St Lucie County. Port St. Lucie Town Place Partners, LLC. Boca Raton. FL. PROJECT PURPOSE: Basic: The basic project purpose is to construct a multi-family residential and commercial development. Overall: The overall project purpose is to construct a multi-family residential and commercial development within Port St. Lucie, St. Lucie County, Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Port St. Lucie Town Place Partners, LLC
Attention: Barry Kupferberg
3767 Coventry Lane
Boca Raton, FL 33496
WATERWAY AND LOCATION: The project would affect waters of the United States associated with 1.15 acres of freshwater wetlands. The project site is located within a vacant lot at the southeast corner of the intersection of US 1 and Savanna Club Boulevard, in Section 26, Township 36 South, Range 40 East, Port St. Lucie, St. Lucie County, Florida.
Directions to the site are as follows: From the Florida Turnpike (State Road 91), take Exit 142 for Port St. Lucie Boulevard. Keep right and turn onto SE Bayshore Boulevard, and then turn right (Travel east) onto Port St. Lucie Boulevard. In 2.34 miles turn left onto SE Midport Road. Travel 2.16 miles and continue straight on Walton Road. Drive 0.13 miles and turn left onto US Highway 1. Travel 1.06 miles and turn right onto Savanna Club Boulevard. Destination will be on the right in 0.18 miles.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 27.3108°
Longitude: -80.3091°
PROJECT PURPOSE:
Basic: The basic project purpose is to construct a multi-family residential and commercial development.
Overall: The overall project purpose is to construct a multi-family residential and commercial development within Port St. Lucie, St. Lucie County, Florida.
EXISTING CONDITIONS: The approximately 18.51 acre project area contains a total two wetland areas for a total of 1.52 acres of freshwater wetlands (1.14 acres and 0.38 acres) that was confirmed by the Corps during a site visit on 16 November 2016. Approximately 81% of the site has been previously cleared, and consists mostly of weedy vegetation and surrounded almost completely by a manmade berm. With the exception of earleaf acacia, no other trees exist in this open area. The site contains approximately 2 acres of pine flatwoods dominated by slash pine.
Project History: By letter dated 3 May 2005, the Corps issued a no permit required letter to the applicant for the construction of a multi-family residential and commercial development currently known as Bella Vista Commercial Parcel. At the time the Corps issued a jurisdictional determination (JD) that the onsite wetland located in the northern portion of the project was not jurisdictional. The site was partially cleared but no construction has occurred. In 2016 the Corps issued an approved JD that stated all wetlands onsite were jurisdictional
PROPOSED WORK: The applicant seeks authorization to fill 1.14 acres of freshwater wetlands to construct a multi-family residential and commercial development and associated stormwater management system. The applicant will purchase credits at the federally approved Bluefield Ranch Mitigation Bank as compensatory mitigation for unavoidable impacts to onsite wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has stated that they have avoided and minimized wetland impacts to the maximum extent practicable. Minimal wetland impacts are proposed to accommodate separate ingress/egress to the bifurcated zoning of the site, stormwater retention, and reasonable use of the property, a total of 1.15 acres of existing freshwater wetlands and approximately 0.36 acres of native uplands are proposed to be impacted. The remaining 0.37 acres of freshwater wetlands, as well as 0.97 acres of adjacent uplands are currently under a conservation easement. The proposed site plan would add 0.01 acres to the upland area. This wetland/upland system under the conservation easement is contiguous with 19.66 acres of freshwater wetlands and pine flatwood buffer east of the project site, making wetland A, along the west side of the site a better choice to impact. Any further reduction of wetland impacts would make the project not practicable or feasible to the applicant.”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The applicant will purchase credits at the federally approved Bluefield Ranch Mitigation Bank as compensatory mitigation for unavoidable impacts to onsite wetlands.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the Eastern indigo snake (Drymarchon couperi); and wood stork (Mycteria americana). The U.S. Fish and Wildlife has given programmatic concurrence with this determination and no further coordination is required.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal will not impact essential fish habitat because no EFH is locate within the project area. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410 within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Linda Knoeck in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; by facsimile transmission at (561)626-6971; or, by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
PROJECT NO. 1669
Construction Plans and Specifications
Of
Project
Location
TOWN PLACE
TOWN PLACE
City of Port St. Lucie, Florida
Paving, Grading & Drainage Plan
LOCATION MAP
NOTES:
THESE PLANS ARE IN ENGLISH UNITS. ALL
ELEVATIONS HEREIN REFERENCE N.A.V.D. 1988
DATUM. ADD 1.48 FEET TO CONVERT TO N.G.V.D.
1929 DATUM. ALL CONSTRUCTION IS TO BE IN
ACCORDANCE WITH FLORIDA DEPARTMENT OF
TRANSPORTATION STANDARDS AND SPECIFICATIONS.
Lying In
Section 26, Township 36 S. , Range 40 E.
St Lucie County, Florida
ENGINEER
SHEET INDEX
MR. JOSEPH W. CAPRA, P.E.
CAPTEC ENGINEERING, INC.
301 NW FLAGLER AVENUE
SUITE 201
P.E. NO. 37638
STUART, FLORIDA 34994
PHONE: (561) 692-4344
FAX:
(561) 692-4341
SHEET
NUMBER
S-
YU
HW
PROJECT
AREA
PROJECT
AREA
1
OWNER
SAVANNA CLUB BLVD.
PSL TOWN PLACE PARTNERS, LLC
RICHARD LUNDY
3737 COVENTRY LANE
BOCA RATON, FLORIDA 33467
OFFICE: (772) 446-7344
SHEET TITLE / DESCRIPTION
1
COVER SHEET
2
SITE PLAN
3
EROSION CONTROL PLAN
4
MASTER DRAINAGE PLAN
5-8
9
PAVING, GRADING AND DRAINAGE PLAN
OFFSITE DRAINAGE PLAN
10
DRAINAGE DETAILS
11
GENERAL NOTES
VILLAGE GREEN DR.
Civil Engineering Professionals
Engineering Business
No. EB-0007657
Vicinity Map
Site Map
TOWN PLACE
PROJECT NO. 1669
Location Map
Lake Lucie
Wetland A
To Be Filled
50 E. Ocean Blvd., Suite 101
Stuart, Florida 34994
STOP BAR, 2' WIDE, WHITE
30"x30" STOP SIGN (TYP)
Land Use
TOB
Boundary
TOB
Site
Entry Sign
TO
TOB
B
B
TO
DOUBLE 4" YELLOW (TYP)
TO
B
30' UPLAND
PRESERVE
B
TO
TOB
va
nn
aC
TO
B
lub
B
B
TO
6' Wall Typ.
B
10
d.
'U
B
TOB
A 18
3-S Units
tor
y
TOB
tili
ty
me
nt
B
TO
B
9.5' x 16'
Typ.
Residential
Area
B
TO
3
8
TOB
19
6' Sidewalk
Typ.
12
Shallow
Wet Pond
0.89 Ac
B
600 sf
General Commercial Parcel
Multi-family Parcel
Fence Typ.
Pool
20'x40'
Commercial Data
9
TO
Commercial / Retail
B
B
TOB
erc
ial
9
8
Bella Vista
TOB
TOB
Residential Data
TOB
alk
ew n
Sid ectio
nn
Co
11
12
Emergency
Access
s
Multi-family Parcel - Total Site Area
Proposed Apartment Units
B
ide
wa
lk
Art
Are
10
Parking Data
9.5' x 18' Typ.
12
a
blic
Copyright
Pu
pa
ces
gS
41
7
T
in
ark
9
22
B.
.O.
8
9.5' x 16'
Typ.
P
mm
Enclosed
Garages
B.
.O.
24 Units
4-Story
T
ial
erc
Wet Pond - Deep
0.55 Ac
7
/R
21
9
C
C
C
C
C
C
C
C
C
11
C
C
C
C
C
193 Spaces
2 Spaces per Unit ( 84 units x 2)
168 Spaces
Guest Parking - 1 Space per 5 Units (84 Units / 5)
17 Spaces
The following drawings are instruments of service to the
Landscape Architect. They are not products of design. All
ideas, designs, arrangements, and plans indicated or
represented by this drawing are owned by and the property of
the designer, and were created, evolved, and developed for
use on and in connection with the specified project. None of
such ideas, designs, arrangements, or plans shall be used by
or disclosed to any person, firm, or corporation for any
purpose whatsoever without the written permission of the
designer.
Pool Area Parking
Pool Building - 1 Space per 200 sf (600 sf / 200)
3 Spaces
Pool & Pool Deck - 1 Space per 600 sf (3,000 sf / 600)
Provided Parking
5 Spaces
190 Spaces
Legend
9
il
eta
alk
ew n
Sid ectio
nn
Co
r
ffe
Bu t
pe
n
sca seme
nd
a
yE
tilit
' La
Co
15
'U
10
alk
ew tion
Sid nnec
Co
D
11
22
Required Parking
10' Landscape Buffer Typ.
22
a
18
C
10.96 DU/AC
TO
.S
Ex
Sp
7.66 Ac
84 Units
Gross Site Density ( 84 DU / 7.66 Ac )
ace
12
441 Spaces
Wetland B
12
7
17
3P
Total Commercial / Retail Provided Parking
il
eta
Art
Pu
g
rkin
432 Spaces
81,542 SF @ 5 per 1000 SF
9.5' x 16'
Typ.
/R
blic
Commercial / Retail Required Parking
C
24 U
nits
4-St
ory
B
TO
r
ffe
Bu t
pe
n
sca seme
nd
a
' La ity E
til
'U
Commercial / Retail
Area16
a
Are
Parking Data
Enclosed
Garages
mm
Co
15
14
22
12
City of Port St. Lucie
6' Wall
Typ.
YIELD SIGN WITH
PAVEMENT MARKING (TYP)
22
y1
wa
igh
.H
10
U.S
2
19
TO
17
S
B
ing
rk
Pa
81,542 SF
8
TO
22
± 10.85 Ac
± 7.66 Ac
Building Data
s
ce
pa
± 18.51 Ac
Town Place
22
Total Site
8
7
TO
9
B
FIRE LANE
STRIPED AREA
Site Data
11
TO
18
TOB
il
eta
/ R .)
ial ROX
erc (APP
mm 2 SF
Co 41,95
"NO PARKING FIRE LANE"
SIGN (TYP)
B 1
8
3-S Units
tor
y
9.5' x 18'
Typ.
5
11
B
998 Town Place Boulevard
Port St. Lucie, FL 34952
12
4
12
Site Address
TO
TO
6
8
B
se
9
Land Use
Boundary
3737 Coventry Lane
Boca Raton, FL 33467
TO
Ea
8
Owner Address
Blv
TO
TO
Offsite Wetland
Sa
TO
Shallow
Wet Pond
0.24 Ac
T 772.678.7200
F 772.678.7201
Florida
TOB
TOB
TOB
TOB
TOB
Preliminary Site Plan
sed
po
c
Pro ceTra
Ra
TOB
9.5' x 18' Typ.
C
Dumpster
Area
35' UPLAND
PRESERVE
C
Compact Parking Space (30 Shown )
- 9' x 18' Typ. or 9' x 16' with 2' overhang when located
along perimeter.
7
(12' x 12' Each
- 4 total)
Wetland To Be Filled
5
6
10' Landscape Buffer Typ.
Scale: 1" = 50'
9.5' x 16' Typ.
lk
wa
ide
.S
Ex
9
0'
25'
50'
100'
150'
Sheet
2 11
of
6. BOUNDARY MARKERS WILL BE PLACED AT THE CORNERS OF RESIDENTIAL LOTS,
ABUTTING PRESERVE AREAS. ALL SIGNS AND BOUNDARY MARKERS WILL BE
APPROVED BY THE MARTIN COUNTY ENVIRONMENTAL PLANNING ADMINISTRATOR
AND WILL BE PLACED PRIOR TO ISSUANCE OF BUILDING PERMIT FOR
CONSTRUCTION ON THIS SITE.
7. FOLLOWING CERTIFICATION OF OCCUPANCY FOR THE DEVELOPMENT, ALL
BARRICADES AND EROSION CONTROL DEVICES SHALL BE REMOVED AND
DISPOSED OF BY THE CONTRACTOR.
8. RELOCATION OF UTILITY LINES SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2%
ER
EXISTING PAVED
2% OR GREAT
ROADWAY
FILTER FABRIC
TOP OF BANK
ELEVATION
X.XX NAVD
TO X.XX NAVD
1
4
(MAX. SLOPE)
BOTTOM = X.XX NAVD
MAX DEPTH OF DEWATERING
= EL. (-) X.XX NAVD
(FOR INSTALLATION OF LIFT STATION)
TYPICAL DRY DETENTION AREA
NTS
DEWATERING PUMPING OPERATIONS
NOTES FOR DEWATERING
AVERAGE DAILY PUMPAGE
A SINGLE (1) 2,500 GPM, 8" DISCHARGE PUMP
OPERATING AT 40% MAXIMUM CAPACITY FOR AN
AVERAGE PUMPING RATE OF
2,500 GPM x 40% x 1 PUMP = 1,000 GPM
FOR A TOTAL OF 1,440,000 GPD
1. PRIOR TO DEWATERING, ALL SILT FENCE
AND ORANGE SAFETY FENCE SHALL BE
CONSTRUCTED.
2. IN CASE OF HEAVY RAIN STORM, ALL
DEWATERING ACTIVITIES SHALL CEASE.
MAXIMUM DAILY PUMPAGE
A SINGLE (1) 2,500 GPM, 8" DISCHARGE PUMP
OPERATING AT 80% MAXIMUM CAPACITY FOR A
MAXIMUM PUMPING RATE OF
2,500 GPM x 80% x 1 PUMP = 2,000 GPM
FOR A TOTAL OF 2,880,000 GPD
ORDER OF EXCAVATION
TOTAL PUMPAGE
TOTAL PUMPAGE = AVG DAILY x 10 DAYS
= 1.44 MGD x 10 DAYS
= 14,400,000 GALLONS
1. INSTALL SILT FENCES AND ORANGE
SAFETY FENCES.
2. INSTALL WELL POINTS OR UNDERGROUND
SOCK DRAINS AS NEEDED.
3. PIPE DISCHARGE TO DEWATERING CELL.
4. SET DEWATERING PUMPS AS NEEDED FOR
INSTALLATION OF UTILITIES
5. PUMP TO RECHARGE TRENCH AND
DEWATERING CELL.
WETLAND
PRESERVE
ORANGE
SAFETY
MESH FENCE
5' (TYP.)
20°
PRINCIPLE
POST POSITION
(CANTED 20°
TOWARD FLOW)
FILTER FABRIC
SILT FLOW
SILT FENCE OPTIONAL POST POSITIONS
ORANGE WEBBING
BARRIER SECURELY
FASTENED TO POSTS
(4) 4"x4" P.T.
POSTS
EXISTING NATIVE
UNDISTURBED
UNDERSTORY
EXISTING GRADE
TO BE MAINTANED
W
FLO
'R
20
FLOW
2"-3" COURSE
AGGREGATE
MIN. 6" THICK
DIVERSION RIDGE
50' MIN.
STABILIZED
CONSTRUCTION ENTRANCE
(4) 4"x4" P.T.
POSTS TO EXTEND
2' BELOW GRADE
EXISTING
UNDISTURBED
BASE
NOTE:
USE SANDBAGS, STRAW
BALES OR OTHER
APPROVED METHODS TO
CHANNELIZE RUNOFF TO
BASIN AS REQUIRED.
NOTES:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC
RIGHTS-OF-WAY. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO
ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY.
3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA
STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED
SEDIMENT BASIN.
PROTECTIVE BARRIER
TO EXTEND 1'
BEYOND DRIPLINE
VERTICAL
THE CONTRACTOR WILL NOT CLEAR AND GRUB ANY SITE WITHOUT PRIOR
CONFIRMATION OF WETLAND AND UPLAND PRESERVATION REQUIREMENTS. ALL
PRESERVATION AREAS WILL BE FENCED TO AVOID ENCROACHMENT AND WILL BE
STRICTLY ENFORCED. CAPTEC ENGINEERING INC. WILL NOT BE RESPONSIBLE
FOR ENCROACHMENT BY CONTRACTOR WITHIN WETLAND AREAS. CONTRACTOR
IS CAUTIONED TO REVIEW ALL PERMITS AND CONSTRUCTION DOCUMENTS PRIOR
TO THE CLEARING/GRUBBING PHASE.
OW
CLEARING AND GRUBBING
FLOW
FL
EXISTING PAVED ROADWAY
SUPPLY WATER TO
WASH WHEELS IF
NECESSARY
12' MIN.
SEDIMENT BARRIER
(STRAW BALE TYPE SHOWN)
TYP. CANOPY TREE BARRICADE
ALWAYS CALL 811
N.T.S.
SILT FENCE/SAFETY FENCE
POSITIONING DETAIL
N.T.S.
BARRICADE NOTES:
1.
TREE PROTECTION BARRICADE TO BE ERECTED PRIOR TO
COMMENCEMENT OF ANY WORK.
2. NO CONSTRUCTION WITHIN BARRICADE WITHOUT OWNER
APPROVAL
3. EXCAVATION (IF APPROVED BY OWNER) WITHIN TREE
PROTECTION AREAS IS LIMITED TO HAND TOOLS (NO
MACHINERY)
R
N/A
CADD FILE:Erosion Control
VERT. SCALE:
BY
REVISIONS
1669
1" = 100'
PROJECT No.:
HORZ. SCALE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
CG
JWC
CHECKED BY:
DATE
5. SOIL STABILIZATION SHALL BE COMPLETED WITHIN 30 DAYS OF VEGETATION
REMOVAL. STABILIZATION TO CONSIST OF PLACEMENT OF SOD OR SEED / MULCH
(3" MIN.) OF ALL DISTURBED AREAS.
NO.
4. ALL CONSTRUCTION BARRICADES AND SILT FENCES WILL REMAIN IN PLACE AND
MONITORED FOR COMPLIANCE BY THE PERMIT HOLDER DURING THE PERMITTED
DEVELOPMENT ACTIVITIES.
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
3. NO LAND CLEARING SHALL BE AUTHORIZED UNTIL PERMIT IS OBTAINED FROM THE
GROWTH MANAGEMENT DEPARTMENT AND POSTED, FOLLOWING SATISFACTORY
INSPECTION OF REQUIRED CONTROL STRUCTURES AND BARRICADES.
CLEARING, GRUBBING
AND DEWATERING PLAN
2. AUTHORIZATION TO INSTALL EROSION CONTROL DEVICES AND PRESERVE
BARRICADES WILL BE GRANTED AT THE PRE-CONSTRUCTION MEETING. THIS
AUTHORIZATION SHALL BE POSTED ON THE SITE, IN THE PERMIT BOX, IT'S
LOCATION SHOWN ELSEWHERE IN THIS PAGE.
PORT ST LUCIE, FL
1. PROPERTY CORNERS SHALL BE LOCATED BY A LICENSED LAND SURVEYOR AND
CLEARLY MARKED IN THE FIELD PRIOR TO THE ENGINEERING DEPARTMENT'S
PRE-CONSTRUCTION MEETING FOR SITE DEVELOPMENT.
MDR
NOTES:
DESIGNED BY:
AND GRUBBING (SUPERVISED BY
ENVIRONMENTAL PROFESSIONAL
1
LIMITS OF EXOTIC CLEARING
0
AND GRUBBING
DATE:
LIMITS OF STANDARD CLEARING
DRAWN BY:
SILT FENCE
ORANGE SAFTEY FENCE
SCALE
VERIFICATION
EXIST. EDGE OF PAVEMENT
TOWN PLACE
SITE BOUNDARY
RIGHT-OF-WAY LINE
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
LEGEND
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
Printed Date:
JOB No.:
1669
SHEET
03
OF
11
EXISTING GRADE
PROPOSED GRADE
PROPOSED BASIN BOUNDARY
MAX STAGE (FT NAVD 88)
WETLAND TO BE FILLED
BASIN 1
BASIN 2
10 YR 24 HR
16.48
14.22
25 YR 72 HR
16.74
15.55
100 YR 72 HR*
16.87
16.73
NORTHEAST
* ZERO DISCHARGE
SOUTHEAST
POND 3
POND 2
POND 4
BASIN 1
DRAINAGE STATEMENT
NORTHWEST
THIS PROJECT SHALL COMPLY WITH SOUTH FLORIDA
WATER MANAGEMENT DISTRICT, CITY OF PORT ST. LUCIE
STORMWATER MANAGEMENT AND REQUIREMENTS .
SOUTHWEST
BASIN 2
POND 1
$Base
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
N/A
PROPOSED SWALE
CADD FILE:
4.13 AC
VERT. SCALE:
x PERVIOUS
PROPOSED STRUCTURE NUMBER
REVISIONS
0.90 AC
BY
x LAKE @C.E.
PROPOSED DRAINAGE STRUCTURE
SD-10
DATE
4.78 AC
NO.
PROPOSED TYPE F CURB
x PAVEMENT
1669
1.80 AC
EXISTING WETLAND
1" = 60'
PROPOSED TYPE D CURB
x BUILDING
EXISTING DITCH
PROJECT No.:
11.61 AC
EXISTING EASEMENT
HORZ. SCALE:
BASIN 2 AREA
EXISTING CURB
MASTER DRAINAGE PLAN
1.49 AC
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
x PERVIOUS
CG
0.13 AC
JWC
DRIVING AISLE CENTERLINE
x LAKE @ C.E.
CHECKED BY:
3.87 AC
PORT ST LUCIE, FL
RIGHT-OF-WAY LINE
x PAVEMENT
MDR
1.04 AC
DESIGNED BY:
PROPERTY LINE
x BUILDING
1
6.53 AC
0
LEGEND
BASIN 1 AREA
DATE:
18.14 AC
DRAWN BY:
0.37 AC
PROJECT AREA
SCALE
VERIFICATION
WETLAND B AREA
TOWN PLACE
18.51 AC
TOTAL SITE AREA
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
PROJECT AREA SITE DATA
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
Printed Date:
JOB No.:
1669
SHEET
04
OF
11
MATCH LINE SOUTHWEST (SHEET 6)
0
GRAPHIC SCALE
SD-10
30'
60'
LEGEND
PROPERTY LINE
RIGHT-OF-WAY LINE
DRIVING AISLE CENTERLINE
EXISTING CURB
EXISTING EASEMENT
EXISTING DITCH
EXISTING WETLAND
PROPOSED TYPE D CURB
PROPOSED TYPE F CURB
PROPOSED DRAINAGE STRUCTURE
PROPOSED STRUCTURE NUMBER
PROPOSED SWALE
EXISTING GRADE
PROPOSED GRADE
PROPOSED BASIN BOUNDARY
DRAINAGE STATEMENT
THIS PROJECT SHALL COMPLY WITH SOUTH FLORIDA
WATER MANAGEMENT DISTRICT, CITY OF PORT ST. LUCIE
STORMWATER MANAGEMENT AND REQUIREMENTS .
05
OF
PAVING, GRADING
AND DRAINAGE PLAN
PORT ST LUCIE, FL
TOWN PLACE - NW
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
NO.
DATE
BY
REVISIONS
JOB No.:
1669
SHEET
Printed Date:
11
$Base
N/A
CADD FILE:
VERT. SCALE:
1669
1" = 30'
HORZ. SCALE:
PROJECT No.:
CG
JWC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
MATCH LINE NORTHEAST (SHEET 8)
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
MATCH LINE NORTHWEST (SHEET 5)
0
GRAPHIC SCALE
SD-10
30'
60'
LEGEND
PROPERTY LINE
RIGHT-OF-WAY LINE
DRIVING AISLE CENTERLINE
EXISTING CURB
EXISTING EASEMENT
EXISTING DITCH
EXISTING WETLAND
PROPOSED TYPE D CURB
PROPOSED TYPE F CURB
PROPOSED DRAINAGE STRUCTURE
PROPOSED STRUCTURE NUMBER
PROPOSED SWALE
EXISTING GRADE
PROPOSED GRADE
PROPOSED BASIN BOUNDARY
DRAINAGE STATEMENT
THIS PROJECT SHALL COMPLY WITH SOUTH FLORIDA
WATER MANAGEMENT DISTRICT, CITY OF PORT ST. LUCIE
STORMWATER MANAGEMENT AND REQUIREMENTS .
06
OF
PAVING, GRADING
AND DRAINAGE PLAN
PORT ST LUCIE, FL
TOWN PLACE - SW
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
NO.
DATE
BY
REVISIONS
JOB No.:
1669
SHEET
Printed Date:
11
$Base
N/A
CADD FILE:
VERT. SCALE:
1669
1" = 30'
HORZ. SCALE:
PROJECT No.:
CG
JWC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
MATCH LINE SOUTHEAST (SHEET 7)
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
GRAPHIC SCALE
SD-10
MATCH LINE SOUTHWEST (SHEET 6)
30'
60'
LEGEND
PROPERTY LINE
RIGHT-OF-WAY LINE
DRIVING AISLE CENTERLINE
EXISTING CURB
EXISTING EASEMENT
EXISTING DITCH
EXISTING WETLAND
PROPOSED TYPE D CURB
PROPOSED TYPE F CURB
PROPOSED DRAINAGE STRUCTURE
PROPOSED STRUCTURE NUMBER
PROPOSED SWALE
EXISTING GRADE
PROPOSED GRADE
PROPOSED BASIN BOUNDARY
DRAINAGE STATEMENT
THIS PROJECT SHALL COMPLY WITH SOUTH FLORIDA
WATER MANAGEMENT DISTRICT, CITY OF PORT ST. LUCIE
STORMWATER MANAGEMENT AND REQUIREMENTS .
07
OF
PAVING, GRADING
AND DRAINAGE PLAN
PORT ST LUCIE, FL
TOWN PLACE - SE
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
NO.
DATE
BY
REVISIONS
JOB No.:
1669
SHEET
Printed Date:
11
$Base
N/A
CADD FILE:
VERT. SCALE:
1669
1" = 30'
HORZ. SCALE:
PROJECT No.:
CG
JWC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
MATCH LINE NORTHEAST (SHEET 8)
0
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
MATCH LINE SOUTHEAST (SHEET 7)
0
SD-10
MATCH LINE NORTHWEST (SHEET 5)
30'
60'
LEGEND
PROPERTY LINE
RIGHT-OF-WAY LINE
DRIVING AISLE CENTERLINE
EXISTING CURB
EXISTING EASEMENT
EXISTING DITCH
EXISTING WETLAND
PROPOSED TYPE D CURB
PROPOSED TYPE F CURB
PROPOSED DRAINAGE STRUCTURE
PROPOSED STRUCTURE NUMBER
PROPOSED SWALE
EXISTING GRADE
PROPOSED GRADE
PROPOSED BASIN BOUNDARY
HEAVY DUTY CONCRETE
WETLAND TO BE FILLED
DRAINAGE STATEMENT
THIS PROJECT SHALL COMPLY WITH SOUTH FLORIDA
WATER MANAGEMENT DISTRICT, CITY OF PORT ST. LUCIE
STORMWATER MANAGEMENT AND REQUIREMENTS .
08
OF
PAVING, GRADING
AND DRAINAGE PLAN
PORT ST LUCIE, FL
TOWN PLACE - NE
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
NO.
DATE
BY
REVISIONS
JOB No.:
1669
SHEET
Printed Date:
11
$Base
N/A
CADD FILE:
VERT. SCALE:
1669
1" = 30'
HORZ. SCALE:
PROJECT No.:
CG
JWC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
GRAPHIC SCALE
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
0
50'
100'
09
OF
BELLA VISTA APARTMENTS
OFFSITE DRAINAGE PLAN
PORT ST LUCIE, FL
TOWN PLACE
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
NO.
DATE
BY
REVISIONS
CG
JOB No.:
1669
SHEET
Printed Date:
11
$Base
N/A
CADD FILE:
VERT. SCALE:
1669
1" = 30'
HORZ. SCALE:
PROJECT No.:
JWC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave, Ste. 201
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
GRAPHIC SCALE
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37638
10
PAVING, GRADING,
AND DRAINAGE DETAILS
ST LUCIE COUNTY, FLORIDA
1
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
0
SCALE
VERIFICATION
OF
NO.
DATE
BY
REVISIONS
JOB No.:
1669
SHEET
Printed Date:
11
\details
N/A
CADD FILE:
VERT. SCALE:
1669
N/A
HORZ. SCALE:
PROJECT No.:
JWC
CC
DESIGNED BY:
CHECKED BY:
MDR
DRAWN BY:
DATE:
Civil Engineering Professionals
Engineering Business
No. EB-0007657
301 NW Flagler Ave
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY RCPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO RCPTEC ENGINEERING, INC.
Joseph W. Capra
301 N.W. Flagler Ave.
Stuart, Florida 34994
P.E. No. 37638
PAVING, GRADING AND DRAINAGE NOTES
1.
2.
3.
ALL AREAS SHALL BE CLEARED AND GRUBBED PRIOR TO CONSTRUCTION THIS SHALL CONSIST
OF THE COMPLETE REMOVAL AND DISPOSAL OF ALL TREES, BRUSH, STUMPS, GRASS, WEEDS,
RUBBISH AND ALL OTHER OBSTRUCTIONS RESTING ON OR PROTRUDING THROUGH THE
SURFACE OF THE EXISTING GROUND TO A DEPTH OF ONE (1) FOOT. ITEMS DESIGNATED TO
REMAIN, TO BE RELOCATED OR TO BE ADJUSTED SHALL BE SO DESIGNATED ON THE DRAWINGS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CERTIFIED MATERIAL TEST
RESULTS TO THE ENGINEER OF RECORD PRIOR TO THE RELEASE OF FINAL CERTIFICATION BY
THE ENGINEER. TEST RESULTS MUST INCLUDE, BUT NOT BE LIMITED TO, DENSITIES FOR
SUBGRADE AND BASE DENSITIES AT UTILITY CROSSINGS, STORM SEWER MANHOLES, INLETS
AND STRUCTURES. TEST SHALL INCLUDE ASPHALT GRADATION REPORTS, CONCRETE
CYLINDERS, ETC. DENSITY TESTS SHALL BE PERFORMED AT THREE (3) LOCATIONS AROUND
ANY STRUCTURE. BEGIN TESTING IN THE FIRST FOOT ABOVE THE BOTTOM OF THE STRUCTURE
AND THEN EVERY TWO FEET TO WITHIN TWO FEET OF THE FINISH GRADE.
ALL INLETS AND PIPE SHALL BE PROTECTED DURING CONSTRUCTION TO PREVENT SILTATION IN
THE DRAINAGE SYSTEMS BY WAY OF TEMPORARY PLUGS AND PLYWOOD OR PLASTIC COVERS
FILTER FABRIC
THE CONTRACTOR SHALL WRAP ALL STORM PIPE JOINTS. CONSTRUCTION SHALL BE PER F.D.O.T. INDEX
NO. 280 WITH WOVEN GEOTEXTILE TYPE D-3 (F.D.O.T. INDEX NO. 199), SECURED W/STRAPPING. ALL
JOINTS SHALL BE WRAPPED FOR A MINIMUM OF 12 INCHES FROM THE BAND OR JOINT OR BELL AND
SPIGOT AS APPLICABLE.
6.
DEWATERING
STORM SEWER PIPES AND STRUCTURES AND UTILITIES SHALL BE LAID "IN THE DRY", UNLESS
OTHERWISE APPROVED IN WRITING BY THE UTILITY AND ENGINEER OF RECORD. THE CONTRACTOR,
AT NO DIRECT COST TO THE OWNER, SHALL PERFORM ALL DEWATERING ACTIVITY. TRENCH
EXCAVATIONS SHALL BE DEWATERED BY USING ONE OR MORE OF THE FOLLOWING METHODS.
SOCK DRAINS, WELL POINT SYSTEM, SUMPS WITH PUMPS OR OTHER METHOD(S) AS APPROVED BY
THE ENGINEER. DEWATERING SYSTEMS SHALL BE UTILIZED IN ACCORDANCE WITH GOOD
STANDARD PRACTICE AND MUST BE EFFICIENT ENOUGH TO LOWER THE WATER LEVEL IN ADVANCE
OF THE EXCAVATION AND MAINTAIN IT CONTINUOUSLY TO KEEP THE TRENCH BOTTOM AND SIDES
FIRM AND DRY. IF THE MATERIAL ENCOUNTERED AT TRENCH GRADE IS SUITABLE FOR THE PASSAGE
OF WATER WITHOUT DESTROYING THE SIDES OR UTILITY FOUNDATION OF THE TRENCH, SUMPS MAY
BE PROVIDED AT INTERVALS AT THE SIDE OF THE MAIN TRENCH EXCAVATION, WITH PUMPS USED TO
LOWER THE WATER LEVEL BY TAKING THEIR SUCTION FROM SAID SUMPS. DISCHARGE FROM
DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT IT WILL NOT INTERFERE WITH
NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS BEING PERFORMED, CREATE A PUBLIC
NUISANCE OR FORM PONDING. ALL DISCHARGE SHALL BE IN ACCORDANCE WITH ANY SFWMD
ISSUED PERMITS. THE OPERATIONS SHALL NOT CAUSE INJURY TO ANY PORTION OF THE WORK
COMPLETED OR IN PROGRESS OR TO THE SURFACE OF STREETS OR TO PRIVATE PROPERTY. THE
ENGINEER OF RECORD AND NECESSARY REGULATORY AGENCIES, PRIOR TO CONSTRUCTION, SHALL
APPROVE THE PROPOSED DEWATERING METHOD(S) AND SCHEDULE. ADDITIONALLY, WHERE
PRIVATE PROPERTY WILL BE INVOLVED, THE CONTRACTOR SHALL OBTAIN ADVANCE PERMISSION
FROM THE PROPERTY OWNER.
OBSTRUCTIONS
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME ACQUAINTED WITH EXISTING
CONDITIONS AND TO LOCATE STRUCTURES AND UTILITIES ALONG THE PROPOSED UTILITY
ALIGNMENT IN ORDER TO AVOID CONFLICTS. WHERE ACTUAL CONFLICTS ARE UNAVOIDABLE, WORK
SHALL BE COORDINATED WITH THE FACILITY OWNER AND PERFORMED SO AS TO CAUSE AS LITTLE
INTERFERENCE AS POSSIBLE WITH THE SERVICE RENDERED BY THE FACILITY DISTURBED. ALL
AFFECTED UTILITIES SHALL BE NOTIFIED PRIOR TO EXCAVATION IN THEIR VICINITY.
SOD
THE SOD SHALL BE CERTIFIED TO MEET FLORIDA STATE PLANT BOARD SPECIFICATIONS,
ABSOLUTELY TRUE TO VARIETAL TYPE AND FREE FROM WEEDS, FUNGUS, INSECTS AND DISEASE OF
ANY KIND. ALL SODDED AREAS SHALL BE GRASSED AS SPECIFIED ON PLANS AND SURVIVAL
GUARANTEED FOR NINETY DAYS FROM DATE OF REPLACEMENT.
GROUNDWATER
HEAVY RAINFALL AND/OR A HIGH WATER TABLE MAY OCCUR BEFORE THE EARTHWORK
COMMENCES, OR DURING THE EARTHWORK OPERATION. WHEN THESE CONDITIONS OCCUR AND
THE SITE PREPARATION CANNOT BE ACHIEVED AS SPECIFIED, AN EXCAVATION OF THE EXISTING
CONDITIONS SHOULD BE CONDUCTED AND THE SPECIFICATIONS REVISED ACCORDINGLY. THE
DEWATERING FOR THE SITE MUST REMAIN ON SITE. NO ADDITIONAL DISCHARGE ALLOWED EXCEPT
THROUGH EXISTING CONTROL STRUCTURE.
7.
8.
9.
MAINTENANCE OF TRAFFIC
1.
2.
ALL M.O.T. SHALL BE IN ACCORDANCE WITH FDOT INDEX 600 SERIES.
THE CONTRACTOR SHALL PREPARE A PROJECT SPECIFIC M.O.T. PLAN FOR THE
PROPOSED WORK AND SUBMIT FOR REVIEW AND APPROVAL A MINIMUM OF TWO
WEEKS PRIOR TO COMMENCING WORK. IMPLEMENTATION OF M.O.T. PLAN MAY NOT
COMMENCE UNTIL AFTER APPROVAL IS GRANTED.
SEPARATION BETWEEN PSLUSD MAINS AND OTHER UTILITIES
THE MINIMUM SEPARATION BETWEEN PSLUSD MAINS AND OTHER UTILITIES, AS
MEASURED FROM THE OUTSIDE OF EACH PIPE, SHALL BE AS FOLLOWS:
1.
2.
3.
4.
WATER MAINS SHALL BE LOCATED A MINIMUM OF 10' FROM A GRAVITY SEWER,
FORCE MAIN AND RECLAIMED WATER MAIN. THE VERTICAL SEPARATION SHALL BE
AT LEAST 18" WITH THE WATER MAIN CROSSING OVER THE OTHER PIPES.
ALL PSLUSD PIPES SHALL HAVE A MINIMUM HORIZONTAL SEPARATION OF 5' FROM
ALL OTHER UNDERGROUND UTILITIES AND A VERTICAL SEPARATION OF AT LEAST
18".
WHEN GRAVITY SEWER IS TO BE INSTALLED PARALLEL TO A DRAINAGE PIPE
GREATER THAN 15" IN DIAMETER, A MINIMUM HORIZONTAL SEPARATION OF 15'
SHALL BE MAINTAINED. A GREATER SEPARATION MAY BE REQUIRED FOR DRAINAGE
PIPES LARGER THAN 24" IN DIAMETER, AS DETERMINED BY PSLUSD.
WHEN FORCE MAIN OR RECLAIMED WATER MAIN IS TO BE INSTALLED PARALLEL TO
A DRAINAGE PIPE, A MINIMUM HORIZONTAL SEPARATION OF 8' SHALL BE
MAINTAINED. A GREATER SEPARATION MAY BE REQUIRED FOR DRAINAGE PIPES
LARGER THAN 48" IN DIAMETER.
UTILITY COMPANIES
ENVIRONMENTAL
48 HOURS BEFORE DIGGING CALL
SUNSHINE STATE ONE CALL CENTER.
TOLL FREE 1-(800) 432-4770
HOBE SOUND ENVIRONMENTAL
CONSULTANTS, INC.
9512 SE DUNCAN STREET
HOBE SOUND, FL 33455
772-545-3676
FLORIDA POWER AND LIGHT
1050 SE BRANDON CIRCLE
PORT ST. LUCIE, FL. 34952
772-337-7001
COMCAST CABLE
1495 NW BRITT ROAD
STUART, FL 34994
561-692-9010
TURBIDITY NOTE
THE CONTRACTOR SHALL PLACE TURBIDITY BARRIERS AT ALL OUTFALLS PRIOR TO CONSTRUCTION.
ALL CUT/FILL WILL BE RELOCATED WITHIN THE EXISTING SITE AND THEREFORE HAULING OF
MATERIAL WILL NOT BE REQUIRED. CONTRACTOR SHALL INSTALL TURBIDITY CONTROL MEASURES
PRIOR TO COMMENCEMENT OF CONSTRUCTION AND MAINTAIN SAID CONTROLS IN WORKING ORDER
THROUGHOUT THE CONSTRUCTION PERIOD, ASSURING THAT TURBID DISCHARGES FROM THE
PROJECT TO PROTECTED WATERS AND WETLANDS DO NOT EXCEED 29 NTU'S ABOVE BACKGROUND
LEVELS AND REMOVE SAID CONTROLS AFTER COMPLETION OF CONSTRUCTION.
ENGINEER OF RECORD INSPECTION REQUIREMENTS
F.B.V.
L.B.R.
DENSITY
THICKNESS
MAX. SPACING MAX. SPACING
MAX. SPACING
MAX. SPACING
LINEAR SQUARE LINEAR SQUARE LINEAR SQUARE LINEAR
SQUARE
FEET
FEET
FEET
FEET
FEET
FEET
FEET
FEET
COMPACTED OR
STABILIZED GRADE
200
5,000
200
5,000
200
5,000
300
10,000
ROCK BASE
----
----
300
10,000
300
10,000
300
10,000
SHELL ROCK
----
----
300
10,000
----
----
300
10,000
----
----
----
----
----
----
PER
INSP.
PER
INSP.
ASPHALT
ALL TESTING SHALL BE TAKEN IN A STAGGERED SAMPLING PATTERN FROM A POINT 12" INSIDE
THE LEFT EDGE OF THE ITEM TESTED, TO THE CENTER, TO A POINT INSIDE OF THE RIGHT EDGE
SURVEYORS:
LAVENTURE & ASSOCIATES, INC.
774 WEST MIDWAY ROAD
FORT PIERCE, FL 34982
772-398-6430
GEOTECHNICAL ENGINEER
AT&T
3380 OKEECHOBEE ROAD,
RM 237
FORT PIERCE, FL 34947
772-460-4448
ANDERSEN ANDRE
CONSULTING ENGINEERS
573 SW BILTMORE STREET
PORT ST LUCIE, FL 34983
772-807-9191
FLORIDA CITY GAS
1304 SW BAYSHORE BOULEVARD
PORT ST LUCIE, FL 34983
800-993-7546
CITY OF PORT ST. LUCIE
PUBLIC WORKS DEPT.
CITY HALL ANNEX BLDG. B
121 SW PORT ST. LUCIE BLVD.
PORT ST. LUCIE, FLORIDA
34984
772-871-5700
CITY OF PORT ST. LUCIE
UTILITIES SYSTEMS
DEPARTMENT
900 SE OGDAN LANE
PORT ST. LUCIE, FLORIDA
34983
772-873-6400
ENGINEER OF RECORD INSPECTION REQUIREMENTS
CONTRACTOR TO CALL CONTRACT ENGINEER OF RECORD
48 HOURS ADVANCE FOR FOLLOWING INSPECTIONS:
1. PRECONSTRUCTION MEETING
2. DRAINAGE STRUCTURE / PIPE
3. SIDEWALK FORMS
4. PAVEMENT SUBGRADE
5. PAVEMENT BASE
6. ASPHALT / CONCRETE PLACEMENT
7. FINAL
ALWAYS CALL 811
R
Engineering Business
No. EB-0007657
N/A
CADD FILE:
VERT. SCALE:
REVISIONS
1669
N/A
HORZ. SCALE:
JWC
Civil Engineering Professionals
301 N.W. Flagler Ave.
Stuart, Florida 34994
Phone: (772) 692-4344
Fax:
(772) 692-4341
BY
2.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE IF EXCAVATED SOILS MEET
THE REQUIREMENTS OF THE PROJECT PLANS AND SPECIFICATIONS RELATIVE TO
MATERIAL CLASSIFICATION. PIPE AND STRUCTURE BACKFILL MATERIAL SHALL BE
LIMITED TO MATERIAL CLASSIFIED AS A-1, A-3 AND A-2-4 IN ACCORDANCE WITH
AASHTO M-145 AND SHALL BE COMPACTED IN ACCORDANCE WITH F.D.O.T. SECTION
125 REQUIREMENTS.
IF THE BACKFILL MATERIAL IS CLASSIFIED AS A-2-4 BASED ON AASHTO M 145
CRITERIA, THE MAXIMUM PERMISSIBLE MOISTURE CONTENT SHALL BE 2 PERCENT
ABOVE THE OPTIMUM MOISTURE CONTENT.
DATE
1.
PROJECT No.:
PIPE AND STRUCTURE BACKFILL
CHECKED BY:
2.
3.
EARTHWORK AND RELATED OPERATIONS PERFORMED ON STRUCTURES AND PIPES
SHALL BE CONDUCTED IN ACCORDANCE WITH SECTIONS 125 AND OTHER APPLICABLE
SECTIONS OF THE F.D.O.T. STANDARD SPECIFICATIONS FOR ROADWAY AND BRIDGE
CONSTRUCTION (LATEST EDITION) UNLESS OTHERWISE SHOWN ON THE PLANS.
REMOVAL OF ORGANIC OR PLASTIC MATERIAL SHALL BE PERFORMED AT THE
DIRECTION OF THE ENGINEER UNLESS OTHERWISE SHOWN ON THE PLANS.
UTILIZATION OF MATERIALS WITHIN THE ROADWAY CROSS SECTION SHALL BE AS
DIRECTED BY THE ENGINEER UNLESS OTHERWISE SHOWN ON THE PLANS.
CG
1.
NO.
5.
EXCAVATION FOR STRUCTURES AND PIPES
THE CONTRACTOR MUST MAINTAIN A COPY OF THE LATEST LOCAL WATER MANAGEMENT
DISTRICT SURFACE WATER PERMIT, COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS
AND PERMIT MODIFICATIONS IN GOOD CONDITIONS AT THE CONSTRUCTION SITE. THE
COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY DISTRICT
REPRESENTATIVES. THE CONTRACTOR SHALL REVIEW THE COMPLETE PERMIT PRIOR TO
COMMENCEMENT OF THE ACTIVITY AUTHORIZED BY THE PERMIT.
ALL ACTIVITIES SHALL BE IMPLEMENTED AS SET FORTH IN THE PLANS, SPECIFICATIONS AND
PERFORMANCE CRITERIA AS APPROVED BY LOCAL SURFACE WATER PERMIT. ANY DEVIATION
FROM THE PERMITTED ACTIVITY AND THE CONDITIONS FOR UNDERTAKING THAT ACTIVITY SHALL
BE CONSIDERED A VIOLATION OF THE PERMIT. PRIOR TO ANY WORK, A NOTICE OF PENDING
CONSTRUCTION NEEDS TO BE SUBMITTED TO THE SOUTH FLORIDA WATER MANAGEMENT
DISTRICT.
THE LOCAL WATER MANAGEMENT DISTRICT AUTHORIZED STAFF, UPON PROPER IDENTIFICATION,
MUST BE GRANTED PERMISSION TO ENTER, INSPECT AND OBSERVE THE SYSTEM TO INSURE
CONFORMITY WITH THE PLANS AND SPECIFICATIONS APPROVED BY THE PERMIT.
PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN
ALL EROSION AND SEDIMENT CONTROL MEASURES (BEST MANAGEMENT PRACTICES) REQUIRED
TO RETAIN SEDIMENT ON-SITE AND TO PREVENT VIOLATIONS OF STATE WATER QUALITY
STANDARDS. ALL PRACTICES MUST BE IN ACCORDANCE WITH THE GUIDELINES AND
SPECIFICATIONS IN CHAPTER 6 OF THE FLORIDA LAND DEVELOPMENT MANUAL. A GUIDE TO
SOUND LAND AND WATER MANAGEMENT (FLORIDA DEPARTMENT OF ENVIRONMENTAL
REGULATIONS 1988), WHICH ARE HEREBY INCORPORATED BY REFERENCE, UNLESS A PROJECT
SPECIFIC EROSION AND SEDIMENT CONTROL PLAN IS APPROVED AS PART OF THE SFWMD
PERMIT, IN WHICH CASE THE PRACTICES MUST BE IN ACCORDANCE WITH THE PLAN. IF SITE
SPECIFIC CONDITIONS REQUIRE ADDITIONAL MEASURES DURING ANY PHASE OF CONSTRUCTION
OR OPERATION TO PREVENT EROSION OR CONTROL SEDIMENT, BEYOND THOSE SPECIFIED IN
THE EROSION AND SEDIMENT CONTROL PLAN, THE CONTRACTOR SHALL IMPLEMENT
ADDITIONAL BEST MANAGEMENT PRACTICES AS NECESSARY, IN ACCORDANCE WITH THE
SPECIFICATIONS IN CHAPTER 6 OF THE FLORIDA LAND DEVELOPMENT MANUAL:- A GUIDE TO
SOUND LAND AND WATER MANAGEMENT (FLORIDA DEPARTMENT OF ENVIRONMENTAL
REGULATION 1988). THE CONTRACTOR SHALL CORRECT ANY EROSION OR SHOALING THAT
CAUSES ADVERSE IMPACTS TO THE WATER RESOURCES.
WITHIN 30 DAYS AFTER COMPLETION OF THE STORMWATER SYSTEM, THE CONTRACTOR MUST
ASSIST IN SUBMITTING TO THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT THE
FOLLOWING:- DISTRICT FORM EN-45 (AS-BUILT CERTIFICATION BY A REGISTERED
PROFESSIONAL), SIGNED AND SEALED BY AN APPROPRIATE PROFESSIONAL REGISTERED IN THE
STATE OF FLORIDA AND TWO SETS OF AS-BUILT DRAWINGS WHEN, A) REQUIRED BY A SPECIAL
CONDITION OF THIS PERMIT; B) THE PROFESSIONAL USES AS-BUILT DRAWINGS TO SUPPORT
THE AS-BUILT CERTIFICATION; OR C) WHEN THE COMPLETED SYSTEM SUBSTANTIALLY DIFFERS
FROM PERMITTED PLANS. THIS SUBMITTAL WILL SERVE TO NOTIFY THE DISTRICT STAFF THAT
THE SYSTEM IS READY FOR INSPECTION AND APPROVAL.
STABILIZATION MEASURES SHALL BE INITIATED FOR EROSION AND SEDIMENT CONTROL ON
DISTURBED AREAS AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARY OR PERMANENTLY CEASED, BUT IN NO CASE
MORE THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE
SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
THE STORMWATER MANAGEMENT SYSTEM MUST BE COMPLETE IN ACCORDANCE WITH THE
PERMITTED PLANS AND PERMIT CONDITIONS PRIOR TO THE INITIATION OF THE PERMITTED USE
OF SITE INFRASTRUCTURE. THE SYSTEM MUST BE COMPLETED IN ACCORDANCE WITH THE
PERMITTED PLANS AND PERMIT CONDITIONS PRIOR TO TRANSFERRING RESPONSIBILITY FOR
OPERATION AND MAINTENANCE OF THE STORMWATER MANAGEMENT SYSTEM TO A
RESPONSIBLE ENTITY.
IF DEWATERING IS TO OCCUR DURING ANY PHASE OF CONSTRUCTION OR THEREAFTER AND
THE SURFACE WATER PUMP(S), WELLS OR FACILITIES ARE CAPABLE OF WITHDRAWING ONE
MILLION GALLONS OF WATER PER DAY OR MORE OR AN AVERAGE OF 100,000 GALLONS PER DAY
OR MORE OVER A YEAR AND ANY DISCHARGE IS TO BE OFF-SITE, THE CONTRACTOR MUST
APPLY FOR AND OBTAIN A CONSUMPTIVE USE PERMIT (40C-2) FROM THE DISTRICT IF
ADDITIONAL INFORMATION OR APPLICATION MATERIALS IS NEEDED. THE DEWATERING FOR THE
SITE MUST REMAIN ON SITE. NO ADDITIONAL DISCHARGE ALLOWED EXCEPT THROUGH EXISTING
CONTROL STRUCTURE.
MONITORING SHALL BE PERFORMED DAILY. SAMPLING TO TAKE PLACE IN WETLAND MEASURING
FOR TURBIDITY DOWNSTREAM OF DISCHARGE. WHEN TURBIDITY EXCEEDS 29 NTU'S, WORK
MUST CEASE. MONITORING TO BE PERFORMED ON DAYS WHEN EXISTING OUTFALL STRUCTURE
DISCHARGES TO THE OUTFALL.
1
4.
5.
0
3.
4.
MDR
2.
3.
DESIGNED BY:
WATER QUALITY NOTES
1.
2.
DATE:
PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT A SPECIFIC SOIL EROSION PLAN.
IN GENERAL, THE SOIL EROSION PLAN SHALL REQUIRE THAT ALL ON-SITE SOILS WILL REMAIN
ON-SITE AND WILL NOT ERODE INTO THE ADJACENT ROADSIDE SWALES, ADJACENT PROPERTIES
OR RETENTION DITCHES. ALL EXISTING SWALES SHALL REMAIN SODDED DURING
CONSTRUCTION. THE CONTRACTOR SHALL SCARIFY ONLY AS NECESSARY TO CONSTRUCT THE
PROJECT. THE CONTRACTOR SHALL SCARIFY AREAS TO PLACE VARIOUS PIPE WORK. AFTER
PLACEMENT OF THE PIPE, THESE TRENCHES SHALL BE BACKFILLED AND COMPACTED TO A 98%
DENSITY. PRIOR TO DISCHARGE FROM THE SITE, SILTATION BARRIERS AND HAY BALES SHALL
BE UTILIZED AS PER FDOT INDEX 102. THE DRAINAGE WHICH OUTFALLS TO THE RETENTION
AREAS SHALL BE STABILIZED AND SODDED IMMEDIATELY UPON COMPLETION OF
CONSTRUCTION. ANY DEWATERING OR PUMPING OF WATER INTO THE ROADSIDE SWALES OR
RETENTION SWALES SHALL BE STAKED WITH BALED HAY AND SILTATION FENCES TO AVOID
FILLING THESE AREAS. UPON COMPLETION OF THE SITE WORK, ALL AREAS SHALL BE SODDED
TO AVOID EROSION. CONTRACTOR IS REQUIRED TO COMPLY WITH ALL STATE WATER QUALITY
CRITERIA. SPECIFICALLY, NO OFF-SITE DISCHARGES WILL BE ALLOWED WHICH EXCEED THE
STATE TURBIDITY CRITERIA.
THE CONTRACTOR SHALL PROVIDE A QUALITY CONTROL PLAN FOR MONITORING OF
ALL EARTHWORK AND RELATED OPERATIONS. THE QUALITY CONTROL PLAN SHALL
INCLUDE AS A MINIMUM, ALL TESTS THAT WILL BE PERFORMED INCLUDING THE
PROPOSED TEST FREQUENCIES, ALL MATERIAL SOURCES, THE NAME AND
BACKGROUND OF THE PERSON THAT THE CONTRACTOR WILL DESIGNATE AS THE
CONTRACTORS QUALITY CONTROL MANAGER, THE NAME AND QUALIFICATIONS OF
THE TESTING LABORATORY THAT WILL BE PERFORMING QUALITY CONTROL TESTING
AND THE NAMES AND QUALIFICATIONS OF THE TESTING LABORATORY PERSONNEL
THAT WILL BE PERFORMING THE QUALITY CONTROL TESTING.
THE TESTING LABORATORY THAT IS RETAINED TO PERFORM THE CONTRACTOR'S
QUALITY CONTROL TESTING MUST BE CERTIFIED BY A RECOGNIZED QUALIFYING
AGENCY SUCH AS FDOT, CMEC OR AASHTO FOR THE TYPE OF WORK TO BE
PERFORMED.
THE QUALITY CONTROL PLAN SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW
AND APPROVAL PRIOR TO THE START OF ANY EARTHWORK OR RELATED OPERATION.
UTILIZATION OF MATERIALS WITHIN THE ROADWAY CROSS SECTION SHALL BE IN
ACCORDANCE WITH FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS (LATEST
EDITION) INDEX NO. 505 UNLESS OTHERWISE SHOWN ON THE PLANS.
IF THE EXISTING FILL IS CLASSIFIED AS A-2-4 BASED ON AASHTO M 145 CRITERIA, THE
MAXIMUM PERMISSIBLE MOISTURE CONTENT SHALL BE 2 PERCENT ABOVE THE
OPTIMUM MOISTURE CONTENT.
SOLID BAR IS EQUAL
TO ONE INCH ON
ORIGINAL DRAWING,
ADJUST ALL SCALED
DIMENSIONS
ACCORDINGLY
CULVERT LEGEND:
RCP
- REINFORCED CONCRETE PIPE
ERCP - ELLIPTICAL REINFORCED CONCRETE PIPE
HDPE - HIGH DENSITY POLYETHYLENE (AIR ENTRENCHED)
CAP
- CORRUGATED ALUMINUM PIPE
MES - MITERED END SECTION
2.
1.
DRAWN BY:
STANDARD SEPARATION FOR ALL WATER AND/OR WASTEWATER MAINS, HORIZONTAL AND VERTICAL,
SHALL BE PER FDEP REQUIREMENTS, PROVISIONS OF F.A.C RULE 62.604 AND TEN STATES
STANDARD.
1. ALL DISTURBED OUTFALL DRAINAGE AREAS SHALL BE SODDED UPON COMPLETION OF GRADING
AFTER AS-BUILT GRADE ELEVATIONS ARE APPROVED BY THE ENGINEER.
2. PRIOR TO FINAL PAYMENT OF RETENTION, DETENTION AND DRAINAGE DITCH QUANTITIES, ALL
SLOPES AND SWALES SHALL BE SODDED TO AVOID EROSION.
3. THERE IS TO BE NO OFF-SITE HAULING WITHOUT PRIOR APPROVAL AND ALL EXCAVATED
MATERIAL SHALL BE USED ON-SITE.
4. THE CONTRACTOR SHALL CONSTRUCT THE STORMWATER MANAGEMENT SYSTEM IN A MANNER
SO AS TO MINIMIZE ANY ADVERSE IMPACTS OF THE WORKS ON FISH, WILDLIFE, NATURAL
ENVIRONMENTAL VALUES AND WATER QUALITY ON OR OFF-SITE. THE CONTRACTOR SHALL
INSTITUTE NECESSARY MEASURES DURING THE CONSTRUCTION PERIOD, INCLUDING FULL
COMPACTION OF ANY FILL MATERIAL PLACED AROUND NEWLY INSTALLED STRUCTURES TO
REDUCE EROSION, TURBIDITY, NUTRIENT LOADING AND SEDIMENTATION IN THE RECEIVING
WATERS.
5. WITHIN THIRTY (30) DAYS AFTER COMPLETION OF CONSTRUCTION OF THE SURFACE WATER
MANAGEMENT SYSTEM, THE CONTRACTOR SHALL ASSIST THE DESIGN ENGINEER TO PROVIDE A
WRITTEN STATEMENT OF COMPLETION AND CERTIFICATION BY A FLORIDA PROFESSIONAL
ENGINEER. THESE STATEMENTS MUST SPECIFY THE ACTUAL DATE OF CONSTRUCTION
COMPLETION AND MUST CERTIFY THAT ALL FACILITIES HAVE BEEN CONSTRUCTED IN
SUBSTANTIAL CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. THE CONSTRUCTION
COMPLETION CERTIFICATION MUST INCLUDE, AT A MINIMUM EXISTING ELEVATIONS, LOCATIONS
AND DIMENSIONS OF THE COMPONENTS OF THE SURFACE WATER MANAGEMENT FACILITIES.
ADDITIONALLY, IF DEVIATIONS FROM THE APPROVED DRAWINGS ARE DISCOVERED DURING THE
CERTIFICATION PROCESS, THE CERTIFICATION MUST BE ACCOMPANIED BY A COPY OF THE
APPROVED PERMIT DRAWINGS WITH DEVIATIONS NOTED. SEE ALSO AS-BUILT REQUIREMENTS.
6. A STABLE PERMANENT AND ACCESSIBLE ELEVATION REFERENCE SHALL BE ESTABLISHED ON
OR WITHIN ONE HUNDRED (100) FEET OF ALL PERMITTED DISCHARGE STRUCTURES NO LATER
THAN THE SUBMISSION OF THE CERTIFICATION TO THE WATER MANAGEMENT DISTRICT. THE
LOCATION OF THE ELEVATION REFERENCE MUST BE NOTED ON OR WITHIN THE CERTIFICATION
REPORT.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTION OF ANY EROSION OR
SHOALING OF THE WATER QUALITY MANAGEMENT SYSTEM.
8. INLETS (425/430): INCLUDES THE LIST OF MATERIALS/INSTALLATION/DEWATERING
STABILIZATION/AS-BUILT SURVEYING/TESTING. ALL STRUCTURES WILL REQUIRE THREE (3)
COMPACTION TESTS AT DIFFERENT LOCATIONS AND UNDER STRUCTURES.
9. PIPE CULVERTS AND STORM SEWERS SHALL BE CONSTRUCTED AND INSTALLED IN
ACCORDANCE WITH SECTION 430 FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION.
10. HDPE (HIGH DENSITY POLYETHYLENE) CULVERT SHALL BE N-12 INSTALLED PER MANUFACTURER
RECOMMENDATIONS. MANUFACTURER IS ADS (ADVANCED DRAINAGE SYSTEMS, INC.) AIR
ENTRENCHED PIPE.
11. REINFORCED CONCRETE PIPE SHALL BE ASTM C-76 CLASS III IN ACCORDANCE WITH SECTION 941
OF THE FDOT STANDARD SPECIFICATIONS.
EARTHWORK AND RELATED OPERATIONS
NO POLLUTION OR EROSION CAUSED BY THIS PROJECT WILL BE ALLOWED IN THE STORMWATER
DRAINAGE SYSTEM. THE CONTRACTOR SHALL INSTALL ANY DEVICES NECESSARY TO PREVENT
POLLUTION OR EROSION. THE COST OF POLLUTION AND EROSION CONTROL SHALL BE
INCIDENTAL TO THE COST OF THE CONSTRUCTION.
SCALE
VERIFICATION
STORM SEWER NOTES
SOIL EROSION PLAN
1.
GENERAL NOTES
12. TEMPORARY BENCHMARK REFERENCED NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
13. CONTRACTOR TO UTILIZE "APPROVED FOR CONSTRUCTION" PLANS ONLY.
14. SHOP DRAWINGS FOR ALL STRUCTURES SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND
APPROVAL PRIOR TO ORDERING.
15. SHOP DRAWINGS ARE REQUIRED ON ALL STRUCTURES. THE ENGINEER REQUIRES FIVE (5)
BUSINESS DAYS TO REVIEW SHOP DRAWINGS AFTER RECEIPT.
16. CONCRETE SHALL BE CLASS I 3,000 PSI MINIMUM COMPRESSIVE STRENGTH UNLESS NOTED
OTHERWISE. REINFORCING SHALL BE GRADE 60 DEFORMED STEEL BARS IN ACCORDANCE ASTM
A-615.
17. CONTRACTOR SHALL PROTECT ALL EXISTING ABOVE OR UNDERGROUND STRUCTURES,
LANDSCAPE FEATURES, TREES AND UTILITIES NOT SHOWN ON THE PLANS TO BE REMOVED BY
CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY DAMAGE CAUSED BY
CONSTRUCTION ACTIVITY.
18. ALL PROPOSED UTILITY MATERIALS, CONSTRUCTION METHODS, TESTING AND DISINFECTION
SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF PORT ST. LUCIE UTILITY SYSTEMS
DEPARTMENT 2010 STANDARD AND AWWA CURRENT STANDARD.
19. ALL HORIZONTAL AND VERTICAL SURVEY CONTROL POINTS SHALL BE PROTECTED AND
UNDISTURBED. IN THE EVENT THAT A CONTROL POINT IS DISTURBED OR DESTROYED, THE
POINT SHALL BE RE-ESTABLISHED BY A FLORIDA REGISTERED LAND SURVEYOR. IF THE
CONSTRUCTION OCCURS IN THE CITY OF PORT ST. LUCIE, THE METHOD TO RE-ESTABLISH THE
POINT SHALL BE APPROVED BY THE CITY ENGINEER AT THE EXPENSE OF THE CONTRACTOR.
OVER THE INLETS. THE ENTIRE DRAINAGE SYSTEMS SHALL BE CLEANED OF ALL DEBRIS PRIOR
TO FINAL ACCEPTANCE. ALL CONCRETE SHALL BE A MINIMUM 3,000 PSI.
ALL PROPOSED ELEVATIONS REFER TO FINISHED GRADES.
THE CONTRACTOR MUST OBTAIN A WATER USE PERMIT PRIOR TO CONSTRUCTION DEWATERING
UNLESS THE WORK QUALIFIES FOR A GENERAL PERMIT PURSUANT TO SUBSECTION
40E-20.302(4), F.A.C.
PORT ST LUCIE, FL
CITY OF PORT ST. LUCIE
PUBLIC WORKS DEPT.
CITY HALL ANNEX BLDG. B
121 SW PORT ST. LUCIE BLVD.
PORT ST. LUCIE, FLORIDA 34984
772-871-5700
4.
5.
TOWN PLACE
ANY DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGE OR DEVIATIONS FROM THE DESIGN
ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE ENGINEER.
2. THE CONTRACTOR SHALL CONTACT ENGINEER OF RECORD, THE APPROPRIATE GOVERNMENTAL
JURISDICTIONAL AGENCY AND ALL OTHER CONCERNED UTILITIES AT LEAST 2 FULL BUSINESS
DAYS IN ADVANCE OF CONSTRUCTION OPERATIONS
3. THE LOCATION AND SIZE OF ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE
AND ARE BASED ON THE BEST AVAILABLE INFORMATION. ADDITIONAL UTILITIES MAY EXIST
WHICH ARE NOT SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
LOCATION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITIES BY
ELECTRONIC METHODS AND BY HAND EXCAVATION IN COORDINATION WITH ALL UTILITY
COMPANIES, PRIOR TO BEGINNING ANY CONSTRUCTION OPERATIONS. ANY AND ALL CONFLICTS
OF EXISTING UTILITIES WITH PROPOSED IMPROVEMENTS SHALL BE RESOLVED BY THE
ENGINEER AND THE OWNER PRIOR TO BEGINNING ANY CONSTRUCTION OPERATIONS. THIS
WORK BY THE CONTRACTOR SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO
ADDITIONAL COMPENSATION SHALL BE ALLOWED.
4. PROJECT SUPERINTENDENT: THE CONTRACTOR SHALL PROVIDE A QUALIFIED SUPERINTENDENT
TO REMAIN ON THE JOB SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. THE
SUPERINTENDENT SHALL BE PRESENT AT THE PRE-CONSTRUCTION MEETING. THE
CONTRACTOR SHALL NOTIFY THE LOCAL UTILITY COMPANY BY LETTER PRIOR TO THE
PRE-CONSTRUCTION MEETING APPOINTING THE SUPERINTENDENT FOR THIS PROJECT
INCLUDING A FORMAL RESUME SHOWING QUALIFICATIONS.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR T0 ENSURE HIS COMPLETE FAMILIARITY WITH
THE PROJECT SITE AND COMPONENTS TO INCLUDE SUBSURFACE CONDITIONS OF SOIL AND
GROUNDWATER TABLE. BY SUBMITTAL OF A BID FOR THIS PROJECT, THE CONTRACTOR
ACKNOWLEDGES HIS COMPLETE UNDERSTANDING AND RESPONSIBILITIES WITH RESPECT TO
THE CONSTRUCTION ACTIVITIES REQUIRED UNDER THE SCOPE OF THIS PROJECT.
6. THE "TRENCH SAFETY ACT" SHALL BE INCORPORATED INTO THIS CONTRACT AS ENHANCED BY
THE LEGISLATURE OF THE STATE OF FLORIDA TO BE IN EFFECT AS OF OCTOBER 1, 1990.
7. AS-BUILT PLANS: THE CONTRACTOR SHALL PROVIDE 6 SETS OF PRINTS / 1 DIGITAL FILE IN
AutoCAD FORMAT. DRAWINGS SHALL BEAR THE ORIGINAL SIGNATURE AND EMBOSSED SEAL OF
THE SURVEYOR AND SHALL BE SUBMITTED AFTER THE COMPLETION OF CONSTRUCTION, BUT
PRIOR TO FINAL APPROVAL. THE AS-BUILT SURVEY SHALL BE PREPARED IN PLAN AND PROFILE
FORMAT BY A LICENSED PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF
FLORIDA AND SHALL COMPLY WITH APPLICABLE PROVISIONS OF THE FLORIDA ADMINISTRATIVE
CODE AND CHAPTER 472 OF THE FLORIDA STATUES. THE DRAWINGS SHALL BE AT A SCALE
COMPARABLE TO THE DESIGN DRAWINGS PREPARED BY THE ENGINEER AND SHALL REFERENCE
THE BASE LINE OF SURVEY APPEARING ON THE ENGINEERING DRAWINGS. THE HORIZONTAL
AND VERTICAL LOCATION OF THE ROADWAYS, DRAINAGE FACILITIES AND ALL APPURTENANCES
SHALL BE ACCURATELY DEPICTED TO SCALE AND SHALL BE IDENTIFIED RELATIVE TO THE BASE
LINE AND TO READILY IDENTIFIABLE PERMANENT OR SEMI-PERMANENT REFERENCE POINTS
EXISTING AFTER THE COMPLETION OF CONSTRUCTION. LOCATIONS SHALL BE SHOWN FOR ALL
FITTINGS, VALVES, HYDRANTS, MANHOLES, SAMPLE POINTS, AIR RELEASES, ETC., BOTH
HORIZONTAL AND VERTICAL, AND THE LOCATION OF THE MAIN AT EACH BASELINE STATION AS
SHOWN ON THE PLANS (100 FEET MAXIMUM) BOTH HORIZONTAL AND VERTICAL. UNDERGROUND
FACILITIES (I.E., DRAINAGE, GAS, ELECTRIC, TELEPHONE, ETC.) CROSSING THE MAINS SHALL BE
ACCURATELY SHOWN BOTH HORIZONTAL AND VERTICAL AND SHALL IDENTIFY SIZE, TYPE,
FACILITY, MATERIAL AND CLEARANCE. ALL INFORMATION SHALL BE BASED UPON
MEASUREMENTS AND OBSERVATIONS MADE IN THE FIELD BY THE SURVEYOR CERTIFYING THE
SURVEY OR BY PERSONNEL UNDER HIS EMPLOYMENT, DIRECTION AND SUPERVISION. THE
COST FOR PREPARING AND MAINTAINING THE AS-BUILT PLANS SHALL BE INCIDENTAL TO THE
CONSTRUCTION COST.
8. THE CONTRACTOR SHALL PREPARE A PLAN SHOWING THE SCHEDULE OF WORK, INCLUDING A
HIGHLIGHTED PLAN SHOWING THE ORDER OF CONSTRUCTION WHICH WILL FACILITATE
MAINTAINING EXISTING SERVICES DURING CONSTRUCTION. THIS PLAN SHALL BE IN
ACCORDANCE WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE OF
TRAFFIC AND STAGING PLAN.
9. ALL CONSTRUCTION IS TO BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF
TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION.
10. ALL TELEPHONE, FPL, LOCAL CABLE AND ALL LOCAL UTILITY COMPANY LOCATIONS SHOWN ARE
TAKEN FROM INFORMATION PROVIDED BY THAT UTILITY COMPANY. THESE LOCATIONS HAVE
NOT BEEN VERIFIED IN THE FIELD. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
UTILITY LOCATIONS PRIOR TO CONSTRUCTION. THE CONTRACTOR TO EXPOSE ALL CROSSINGS
WITH BELL SOUTH, CATV AND FLORIDA POWER AND LIGHT CONDUITS PRIOR TO BEGINNING
CONSTRUCTION AND DELIVERY OF PIPE. THE CONTRACTOR IS TO USE EXTREME CAUTION
WITHIN THE VICINITY OF PRIVATE UTILITY FACILITIES. THE CONTRACTOR WILL REQUEST THE
PRESENCE OF A PRIVATE UTILITY REPRESENTATIVES DURING CONSTRUCTION IN THE VICINITY
OF THEIR FACILITIES. A PROFILE OF THE PRIVATE UTILITY FACILITIES ARE NOT PROVIDED IN
THESE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE PRIVATE
UTILITIES AND OBTAINING THE APPROXIMATE LOCATION OF THESE FACILITIES.
11. ANY NGVD 29 AND NAVD 88 MONUMENT WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE
PROTECTED. IF IN DANGER OF DAMAGE, THE CONTRACTOR SHOULD NOTIFY THE CITY
SURVEYOR,
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADOPTION BY CAPTEC ENGINEERING, INC. SHALL BE WITHOUT LIABILITY TO CAPTEC ENGINEERING, INC.
GENERAL NOTES
1.
Joseph W. Capra
301 N.W. Flagler Ave., Ste. 201
Stuart, Florida 34994
P.E. No. 37368
Printed Date:
JOB No.:
1669
SHEET
11
OF
11