Bay County. Mr. Bryan Mack, BMack Enterprises, LLC. Franklin, Tennessee. PROJECT PURPOSE: Basic: Residential development. Overall: To construct a residential development to provide housing for moderate income families in central Panama City in Bay County, Florida.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Mr. Bryan Mack

BMack Enterprises, LLC

1545 Championship Boulevard

Franklin, Tennessee 37064

WATERWAY AND LOCATION: The project would affect waters of the United States associated with Mill Bayou. The project site is located at Ten Acre Road in Section 26, Township 3 South, Range 14 West, Panama City, Bay County, Florida.

Directions to the site are as follows: Travel north of Highway 231. Turn right onto Transmitter Road and right onto Ten Acre Road. The property is located on the south side of Ten Acre Road between Naples Avenue and McGraw Lane.

APPROXIMATE CENTRAL COORDINATES: Latitude 30.19410°

Longitude -85.6117°

PROJECT PURPOSE:

Basic: Residential development.

Overall: To construct a residential development to provide housing for moderate income families in central Panama City in Bay County, Florida.

EXISTING CONDITIONS: The wetland system consists of 2.92 acres scrub shrub palustrine system. The onsite vegetation consists of Chinese tallow, sedge species, beakrush, slash pine, sweet bay, and titi. The existing area surrounding the project area consists of residential housing to the east, west, and south and a road to the north.

PROPOSED WORK: The applicant seeks authorization to impact 2.34 acres of palustrine wetlands in order to develop a single family residential subdivision. The development would be constructed in 2 phases. The first phase would impact 0.25 acre and the second phase would impact 2.09 acres. The applicant proposes to preserve 0.59 acre of the remaining onsite wetlands. Erosion and sedimentation controls are proposed.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

Impacts have been limited to wetland areas that were previously disturbed areas prior to the onsite wetlands being jurisdictional for the Corps or areas that were created as a result of previous land disturbing activities.

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

The applicant proposes to purchase 0.08 palustrine mitigation bank credits for Phase 1 and 0.684 credits for Phase II from Breakfast Point Mitigation Bank.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Panama City Permit Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405 within 30 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Mrs. Lisa S. Lovvorn, in writing at the Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405; by electronic mail at lisa.s.lovvorn@usace.army.mil; by facsimile transmission at (850)872-0231; or, by telephone at (850)763-0717, extension 27.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23RD STREET, SUITE 350 PANAMA CITY, FLORIDA 32405

August 24, 2017

REPLY TO ATTENTION OF

Regulatory Division North Permits Branch Panama City Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2007-03918(SP-LSL) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Mr. Bryan Mack BMack Enterprises, LLC 1545 Championship Boulevard Franklin, Tennessee 37064 WATERWAY AND LOCATION: The project would affect waters of the United States associated with Mill Bayou. The project site is located at Ten Acre Road in Section 26, Township 3 South, Range 14 West, Panama City, Bay County, Florida. Directions to the site are as follows: Travel north of Highway 231. Turn right onto Transmitter Road and right onto Ten Acre Road. The property is located on the south side of Ten Acre Road between Naples Avenue and McGraw Lane. APPROXIMATE CENTRAL COORDINATES: Latitude 30.19410° Longitude -85.6117° PROJECT PURPOSE: Basic: Residential development. Overall: To construct a residential development to provide housing for moderate income families in central Panama City in Bay County, Florida. EXISTING CONDITIONS: The wetland system consists of 2.92 acres scrub shrub palustrine system. The onsite vegetation consists of Chinese tallow, sedge species, beakrush, slash pine, sweet bay, and titi. The existing area surrounding the project area consists of residential housing to the east, west, and south and a road to the north. PROPOSED WORK: The applicant seeks authorization to impact 2.34 acres of palustrine wetlands in order to develop a single family residential subdivision. The development would be constructed in 2 phases. The first phase would impact 0.25 acre and the second phase would impact 2.09 acres. The applicant proposes to preserve

0.59 acre of the remaining onsite wetlands. Erosion and sedimentation controls are proposed. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Impacts have been limited to wetland areas that were previously disturbed areas prior to the onsite wetlands being jurisdictional for the Corps or areas that were created as a result of previous land disturbing activities. COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The applicant proposes to purchase 0.08 palustrine mitigation bank credits for Phase 1 and 0.684 credits for Phase II from Breakfast Point Mitigation Bank. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Panama City Permit Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405 within 30 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

2

QUESTIONS concerning this application should be directed to the project manager, Mrs. Lisa S. Lovvorn, in writing at the Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405; by electronic mail at lisa.s.lovvorn@usace.army.mil; by facsimile transmission at (850)872-0231; or, by telephone at (850)763-0717, extension 27. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. 3

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

GENERAL NOTES 1. ELEVATIONS SHOWN ON THESE PLANS ARE BASED ON A TOPOGRAPHIC SURVEY PROVIDED BY SEA LEVEL SURVEYING AND MAPPING, INC. DATED 7/15/2008. 2. SURVEY DATUM NGVD 1929: USC AN GS BRASS DISK No. L42 - ELEV. 29.99'

DREDGE & FILL PERMIT DOCUMENTS

3. EROSION/SEDIMENTATION CONTROLS SHALL BE PLACED PRIOR TO EXCAVATION AND DEMOLITION. THESE DEVICES SHALL BE MAINTAINED DURING THE ENTIRE DURATION OF CONSTRUCTION. 4. THE CONTRACTOR SHALL COORDINATE A PRE-CONSTRUCTION MEETING WITH THE ENGINEER, OWNER, AND OTHER NECESSARY PARTIES. AT THE PRE CONSTRUCTION MEETING THE CONTRACTOR SHALL DESIGNATE A REPRESENTATIVE WHO SHALL BE CAPABLE OF BEING REACHED 24 HOURS A DAY, 7 DAYS A WEEK. ALL PERMITS SHALL BE IN PLACE PRIOR TO CONSTRUCTION. 5. THE UTILITIES SHOWN IN THESE PLANS ARE MINIMUM REQUIRED. EXISTING UTILITIES HAVE BEEN LOCATED BY SEA LEVEL SURVEYING AND MAPPING, INC.,7/15/2008 ON . IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES AND PROVIDE FOR PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY SUNSHINE ONE, CALL (1-800-432-4770), 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION.

BAY COUNTY, FLORIDA

FOR

Ten Acre Terrace Springfield, Florida

6. HORIZONTAL AND VERTICAL CONTROL SHALL BE PROVIDED FOR THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE CONTROLS THROUGHOUT THE DURATION OF CONSTRUCTION.

PREPARED FOR: Millirons Construction PO Box 15148 Panama City, Florida 32406

7. ALL DISTURBED AREAS THAT ARE NOT STABILIZED OR PLANTED SHALL BE GRASSED, AS APPLICABLE, UNLESS OTHERWISE SHOWN ON THE CONSTRUCTION PLANS. PROBLEM AREAS SHALL BE SODDED AS DIRECTED BY THE OWNER. 8. UNLESS OTHERWISE INDICATED OR MODIFIED ON THE PLANS, ALL ROADWAY AND DRAINAGE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF F.D.O.T. STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, SUPPLEMENTS AND SPECIAL PROVISIONS THERETO. 9. WHERE REFERENCE IS MADE TO STANDARD INDEX OR DETAIL, THE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS, LATEST EDITION, SHALL BE USED AS IF A PART OF THIS PLAN. 10. ALL UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF SPRINGFIELD PUBLIC WORKS LATEST STANDARD SPECIFICATIONS AND LATEST FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION REQUIREMENTS. 11. MINIMUM COMPACTION FOR FILL SECTIONS SHALL BE 95% MODIFIED PROCTOR. SOIL UNDER ALL STRUCTURES AND PAVED AREAS (MIN. 18" DEPTH) SHALL BE COMPACTED TO 95% MODIFIED PROCTOR THROUGHOUT ITS FULL DEPTH. BORROW MATERIAL, IF REQUIRED, IS TO BE PROVIDED BY THE CONTRACTOR AND HAVE A MINIMUM LBR VALUE OF 40. TOPSOIL IS TO BE STRIPPED AND STOCKPILED. FOLLOWING FINAL GRADING, PLACE STOCKPILED TOPSOIL, AS NEEDED, OVER DISTURBED AREA. UPON SUBGRADE COMPLETION, DENSITIES SHALL BE OBTAINED AND SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO PLACING THE BASE COARSE.

PROJECT LOCATION

EAST C.R. 2314

16. THE FOLLOWING PERMITS/APPROVALS HAVE OR WILL BE OBTAINED FOR THIS PROJECT: A. CITY OF SPRINGFIELD - DEVELOPMENT ORDER B. ENVIRONMENTAL RESOURCE PERMIT C. FDEP - POTABLE WATER PERMIT D. FDEP - WASTEWATER PERMIT E. FDEP/ACOE - WETLAND RESOURCE PERMIT F. FDEP - NPDES * - OWNER/CONTRACTOR IS RESPONSIBLE FOR SUBMITTING THE "NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES" IN ACCORDANCE WITH F.A.C. RULE 62-621.300(4) *PERMIT CAN BE FOUND AT HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/CONSTRUCTION3.HTM

17. PRIOR TO FINAL ACCEPTANCE OF THE PROJECT, ALL SILT AND DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE.

DOUGLAS ROAD

TRANSMITTER ROAD

15. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF THE DISCOVERY OF ANY ERRORS AND/OR OMISSIONS IN THE PLANS OR SPECIFICATIONS. THE ENGINEER WILL MAKE SUCH CORRECTIONS AND INTERPOLATIONS AS DEEMED NECESSARY REFLECTING THE ACTUAL SPRIRIT AND INTENT OF THE PLANS AND SPECIFICAITONS.

TEN ACRE ROAD

NAPLES AVE

14. THE CONTRACTOR SHALL SUBMIT A POST-CONSTRUCTION CERTIFICATION AND REPRODUCIBLE RECORD DRAWINGS TO THE ENGINEER PRIOR TO INSPECTION AND ACCEPTANCE. THE RECORD DRAWINGS SHALL BE PREPARED AND CERTIFIED BY A PROFESSIONAL LAND SURVEYOR.

McGRAW LN

13. TOLERANCE FOR ALL FINISHED GRADES SHALL BE 0.1'±.

SHEET NO. SHEET DESCRIPTION COVER SHEET 1 PROJECT AERIAL 2 MASTER SITE PLAN 3 UTILITY DETAILS 4 5 CONSTRUCTION DETAILS

BOUNDARY/TOPO SURVEY

DATE 11/18/2016 11/18/2016 11/18/2016 11/18/2016 11/18/2016

REVISION 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017

See Sheets

18. THE CONTRACTOR SHALL CONFINE ALL WORK WITHIN THE PROPERTY BOUNDARIES, EASEMENTS OR PUBLIC RIGHT OF WAY. NO TRESPASSING IS ALLOWED. 19. MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE FDOT, LATEST EDITION, DESIGN STANDARDS (600 SERIES) AT ALL TIMES.

20. NONCOMPLIANCE WITH NPDES REQUIREMENTS MAY RESULT IN ISSUANCE OF A STOP WORK ORDER. 21. CONTRACTOR SHALL PERFORM ALL NOTIFICATIONS TO REQUIRED PARTIES AS SET FORTH IN PERMIT REQUIREMENTS, SPECIFIC CONDITIONS, AND INSPECTIONS. REQUIRED PARTIES SHALL INCLUDE, BUT NOT LIMITED TO, THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), THE NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT (NWFWMD), THE LOCAL APPROVING AUTHORITY (THE CITY OF SPRINGFIELD, ETC.), THE ENGINEER, THE ARCHITECT, AND THE OWNER.

PROJECT LOCATION

ATTENTION IS DIRECTED TO THE FACT THAT THESE PLANS MAY HAVE BEEN ALTERED IN SIZE BY REPRODUCTION. THIS MUST BE CONSIDERED WHEN OBTAINING SCALED DATA.

GE

Gortemoller Engineering, Inc. 708 Thomas Drive Panama City Beach, FL 32408 (850) 249-2425 CA-00009505

ENGINEER OF RECORD Brad M. Harris, P.E. FLORIDA NO. 68420 708 Thomas Drive Panama City Beach, Florida 32408 (850) 249-2425 (850) 249-2426-Fax bharris@gorteng.com

N

CIVIL ENGINEERING BY:

Pe ot rm Fo it r C ting on P st lan ru s ct io n

LOCATION MAP

Ten Acre Terrace: 16-016

SHEET INDEX

12. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. SEDIMENT CONTROL DEVICES SHOWN ON THE PLANS ARE MINIMUM REQUIREMENTS. ADDITIONAL SEDIMENT CONTROLS MAY BE REQUIRED TO PREVENT SEDIMENTS FROM LEAVING THE SITE. THESE ADDITIONAL SEDIMENT CONTROLS ARE THE CONTRACTORS RESPONSIBILITY. ADDITIONALLY, STORMWATER RUNOFF IS TO BE CONTROLLED DURING CONSTRUCTION AS TO NOT DETRIMENTALLY AFFECT ADJACENT PROPERTIES.

BRENTWOOD PLACE

Gortemoller Engineering, Inc. 708 Thomas Drive Panama City Beach, FL 32408 (850) 249-2425 CA-00009505

Ten Acre Terrace Residential Subdivision Springfield, Florida

PROJECT:

ARDEN AVENUE

TEN ACRE TERRACE PROJECT BOUNDARY

NOT VALID FOR CONSTRUCTION UNLESS SIGNED IN THIS BLOCK

Date:

E.O.R.: Brad M. Harris P.E. No. 68420 (Florida)

AVON ROAD IF THIS LINE DOES NOT MEASURE ONE INCH IN LENGTH, THE SCALES ON THIS DRAWING ARE NOT VALID.

1"

AMELIA AVENUE

GLENVIEW AVENUE

Project Aerial

TEN ACRE ROAD

Millirons Construction PO Box 15148 Panama City, FL 32406

CLIENT:

NAPLES AVENUE

LANE ROAD

GE

DOUGLAS ROAD

MONICA ROAD

TRANSMITTER ROAD

QUIET OAKS DRIVE

McGRAW LANE

VOLUSIA AVENUE

ORMOND AVENUE

AVON COURT

AVON ROAD 11/18/2016 7/25/2017

2

REVISION

SHEET

BMH

BRF

16-016

DATE

CHECKED

DRAWN

JOB NO.

7/25/2017

4

REVISION

SHEET

EXIST. BASE 6" TYP.

11/18/2016

SEEDING OR SODDING WIDTH "W" EXIST. BASE

BMH

EXIST. WEARING SURFACE

DATE

SEE NOTE 5

SEE NOTE 7

BRF

16-016 12"

CHECKED

3"- 4" CROWN

FINISH GRADE

*

*

PIPE O.D.

UNDISTURBED STABLE MATERIAL

2.)

NOTES: 1. PVC PIPE SHALL REQUIRE INSULATED METALLIC LOCATING TAPE (12 GAUGE COPPER) CAPABLE OF DETECTION BY A CABLE LOCATOR AND SHALL BE BURIED DIRECTLY ABOVE THE CENTERLINE OF THE PIPE. 2. LOCATING WIRE SHALL TERMINATE AT THE TOP OF EACH VALVE BOX AND BE CAPABLE OF EXTENDING 12" ABOVE TOP OF BOX IN SUCH A MANNER SO AS NOT TO INTERFERE WITH VALVE OPERATION. 3. USE DUCT TAPE AS NECESSARY TO HOLD WIRE ON THE TOP OF THE PIPE. 4. ALL SPLICES SHALL BE MADE USING A WATER-TIGHT SEALING METHOD APPROVED BY THE CITY.

PVC PIPE LOCATING TAPE DETAIL

3.) 4.) 5.)

USE OF TYPE A-2 AND A-3 PIPE BEDDING TO BE DETERMINED IN THE FIELD BY THE ENGINEER. 10" MAX. FOR PIPE DIAMETERS LESS THAN 24"; 12" MAX. FOR PIPE DIAMETER 24" AND LESS THAN 42"; 24" MAX. FOR PIPE DIAMETER 42" AND OVER. 4" MAX. FOR PIPE 16" DIAMETER & LESS; 6" MAX. FOR PIPE 18" TO 36" DIAMETER; AND 9" MAX. FOR PIPE 42" DIAMETER AND LARGER. INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. WEARING SURFACE TO BE SAME TYPE & THICKNESS.

6.)

SHEETING ORDERED LEFT IN PLACE TO BE CUT OFF 24" BELOW FINISHED GRADE OR 12" BELOW SUBGRADE.

7.)

BASE SHALL BE 6" MINIMUM THICKNESS SAND ASPHALT, 10" MIN. THICKNESS CRUSHED CONCRETE, OR APPROVED EQUAL.

8.)

BACKFILL AASHTO M-145 SHALL BE PLACED IN LAYERS NOT TO EXCEED 6 INCHES. EACH LAYER SHALL BE THOROUGHLY TAMPED AND/OR ROLLED TO 98% AASHTO T-180 DENSITY.

9.)

NTS 10.)

TEMPORARY PATCHES WILL BE INSTALLED TO PROVIDE A SMOOTH ALL WEATHER SURFACE AT ALL TIMES. PERMANENT REPLACEMENT TO BE MADE AS SOON AS POSSIBLE. NOTES 5.) THRU 9.) ARE MINIMUM REQUIREMENTS. REFER TO F.D.O.T. ROADWAY AND TRAFFIC DESIGN STANDARDS FOR ADDITIONAL REQUIREMENTS.

TRENCH DETAIL IMPROVED SURFACE: TYPE A-1 BEDDING

POLYETHYLENE TUBING (1" MIN.)

POLYETHYLENE TUBING (1" MIN.)

SINGLE METER BOX AND WATER METER (BY CITY)

DOUBLE METER BOX AND WATER METER (BY CITY)

SINGLE SERVICE

CORPORATION STOP & FITTING (NORMALLY OPEN) AWWA TYPE CC THREADS

TO METER BOX ASSEMBLY

SADDLE

POLYETHYLENE TUBING 30 - 45 DEG.

SEE NOTE 3

THESE WIDTHS ARE FOR PAYMENT PURPOSES ONLY. SAFETY REQUIREMENTS MAY DICTATE INCREASED WIDTHS.

Date:

DOUBLE SERVICE

FOR PIPE SIZES 6" THRU 40" W = 2'-4"+PIPE O.D.+ D FOR PIPE SIZES OVER 40" W = 4'-4"+PIPE O.D.+ D

IF THIS LINE DOES NOT MEASURE ONE INCH IN LENGTH, THE SCALES ON THIS DRAWING ARE NOT VALID.

1"

WATER MAIN

WATER MAIN

DEPTH "D"

2' MINIMUM

SEEDING OR SODDING WIDTH "W" 1.)

TO 90% DENSITY, AASHTO T-180

SEE NOTE 2

CURB STOP 2 EA.

Utility Details

THESE WIDTHS ARE FOR PAYMENT PURPOSES ONLY. SAFETY REQUIREMENTS MAY DICTATE INCREASED WIDTHS.

MARK WITH WOOD PAINTED BLUE & WITH LOT NUMBERS

U-BRANCH FITTING (1" x 3/4" x 3/4")

WATER MAIN

UNDISTURBED STABLE MATERIAL

NOTES: 1. ALL FITTINGS SHALL BE BRASS WITH COMPRESSION/PACK JOINT TYPE CONNECTIONS. 2. NO SERVICE LINE SHALL TERMINATE UNDER A DRIVEWAY. 3. EACH SERVICE SHALL TERMINATE AT A CURB STOP(S) WHICH SHALL BE BURIED APPROXIMATELY 3" BELOW FINAL GRADE AND SHALL BE CLEARLY MARKED WITH A 2" X 2" X 18" STAKE WITH THE TOP PAINTED BLUE AND MARKED WITH THE NUMBER OF THE LOT(S) TO BE SERVED.

NOTES: 1.) USE OF TYPE A-2 AND A-3 PIPE BEDDING TO BE DETERMINED IN THE FIELD BY THE ENGINEER. 2.) 10" MAX. FOR PIPE DIAMETER LESS THAN 24"; 12" MAX. FOR PIPE DIAMETER 24" AND LESS THAN 42"; 24" MAX. FOR PIPE DIAMETER 42" AND OVER. 3.) 4" MAX. FOR PIPE 16" DIAMETER & LESS; 6" MAX. FOR PIPE 18" TO 36" DIAMETER; AND 9" MAX FOR PIPE 42" DIAMETER AND LARGER.

WATER SERVICE CONNECTION DETAILS NTS

4.) INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.

TRENCH DETAIL UNIMPROVED SURFACE: TYPE A-1 BEDDING NTS

NTS

Ten Acre Terrace Residential Subdivision Springfield, Florida

METALLIC LOCATION TAPE

FOR PIPE SIZES 24" THRU 40" " " "W =" 5'-0"+PIPE O.D.+ D

SELECTED COMMON FILL (SEE NOTE 1)

CORPORATION STOP (1" MIN.)

PROJECT:

1" MAX.

P.V.C. WATER MAIN OR FORCE MAIN

"

SEE NOTE 3

FOR PIPE SIZES 6" THRU 22" " " W"= 4'-8"+PIPE O.D.+ D

BACKFILLED AND COMPACTED

4"LAYERS

COMMON FILL

PIPE BEDDING

"

PAVEMENT REPLACEMENT WIDTH W"

12" LAYERS

*

6" LAYERS

PIPE O.D.

12"MIN.

*

CURB STOP (SEE NOTE 3)

TRENCH WIDTH

3" DETECTABLE TAPE 12" BELOW GRADE OR 6" DETECTABLE TAPE BETWEEN 12" & 24" BELOW GRADE OVER PVC PIPE. TAPE SHALL BE MARKED "RECLAIMED WATER" "POTABLE WATER" OR "SANITARY SEWER"

12"MIN.

FINISHED GRADE

1" MAX.

3" DETECTABLE TAPE 12" BELOW GRADE OR 6" DETECTABLE TAPE BETWEEN 12" & 24" BELOW GRADE OVER PVC PIPE. TAPE SHALL BE MARKED "RECLAIMED WATER" "POTABLE WATER" OR "SANITARY SEWER"

PIPE BEDDING

SEE NOTE 2

" DEPTH D"

COMMON FILL (SEE NOTE 1)

CORPORATION STOP (1" MIN.) BACKFILLED & COMPACTED TO 98% DENSITY, AASHTO T-180

VARIES

SEE NOTE 6

6" LAYERS

3"DETECTABLE TAPE 12" BELOW GRADE OR 6" DETECTABLE TAPE BETWEEN 12" & 24" BELOW GRADE OVER PVC PIPE. TAPE SHALL BE MARKED "RECLAIMED WATER" "POTABLE WATER" OR SELECTED "SANITARY SEWER"

E.O.R.: Brad M. Harris P.E. No. 68420 (Florida)

CLEAN COMMON FILL

NOT VALID FOR CONSTRUCTION UNLESS SIGNED IN THIS BLOCK

12"

DRAWN

SAW CUT

JOB NO.

PAVEMENT REPLACEMENT WIDTH W""

CONCRETE BASE

PE

SL

WATER MAIN

BOX SHALL REST ON BEDDING ROCK NOT ON VALVE OR PIPE AND SHALL BE CENTERED ON OPERATING NUT

1'-6" MIN. 3'-0" MAX.

5"

EPOXY COAL TAR COATINGS PER SPECIFICATIONS

RESILIENT SEAT GATE VALVE AND BOX (SEE DETAIL)

NOTES: 1. FIRE HYDRANT SHALL BE SUPPLIED WITHOUT A WEEP HOLE, OR WITH A PERMANENTLY PLUGGED WEEP HOLE. 2. THE DEVELOPER MAY INSTALL THE SHEAR PAD RECESSED UP TO 4 INCHES BELOW FINISHED GRADE AND SOD THE RECESSED SECTION. 3. CLEARANCE BETWEEN BOTTOM OF BOLTS AND TOP OF SHEAR PAD SHALL BE A 6" MINIMUM.

FIRE HYDRANT ASSEMBLY DETAIL NTS

2'-0"

4'-0"

12"

1"

NOTES: 1. PVC EXTENSIONS SHALL NOT BE USED ON VALVE BOX INSTALLATION. 2. THE ACTUATING NUT FOR DEEPER VALVES SHALL BE EXTENDED TO COME UP TO 4 FOOT DEPTH BELOW FINISHED GRADE.

PRE-PRIMED JOINT SURFACES

COMPLETED JOINT WITH SQUEEZE-OUT

9"

BEDDING ROCK

TERMINAL DEPTH AS REQUIRED FOR "HOUSE" SERVICE (3' MIN.) (TYP.)

(TY RO P.) TA (S TE EE 30 NO ° TE

SINGLE LATERAL VARIES

CLIENT: SPRING LINE SEWER MAIN 2)

PROFILE

PRECAST MONOLITHIC BASE

GATE VALVE AND BOX DETAIL NTS

PRE-MOLDED PLASTIC JOINT SEALER WITH PROTECTIVE WRAPPER (WRAPPER TO BE REMOVED)

SLOPE TO TERMINAL DEPTH AT 1.0% MIN. (TYP.)

9" 2" MIN.

CAST-IN-PLACE CONCRETE BASE

OUTSIDE WALL

SQUEEZE-OUT

8" MIN.

9"

FINISHED GRADE

PRE-PRIMED JOINT SURFACES

6" MIN.

REINFORCEMENT AND JOINT DETAIL TO BE DESIGNED BY THE ENGINEER AND APPROVED BY THE COUNTY. 9"

6" BEDDING ROCK

D

5" MIN.

INSIDE WALL

PLAN

3'

2 COURSES OF BRICK (MIN.) 4 COURSES (MAX.)

BENCHING PER SPECIFICATIONS

6" BEDDING ROCK M J ANCHORING COUPLING

FRAMES BEDDED IN MORTAR

NOTES: 1. MANHOLE SHOWN IS FOR SEWER SIZE 8" THRU 24", SEE SECTION 20.4.3 OF THE MANUAL FOR MANHOLE DIAMETER FOR SEWERS LARGER THAN 24". 2. DROP CONNECTIONS ARE REQUIRED WHENEVER INVERT OF INFLUENT SEWER IS 24" OR MORE ABOVE THE INVERT OF THE MANHOLE. SEE MANHOLE CONNECTION DETAILS. 3. APPROVED CONCENTRIC CONE DESIGN MAY BE USED AS AN ALTERNATIVE.

PRECAST CONCRETE MANHOLE NTS

NOTES: 1. LOCATE SINGLE LATERAL AS CLOSE TO LOT LINE AS POSSIBLE, 25' MAXIMUM. 2. INVERT OF SERVICE LATERAL SHALL NOT ENTER SEWER MAIN BELOW SPRING LINE. 3. ALL SERVICE LATERALS SHALL BE SINGLE SERVICE.

SEWER SERVICE LATERAL DETAIL NTS

GE

RESILIENT SEAT M. J. GATE VALVE

ADJUSTABLE CAST IRON VALVE BOX

SET COVERS FLUSH IN PAVED AREAS & AT ELEVATIIONS SHOWN IN UNPAVED AREAS.

Gortemoller Engineering, Inc. 708 Thomas Drive Panama City Beach, FL 32408 (850) 249-2425 CA-00009505

12" MIN.

SEE NOTE 2

REMOVABLE PLUG

MANHOLE FRAME & COVER (SEE STANDARD DETAIL)

R/W

SEE NOTE 3

M J HYDRANT ANCHORING TEE

FINISHED GRADE

AS VARIES REQ'D

COMPACTED BACKFILL

VARIES

2 - #4 AT 9" O.C. ALL AROUND

VALVE COLLAR (SEE DETAIL)

CONCRETE COLLAR IN UNPAVED AREAS (SEE DETAILS)

VARIES

18" MIN.

PUMPER NOZZLE FACING STREET

R/W LINE

SET TOP OF VALVE BOX TO FINISHED GRADE

0.8 D

24" SQUARE OR ROUND AND 6" THICK REINFORCED CONCRETE SHEAR PAD. SEE NOTE 2

SEWER MAIN SIZE VARIES

4" 45° BEND

PE

O

AS REQ'D.

WYE WITH 4" BRANCH

O

SL

HOSE NOZZLE

LOT LINE SEE NOTE 1

PE SL O

PE

O SL

HYDRANT OPERATING NUT

SEE MANHOLE CONNECTION DETAILS

Millirons Construction PO Box 15148 Panama City, FL 32406

TROWEL-FINISHED CONCRETE BENCHING

15 1

1

4: 1

DEWATERING NOTE: 1) SEDIMENT BASIN TO BE COSTRUCTED PRIOR TO THE CUT AND FILL PROCESS. 2) SEDIMENT BASIN TO REMAIN INTACT FOR ENTIRE LENGTH OF CUT ANF FILL PROCESS. 3) AFTER COMPLETION OF CUT AND FILL PROCESS, THE SEDIMENT BASIN IS TO BE REMOVED.

1"

EXISTING GRADE

LOT LINE

N.T.S.

TEMPORARY SEDIMENT & DEWATERING BASIN SECTION

EASEMENT LINE

NTS

3.0'

12' SWALE

PROPOSED 5' FENCE 2.5' FROM POND TOP (MIN)

PROPOSED 5' FENCE 2.5' FROM POND TOP (MIN) X

0.5' 12

X

X

1

X EXISTING GRADE (APPROX 39.00 - 41.50)

41.50 4

41.50

EXISTING GRADE PROPOSED GRADE

PROPOSED GRADE

1

MAX 25 YEAR STORM - 40.60 NOTE: DISTURBED AREAS TO BE SEED AND MULCHED 4

TREATMENT - 39.80

1

CONVEYANCE SWALE (SECTION B-B)

4

N.T.S.

1

37.00

PROJECT:

39.00

37.00

2

2 1

1

30.00

30.00

NOTE: SWF SLOPES TO BE SODDED

WET POND SECTION N.T.S.

PLAN PROPOSED GRADE 8.00' 8" ELEV - 39.00

12"

4:1

ELEV - 38.30 ELEV - 38.00

A

4" PVC SCREW IN CAP 4" PVC ELEV - 41.00 4" PVC TEE

30" 30" WEIR ELEV - 39.80 4" PVC ELEV - 39.00

4" PVC CAP WITH 1.75" HOLE DRILLED IN CENTER

EXISTING GRADE

12"

12" 6"

18" RCP ELEV - 35.50 ELEV - 34.50

18" RCP ELEV - 35.50

SECTION

BUBBLE UP STRUCTURE (DS - 13) TYPE "D" INLET - FDOT INDEX 232 NOTE: ALL DISTURBED AREAS TO BE SODDED

ELEV - 34.50

SECTION A-A

SECTION B-B

CONTROL STRUCTURE (DS - 12) TYPE "D" INLET - FDOT INDEX 232

GE

B

Gortemoller Engineering, Inc. 5 Miracle Strip Loop, Suite 16 Panama City Beach, FL 32407 (850) 249-2425 CA-00009505

24"

B

36"

CLIENT:

A

36"

4' BERM (ELEV - 39.00)

SHEET

12 1

Millirons Construction PO Box 15148 Panama City, FL 32406

PROPOSED 5' BERM

CUT

Ten Acre Terrace - Phase I Lots 1-15 Residential Subdivision Springfield, Florida

FILL

4:1

REVISION

Construction Details

CONVEYANCE SWALE (SECTION A-A)

PROPERTY LINE

NOTE: DISTURBED AREAS TO BE SEED AND MULCHED

Date:

E.O.R.: Brad M. Harris P.E. No. 68420 (Florida)

15

6:1

EXISTING GRADE LINE

4:1

5

11/ 18 / 2016 DATE

BMH CHECKED

DRAWN

0.5'

0.50% MIN

IF THIS LINE DOES NOT MEASURE ONE INCH IN LENGTH, THE SCALES ON THIS DRAWING ARE NOT VALID.

6:1

TIE BACK

15' SWALE

SEE PLANS

1 4:

3' BERM

NOT VALID FOR CONSTRUCTION UNLESS SIGNED IN THIS BLOCK

7.5'

PROPOSED GRADE LINE

BRF

16-016 JOB NO.

LOT LINE

SWALE CENTER LINE

EASEMENT LINE

LOT LINE / WETLAND LINE

7.5'

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits