PROJECT PURPOSE:
Basic: Housing.
Overall: Construct an age-restricted residential development in south-east Lake County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: VK Avalon Groves
701 South Olive Ave., Suite 104
West Palm Beach, FL 33401
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Reedy Creek. The project site is located off of Sawgrass Boulevard, in Section 13, Township 24 South, Range 26 East, Lake County, Florida.
Directions to the site are as follows: From Clermont Florida, travel south on US Highway 27, and turn left on Sawgrass Boulevard. The project site is located at the end of Sawgrass Boulevard.
APPROXIMATE CENTRAL COORDINATES:
Latitude 28.400350º
Longitude -81.665664º
PROJECT PURPOSE:
Basic: Housing
Overall: Construct an age-restricted residential development in south-east Lake County.
EXISTING CONDITIONS: The 322 acres site is largely upland characterized as pine plantations, sand live oak, and coniferous plantations. The site also consists of both forested and herbaceous wetland systems totaling 102.91 acres. Of these wetlands, 65.31 acres have been determined to be Corps jurisdictional while 37.6 acres are isolated, non-jurisdictional. The existing area surrounding the project area consists of improved pasture, pine flatwoods, xeric oak and pine plantation.
PROPOSED WORK: The applicant seeks authorization to construct an age-restricted residential development in the Avalon Groves area of Lake County. Work will include fill placed in 0.94 acres of jurisdictional wetlands and 7.92 acres of non-jurisdictional wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
“In considering alternative site plans with respect to the elimination or reduction of wetland impacts, it is believed that the provisions of the Corps’ requirements have been met. The proposed project design will include certain unavoidable impacts to wetland systems. These impacts are required to facilitate basic design requirements, including roadway access to major roadways, roadway alignments with existing and previously approved roadways, minimum roadway turning radii to meet minimum safety requirements, and other design characteristics necessary to meet local, regional and other agency requirements.
The submitted design requires some wetland impacts that are unavoidable. These impacts are limited to small and isolated wetland systems and the minimal amount of impact for an entrance road from the existing Avalon Groves Roadway. The majority of these proposed wetland impacts are to low quality systems that have been severely impacted by the agricultural activities on the subject property. To minimize impacts to resources, the project design was modified several times so as to preserve the higher-functioning wetland areas and direct any unavoidable impacts to lower-quality wetlands and smaller wetlands that would be extremely difficult to maintain in any post-development setting. Focusing any unavoidable impacts are minimized in this manner because these lower-quality systems are typically difficult to maintain in the post development condition. The small and isolated systems become land-locked within development and access for non-avian species is virtually eliminated. Additionally, smaller systems or systems with pre-development hydrology that is already impaired most often lose what remaining functional values exist after development of the surrounding areas.”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
The proposed wetland impacts will be offset by the purchase of mitigation bank credits from Reedy Creek Mitigation Bank.
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely affect the Florida Scrub Jay, Wood Stork, or the Audubon’s Crested Caracara. The Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
The Corps has determined the proposal may affect the Eastern Indigo Snake, Sand Skink and Blue Tailed Mole Skink. The Corps will request initiation of formal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.
The Corps has determined the proposal would have no effect on the Everglades Snail Kite.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries as the project is inland of Fisheries resources. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
10117 PRINCESS PALM AVENUE, SUITE 120
TAMPA, FLORIDA 33610
August 29, 2017
REPLY TO
ATTENTION OF
Regulatory Division
West Branch
Tampa Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2015-01634(SP-CMW)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: VK Avalon Groves
701 South Olive Ave., Suite 104
West Palm Beach, FL 33401
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Reedy Creek. The project site is located off of Sawgrass Boulevard, in
Section 13, Township 24 South, Range 26 East, Lake County, Florida.
Directions to the site are as follows: From Clermont Florida, travel south on US
Highway 27, and turn left on Sawgrass Boulevard. The project site is located at the end
of Sawgrass Boulevard.
APPROXIMATE CENTRAL COORDINATES: Latitude 28.400350°
Longitude -81.665664°
PROJECT PURPOSE:
Basic: Housing
Overall: Construct an age-restricted residential development in south-east Lake
County.
EXISTING CONDITIONS: The 322 acres site is largely upland characterized as pine
plantations, sand live oak, and coniferous plantations. The site also consists of both
forested and herbaceous wetland systems totaling 102.91 acres. Of these wetlands,
65.31 acres have been determined to be Corps jurisdictional while 37.6 acres are
isolated, non-jurisdictional. The existing area surrounding the project area consists of
improved pasture, pine flatwoods, xeric oak and pine plantation.
PROPOSED WORK: The applicant seeks authorization to construct an age-restricted
residential development in the Avalon Groves area of Lake County. Work will include fill
placed in 0.94 acres of jurisdictional wetlands and 7.92 acres of non-jurisdictional
wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
"In considering alternative site plans with respect to the elimination or reduction of
wetland impacts, it is believed that the provisions of the Corps' requirements have been
met. The proposed project design will include certain unavoidable impacts to wetland
systems. These impacts are required to facilitate basic design requirements, including
roadway access to major roadways, roadway alignments with existing and previously
approved roadways, minimum roadway turning radii to meet minimum safety
requirements, and other design characteristics necessary to meet local, regional and
other agency requirements.
The submitted design requires some wetland impacts that are unavoidable. These
impacts are limited to small and isolated wetland systems and the minimal amount of
impact for an entrance road from the existing Avalon Groves Roadway. The majority of
these proposed wetland impacts are to low quality systems that have been severely
impacted by the agricultural activities on the subject property. To minimize impacts to
resources, the project design was modified several times so as to preserve the higherfunctioning wetland areas and direct any unavoidable impacts to lower-quality wetlands
and smaller wetlands that would be extremely difficult to maintain in any postdevelopment setting. Focusing any unavoidable impacts are minimized in this manner
because these lower-quality systems are typically difficult to maintain in the post
development condition. The small and isolated systems become land-locked within
development and access for non-avian species is virtually eliminated. Additionally,
smaller systems or systems with pre-development hydrology that is already impaired
most often lose what remaining functional values exist after development of the
surrounding areas."
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
The proposed wetland impacts will be offset by the purchase of mitigation bank credits
from Reedy Creek Mitigation Bank.
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area. By copy
of this public notice, the Corps is providing information for review. Our final
determination relative to historic resource impacts is subject to review by and
coordination with the State Historic Preservation Officer and those federally recognized
tribes with concerns in Florida and the Permit Area.
2
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely
affect the Florida Scrub Jay, Wood Stork, or the Audubon's Crested Caracara. The
Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant
to Section 7 of the Endangered Species Act.
The Corps has determined the proposal may affect the Eastern Indigo Snake, Sand
Skink and Blue Tailed Mole Skink. The Corps will request initiation of formal
consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered
Species Act by separate letter.
The Corps has determined the proposal would have no effect on the Everglades Snail
Kite.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or Federally managed
fisheries as the project is inland of Fisheries resources. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and
coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Tampa Permits
Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days
from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm
Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at
3
Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061;
or, by telephone at (813)769-7064.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
4
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
""'""''
Ro.
0
'=
I ronk Jarrellir.
Or
!1
:1
11
:1
I
IIII
11
II
USGS~
Legend
Sources: Esri, JbRE, Delorme,
lntermap, incre
China (Hong Koifig). Esri (Thailand). To1;nTom, Mapmyln
User Communi~
-·
t!~~:!!!~1~!~~!~!~~~~;!;.
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Avalon Grove Active Adult Property
Lake County, Florida
Figure 1
Location Niap
~ Avalon Groves Active Adult Property
w
-\>N
s
1
----1 Miles
L__ _ _ _ _ _ _
E
Project # : 588-10
Produced By: STC
D ate: 12/ 27/ 2016
Legend
·---·
.......
·
t~n~~:!!!~l~~~!~!~~~~!s
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Avalon Grove Active Adult Property
Lake County, Florida
Figure 2
2014 Aerial Photograph
I Avalon Groves Active Adult Property
1,400
Feet
N
__A__
wy
8
E
Project#: 588-10
Produced By: STC
Date: 12/ 27 / 2016
....SU...
-
·---·
.......
·
t~.~~:!!!~!~~~!!~~~~!.
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Avalon Grove Active Adult Property
Lake County, Florida
Figure 3
USGS Topographic Map
I Avalon Groves Active Adult Property
1,400
Feet
N
__A_
wy
8
E
Project#: 588-10
Produced By: STC
Date: 12/27 /2016
Legend
c::J
Avalon Groves Active Adult Property
NRCS Lake County Soils
8: Candler sand, 0 to 5 percent slopes
20: lmmokalee sand
40: Placid and Myakka sands, depressional
41 : Pomello sand, 0 to 5 percent slopes
43: St. Lucie sand, 0 to 5 percent slopes
44: Swamp
45: Tavares sand, 0 to 5 percent slopes
99: Water
t~n~~:!!!~I~~'?!!~!~~~~!=;.
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Avalon Grove Active Adult Property
Lake County, Florida
Figure 4
SSURGO Soils Map
900
L----------' Feet
s
Project # : 588-10
Produced By: ST C
D ate: 12/27/2016
Legend
··"II
L Serenoa Active Adult Property
1
····
FLUCFCS
FLUCCS_sym, FLUCCS_nam
411 , Pine Flatwoods
432, Sand Live Oak
441, Coniferous Plantations
618, Willow and Elderberry
630, Wetland Forested Mixed
641, Freshwater Marshes
t~"~~:!!!~1~~~~!~!~~~!!=:.
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Serenoa Active Adult P roperty
Lake Coun ty, Florida
Figure 5
FLUCFCSMap
0
500
1,000
--===--=:::::J Feet
s
Project#: 588-10
Produced By: JDH
D ate: 7 / 14/ 2017
Legend
······
·
I
..........
Avalon Groves Active Adult Property
wetland_ft ags_ merge
wetlands
ACOE Jurisdiction
Jurisdictional
t~n~~:!!!~1~!~~!~!~~~~!=;.
3025 E. South Street Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting. com
Avalon G rove Active Adult Property
Lake County, Florida
Figure 6
ACOE Wetland Map
1,000
L - - - - - - - - - ' Feet
s
Project # : 588-10
Produced By: ST C
D ate: 12/ 27 / 2016
NO*JU'lllSO!crtlONA.lwtTI.ANO
IMPACTTAllU.A'Tf
OfVElOl'MD>ll
~
""
H
o.n
·"
~
ft
...".
~
""
Tl111I
....
.,,...
....'",..,
IMPACT I
Allf A !AC!
911 'IClll..iillll'>IJlf.TIC"l\ U
l)tlCtltl'4"1
Q.'joji
flQArY(llJ<'O
7.!D
JU·USOlct10HAL WO lANI>
TA8lf · flO)l:iWAV
!M~CT
1
11
111
11
ii'
·IIll
Serenoa
Active Adult Parcel - Wetland Impacts Exhibit
VK Avalon Groves LLC
Lake County
'
~~·~-
- - =lrllf·...-
=-~~-== \L ~~f,,!!o? T
......- -...-----~ 'D
'iii
ln1
il!ll!f.
l . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .;miiiiii;mlliilllll"""""'
------------
------
-- -- - --