The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for alternatives for detention structures located in Gallatin's Triple Creek Park in Tennessee on two unnamed tributary creeks.
The U.S. Army Corps of Engineers is seeking public and agency comments concerning environmental or socioeconomic issues that should be addressed in the course of the NEPA process for alternatives for detention structures located in Gallatin's Triple Creek Park in Tennessee on two unnamed tributary creeks.
DEPARTMENT OF THE ARMY
NASHVILLE DISTRICT, CORPS OF ENGINEERS
110 9TH AVENUE SOUTH, ROOM A-405
NASHVILLE, TENNESSEE 37203
IN REPLY REFER TO
AUG 1,.0' 2017
Project Planning Branch
TO ALL INTERESTED PARTIES:
The U.S. Almy Corps of Engineers, Nashville District in accordance with the National
Environmental Policy Act (NEPA) is preparing a Feasibility Study and Environmental
Assessment (EA) to assess the impacts of proposed flood risk management (FRM) measures for
the City of Gallatin, Sumner County, Tennessee (enclosure 1). The EA would provide the basis
for a decision whether to proceed with preparation of an Environmental Impact Statement (EIS)
or a Finding of No Significant Impact.
The City of Gallatin is located in Middle Tennessee in Sumner County. The city lies 25 miles
north of Nashville. East Camp Creek watershed lies in the southeastern pali of Sumner County
covering a total of 46.2 square miles. The watershed has a long history of flood damages.
Flooding occurred in 1926, 1975, 1978, and 2010. This study is being conducted under the
authority of section 205 of the Flood Control Act of 1948, as amended. Projects implemented
under this authority are formulated for structural or non-structural measures for flood damage
reduction.
There are three action alternatives to be analyzed in the study in addition to a No Action
Alternative. All three action alternatives considered are detention structures located in Gallatin's
Triple Creek Park on two unnamed tributary creeks (see enclosure 2) which would be designed
to hold higher flood .waters for a time in order to more slowly release them downstream. The No
Action Alternative, would be no FRM measures being implemented. Consideration of the "No
Action" alternative is required under NEPA (where no federal action or work would be done).
The impacts of the "No Action" alternative are used as a baseline to compare impacts of other
alternatives considered. The Entrance Detention Structure alternative would be a structure
located neeµ· the entrance of the park close to Highway 3 lE. The Touchdown Detention
Structure alternative would include raising the elevation of Touchdown Drive to act as a
detention structure. The third alternative would be a combination of Entrance and Touchdown
Detention Structures. Other measures that have been considered but will not be considered in
detail due to various reasons include stream bank modifications, bridge removal/modifications,
and nonstructural measures including structure raising/removal.
By way of this letter, the Corps is soliciting public and agency comments concerning
environn1ental or socioeconomic issues that should be addressed in the course of the NEPA
process. We encourage comments not only about the immediate project area, but also of plans or
proposals for any other development that may impact or influence project resources . This letter
also serves to initiate the public involvement requirements of Section 106 of the National
Historic Preservation Act of 1966, as amended. Section 106, implemented by regulations at 36
CFR 800, requires the Corps of Engineers to consider the effects of its unde1iakings on historic
-2
properties. If required, appropriate architectural and archeological investigations would be
conducted within those areas affected by the proposed activities and resulting findings would be
coordinated with the Tennessee State Historic Preservation Officer, Federally Recognized
Tribes, and other consulting parties.
Comments may be submitted within 30 days to the address on the letterhead or electronically
to CorpsLRNPlanningPublicCom@usace.army.mil. For additional information regarding the
proposed project, please contact Chip Hall at (615)736-7666.
Sincerely,
1-:J~,, '?J,~
~('Craig D. Carrington
Chief, Project Planning Branch
Enclosures