Broward County. Westrect Marinas. Dania Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is to improve navigation of an existing commercial marina. Overall: The overall project purpose is to improve navigation of the existing Sunrise Harbor commercial marina in Ft. Lauderdale, Broward County Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Westrect Marinas
C/o Gary Groenewold
801 NE 3rd Ave.
Dania Beach, FL 33004
WATERWAY AND LOCATION: The project is located within Coral Bay adjacent to the Intracoastal Waterway at 1030 Seminole Drive, Ft. Lauderdale (Section 36 Township 49 and South, Range 42 East), Broward County Florida.
Directions to the site are as follows: Take I-95 south toward Ft. Lauderdale and exit onto Sunrise Blvd east. Continue east on Sunrise Blvd over the Intracoastal bridge. Turn right onto Seminole Drive and the marina is on the right.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 26.1395°
Longitude: -80.1088°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve navigation of an existing commercial marina.
Overall: The overall project purpose is to improve navigation of the existing Sunrise Harbor commercial marina in Ft. Lauderdale, Broward County Florida.
EXISTING CONDITIONS: The project area is an existing commercial marina consisting primarily of concrete cap and seawall, and pile supported structures. A seagrass survey was conducted in April 2017. The benthic substrate contains sand, silt, and rock substrate w/ average depths between 3-12 feet. One species of seagrass, paddle grass (Halophila decipiens) was observed within the southeastern portion of the survey area beginning 5-feet waterward of the existing marginal dock and continued approximately 125-feet waterward. Coverage was <25% and decreased with distance toward the center of Coral Bay to 5-105. Several small patches of H. decipiens were observed at the end of two of the finger piers and within the survey area with 5-10% coverage.
PROJECT HISTORY: The Corps issued a permit in 2001 to construct a 30-slip marina.
PROPOSED WORK: The applicant proposes to dredge approximately 78,409 square feet (3,630 cy) of material to a depth of -11.5-feet NAVD.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Impacts to seagrass have been avoided. A 10-foot buffer from the edge of the dredge footprint and the southeastern seagrass patch was established to avoid secondary impacts to seagrass. Turbidity curtains will be utilized as well as dredging BMP’s for water quality.
COMPENSATORY MITIGATION – The applicant has provided the following explanation why compensatory mitigation should not be required: Although seagrass is located adjacent to the dredge footprint, no impacts to seagrass are proposed or anticipated therefore no compensatory mitigation is required.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal may affect but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps evaluated potential project related effects to the manatee by using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> N>O>P couplet 4, resulted in a “May Affect Not Likely to Adversely Affect” determination. The U.S. Fish and Wildlife has given programmatic concurrence with this determination and no further coordination is required.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The project is anticipated to impact approximately 78,409 square feet of un-vegetated benthic substrate, utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Dredging offshore shoal areas consisting of sand and shell may also affect managed species. Previously constructed artificial reefs have provided similar ecological functions and mitigate the proposed buried hardbottom. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. The Corps final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, or by electronic mail at Linda.C.Knoeck@usace.army.mil or by telephone at (561) 472-3531 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil, or, by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDNES, FL 33410
REPLY TO
ATTENTION OF
August 18, 2017
Regulatory Division
South Permits Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-1989-00309 (SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as
described below:
APPLICANT: Westrect Marinas
C/o Gary Groenewold
801 NE 3rd Ave.
Dania Beach, FL 33004
WATERWAY AND LOCATION: The project is located within Coral Bay adjacent to the
Intracoastal Waterway at 1030 Seminole Drive, Ft. Lauderdale (Section 36 Township 49
and South, Range 42 East), Broward County Florida.
Directions to the site are as follows: Take I-95 south toward Ft. Lauderdale and exit onto
Sunrise Blvd east. Continue east on Sunrise Blvd over the Intracoastal bridge. Turn
right onto Seminole Drive and the marina is on the right.
APPROXIMATE CENTRAL COORDINATES:
Latitude:
26.1395°
Longitude: -80.1088°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve navigation of an existing commercial
marina.
Overall: The overall project purpose is to improve navigation of the existing Sunrise
Harbor commercial marina in Ft. Lauderdale, Broward County Florida.
EXISTING CONDITIONS: The project area is an existing commercial marina consisting
primarily of concrete cap and seawall, and pile supported structures. A seagrass survey
was conducted in April 2017. The benthic substrate contains sand, silt, and rock
substrate w/ average depths between 3-12 feet. One species of seagrass, paddle grass
(Halophila decipiens) was observed within the southeastern portion of the survey area
beginning 5-feet waterward of the existing marginal dock and continued approximately
125-feet waterward. Coverage was <25% and decreased with distance toward the
center of Coral Bay to 5-105. Several small patches of H. decipiens were observed at
the end of two of the finger piers and within the survey area with 5-10% coverage.
PROJECT HISTORY: The Corps issued a permit in 2001 to construct a 30-slip marina.
PROPOSED WORK: The applicant proposes to dredge approximately 78,409 square
feet (3,630 cy) of material to a depth of -11.5-feet NAVD.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: Impacts to seagrass have been avoided. A 10-foot buffer from the
edge of the dredge footprint and the southeastern seagrass patch was established to
avoid secondary impacts to seagrass. Turbidity curtains will be utilized as well as
dredging BMP's for water quality.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required: Although seagrass is located
adjacent to the dredge footprint, no impacts to seagrass are proposed or anticipated
therefore no compensatory mitigation is required.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal may affect but is
not likely to adversely affect the West Indian Manatee or its designated critical habitat.
The Corps evaluated potential project related effects to the manatee by using The
Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination
Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G>
N>O>P couplet 4, resulted in a "May Affect Not Likely to Adversely Affect"
determination. The U.S. Fish and Wildlife has given programmatic concurrence with
this determination and no further coordination is required.
The Corps has determined the proposed project may affect, but is not likely to
adversely affect the threatened and endangered swimming sea turtles; loggerhead
(Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea),
hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the
threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their
designated critical habitat. The Corps will request National Marine Fisheries Service
concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act by separate letter.
2
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The project is anticipated to impact
approximately 78,409 square feet of un-vegetated benthic substrate, utilized by various
life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster,
migratory/pelagic fish, and snapper/grouper complex. Dredging offshore shoal areas
consisting of sand and shell may also affect managed species. Previously constructed
artificial reefs have provided similar ecological functions and mitigate the proposed
buried hardbottom. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or Federally managed fisheries in the South
Atlantic Region. The Corps final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, or
by electronic mail at Linda.C.Knoeck@usace.army.mil or by telephone at (561) 4723531 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at
Linda.C.Knoeck@usace.army.mil, or, by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
3
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
SUNRISE HARBOR
MAINTENANCE DREDGING PROJECT
DRAWING INDEX
SHEET 1
SHEET 2
SHEET 3
SHEET 4
SHEET 5
COVER
EXISTING
CONDITIONS
DREDGE PLAN
DREDGE
SECTION
DETAILS
PROJECT LOCATION
PROJECT LOCATION
LOCATION MAP (n.t.s.)
VICINITY AERIAL (n.t.s.)
THIS DRAWING AND ALL APPURTENANT MATTER CONTAINS
INFORMATION PROPRIETARY TO THE CHAPPELL GROUP, INC.
AND IS LOANED SUBJECT TO RETURN UPON DEMAND AND
MUST NOT BE REPRODUCED, COPIED, LOANED, REVEALED,
NOR LISTED FOR ANY PURPOSE OTHER THAN THAT FOR
714 East McNab Road
WHICH IT IS SPECIFICALLY FURNISHED WITHOUT EXPRESSED
Pompano Beach, Florida 33060
WRITTEN CONSENT OF THE CHAPPELL GROUP, INC.
tel. 954.782.1908
© THE CHAPPELL GROUP, INC. 2017
fax. 954.782.1108
Chappell
INC.
· Environmental Consultants
·Marina & Wetland Permitting
·Mitigation Design & Monitoring
GROUP
·T&E Species Surveys
www.thechappellgroup.com ·Phase I ESAs
SUNRISE HARBOR
PREPARED FOR:
WESTREC MARINAS
COVER
Sheet :
Date:
6/28/2017
Proj No.:
09-0006.001
of :
1
5
NORTH
PROPERTY LINE
25'
PROPERTY LINE
CHAN
NEL L
IMIT
INTRA
CO
WATE ASTAL
RWAY
C
L
IMIT
NEL L
CHAN
EXIS
T
LAN ING SU
B
D LE
ASE MERGE
D
(10,8
71 S
Q.FT
.)
SCALE
1"= 50'
LEGEND
EXISTING FLOATING CONCRETE
FINGER PIERS
175,050 SQUARE FEET±
4.0186 ACRES±
(TO SURVEY TIE LINE)
EXISTING SEAGRASS (Halophila
PROPERTY LINE
25'
THIS DRAWING AND ALL APPURTENANT MATTER CONTAINS
INFORMATION PROPRIETARY TO THE CHAPPELL GROUP, INC.
AND IS LOANED SUBJECT TO RETURN UPON DEMAND AND
MUST NOT BE REPRODUCED, COPIED, LOANED, REVEALED,
NOR LISTED FOR ANY PURPOSE OTHER THAN THAT FOR
714 East McNab Road
WHICH IT IS SPECIFICALLY FURNISHED WITHOUT EXPRESSED
Pompano Beach, Florida 33060
WRITTEN CONSENT OF THE CHAPPELL GROUP, INC.
tel. 954.782.1908
© THE CHAPPELL GROUP, INC. 2017
fax. 954.782.1108
Chappell
INC.
· Environmental Consultants
·Marina & Wetland Permitting
·Mitigation Design & Monitoring
GROUP
·T&E Species Surveys
www.thechappellgroup.com ·Phase I ESAs
SUNRISE HARBOR
PREPARED FOR:
WESTREC MARINAS
M.H.W. = 0.26' NAVD M.L.W. = (-) 2.13' NAVD
NOTES:
1. BATHYMETRIC SURVEY AND COUNTOURS
PROVIDED BY TERRAQUATIC, INC.
2. BOUNDARY AND UPLAND TOPOGRAPHIC
SURVEY PROVIDED BY MCLAUGHLIN ENGINEERING
COMPANY
EXISTING CONDITIONS
Sheet :
Date:
6/28/2017
Proj No.:
09-0006.001
of :
2
5
NORTH
PROPERTY LINE
25'
PROPERTY LINE
A
SCALE
1"= 50'
CHAN
NEL L
IM
IT
INTRA
CO
WATE ASTAL
RWAY
C
L
CHAN
NEL L
EXIS
T
LAN ING SU
B
D LE
ASE MERGE
D
(10,8
71 S
Q.FT
.)
IMIT
A
LEGEND
WEIGHTED TURBIDITY CURTAIN
(TYP.)
EXISTING FLOATING CONCRETE
FINGER PIERS
175,050 SQUARE FEET±
4.0186 ACRES±
(TO SURVEY TIE LINE)
(PROPOSED DREDGING TO -11.5
NAVD (±3,630 CU.YDS)(±78,409 SQ.FT)
PROPERTY LINE
25'
THIS DRAWING AND ALL APPURTENANT MATTER CONTAINS
INFORMATION PROPRIETARY TO THE CHAPPELL GROUP, INC.
AND IS LOANED SUBJECT TO RETURN UPON DEMAND AND
MUST NOT BE REPRODUCED, COPIED, LOANED, REVEALED,
NOR LISTED FOR ANY PURPOSE OTHER THAN THAT FOR
714 East McNab Road
WHICH IT IS SPECIFICALLY FURNISHED WITHOUT EXPRESSED
Pompano Beach, Florida 33060
WRITTEN CONSENT OF THE CHAPPELL GROUP, INC.
tel. 954.782.1908
© THE CHAPPELL GROUP, INC. 2017
fax. 954.782.1108
Chappell
INC.
· Environmental Consultants
·Marina & Wetland Permitting
·Mitigation Design & Monitoring
GROUP
·T&E Species Surveys
www.thechappellgroup.com ·Phase I ESAs
SUNRISE HARBOR
PREPARED FOR:
WESTREC MARINAS
M.H.W. = 0.26' NAVD M.L.W. = (-) 2.13' NAVD
NOTES:
1. BATHYMETRIC SURVEY AND COUNTOURS
PROVIDED BY TERRAQUATIC, INC.
2. BOUNDARY AND UPLAND TOPOGRAPHIC
SURVEY PROVIDED BY MCLAUGHLIN ENGINEERING
COMPANY
PROPOSED CONDITIONS
Sheet :
Date:
6/28/2017
Proj No.:
09-0006.001
of :
3
5
SECTION "A-A"
(TYPICAL)
N.T.S.
MARINA BASIN
EXISTING FLOATING
FINGER PIER
VARIES
11.3'
MARINA BASIN
±102'
EXISTING FLOATING
FINGER PIER
MARINA BASIN
±11.4'
VARIES
M.H.W. 0.26'
NAVD
M.L.W. (-)2.13'
-10.5' NAVD
-9.5 NAVD
-11.5' NAVD
-11.5' NAVD
LEGEND
PROPOSED DREDGING TO -11.5
NGVD (±3,630 CU.YDS)(±78,409 SQ.FT)
-11.5' NAVD
PROPOSED ELEVATION
-11.5' NAVD
EXISTING ELEVATION
THIS DRAWING AND ALL APPURTENANT MATTER CONTAINS
INFORMATION PROPRIETARY TO THE CHAPPELL GROUP, INC.
AND IS LOANED SUBJECT TO RETURN UPON DEMAND AND
MUST NOT BE REPRODUCED, COPIED, LOANED, REVEALED,
NOR LISTED FOR ANY PURPOSE OTHER THAN THAT FOR
714 East McNab Road
WHICH IT IS SPECIFICALLY FURNISHED WITHOUT EXPRESSED
Pompano Beach, Florida 33060
WRITTEN CONSENT OF THE CHAPPELL GROUP, INC.
tel. 954.782.1908
© THE CHAPPELL GROUP, INC. 2017
fax. 954.782.1108
Chappell
INC.
· Environmental Consultants
·Marina & Wetland Permitting
·Mitigation Design & Monitoring
GROUP
·T&E Species Surveys
www.thechappellgroup.com ·Phase I ESAs
SUNRISE HARBOR
PREPARED FOR:
WESTREC MARINAS
SECTIONS
Sheet :
Date:
6/28/2017
Proj No.:
09-0006.001
of :
4
5
CONSTRUCTION BARGE
(TYP.)
TEMPORARY SPOIL CONTAINMENT
(N.T.S.)
PRIMARY TURBIDITY
BARRIER (TYP.)
TEMPORARY SPOIL
CONTAINER
THIS DRAWING AND ALL APPURTENANT MATTER CONTAINS
INFORMATION PROPRIETARY TO THE CHAPPELL GROUP, INC.
AND IS LOANED SUBJECT TO RETURN UPON DEMAND AND
MUST NOT BE REPRODUCED, COPIED, LOANED, REVEALED,
NOR LISTED FOR ANY PURPOSE OTHER THAN THAT FOR
714 East McNab Road
WHICH IT IS SPECIFICALLY FURNISHED WITHOUT EXPRESSED
Pompano Beach, Florida 33060
WRITTEN CONSENT OF THE CHAPPELL GROUP, INC.
tel. 954.782.1908
© THE CHAPPELL GROUP, INC. 2017
fax. 954.782.1108
Chappell
INC.
· Environmental Consultants
·Marina & Wetland Permitting
·Mitigation Design & Monitoring
GROUP
·T&E Species Surveys
www.thechappellgroup.com ·Phase I ESAs
SUNRISE HARBOR
PREPARED FOR:
WESTREC MARINAS
DETAILS
Sheet :
Date:
6/28/2017
Proj No.:
09-0006.001
of :
5
5