INSTALLATION OF A 20-INCH BRINE PIPELINE, CONSTRUCTION OF A NEW COMMERCIAL INDUSTRIAL FACILITY AND EXPANSION OF EXISTING FACILITY IN IBERVILLE PARISH
NAME OF APPLICANT: Shintech Louisiana, LLC, c/o Providence Engineering, Attn: Paul Clifton, 1201 Main Street, Baton Rouge, Louisiana 70802
LOCATION OF WORK: Located on an approximate 817.42-acre site, located approximately 3.9 miles southeast of Plaquemine, Louisiana, located in Iberville Parish, as shown on the enclosed drawings (Latitude 30.238053 N Longitude -91.1602297 W). This project is located in the Terrebonne Basin (Lower Grand HUC 08070300).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the construction of the new Shintech Plaquemine Plant-3 (SPP-3) and expansion/modification of the existing Shintech Plaquemine Plant-1 (SPP-1). Both facilities would be integrated into the Shintech Plaquemine Plant Complex on the west bank of the Mississippi River, near Plaquemine, Iberville Parish, Louisiana. SPP-3 is a proposed manufacturing facility that would produce vinyl chloride monomer (VCM) and other intermediate products such as chlorine (caustic soda as a byproduct of chlorine production) and ethylene dichloride. Purified VCM is then sent to SPP-1 or shipped to produce polyvinyl chloride (PVC). SPP-3 also would contain a hydrochloric acid production unit. The proposed modification of SPP-1 would allow for the expansion of the PVC facility production. With this project’s implementation, the PVC production would increase from 1,400 million pounds per year to 2,215 million pounds per year. This project also proposes the installation and maintenance of an approximate 11.5-mile long 20-inch diameter brine pipeline extending from the existing White Castle Oil and Gas facility to the Shintech Plaquemine Plant Complex. Approximately 76,581 cubic yards of native material would be placed in jurisdictional areas during the brine pipeline installation. Approximately 466,065 cubic yards of hauled in gravel/ballast material and 470,510 cubic yards of hauled in native soil fill material would be placed onsite in jurisdictional areas during the facility construction phase of this project. Approximately 34.9 acres of potentially jurisdictional herbaceous wetlands and 1.82 acres of potentially jurisdictional Other Waters of the United States (OWOUS) would be temporarily impacted as a result of the brine pipeline installation. Approximately 6.72 acres of potentially jurisdictional forested wetlands and 0.93 acre of potentially jurisdictional scrub-shrub wetlands would be permanently converted to herbaceous wetlands during the pipeline installation process. Approximately 6.52 acres of jurisdictional herbaceous wetlands, 10.47 acres of forested wetlands, and 0.22 acre of OWOUS would be permanently impacted via fill placement during the facility construction and expansion portions of this project. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. The applicant is proposing to utilize best management practices during and after the construction phase of the project. A jurisdictional determination for the brine pipeline project area is currently pending in the Corps’ Surveillance and Enforcement Section. If additional jurisdictional impacts are determined as a result of this determination, an addendum to this Public Notice shall be required. The applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank.
JOINT PUBLIC NOTICE
August 28, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
MVN 2016-1526-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Hill
WQC Application Number
WQC 170821-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
INSTALLATION OF A 20-INCH BRINE PIPELINE, CONSTRUCTION OF A NEW
COMMERCIAL INDUSTRIAL FACILITY AND EXPANSION OF EXISTING FACILITY
IN IBERVILLE PARISH
NAME OF APPLICANT: Shintech Louisiana, LLC, c/o Providence Engineering, Attn: Paul
Clifton, 1201 Main Street, Baton Rouge, Louisiana 70802.
LOCATION OF WORK: Located on an approximate 817.42-acre site, located approximately
3.9 miles southeast of Plaquemine, Louisiana, located in Iberville Parish, as shown on the
enclosed drawings (Latitude 30.238053 N Longitude -91.1602297 W). This project is located in
the Terrebonne Basin (Lower Grand HUC 08070300).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit
authorization for the construction of the new Shintech Plaquemine Plant-3 (SPP-3) and
expansion/modification of the existing Shintech Plaquemine Plant-1 (SPP-1). Both facilities
would be integrated into the Shintech Plaquemine Plant Complex on the west bank of the
Mississippi River, near Plaquemine, Iberville Parish, Louisiana. SPP-3 is a proposed
manufacturing facility that would produce vinyl chloride monomer (VCM) and other intermediate
products such as chlorine (caustic soda as a byproduct of chlorine production) and ethylene
dichloride. Purified VCM is then sent to SPP-1 or shipped to produce polyvinyl chloride (PVC).
SPP-3 also would contain a hydrochloric acid production unit. The proposed modification of
SPP-1 would allow for the expansion of the PVC facility production. With this project's
implementation, the PVC production would increase from 1,400 million pounds per year to 2,215
million pounds per year. This project also proposes the installation and maintenance of an
approximate 11.5-mile long 20-inch diameter brine pipeline extending from the existing White
Castle Oil and Gas facility to the Shintech Plaquemine Plant Complex. Approximately 76,581
cubic yards of native material would be placed in jurisdictional areas during the brine pipeline
installation. Approximately 466,065 cubic yards of hauled in gravel/ballast material and 470,510
cubic yards of hauled in native soil fill material would be placed onsite in jurisdictional areas
during the facility construction phase of this project. Approximately 34.9 acres of potentially
jurisdictional herbaceous wetlands and 1.82 acres of potentially jurisdictional Other Waters of
the United States (OWOUS) would be temporarily impacted as a result of the brine pipeline
installation. Approximately 6.72 acres of potentially jurisdictional forested wetlands and 0.93
acre of potentially jurisdictional scrub-shrub wetlands would be permanently converted to
herbaceous wetlands during the pipeline installation process. Approximately 6.52 acres of
jurisdictional herbaceous wetlands, 10.47 acres of forested wetlands, and 0.22 acre of OWOUS
would be permanently impacted via fill placement during the facility construction and expansion
portions of this project. The applicant has claimed that the project has been designed to avoid
and minimize direct and secondary adverse wetland impacts to the maximum extent practicable.
The applicant is proposing to utilize best management practices during and after the
construction phase of the project. A jurisdictional determination for the brine pipeline project
area is currently pending in the Corps' Surveillance and Enforcement Section. If additional
jurisdictional impacts are determined as a result of this determination, an addendum to this
Public Notice shall be required. The applicant is proposing to compensate for the unavoidable
impact by purchasing mitigation credits from an approved mitigation bank.
The comment period for the Department of Army Permit and the Louisiana Department of
Environmental Quality will close in 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above. Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above.
Any request must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section Chief will
review the request and the requestor will be promptly notified of the decision to grant or deny
the request. If granted, the time extension will be continuous to the initial comment period and,
inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this notice are being sent to the State Archeologist and State Historic
Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Utilizing Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office, the Corps has determined that the proposed activity would have no
effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 0 acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
for
Enclosure
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
_
^
True
North
SPP-1 and SPP-3 Site Location Centers
Latitude: 30.238053°
Longitude: -91.160229°
Proposed Brine Pipeline Center
Latitude: 30.198629°
Longitude: -91.220038°
1
0
Legend
2
Miles
SPP-1 and SPP-3 Site Locations (817.42 Acres)
Proposed Brine Pipeline Location
Vicinity Map
Section 404 Permit Application
Plaquemine, Iberville Parish, Louisiana
Shintech Louisiana, LLC
SPP-1 Expansion and New SPP-3 Project
Reference
Base map comprised of ESRI StreetMap USA data.
Drawn By
LMM
07/25/17
Checked By
LMH
07/25/17
Approved By
RPC
07/25/17
Project Number
Drawing Number
1
039-115-003-A077
Figure
039-115-003
Providence Engineering and Environmental Group LLC
2
SPP-1 and SPP-3 Site Locations Center
Latitude: 30.238053°
Longitude: -91.160229°
_
^
True
North
1.5
0.75
0
Legend
1.5
Miles
SPP-1 and SPP-3 Site Locations (817.42 Acres)
Proposed Brine Pipeline Location
Site Location Map
Section 404 Permit Application
Plaquemine, Iberville Parish, Louisiana
Shintech Louisiana, LLC
SPP-1 Expansion and New SPP-3 Project
Reference
Base map comprised of United States Geological Survey (USGS) 100K
topographic map, "Baton Rouge, LA".
Drawn By
LMM
07/25/17
Checked By
LMH
07/25/17
Approved By
RPC
07/25/17
Project Number
Drawing Number
2
039-115-003-A078
Figure
039-115-003
Providence Engineering and Environmental Group LLC
Proposed Brine Pipeline Center
Latitude: 30.198629°
Longitude: -91.220038°