Home

Nashville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for alternatives for detention structures located in Gallatin's Triple Creek Park in Tennessee on two unnamed tributary creeks.

The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for alternatives for detention structures located in Gallatin's Triple Creek Park in Tennessee on two unnamed tributary creeks.

DEPARTMENT OF THE ARMY NASHVILLE DISTRICT, CORPS OF ENGINEERS 110 9TH AVENUE SOUTH, ROOM A-405 NASHVILLE, TENNESSEE 37203 IN REPLY REFER TO

AUG 1,.0' 2017

Project Planning Branch TO ALL INTERESTED PARTIES: The U.S. Almy Corps of Engineers, Nashville District in accordance with the National Environmental Policy Act (NEPA) is preparing a Feasibility Study and Environmental Assessment (EA) to assess the impacts of proposed flood risk management (FRM) measures for the City of Gallatin, Sumner County, Tennessee (enclosure 1). The EA would provide the basis for a decision whether to proceed with preparation of an Environmental Impact Statement (EIS) or a Finding of No Significant Impact. The City of Gallatin is located in Middle Tennessee in Sumner County. The city lies 25 miles north of Nashville. East Camp Creek watershed lies in the southeastern pali of Sumner County covering a total of 46.2 square miles. The watershed has a long history of flood damages. Flooding occurred in 1926, 1975, 1978, and 2010. This study is being conducted under the authority of section 205 of the Flood Control Act of 1948, as amended. Projects implemented under this authority are formulated for structural or non-structural measures for flood damage reduction. There are three action alternatives to be analyzed in the study in addition to a No Action Alternative. All three action alternatives considered are detention structures located in Gallatin's Triple Creek Park on two unnamed tributary creeks (see enclosure 2) which would be designed to hold higher flood .waters for a time in order to more slowly release them downstream. The No Action Alternative, would be no FRM measures being implemented. Consideration of the "No Action" alternative is required under NEPA (where no federal action or work would be done). The impacts of the "No Action" alternative are used as a baseline to compare impacts of other alternatives considered. The Entrance Detention Structure alternative would be a structure located neeµ· the entrance of the park close to Highway 3 lE. The Touchdown Detention Structure alternative would include raising the elevation of Touchdown Drive to act as a detention structure. The third alternative would be a combination of Entrance and Touchdown Detention Structures. Other measures that have been considered but will not be considered in detail due to various reasons include stream bank modifications, bridge removal/modifications, and nonstructural measures including structure raising/removal. By way of this letter, the Corps is soliciting public and agency comments concerning environn1ental or socioeconomic issues that should be addressed in the course of the NEPA process. We encourage comments not only about the immediate project area, but also of plans or proposals for any other development that may impact or influence project resources . This letter also serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. Section 106, implemented by regulations at 36 CFR 800, requires the Corps of Engineers to consider the effects of its unde1iakings on historic

-2 properties. If required, appropriate architectural and archeological investigations would be conducted within those areas affected by the proposed activities and resulting findings would be coordinated with the Tennessee State Historic Preservation Officer, Federally Recognized Tribes, and other consulting parties. Comments may be submitted within 30 days to the address on the letterhead or electronically to CorpsLRNPlanningPublicCom@usace.army.mil. For additional information regarding the proposed project, please contact Chip Hall at (615)736-7666. Sincerely,

1-:J~,, '?J,~ ~('Craig D. Carrington Chief, Project Planning Branch Enclosures

r·" ' \

,i

\

I

\

\', r ~·\ j i} J ~

'I

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas