydraulic shovels and mining trucks, as well as by tractorscrapers and track dozers. The SPGM will either be stockpiled in areas designated for
topsoil/subsoil stockpiles or will be directly respreads onto approved regraded areas. The
SPGM stripping operation is generally scheduled for two shifts per day, five days per week. An
annual soils handling plan presented to the North Dakota Public Service Commission (PSC)
each spring details specific soil stripping locations. Overburden removal includes the removal of
any material between the SPGM and the mineable coal seam. Interburden removal includes
the removal of any material below the mineable coal seam and above the next mineable coal
seam. Overburden and/or interburden removal is accomplished with the use of draglines,
electric and hydraulic truck-shovel fleets, tractor-scrapers or other auxiliary equipment. The
truck-shovel fleets will be used for pre-benching off coal behind the dragline, opening a boxcut
pit to allow the dragline room to spoil and tie into, as well for digging pits along the cropline
where shallow cover and steep slopes prohibit the use of the dragline. Once the overburden
has been removed, the coal surface is cleaned with the rubber-tired dozer. The coal seam will
be ripped with the track dozer ripping shank to a size that can be loaded into the haul trucks.
2
PUBLIC NOTICE NWO-2017-1364-BIS
[Falkirk Mining Company, Falkirk Mine]
Coal will be loaded by either an electric shovel or front-end loader, and hauled by trucks. After
the coal is removed, overburden from the next pit is spoiled into the empty pit and the mining
operation evolves into a reclamation operation. Spoil grading will occur so that no more than
four spoil peaks are standing at any one time, except in isolated variance areas. The mined
area will be final graded to the approved post-mining topography and then the SPGM will be
respreads. The new SPGM respreads will be field worked and seeded to the approved postmine land use.
CONSTRUCTION METHODS. Typical mining machinery and equipment will be used for the
project including, hydraulic shovels, front-end loaders, tractor-scrapers, truck dozers, draglines,
etc... Proposed work will typically occur in a sequence of eight events: surface water control
(build sedimentation ponds), suitable plant growth material (SPGM) removal, overburden
removal, coal removal, overburden replacement, final grading, SPGM replacement and revegetation.
ANTICIPATED ENVIRONMENTAL IMPACTS.
· Wetlands and Other Waters of the United States. Approximately 1,080.25 acres of
wetlands and other waters have been identified within the mine areas and will be
disturbed as a result of the mining activities. Wetland processes and functions will be
affected by the surface lignite mining operations. This acreage number is based on the
Corps having jurisdiction over all waters within the mine site. This mine is located in the
prairie potholes region of North Dakota and may have many isolated, non-jurisdictional
waters included in the total. The Falkirk Mine may, at any time, request an approved
jurisdictional determination for any portion of the mine site. Actual jurisdictional waters
on site may be much less than the 1,080.25 acres indicated above.
· Woodlands. No woodlands would be impacted.
· Grasslands. No grasslands would be impacted.
COMPENSATORY MITIGATION. Falkirk Mine is currently working on a mitigation plan. The
Corps will incorporate all terms and conditions of the existing Public Service Commission (PSC)
Mine permit as a condition of the standard permit. In most cases, the PSC requires a mine
reclamation plan that includes restoring the natural topography and replacing wetlands and
waters where practical. The Corps will also consider long-term sedimentation ponds as
mitigation for temporal losses.
ALTERNATIVES. Three alternatives were analyzed including two action and one no-action.
National Environmental Policy Act of 1969 ["NEPA"] (42 USC 4321 et seq.; Public Law 91190) NEPA Statement: NEPA is the Nation's basic charter for protection of the environment.
NEPA is to provide decision-makers and the public full disclosure of the environmental
consequences of taking an action so they can make informed decisions. NEPA itself does not
impose substantive duties mandating particular results, but prescribes the necessary process
for preventing uninformed agency action.
Section 106 of the National Historic Preservation Act ["NHPA"] (54 USC 306108). Cultural
Resources Statement: The Omaha District will comply with the NHPA and amendments and
the procedures set forth in 33 CFR, Appendix C. We will evaluate input by Indian Tribes, the
North Dakota State Historic Preservation Officer (SHPO), and any interested parties in response
3
PUBLIC NOTICE NWO-2017-1364-BIS
[Falkirk Mining Company, Falkirk Mine]
to this public notice. The Corps' initial review is that the project would not affect properties
listed, or eligible for listing, on the National Register of Historic Places.
Section 404(b)(1) Guidelines ["Guidelines"] (40 CFR 230 Subpart B): These Guidelines are
the substantive environmental criteria used in evaluating the discharges of dredged or fill
material in waters of the United States under Section 404 of the Clean Water Act and are
applicable to all 404 permit decisions. The purpose of these Guidelines is to restore and
maintain the chemical, physical, and biological integrity of United States waters through the
control of discharges of dredged or fill material. Fundamental to the Guidelines is an
understanding that dredge or fill material should not be discharged into such waters unless it is
demonstrated that such discharges would not have unacceptable adverse impacts either
individually or in combination with existing and/or probable impacts of other activities affecting
the environment.
Section 401 of the Clean Water Act ["Water Quality Certification"] (33 USC Section 1341)
Water Quality Certification Statement: The North Dakota Department of Health, Division of
Water Quality, 918 East Divide Avenue, Bismarck, North Dakota 58501-1947, will review the
proposed project for State certification in accordance with the provisions of Section 401 of the
Clean Water Act. The certification, if issued, will express the State's opinion that the project will
not result in a violation of applicable water quality standards. Although water quality certification
is a prerequisite for issuance of a DA permit, certification alone does not guarantee a DA permit
will be issued for the project.
Endangered Species Act of 1973 ["ESA"] (16 USC 1531, et seq.) Pursuant to the
Endangered Species Act, the proposed project is being reviewed for impacts to threatened
and/or endangered species and their critical habitat. This project is within the known range of
the Interior Least Tern (E), Whooping Crane (E), Black-Footed Ferret (E), Gray Wolf (E), Piping
Plover (T), Rufa Red Knot (T), Northern Long-Eared Bat (T) and the Sprague's Pipit (C). Critical
habitat also exists for the Piping Plover within Mercer County. During the review process a "No
Effect" determination has been made as there have been no listed species identified within the
Corps action area.
Public Interest Review [33 CFR 325.3(c)(1)]: The public interest review procedures call for
weighing the benefits that reasonably may be expected to accrue from the proposed project.
These are balanced against its reasonably foreseeable detriments and results in reaching a
determination that expresses the public interest. Public interest factors include all factors
which may be, or may become, relevant to this project, such as conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife
values, flood hazards, floodplain values, land use, navigation, shoreline erosion and
accretion, recreation, water supply and conservation, water quality, energy needs, safety,
food and fiber production, mineral needs, considerations of property ownership and, in
general, the needs and welfare of the people. The decision whether to issue a permit is
based on an evaluation of those factors and the probable impact, including cumulative
impacts, and reflects the national concern for both the protection and utilization of important
natural resources.
The 404(b)(1) Guidelines and the Public Interest Review are both administrative processes
required as part of the Regulatory Program, but they are independent of each other. A project
4
PUBLIC NOTICE NWO-2017-1364-BIS
[Falkirk Mining Company, Falkirk Mine]
must be in compliance with the Guidelines and must not be contrary to the public interest in
order to be permitted by the Army Corps of Engineers.
Anyone whose interests may be affected by the applicant's proposal is invited to submit
favorable or unfavorable written comments to the U.S. Army Corps of Engineers [Omaha
District] North Dakota Regulatory Office, 1513 South 12th Street, Bismarck, North Dakota
58504. Comments must be submitted on or before the date on the front of this notice to be
considered in subsequent actions on this application. For additional information, you may
contact Mr. Benjamin Reile, Project Manager, by e-mail at Benjamin.D.Reile@usace.army.mil or
Patricia L. McQueary, Regulatory Program Manager, by e-mail at
Patricia.L.Mcqueary@usace.army.mil, at telephone number (701) 255-0015, extension 2001, or
by visiting the North Dakota Regulatory Office.
Request to Postmasters: Please post this notice in a conspicuous place until the expiration
date specified at the top of page one.
Notice to Editors: This notice is provided for your use in developing news stories only. No
payment for publication will be provided.
ATTACHMENTS (1 Total)
5
NWO-2017-1364-BIS, Page 1 of 1
U.S
w
igh
.H
83
ay
State Highway 200
FUTURE PERMIT
ADDITION
LANDENBERGER'S
SLOUGH
State Highway 200
UNDERWOOD
EAST PERMIT
NAFK-8405
C
A
O
L
LA
E
K
WEST PERMIT
NAFK-8705
FALKIRK
MINE
GREAT RIVER
ENERGY
y 83
ighwa
U.S. H
SAMUELSON'S
SLOUGH
RIVERDALE PERMIT
NAFK-9503
MI
MISSO
SS
O
UR
IR
IV
ER
2801 1st Street SW
Underwood, ND 58576-1087
(701) 442-5751 - Fax (701) 250-2473
PERMIT BOUNDARY
PRIMARY ROADS
5280'
WASHBURN
T HE F AL KIRK
M INING C OMP ANY
LEGEND
0'
ER
URI RIV
State Highway 200A
WELLER'S
SLOUGH
10560'
0
JJF