Home

Jacksonville District

Run scraper

USACE withdrawal from Joint Appl Process Oct 1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SUBMIT APPLICATIONS DIRECTLY TO THE CORPS

Starting October 1, 2017, you must submit your applications directly to us using our forms and/or formats described by the following paragraphs. You may submit directly to us prior to this date. If you do so, please add a note to this effect to your Joint Application Form 62-330.060(1) you submit to the Florida Department of Environmental Protection (FDEP), Water Management Districts (WMDs) or delegated local program. Starting October 1, 2017, we will no longer download your Joint Application and associated documents from the document portals and/or e-mails by which FDEP, WMDs or delegated local program sends and/or makes those documents available to us. Starting that date, we will no longer act on your Joint Application that the FDEP, WMDs and delegated local programs forward to us.

CORPS WITHDRAWING FROM THE FLORIDA JOINT APPLICATION PROCESS EFFECTIVE OCTOBER 1, 2017

SUBMIT APPLICATIONS DIRECTLY TO THE CORPS

Starting October 1, 2017, you must submit your applications directly to us using our forms and/or formats described by the following paragraphs. You may submit directly to us prior to this date. If you do so, please add a note to this effect to your Joint Application Form 62-330.060(1) you submit to the Florida Department of Environmental Protection (FDEP), Water Management Districts (WMDs) or delegated local program.

Starting October 1, 2017, we will no longer download your Joint Application and associated documents from the document portals and/or e-mails by which FDEP, WMDs or delegated local program sends and/or makes those documents available to us. Starting that date, we will no longer act on your Joint Application that the FDEP, WMDs and delegated local programs forward to us. We have asked the FDEP to remove references in Chapter 62-330 F.A.C. (Environmental Resource Permitting) to our use of Joint Application, including removing from the Applicant’s Handbook that the FDEP, WMDs or delegated local programs will send and/or make available to us your Joint Application. We are also working with FDEP to amend our Operating Agreement.

If you apply for a Department of Army Permit and if you know (or not sure) your proposed work cannot be authorized under one of our Nationwide Permits (NWP) or Regional General Permits (RGP), you must use the APPL/ CAT/ ON FOR DEPARTMENT OF THE ARMY PERMIT ENG FORM 4345 and provide certain attachments (enclosed are the current versions of ENG FORM 4345 and its instructions as posted at http://www.usace.army.mil/Missions/Civil-Works/Regulatorv-Program-and­ Permits/Obtain-a-Permit/). This form is designed to guide your submittal of the information required at 33 CFR 325.1(d) Content of Application (enclosed for your convenience). Absence of this information may delay our issuing the Public Notice and/or coordination letters that are among our initial review steps toward determining whether to issue a Standard Permit (SP) or Letter of Permission (LOP).

If you request verification that your proposed work would be authorized under a specific NWP or RGP, we strongly encourage you to use ENG FORM 4345 because the standardized format speeds our initial processing steps. Note the information required

to be submitted is stated in the terms and conditions of the each NWP/RGP and will be different for different NWPs/RGPs. Not all the fields on ENG FORM 4345 will be required for your submittal, for example, mailing addresses for adjoining property owners typically are not required for verifications under a NWP/RGP. You will need to attach information required by the NWP/RGP where no fields are present on ENG FORM 4345, for example, for some of our NWPs, the requirements of General Condition # 32 Pre-Construction Notification (enclosed is the latest version).

Information on our review process is found in the Source Book section of our web page: http://www.sa j.usace.army.mil/M issions/Reg ulatory/Source-Book/

If you are confident that your proposed work would be authorized under the State Programmatic General Permit (SPGP) or one of our other Programmatic General Permits (PGPs), submit to the applicable administering entity and do not submit to us.

The current list of PGPs is enclosed (screenshot of our web page).

a. If the administering entity advises your proposed work is not authorized under the SPGP/PGPs, then submit to us your ENG FORM 4345 and its attachments.

b. For the State Programmatic General Permit (SPGP), under the current process, the administrating entity advises our local office within 5 days if your proposed work is "red" (not authorized by the SPGP) or is "yellow" (which may result in our determination your proposed work is "red"). The administrating entity will advise you of the "red" when they issue their authorization. In order to

inform you sooner, our office will contact you requesting submission of your ENG FORM 3435 and its attachments because typically the Joint Application will not include information needed to initiate our review.

c. For submittals through FDEP's Self Certification for Single Family Docks web page, if you receive an email explaining it does not qualify for the SPGP, then submit to us your ENG FORM 4345 and its attachments.

Submit your ENG FORM 4345 and its attachments by mail or e-mail to one of our offices based on the location of the proposed work (enclosed map).

We ask you arrange and separate your submittal, whether in paper (hardcopy) or electronic format, into the following parts.

a. ENG FORM 4345.

b. Drawings. A minimum of 3 drawings (Vicinity Map, Plan View, and Typical Cross-Section) in 8 1/2 X 11 format (per the instructions for the ENG FORM 4345) to describe the work for which a permit is requested.

c. NWP/RGP Information (if applicable). The information required by the NWP/RGP for which you are requesting verification.

d. Supplemental Information. More detailed drawings and/or description of the proposed work to assist the review process.

We welcome and prefer electronic submittals. Please note the following.

a. Our e-mail system limits the total size of your e-mail to 20MB. Your e­ mail system may have a lower limit. If you are sending *.pdf files, note that your *.pdf software may be able to optimize or reduce the file size. Our e-mail system will block *.zip files.

b. For submittals greater than the e-mail limits, please use the U.S. Army's Safe Access File Exchange (SAFE) web page: https://safe.amrdec.army.mil/safe/. On the SAFE homepage, begin by clicking the blue "Click Here" box on the right under "Non-CAC Users." Enter your name and email address (this will display in the email sent to us), then click the "Choose File" button to select the file(s) that you are sending. The "Description of File(s)" field cannot be left blank, please enter the applicant's name and description project, e.g., Joe Smith I Dock (this will display in the email sent to us). Under "Recipient Information", enter the e-mail address for one of our offices (based on the enclosed map) and click the blue "Add" button. Please select the maximum 14 days until deletion. After your file has been uploaded, you will receive an email to verify your email address and send the documents. Files will not be sent until this step is completed.

c. Please do not send one part of the application by e-mail and other parts by SAFE, i.e., submit the application as one package.

d. We will not download applications from any other file transfer site.

e. An alternative to SAFE (e.g., if SAFE's webpage is not available) is the Corps' RepliWeb Managed File Transfer (RMFT) web-based software. You must first establish an account (that will then be active for 7 days).

Send an email to one of our offices (based on the enclosed map). You will receive an e-mail from USACE.RepliWeb titled "Invitation to access ..." Follow the instructions to create a password. The only required information is your email address (the blanks for first, last and company names are optional but if provided will display on the address book within RMFT). To send your application within RMFT, click on the "New" icon, enter the email address for one of our field offices, enter the applicant's name I project in the Subject field, click on the "Add" button to add files, then click "Send" to transmit the "package". You can submit additional

applications/requests until the system auto-expires your account in 7 days.

These procedures are effective October 1, 2017, unless modified by a subsequent public notice. This public notice does not affect permitting submittal requirements for any other agency.

Please send any questions or comments on the above to Jacksonville District, Regulatory Division, PO Box 4970, Jacksonville, Florida 32232, Attn: Bob Barron; by phone number at 904-232-2203, or by email at robert.b.barron@usace.army.mil.

U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT

Form Approved OMB No. 0710-0003 Expires: 30-SEPTEMBER-2015

33 CFR 325. The proponent agency is CECW-CO-R.

Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO.

3. DATE RECEIVED

2. FIELD OFFICE CODE

4. DATE APPLICATION COMPLETE

(ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME First -

8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) Middle -

Last -

First -

Middle -

Company -

Company -

E-mail Address -

E-mail Address -

6. APPLICANT'S ADDRESS:

9. AGENT'S ADDRESS:

Address-

Address-

City -

State -

Country -

Zip -

7. APPLICANT'S PHONE NOs. w/AREA CODE a. Residence

b. Business

Last -

State -

City -

Country -

Zip -

10. AGENTS PHONE NOs. w/AREA CODE c. Fax

a. Residence

b. Business

c. Fax

STATEMENT OF AUTHORIZATION 11. I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application.

DATE

SIGNATURE OF APPLICANT

NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions)

13. NAME OF WATERBODY, IF KNOWN (if applicable)

14. PROJECT STREET ADDRESS (if applicable) Address

15. LOCATION OF PROJECT Latitude: N

City -

Longitude: W

State-

Zip-

16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Section -

Municipality Township -

ENG FORM 4345, DEC 2014

Range PREVIOUS EDITIONS ARE OBSOLETE.

Page 1 of 3

17. DIRECTIONS TO THE SITE

18. Nature of Activity (Description of project, include all features)

19. Project Purpose (Describe the reason or purpose of the project, see instructions)

USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge

21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Amount in Cubic Yards Amount in Cubic Yards

Type Amount in Cubic Yards

22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres or Linear Feet 23. Description of Avoidance, Minimization, and Compensation (see instructions)

ENG FORM 4345, DEC 2014

Page 2 of 3

24. Is Any Portion of the Work Already Complete?

Yes

No

IF YES, DESCRIBE THE COMPLETED WORK

25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. AddressCity -

State -

Zip -

State -

Zip -

State -

Zip -

State -

Zip -

State -

Zip -

b. AddressCity c. AddressCity d. AddressCity e. AddressCity -

26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY

TYPE APPROVAL*

IDENTIFICATION NUMBER

DATE APPLIED

DATE APPROVED

DATE DENIED

* Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant.

SIGNATURE OF APPLICANT

DATE

SIGNATURE OF AGENT

DATE

The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, DEC 2014

Page 3 of 3

Instructions for Preparing a Department of the Army Permit Application Blocks 1 through 4. To be completed by Corps of Engineers. Block 5. Applicant's Name. Enter the name and the E-mail address of the responsible party or parties. If the responsible party is an agency, company, corporation, or other organization, indicate the name of the organization and responsible officer and title. If more than one party is associated with the application, please attach a sheet with the necessary information marked Block 5. Block 6. Address of Applicant. Please provide the full address of the party or parties responsible for the application. If more space is needed, attach an extra sheet of paper marked Block 6. Block 7. Applicant Telephone Number(s). Please provide the number where you can usually be reached during normal business hours. Blocks 8 through 11. To be completed, if you choose to have an agent. Block 8. Authorized Agent's Name and Title. Indicate name of individual or agency, designated by you, to represent you in this process. An agent can be an attorney, builder, contractor, engineer, or any other person or organization. Note: An agent is not required. Blocks 9 and 10. Agent's Address and Telephone Number. Please provide the complete mailing address of the agent, along with the telephone number where he / she can be reached during normal business hours. Block 11. Statement of Authorization. To be completed by applicant, if an agent is to be employed. Block 12. Proposed Project Name or Title. Please provide name identifying the proposed project, e.g., Landmark Plaza, Burned Hills Subdivision, or Edsall Commercial Center. Block 13. Name of Waterbody. Please provide the name of any stream, lake, marsh, or other waterway to be directly impacted by the activity. If it is a minor (no name) stream, identify the waterbody the minor stream enters. Block 14. Proposed Project Street Address. If the proposed project is located at a site having a street address (not a box number), please enter it here. Block 15. Location of Proposed Project. Enter the latitude and longitude of where the proposed project is located. If more space is required, please attach a sheet with the necessary information marked Block 15. Block 16. Other Location Descriptions. If available, provide the Tax Parcel Identification number of the site, Section, Township, and Range of the site (if known), and / or local Municipality that the site is located in. Block 17. Directions to the Site. Provide directions to the site from a known location or landmark. Include highway and street numbers as well as names. Also provide distances from known locations and any other information that would assist in locating the site. You may also provide description of the proposed project location, such as lot numbers, tract numbers, or you may choose to locate the proposed project site from a known point (such as the right descending bank of Smith Creek, one mile downstream from the Highway 14 bridge). If a large river or stream, include the river mile of the proposed project site if known Block 18. Nature of Activity. Describe the overall activity or project. Give appropriate dimensions of structures such as wing walls, dikes (identify the materials to be used in construction, as well as the methods by which the work is to be done), or excavations (length, width, and height). Indicate whether discharge of dredged or fill material is involved. Also, identify any structure to be constructed on a fill, piles, or float-supported platforms. The written descriptions and illustrations are an important part of the application. Please describe, in detail, what you wish to do. If more space is needed, attach an extra sheet of paper marked Block 18. Block 19. Proposed Project Purpose. Describe the purpose and need for the proposed project. What will it be used for and why? Also include a brief description of any related activities to be developed as the result of the proposed project. Give the approximate dates you plan to both begin and complete all work.

Block 20. Reasons for Discharge. If the activity involves the discharge of dredged and/or fill material into a wetland or other waterbody, including the temporary placement of material, explain the specific purpose of the placement of the material (such as erosion control). Block 21. Types of Material Being Discharged and the Amount of Each Type in Cubic Yards. Describe the material to be discharged and amount of each material to be discharged within Corps jurisdiction. Please be sure this description will agree with your illustrations. Discharge material includes: rock, sand, clay, concrete, etc. Block 22. Surface Areas of Wetlands or Other Waters Filled. Describe the area to be filled at each location. Specifically identify the surface areas, or part thereof, to be filled. Also include the means by which the discharge is to be done (backhoe, dragline, etc.). If dredged material is to be discharged on an upland site, identify the site and the steps to be taken (if necessary) to prevent runoff from the dredged material back into a waterbody. If more space is needed, attach an extra sheet of paper marked Block 22. Block 23. Description of Avoidance, Minimization, and Compensation. Provide a brief explanation describing how impacts to waters of the United States are being avoided and minimized on the project site. Also provide a brief description of how impacts to waters of the United States will be compensated for, or a brief statement explaining why compensatory mitigation should not be required for those impacts. Block 24. Is Any Portion of the Work Already Complete? Provide any background on any part of the proposed project already completed. Describe the area already developed, structures completed, any dredged or fill material already discharged, the type of material, volume in cubic yards, acres filled, if a wetland or other waterbody (in acres or square feet). If the work was done under an existing Corps permit, identity the authorization, if possible. Block 25. Names and Addresses of Adjoining Property Owners, Lessees, etc., Whose Property Adjoins the Project Site. List complete names and full mailing addresses of the adjacent property owners (public and private) lessees, etc., whose property adjoins the waterbody or aquatic site where the work is being proposed so that they may be notified of the proposed activity (usually by public notice). If more space is needed, attach an extra sheet of paper marked Block 24. Information regarding adjacent landowners is usually available through the office of the tax assessor in the county or counties where the project is to be developed. Block 26. Information about Approvals or Denials by Other Agencies. You may need the approval of other federal, state, or local agencies for your project. Identify any applications you have submitted and the status, if any (approved or denied) of each application. You need not have obtained all other permits before applying for a Corps permit. Block 27. Signature of Applicant or Agent. The application must be signed by the owner or other authorized party (agent). This signature shall be an affirmation that the party applying for the permit possesses the requisite property rights to undertake the activity applied for (including compliance with special conditions, mitigation, etc.).

DRAWINGS AND ILLUSTRATIONS General Information. Three types of illustrations are needed to properly depict the work to be undertaken. These illustrations or drawings are identified as a Vicinity Map, a Plan View or a Typical Cross-Section Map. Identify each illustration with a figure or attachment number. Please submit one original, or good quality copy, of all drawings on 8½ x11 inch plain white paper (electronic media may be substituted). Use the fewest number of sheets necessary for your drawings or illustrations. Each illustration should identify the project, the applicant, and the type of illustration (vicinity map, plan view, or crosssection). While illustrations need not be professional (many small, private project illustrations are prepared by hand), they should be clear, accurate, and contain all necessary information.

Corps of Engineers, Dept. of the Army, DoD element having responsibility for administering, processing, and enforcing federal laws and regulations relating to the Corps of Engineers regulatory program shall be available to advise potential applicants of studies or other information foreseeably required for later federal action. The district engineer will establish local procedures and policies including appropriate publicity programs which will allow potential applicants to contact the district engineer or the regulatory staff element to request pre-application consultation. Upon receipt of such request, the district engineer will assure the conduct of an orderly process which may involve other staff elements and affected agencies (Federal, state, or local) and the public. This early process should be brief but thorough so that the potential applicant may begin to assess the viability of some of the more obvious potential alternatives in the application. The district engineer will endeavor, at this stage, to provide the potential applicant with all helpful information necessary in pursuing the application, including factors which the Corps must consider in its permit decision making process. Whenever the district engineer becomes aware of planning for work which may require a DA permit and which may involve the preparation of an environmental document, he shall contact the principals involved to advise them of the requirement for the permit(s) and the attendant public interest review including the development of an environmental document. Whenever a potential applicant indicates the intent to submit an application for work which may require the preparation of an environmental document, a single point of contact shall be designated within the district's regulatory staff to effectively coordinate the regulatory process, including the National Environmental Policy Act (NEPA) procedures and all attendant reviews, meetings, hearings, and other actions, including the scoping process if appropriate, leading to a decision by the district engineer. Effort devoted to this process should be commensurate with the likelihood of a permit application actually being submitted to the Corps. The regulatory staff coordinator shall maintain an open relationship

§ 325.1

with each potential applicant or his consultants so as to assure that the potential applicant is fully aware of the substance (both quantitative and qualitative) of the data required by the district engineer for use in preparing an environmental assessment or an environmental impact statement (EIS) in accordance with 33 CFR part 230, Appendix B. (c) Application form. Applicants for all individual DA permits must use the standard application form (ENG Form 4345, OMB Approval No. OMB 49­R0420). Local variations of the application form for purposes of facilitating coordination with federal, state and local agencies may be used. The appropriate form may be obtained from the district office having jurisdiction over the waters in which the activity is proposed to be located. Certain activities have been authorized by general permits and do not require submission of an application form but may require a separate notification. p (d) Content of application. (1) The application must include a complete description of the proposed activity including necessary drawings, sketches, or plans sufficient for public notice (detailed engineering plans and specifications are not required); the location, purpose and need for the proposed activity; scheduling of the activity; the names and addresses of adjoining property owners; the location and dimensions of adjacent structures; and a list of authorizations required by other federal, interstate, state, or local agencies for the work, including all approvals received or denials already made. See § 325.3 for information required to be in public notices. District and division engineers are not authorized to develop additional information forms but may request specific information on a caseby-case basis. (See § 325.1(e)). (2) All activities which the applicant plans to undertake which are reasonably related to the same project and for which a DA permit would be required should be included in the same permit application. District engineers should reject, as incomplete, any permit application which fails to comply with this requirement. For example, a permit application for a marina will include dredging required for access as

407

§ 325.1

33 CFR Ch. II (7­1­16 Edition)

well as any fill associated with construction of the marina. (3) If the activity would involve dredging in navigable waters of the United States, the application must include a description of the type, composition and quantity of the material to be dredged, the method of dredging, and the site and plans for disposal of the dredged material. (4) If the activity would include the discharge of dredged or fill material into the waters of the United States or the transportation of dredged material for the purpose of disposing of it in ocean waters the application must include the source of the material; the purpose of the discharge, a description of the type, composition and quantity of the material; the method of transportation and disposal of the material; and the location of the disposal site. Certification under section 401 of the Clean Water Act is required for such discharges into waters of the United States. (5) If the activity would include the construction of a filled area or pile or float-supported platform the project description must include the use of, and specific structures to be erected on, the fill or platform. (6) If the activity would involve the construction of an impoundment structure, the applicant may be required to demonstrate that the structure complies with established state dam safety criteria or that the structure has been designed by qualified persons and, in appropriate cases, independently reviewed (and modified as the review would indicate) by similiarly qualified persons. No specific design criteria are to be prescribed nor is an independent detailed engineering review to be made by the district engineer. (7) For activities involving discharges of dredged or fill material into waters of the United States, the application must include a statement describing how impacts to waters of the United States are to be avoided and minimized. The application must also include either a statement describing how impacts to waters of the United States are to be compensated for or a statement explaining why compensatory mitigation should not be re-

quired for the proposed impacts. (See § 332.4(b)(1) of this chapter.) (8) Signature on application. The application must be signed by the person who desires to undertake the proposed activity (i.e., the applicant) or by a duly authorized agent. When the applicant is represented by an agent, that information will be included in the space provided on the application or by a separate written statement. The signature of the applicant or the agent will be an affirmation that the applicant possesses or will possess the requisite property interest to undertake the activity proposed in the application, except where the lands are under the control of the Corps of Engineers, in which cases the district engineer will coordinate the transfer of the real estate and the permit action. An application may include the activity of more than one owner provided the character of the activity of each owner is similar and in the same general area and each owner submits a statement designating the same agent. (9) If the activity would involve the construction or placement of an artificial reef, as defined in 33 CFR 322.2(g), in the navigable waters of the United States or in the waters overlying the outer continental shelf, the application must include provisions for siting, constructing, monitoring, and managing the artificial reef. (10) Complete application. An application will be determined to be complete when sufficient information is received to issue a public notice (See 33 CFR 325.1(d) and 325.3(a).) The issuance of a public notice will not be delayed to obtain information necessary to evaluate an application. (e) Additional information. In addition to the information indicated in paragraph (d) of this section, the applicant will be required to furnish only such additional information as the district engineer deems essential to make a public interest determination including, where applicable, a determination of compliance with the section 404(b)(1) guidelines or ocean dumping criteria. Such additional information may include environmental data and information on alternate methods and sites as may be necessary for the preparation

408

Corps of Engineers, Dept. of the Army, DoD (C) A 401 certification has been issued or waived and, if appropriate, CZM consistency concurrence obtained or presumed either on a generic or individual basis. (2) Regional permits. Regional permits are a type of general permit as defined in 33 CFR 322.2(f) and 33 CFR 323.2(n). They may be issued by a division or district engineer after compliance with the other procedures of this regulation. After a regional permit has been issued, individual activities falling within those categories that are authorized by such regional permits do not have to be further authorized by the procedures of this regulation. The issuing authority will determine and add appropriate conditions to protect the public interest. When the issuing authority determines on a case-by-case basis that the concerns for the aquatic environment so indicate, he may exercise discretionary authority to override the regional permit and require an individual application and review. A regional permit may be revoked by the issuing authority if it is determined that it is contrary to the public interest provided the procedures of § 325.7 off this part are followed. Following revocation, applications for future activities in areas covered by the regional permit shall be processed as applications for individual permits. No regional permit shall be issued for a period of more than five years. (3) Joint procedures. Division and district engineers are authorized and encouraged to develop joint procedures with states and other Federal agencies with ongoing permit programs for activities also regulated by the Department of the Army. Such procedures may be substituted for the procedures in paragraphs (a)(1) through (a)(5) off this section provided that the substantive requirements of those sections are maintained. Division and district engineers are also encouraged to develop management techniques such as joint agency review meetings to expedite the decision-making process. However, in doing so, the applicant's rights to a full public interest review and independent decision by the district or division engineer must be strictly observed.

§ 325.3

(4) Emergency procedures. Division engineers are authorized to approve special processing procedures in emergency situations. An ``emergency'' is a situation which would result in an unacceptable hazard to life, a significant loss of property, or an immediate, unforeseen, and significant economic hardship if corrective action requiring a permit is not undertaken within a time period less than the normal time needed to process the application under standard procedures. In emergency situations, the district engineer will explain the circumstances and recommend special procedures to the division engineer who will instruct the district engineer as to further processing of the application. Even in an emergency situation, reasonable efforts will be made to receive comments from interested Federal, state, and local agencies and the affected public. Also, notice of any special procedures authorized and their rationale is to be appropriately published as soon as practicable. [51 FR 41236, Nov. 13, 1986, as amended at 62 FR 26230, May 13, 1997]

§ 325.3 Public notice. (a) General. The public notice is the primary method of advising all interested parties of the proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable impact on the public interest. The notice must, therefore, include sufficient information to give a clear understanding of the nature and magnitude of the activity to generate meaningful comment. The notice should include the following items of information: (1) Applicable statutory authority or authorities; (2) The name and address of the applicant; (3) The name or title, address and telephone number of the Corps employee from whom additional information concerning the application may be obtained; (4) The location of the proposed activity; (5) A brief description of the proposed activity, its purpose and intended use, so as to provide sufficient information concerning the nature of the activity

415

§ 325.3

33 CFR Ch. II (7­1­16 Edition)

to generate meaningful comments, including a description of the type of structures, if any, to be erected on fills or pile or float-supported platforms, and a description of the type, composition, and quantity of materials to be discharged or disposed of in the ocean; (6) A plan and elevation drawing showing the general and specific site location and character of all proposed activities, including the size relationship of the proposed structures to the size of the impacted waterway and depth of water in the area; (7) If the proposed activity would occur in the territorial seas or ocean waters, a description of the activity's relationship to the baseline from which the territorial sea is measured; (8) A list of other government authorizations obtained or requested by the applicant, including required certifications relative to water quality, coastal zone management, or marine sanctuaries; (9) If appropriate, a statement that the activity is a categorical exclusion for purposes of NEPA (see paragraph 7 of appendix B to 33 CFR part 230); (10) A statement of the district engineer's current knowledge on historic properties; (11) A statement of the district engineer's current knowledge on endangered species (see § 325.2(b)(5)); (12) A statement(s) on evaluation factors (see § 325.3(c)); (13) Any other available information which may assist interested parties in evaluating the likely impact of the proposed activity, if any, on factors affecting the public interest; (14) The comment period based on § 325.2(d)(2); (15) A statement that any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing; (16) For non-federal applications in states with an approved CZM Plan, a statement on compliance with the approved Plan; and (17) In addition, for section 103 (ocean dumping) activities:

(i) The specific location of the proposed disposal site and its physical boundaries; (ii) A statement as to whether the proposed disposal site has been designated for use by the Administrator, EPA, pursuant to section 102(c) of the Act; (iii) If the proposed disposal site has not been designated by the Administrator, EPA, a description of the characteristics of the proposed disposal site and an explanation as to why no previously designated disposal site is feasible; (iv) A brief description of known dredged material discharges at the proposed disposal site; (v) Existence and documented effects of other authorized disposals that have been made in the disposal area (e.g., heavy metal background reading and organic carbon content); (vi) An estimate of the length of time during which disposal would continue at the proposed site; and (vii) Information on the characteristics and composition of the dredged material. (b) Public notice for general permits. District engineers will publish a public notice for all proposed regional general permits and for significant modifications to, or reissuance of, existing regional permits within their area of jurisdiction. Public notices for statewide regional permits may be issued jointly by the affected Corps districts. The notice will include all applicable information necessary to provide a clear understanding of the proposal. In addition, the notice will state the availability of information at the district office which reveals the Corps' provisional determination that the proposed activities comply with the requirements for issuance of general permits. District engineers will publish a public notice for nationwide permits in accordance with 33 CFR 330.4. (c) Evaluation factors. A paragraph describing the various evaluation factors on which decisions are based shall be included in every public notice. (1) Except as provided in paragraph (c)(3) of this section, the following will be included:

416

sradovich on DSK3GMQ082PROD with RULES3

Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Rules and Regulations including the achievement of ecological performance standards, will be addressed separately by the district engineer. The Corps will provide the permittee the certification document with the NWP verification letter. The certification document will include: (a) A statement that the authorized activity was done in accordance with the NWP authorization, including any general, regional, or activity-specific conditions; (b) A statement that the implementation of any required compensatory mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(l)(3) to confirm that the permittee secured the appropriate number and resource type of credits; and (c) The signature of the permittee certifying the completion of the activity and mitigation. The completed certification document must be submitted to the district engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later. 31. Activities Affecting Structures or Works Built by the United States. If an NWP activity also requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers (USACE) federally authorized Civil Works project (a ``USACE project''), the prospective permittee must submit a preconstruction notification. See paragraph (b)(10) of general condition 32. An activity that requires section 408 permission is not authorized by NWP until the appropriate Corps office issues the section 408 permission to alter, occupy, or use the USACE project, and the district engineer issues a written NWP verification. 32. Pre-Construction Notification. (a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre-construction notification (PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary to make the PCN complete. The request must specify the information needed to

VerDate Sep<11>2014

21:11 Jan 05, 2017

Jkt 241001

make the PCN complete. As a general rule, district engineers will request additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity until either: (1) He or she is notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or (2) 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 18 that listed species or critical habitat might be affected or are in the vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the activity might have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that there is ``no effect'' on listed species or ``no potential to cause effects'' on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)) has been completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee may not begin the activity until the district engineer issues the waiver. If the district or division engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). (b) Contents of Pre-Construction Notification: The PCN must be in writing and include the following information: (1) Name, address and telephone numbers of the prospective permittee; (2) Location of the proposed activity;

PO 00000

Frm 00145

Fmt 4701

Sfmt 4700

2003

(3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to authorize the proposed activity; (4) A description of the proposed activity; the activity's purpose; direct and indirect adverse environmental effects the activity would cause, including the anticipated amount of loss of wetlands, other special aquatic sites, and other waters expected to result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a description of any proposed mitigation measures intended to reduce the adverse environmental effects caused by the proposed activity; and any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings for linear projects that require Department of the Army authorization but do not require pre-construction notification. The description of the proposed activity and any proposed mitigation measures should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory mitigation or other mitigation measures. For single and complete linear projects, the PCN must include the quantity of anticipated losses of wetlands, other special aquatic sites, and other waters for each single and complete crossing of those wetlands, other special aquatic sites, and other waters. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the activity and when provided results in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description of the proposed activity (e.g., a conceptual plan), but do not need to be detailed engineering plans); (5) The PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the project site, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many wetlands, other special aquatic sites, and other waters. Furthermore, the 45 day period will not start until the delineation has

E:\FR\FM\06JAR3.SGM

06JAR3

sradovich on DSK3GMQ082PROD with RULES3

2004

Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Rules and Regulations

been submitted to or completed by the Corps, as appropriate; (6) If the proposed activity will result in the loss of greater than 1/10-acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied, or explaining why the adverse environmental effects are no more than minimal and why compensatory mitigation should not be required. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. (7) For non-Federal permittees, if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed activity or utilize the designated critical habitat that might be affected by the proposed activity. For NWP activities that require pre-construction notification, Federal permittees must provide documentation demonstrating compliance with the Endangered Species Act; (8) For non-Federal permittees, if the NWP activity might have the potential to cause effects to a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property might have the potential to be affected by the proposed activity or include a vicinity map indicating the location of the historic property. For NWP activities that require pre-construction notification, Federal permittees must provide documentation demonstrating compliance with section 106 of the National Historic Preservation Act; (9) For an activity that will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a ``study river'' for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild and Scenic River or the ``study river'' (see general condition 16); and (10) For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the pre-construction notification must include a statement confirming that the project proponent has submitted a written request for section 408

VerDate Sep<11>2014

21:11 Jan 05, 2017

Jkt 241001

permission from the Corps office having jurisdiction over that USACE project. (c) Form of Pre-Construction Notification: The standard individual permit application form (Form ENG 4345) may be used, but the completed application form must clearly indicate that it is an NWP PCN and must include all of the applicable information required in paragraphs (b)(1) through (10) of this general condition. A letter containing the required information may also be used. Applicants may provide electronic files of PCNs and supporting materials if the district engineer has established tools and procedures for electronic submittals. (d) Agency g y Coordination: (1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the activity's adverse environmental effects so that they are no more than minimal. (2) Agency coordination is required for: (i) All NWP activities that require pre-construction notification and result in the loss of greater than 1/2-acre of waters of the United States; (ii) NWP 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 activities that require pre-construction notification and will result in the loss of greater than 300 linear feet of stream bed; (iii) NWP 13 activities in excess of 500 linear feet, fills greater than one cubic yard per running foot, or involve discharges of dredged or fill material into special aquatic sites; and (iv) NWP 54 activities in excess of 500 linear feet, or that extend into the waterbody more than 30 feet from the mean low water line in tidal waters or the ordinary high water mark in the Great Lakes. (3) When agency coordination is required, the district engineer will immediately provide (e.g., via email, facsimile transmission, overnight mail, or other expeditious manner) a copy of the complete PCN to the appropriate Federal or state offices (FWS, state natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will have 10 calendar days from the date the material is transmitted to notify the district engineer via telephone, facsimile transmission, or email that they intend to provide substantive, site-specific comments. The comments must explain why the agency believes the adverse environmental effects will be more than minimal. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the preconstruction notification. The district

PO 00000

Frm 00146

Fmt 4701

Sfmt 4700

engineer will fully consider agency comments received within the specified time frame concerning the proposed activity's compliance with the terms and conditions of the NWPs, including the need for mitigation to ensure the net adverse environmental effects of the proposed activity are no more than minimal. The district engineer will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each pre-construction notification that the resource agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. (4) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by section 305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act. (5) Applicants are encouraged to provide the Corps with either electronic files or multiple copies of preconstruction notifications to expedite agency coordination. D. District Engineer's Decision 1. In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by a specific NWP, the district engineer should issue the NWP verification for that activity if it meets the terms and conditions of that NWP, unless he or she determines, after considering mitigation, that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and exercises discretionary authority to require an individual permit for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of waters of the United States to determine whether they individually satisfy the

E:\FR\FM\06JAR3.SGM

06JAR3

Addresses for Submission of Permit Applications in Florida to the Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers Holmes Santa Rosa Okaloosa Pensacola

Jackson

Walton

Leon Bay

Hamilton

Madison

Wakulla

Suwannee Taylor

Gulf

Franklin

Office

Mailing Address

Telephone:, Facsimile and Email* Address

Pensacola

Pensacola Permits Section 41 North Jefferson Street, Suite 301 Pensacola, FL 32502 5644

Telephone:: (850) 4393474 Facsimile: (850) 4338160 Email: CorpsjaxregNL@usace.army.mil Click on this box to open a new email with your default mail client

Cocoa

Panama City Permits Section 1002 West 23rd Street, Suite 350 Panama City, FL 324053648

Telephone:: 8507630717 Facsimile: (850) 8720231s Email: CorpsjaxregNP@usace.army.mil Click on this box to open a new email with your default mail client

Jacksonville Permits Section P.O. Box 4970 Jacksonville, FL 322320019

Telephone:: (904) 2323286 Facsimile: (904) 2321904 Email: corpsjaxregnj@usace.army.mil Click on this box to open a new email with your default mail client

Cocoa Permits Section 400 High Point Drive, Suite 600 Cocoa, FL 329266662

Telephone: (321) 5043771 Facsimile: (321) 5043803 Email: corpsjaxregnc@usace.army.mil Click on this box to open a new email with your default mail client

Clay

Bradford

Dixie

Map shows office locations and the geographic area each covers for review of applications. Please submit your permit application to the office based on the county the proposed work is located.

Jacksonville

Duval

Union Lafayette Gilchrist

Panama City

Jacksonville Baker

Panama City Liberty

Jacksonville District Web Page http://www.saj.usace.army.mil/Missions/Regulatory/

Nassau

Gadsden

Gainesville Putnam Alachua

Flagler

Levy Marion Volusia Citrus

Lake Seminole

Sumter Hernando

Orange

Tampa

OSsceola

Polk

Indian River Manatee

Hardee St. Lucie Highlands

Sarasota

DeSoto Martin

Tampa

Telephone:: (813) 7697073 Facsimile: (813) 7697061 Email: Tampareg@usace.army.mil Click on this box to open a new email with your default mail client

Gainesville

Gainesville Regulatory Office 2833 NW 41st St, Unit 130 Gainesville, FL 326066987

Telephone:: (352) 2647672 Facsimile: (352) 2647733 Email: Tampareg@usace.army.mil Click on this box to open a new email with your default mail client

Ft Myers

Fort Myers Permits Section 1520 Royal Palm Square Boulevard Suite 310 Ft Myers, FL 339191036

Telephone: (239) 3341975 Facsimile: (239) 3340797 Email: SF.New.Applications@usace.army.mil Click on this box to open a new email with your default mail client

Palm Beach Gardens

Palm Beach Gardens Permit Section 4400 PGA Boulevard, Suite 500 Palm Beach Gardens, FL 334106557

Telephone:: (561) 4723504 Facsimile: (561) 6266791 Email: Applicationsp@usace.army.mil Click on this box to open a new email with your default mail client

Miami

Miami Permits Section 9900 SW 107th Ave., Suite 203 Miami, FL 331762785

Telephone:: (305) 5267181 Facsimile: (305) 5267184 Email: SEAPPLS@usace.army.mil Click on this box to open a new email with your default mail client

Palm Beach Gardens

Glades

Charlotte

Tampa Permits Section 10117 Princess Palm Drive, Suite 120 Tampa, FL 336108302

Cocoa

Pasco

Ft. Myers Hendry

Palm Beach

Lee

Collier

Broward

Miami

Miami-Dade

*For some offices, there may be a different email address for use by a particular agency to implement an applicable agreement. Applications by the Florida Department of Transportation are sent the Panama City Office, except the email address is different.

Email: CORPSJAXREGFDOT@usace.army.mil Click on this box to open a new email with your default mail client

Map version August 17, 2017

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas