Herbert Development East - Herbert Development East is planning to construct a 62-acre residential development in Lancaster County, Nebraska. Construction activities include grading for approximately 9,500 feet of roads, 150 single-family building sites, and a 1.1-acre storm water detention pond. Infrastructure development includes sanitary sewer lines, water mains, storm sewers, concrete street pavement, gas lines, and underground electric and data lines. The underground utilities will be installed in open cut trenches using backhoes, trenchers, and loaders. The proposed project would fill 256 linear feet of R6SB un-named tributary (ephemeral) to Stephens Creek, 1.127 acres of PEMA/C riverine floodplain wetlands, and 0.174 acre of PFOA riverine floodplain wetlands.

Herbert Development East - Herbert Development East is planning to construct a 62-acre residential development in Lancaster County, Nebraska. Construction activities include grading for approximately 9,500 feet of roads, 150 single-family building sites, and a 1.1-acre storm water detention pond. Infrastructure development includes sanitary sewer lines, water mains, storm sewers, concrete street pavement, gas lines, and underground electric and data lines. The underground utilities will be installed in open cut trenches using backhoes, trenchers, and loaders. The proposed project would fill 256 linear feet of R6SB un-named tributary (ephemeral) to Stephens Creek, 1.127 acres of PEMA/C riverine floodplain wetlands, and 0.174 acre of PFOA riverine floodplain wetlands.

PUBLIC NOTICE Application No: NWO-2017-00723-WEH Project Name: Whitehorse Development Applicant: Herbert Development East Waterway: Unnamed Tributary to Stephens Creek and Adjacent/Abutting Wetlands Issue Date: August 25, 2017 Expiration Date: September 15, 2017 21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154T H STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635 JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality (NDEQ). The NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their public notice will expire 30 calendar days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Vicki Cox, Herbert Development East, 7910 East Point Road, Lincoln, Nebraska 68506. PROJECT LOCATION: 90th and A Street, Lincoln, Nebraska 68520; Section 26, Township 10 North, Range 7 East; 40.801657° North, -96.599764° West. PROJECT DESCRIPTION: Herbert Development East is planning to construct a 62-acre residential development in Lancaster County, Nebraska. Construction activities include grading for approximately 9,500 feet of roads, 150 single- family building sites, and a 1.1-acre storm water detention pond. Infrastructure development includes sanitary sewer lines, water mains, storm sewers, concrete street pavement, gas lines, and underground electric and data lines. The underground utilities will be installed in open cut trenches using backhoes, trenchers, and loaders. The proposed project would fill 256 linear feet of R6SB un-named tributary (ephemeral) to Stephens Creek, 1.127 acres of PEMA/C riverine floodplain wetlands, and 0.174 acre of PFOA riverine floodplain wetlands. 1

PROJECT PURPOSE: The applicant's project purpose is as follows: "The purpose of the project is to create a single family residential development containing 150 lots on approximately 62 acres of farm ground immediately adjacent to an existing residential neighborhood." The basic project purpose, as defined by the USACE, is residential development. The overall project purpose, as defined by the USACE, is residential development to serve the Lincoln real estate market. SPECIAL AQUATIC SITES: The proposed project would result in the discharge of fill material into Waters of the U.S., impacting 1.127 acres of PEMA/C riverine floodplain wetlands, 0.174 acre of PFOA riverine floodplain wetlands, and 256 linear feet of R6SB un-named tributary (ephemeral) to Stephens Creek. AVOIDANCE, MINIMIZATION, AND MITIGATION: The applicant has not identified avoidance or minimization of impacts to waters of the U.S. All waters of the U.S. on site will be eliminated. Description provided by the applicant stated "because of the central location of the delineated wetland, it is not possible to avoid or minimize the wetland impacts and still meet the neighborhood connectivity requirements in the Lincoln Comprehensive Plan for the development of residential neighborhoods." The applicant has not yet provided an alternatives analysis for compliance with 404(b)(1) guidelines. Wetland Mitigation: Applicant proposes to purchase mitigation bank credits for the impacts to wetlands. A final mitigation plan, completed in accordance with the 2008 Mitigation Rule, is required to be submitted by the applicant, and approved by the U. S. Army Corps of Engineers, prior to any permit issuance. Stream Mitigation: The Nebraska Stream Condition Assessment Procedure (NeSCAP) will be used by the applicant to evaluate pre-construction and proposed post-construction functions of the impacted channel. An evaluation between existing Pre-Project functions and Post-Project functions is used to determine if sufficient stream mitigation has been proposed. The applicant has not yet provided a NeSCAP functional assessment for review. Mitigation Banks or In-Lieu Fee Programs: The project is located within the service area of the following mitigation banks: Blue Heron, Bundy Bank-Phase I, Bundy Bank-Phase III, and Sampson. CULTURAL RESOURCES: The Corps of Engineers, Omaha District, will comply with the National Historic Preservation Act of 1966 and amendments, and the procedures set forth in 33 2

CFR 325, Appendix C. We have checked the National Register of Historic Places, and any available site database information, and there are no known National Register sites in the vicinity. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat for the following species: Least Tern (Sterna antillarum), Piping Plover (Charadrius melodus), Whooping Crane (Grus americana), Pallid Sturgeon (Scaphirhynchus albus), Salt Creek Tiger Beetle (Cicindela nevadica lincolniana) and Western Prairie Fringed Orchid (Platanthera praeclara). The project is in the known range of the threatened Northern Long-Eared Bat (Myotis septentrionalis). A preliminary determination has been made that the described work may affect but is not likely to adversely affect the Northern Long-Eared Bat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the State's opinion that the discharge will not violate applicable water quality standards. It is the responsibility of the applicant to contact Nebraska Department of Environmental Quality as soon as possible in the permitting process to discuss requirements for certification. Please contact: CWA Section 401 Coordinator Water Quality Division, Planning Unit Nebraska Department of Environmental Quality 1200 'N' Street, Suite 400 Lincoln, NE 68509-8922 Phone: 402.471.2875 Fax: 402.471.2909 E-mail: ndeq.401certification@nebraska.gov 3

PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed/completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed/completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commenters, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location.

4

ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Ms. Jolene Hulsing at the address shown on page one, or by calling (402) 896-0896. You can also e-mail Ms. Hulsing at jolene.m.hulsing@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice purpose is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising.

5

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas