The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for the North of Kiowa North highway reconstruction project. This is Phase 4 of a 5 phase project involving the reconstruction of approximately 25.5 miles of US Highway 89 east of Glacier National Park. The project is covered under the Browning to Hudson Bay Divide EIS STPP-FLA 58-1(40)15. This phase of the project involves the reconstruction of approximately 5.8 miles of US highway 89 (6.4 miles on current alignment) from approximately Reference Post (RP) 14.4 to approximately RP 20, increasing the road width to 36 feet. The improved roadway would include two 12-foot travel lanes, with 6-foot wide shoulders on each side. The proposed project would result in permanent impacts to 1.63 acres of wetlands and 1,092 linear feet (0.097 acre) of stream. Stream impacts include the removal of existing culverts and construction of new culverts. This notice is to inform interested parties of the proposed activity and to solicit comments.

The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for the North of Kiowa North highway reconstruction project. This is Phase 4 of a 5 phase project involving the reconstruction of approximately 25.5 miles of US Highway 89 east of Glacier National Park. The project is covered under the Browning to Hudson Bay Divide EIS STPP-FLA 58-1(40)15. This phase of the project involves the reconstruction of approximately 5.8 miles of US highway 89 (6.4 miles on current alignment) from approximately Reference Post (RP) 14.4 to approximately RP 20, increasing the road width to 36 feet. The improved roadway would include two 12-foot travel lanes, with 6-foot wide shoulders on each side. The proposed project would result in permanent impacts to 1.63 acres of wetlands and 1,092 linear feet (0.097 acre) of stream. Stream impacts include the removal of existing culverts and construction of new culverts. This notice is to inform interested parties of the proposed activity and to solicit comments.

PUBLIC NOTICE

z Omaha District

Application No: NWO-2013-00133-MTM Applicant: Montana Department of Transportation (MDT) Waterways: South Fork Cut Bank Creek, North Fork Cut Bank Creek and Associated Unnamed Intermittent and Associated Ephemeral Tributaries Issue Date: August 30, 2017 Expiration Date: September 29, 2017 30 DAY NOTICE

Missoula Regulatory Office, 1600 North Ave. West, Suite 105, Missoula, Montana 59801

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND BLACKFEET TRIBE SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for the North of Kiowa North highway reconstruction project. This is Phase 4 of a 5 phase project involving the reconstruction of approximately 25.5 miles of US Highway 89 east of Glacier National Park. The project is covered under the Browning to Hudson Bay Divide EIS STPP-FLA 58-1(40)15. This phase of the project involves the reconstruction of approximately 5.8 miles of US highway 89 (6.4 miles on current alignment) from approximately Reference Post (RP) 14.4 to approximately RP 20, increasing the road width to 36 feet. The improved roadway would include two 12-foot travel lanes, with 6-foot wide shoulders on each side. The proposed project would result in permanent impacts to 1.63 acres of wetlands and 1,092 linear feet (0.097 acre) of stream. Stream impacts include the removal of existing culverts and construction of new culverts. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Montana Department of Transportation (MDT) P.O. Box 201001 Helena, Montana 59620-1001 LOCATION: The site is located on the Blackfeet Indian Reservation, within Sections 4, 9, 16, 15 and 22, Township 33 N, Range 13 W, Glacier County, Montana. There are approximately 3,200 linear feet of the North Fork Cut Bank Creek, South Fork Cut Bank, unnamed tributaries to these streams; and 10.831 acres of palustrine emergent, scrub/shrub and forested wetlands within the project area.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 2

Application No. NWO-2013-00133-MTM

PROJECT DESCRIPTION: The following work is proposed within the project area: Work Item

A

B

C

D

E

F

G

H

Description Station 799+56 ­ Installation of a new culvert to convey flows of an unnamed intermittent tributary of the South Fork Cut Bank Creek. The road and existing 63.4-foot long by 27-inch diameter culvert at Station 814+01 (offset 100 feet west from the new roadway alignment) would be removed and the channel will be reformed to match upstream and downstream channel geometries and gradient. The new 30-inch diameter culvert would be approximately 148 feet long and require the placement of approximately 69 yd3 of fill into approximately 0.001 acre of WL 23-A. Station 2057+50 ­ An existing 36.6-foot long 15-inch diameter culvert at Station 2057+97 LT will be removed at the cross drain between WL-17A and WL-17B, and replaced with a new 78-foot long, 24-inch diameter culvert at Station 2057+50. Placement of road fill and the new culvert would impact approximately 0.026 acres of WL-17A and 0.470 acre of WL-17B. Station 888+00 ­ An existing 94.6-foot long culvert will be removed and replaced with a new 98-foot long, 24-inch diameter culvert at the cross drain between WL16B and WL-16A, The new culvert will be approximately 98-feet long, and the existing culvert is approximately 94.6-feet long. Placement of road fill and the new culvert would impact approximately 0.378 acre of WL-16B. Station 896+00 LT ­ An existing approach culvert (48.2-foot long by 42-inch diameter) at Station 896+03 LT between WL-16B and WL-15B will be removed and replaced with a new 50-foot long by 18-inch diameter culvert at Station 896+00 LT. Impacts to WL-16B are included in Work Item C. Approximately 0.009 acre of impacts to WL-15B from the placement of fill for the new culvert and the new roadway. Station 906+58 LT ­ Removal of an existing approach culvert (58.2-foot long by 18-inch) at Station 906+60 LT between WL-15B and WL-15A. Placement of a new 48-foot long by 42-inch diameter culvert at Station 906+58 LT. The placement of fill for the culvert and new roadway would result in impacts to WL15B which are included in Work Item D. Station 937+30 ­ Removal of an existing 21-inch diameter by 141.1-foot long culvert at Station 936+87 from an unnamed ephemeral tributary of the North Fork Cut Bank Creek. Installation of a 42-inch diameter by 266-foot long culvert at Station 937+30. The new culvert will be approximately 266-feet long, and the existing culvert is approximately 141.1 feet long. Approximately 58 yd3 of fill will be placed at this crossing. Removal and replacement of the culverts and the placement of roadway fill will result in impacts to approximately 0.003 acre of WL11. Station 978+34 ­ Removal of an existing 27-inch diameter by 103.7-foot long culvert at Station 978+35 within an unnamed tributary of the North Fork Cut Bank Creek. Installation of a new 48-inch by 270-foot long culvert at Station 978+34. Placement of approximately 89 yd3 of fill for the new culvert and roadway would impact approximately 0.016 acre of WL-8. Station 984+73 ­ Removal of an existing 27-inch by 143.8-foot long culvert at Station 984+69 from an unnamed tributary of the North Fork Cut Bank Creek. Installation of a 48-inch by 408-foot long culvert at Station 984+73.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Work Item I J K L M

Page 3

Application No. NWO-2013-00133-MTM

Description Station 1004+00 ­ A 41.4-foot long culvert at Station 1003+96 will be removed and replaced by a 126-foot long culvert at Station 1004+00. Placement of fill for the new culvert and the new roadway would result in impacts to approximately 0.019 acre of WL-9A, 0.001 acre of WL- 9B, and 0.001 acre of WL-10. Station 1030+06 to 1035+70. Placement of fill for the new roadway at this location would result in impacts to approximately 0.093 acre of WL-4. Station 1032+93 to 1035+41. Placement of fill for the new roadway at this location would result in impacts to approximately 0.468 acre of WL-5. Station 1079+01 to 1081+06. Placement of fill for the new roadway at this location would result in impacts to approximately 0.058 acre of WL-1. Station 1079+05 to 1081+28. Placement of fill for the new roadway at this location would result in impacts to approximately 0.084 acre of WL-3.

The applicant's preferred alternative would result in permanent impacts to 1.627 acres of wetlands (0.418 acre of palustrine emergent, 0.654 acre of scrub-shrub, and 0.55 acre of forested wetland) and 1,902 linear feet (0.097 acre) of perennial, intermittent and ephemeral stream channel. The applicant's stated project purpose is to improve traffic flow, increase roadway safety, and accommodate future roadway maintenance. The attached drawings provide additional project details. ADDITIONAL INFORMATION: Alternatives. The applicant has information concerning the following project alternatives: Alternative 1: No action. The No Action alternative is to leave the road in its current condition. Alternative 2: US 89 would be widened as in the applicant's preferred alternative, but with 4foot wide shoulders instead of 6-foot wide shoulders for a total width of 32-feet. The applicant's preferred alternative would result in approximately 4% more wetland impacts (approximately 0.055 acre) than Alternative 2, but the wider shoulders would provide increased highway safety for the traveling public. Mitigation: Wetlands 1, 2, and 3 fall within the Milk Watershed (#11), while the remaining wetlands are located within the Marias Watershed (#8). The applicant is proposing to mitigate impacts to 0.14 acre of wetlands in the Milk Watershed at a 1:1 ratio from MDT's ACOE approved Musgrave Lake Mitigation Reserve. The remaining 1.49 acres of wetlands impacts occur within the Marias Watershed. The applicant is proposing to mitigate these wetlands at 1:1 ratio from MDT's approved Alkali Lake Mitigation Reserve. OTHER GOVERNMENTAL AUTHORIZATIONS: The Blackfeet Tribal Environmental Office Blackfeet Tribe will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the Tribe's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The Blackfeet Tribe hereby incorporates this public notice as its own public notice and procedures by reference thereto.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 4

Application No. NWO-2013-00133-MTM

HISTORIC PROPERTIES: MDT, acting on behalf of the U.S. Federal Highway Administration (FHWA) is the lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and has completed a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Omaha District's initial review, based on currently available information, indicates there are recorded properties within the permit area. It has been determined that the project will have adverse effects to properties listed. ENDANGERED SPECIES: The proposed activity may affect and is likely to adversely affect grizzly bear, may affect and is not likely to adversely affect Canada lynx and is not likely to jeopardize the continued existence of wolverine. FHWA has completed consultation with the U.S. Fish and Wildlife Service (USFWS), pursuant to Section 7 of the Endangered Species Act. The USFWS provided a Biological Opinion on March 8, 2017. The above determinations are based on information provided by the applicant and the Omaha District's initial review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 5

Application No. NWO-2013-00133-MTM

Corps of Engineers, at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Comments will be accepted by mail, e-mail, or fax, and should be addressed to Mr. Nathan Green at: Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801; email to Nathan.J.Green@usace.army.mil; or fax (406) 441-1380. If you have questions you can contact Mr. Green by telephone at (406) 439-7265, or by sending your questions to the address or e-mail above. Please refer to identification number NWO-201300133-MTM on any comments or correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: 18 pages of plans

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

MONTANA DEPARTMENT OF TRANSPORTATION

\.\

\.r.

THIS PROJECT

LENGTH

5.8

2014 2018

2038

A.D.T.= A.D.T. = A.D.T.= D.H.V. =

950

990 1,210 270

TRUCKS= 6.6% V.= 45Mph 18KIP ESAL'S = 28.0 DAILY GROWTli RATE = 1.0%ANNUALLY

FEDERAL AID PROJECT STPP-FLA 58-1(38)14 ROAD RECONSTRUCTION N OFKIOWA-N GLACIER COUNTY

t:. ,.,· "l\EAVERHEA

PRESENT LETTING DESIGN

CSF = 0.99953320

MILES

R.12W.

R. 13 w.

!

3S

j

31

R. 12W.

:z ..,:: GREAT WEST PLANS PREPARED

BY

,,,\\\\\\11111

...

.$"'()

Halerm MT 59601

(408)44s-8827

(I)

z RELATED

PROJECTS II

.... N N

z

"'

R/W & I.C. P. E.

I I

z z

0 ()

u. 0

m 5

c c z w z w

8 8

c1;

scb scb

j'.5

j'.5 j'.5 (I)

ASSOCIATED PROJECT AGREEM ENT NUMBERS

§w

;!:

Cll

(I)

i

z

0

w

c C)

ii:

+

g

"'

;;

..,,,,

'!,;.. ( 1CENBt.' 1

1 11

DATE

...

z

U.S.89 TO BROWNING

C'I

C']

...!::!

u.

RECEIVED:

Cll

BY

0

Ill

z

z C)

ti

j'.5

THISCONTRACT RP14.4 TO RP20.8

STPP-FLA 58-1(37)14

ROAD PLANS

ci w

j'.5 Cll

CONSULTANT DESIGN ENGINEER

.$'

.._,s,

111111\\\\'"''

DATE

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED

DIVISION ADMINISTRATOR

FOR PERMIT REVIEW

.2

11/0HA\.. 1

MONTANA DEPARTM ENT OF TR ANSPORTATION

II

d.. n.

ffi !!_ -ci

LAITYPE 16863

,;;

___,------... - .... !::!

T JI ,i),,11

f* CHRISTOPH T.

GLACIER NATIONAL PARK

engineering · 2501Bell\li&wllriva

ENGI NEERI NG

DATE

WETLAND DELINEATION WETLAND AREA (acres)

STATION

WETLAND DESIGNATION

DELINEATED AREA FROM

WL-1 WL-2 WL-3 WL-4 WL-5 WL-6 WL-7 WL-8 WL-9A WL-9B WL-10 WL-11 WL-12A WL-12B WL-14 WL-15A WL-15B WL-16A WL-16B WL-17A WL-17B WL-19 WL-23A WL-23B

1079+01 1069+78 1079+05 1030+06 1032+93 984+03 1007+08 979+40 1003+74 1003+87 1000+07 937+27 909+97 911+03 906+32 906+93 896+34 887+95 2059+53 2056+82 2053+14 800+64 813+49 814+25 TOTAL

TO 1081+06 1073+45 1081+28 1035+70 1035+41 984+80 1012+41 980+29 1004+19 1004+09 1005+91 937+42 911+72 912+22 908+11 908+62 906+33 890+16 895+79 2058+77 2060+98 806+62 813+84 814+93

0.06 0.91 0.36 0.09 0.48 0.04 0.48 0.02 0.02 0.01 0.33 0.00 0.22 0.11 0.35 0.07 0.35 0.43 2.52 0.03 3.68 0.21 0.01 0.04 10.82

# AREA OF EXISTING WETLAND EXTENDS BEYOND PLAN LIMITS

PERMANENT IMPACTED AREA 0.058 0.000 0.084 0.093 0.468 0.000 0.000 0.016 0.019 0.001 0.001 0.003 0.000 0.000 0.000 0.000 0.009 0.000 0.378 0.026 0.470 0.000 0.001 0.000 1.63

REMARKS LT. LT. DO NOT DISTURB RT. LT. & RT. RT. RT. DO NOT DISTURB LT. DO NOT DISTURB LT. LT. RT. LT. RT. LT. DO NOT DISTURB LT. DO NOT DISTURB RT. DO NOT DISTURB LT. DO NOT DISTURB LT. RT. DO NOT DISTURB LT. LT. LT. & RT. LT. DO NOT DISTURB LT. LT. DO NOT DISTURB

EOP KIOWA JUNCTION NORTH & SOUTH BOP NORTH OF KIOWA NORTH R.P. 14.5

WL-19 G

G

WL-23a

15

WL-18

WL-23b G

16

400' CORR

IDOR (TYP .)

G

LEGEND G GRASSLAND (UPLAND) ORDINARY HIGH WATER (OHW) ASPEN FOREST (UPLAND) CONIFEROUS FOREST (UPLAND)

COTTONWOOD FOREST (UPLAND) RIPARIAN (NON-WETLAND) UPLAND SHRUB WETLAND BASE MAP: GREAT WEST ENGINEERING, 2012

K

WL-17a

TH R NO

WL-16b G

RK O F

T CU

NK A B

EE R C

WL-15b WL-15a

G

WL-17b

G

G

WL-12b G

17

G

WL-16a G

G

WL-12a WL-14 D

OA R L

O

RR

HO C S

A ST

LEGEND G GRASSLAND (UPLAND) ORDINARY HIGH WATER (OHW) ASPEN FOREST (UPLAND) CONIFEROUS FOREST (UPLAND)

COTTONWOOD FOREST (UPLAND) RIPARIAN (NON-WETLAND) UPLAND SHRUB WETLAND BASE MAP: GREAT WEST ENGINEERING, 2012

WL-7 WL-10

G G G G

G

G 18

WL-8

G

G

G

G

G G

WL-11

G

G

LEGEND G GRASSLAND (UPLAND) ORDINARY HIGH WATER (OHW) ASPEN FOREST (UPLAND) CONIFEROUS FOREST (UPLAND)

19

G WL-9a WL-9b

G

G

G

WL-6

COTTONWOOD FOREST (UPLAND) RIPARIAN (NON-WETLAND) UPLAND SHRUB WETLAND BASE MAP: GREAT WEST ENGINEERING, 2012

EOP NORTH OF KIOWA NORTH R.P. 20.7

WL-1 WL-2

G

WL-4

WL-3

G WL-5

G

LEGEND G GRASSLAND (UPLAND) ORDINARY HIGH WATER (OHW) ASPEN FOREST (UPLAND) CONIFEROUS FOREST (UPLAND)

20

COTTONWOOD FOREST (UPLAND) RIPARIAN (NON-WETLAND) UPLAND SHRUB WETLAND BASE MAP: GREAT WEST ENGINEERING, 2012

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas