You can copy from here when filling out the rest of the page.
Broward County. Florida Department of Transportation – District 4, Fort Lauderdale, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to provide additional capacity in order to accommodate the projected traffic demands, alleviate traffic congestion on local crossroads, facilitate a hurricane evacuation and other emergency evacuation route, improve highway safety by addressing speed differences among lanes at interchanges and lane weaving on cross streets, and provide multi-modal transportation options within the eastern corridor of Broward County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Florida Department of Transportation – District 4
Attn: Ms. Hui Shi
3400 West Commercial Boulevard
Fort Lauderdale, Florida 33309
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the C-10 Canal, C-10 Spur Canal, Dania Cutoff Canal (part of the Central and South Florida Flood Control Project), Pond Apple Slough, South Fork of the New River Canal, and the Florida Power and Light (FP&L) Cooling Canal. The project site is located along 9 miles of Interstate (I) 95, from south of Hollywood Boulevard to Broward Boulevard and along 2 miles of I-595, from State Road (SR) 7 to I-95, in Sections 8, 9, 16, 17, 18, 19, 20, 21, 28, 29, and 33; Township 50 South; Range 42 East; and in Sections 4, 8, 9, 16, and 17; Township 51 South; Range 42 East, in the city of Dania Beach, Broward County, Florida.
Directions to the site are as follows: The project site begins along Interstate (I) 95, just south of Hollywood Boulevard, and ends at Broward Boulevard in Broward County, including construction along I-595 from SR 7 to I-95.
APPROXIMATE CENTRAL COORDINATES: Latitude25.999389 °
Longitude -80.166417 °
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to provide additional capacity in order to accommodate the projected traffic demands, alleviate traffic congestion on local crossroads, facilitate a hurricane evacuation and other emergency evacuation route, improve highway safety by addressing speed differences among lanes at interchanges and lane weaving on cross streets, and provide multi-modal transportation options within the eastern corridor of Broward County.
EXISTING CONDITIONS: The existing site conditions, as provided by the applicant, are as follows: The overall project area where work is proposed to occur encompasses approximately 507 acres. The project corridor consists of land that has previously been filled to create the current I-95 and I-595 highway system consisting of travel lanes, shoulders, recovery zones, and stormwater management systems. The project corridor includes the following crossings over waterbodies: I-95 bridges over the C-10 Canal, I-95 bridges over the C-10 Spur Canal, I-95 bridges over the Dania Cutoff Canal, I-595 bridges over wetlands contiguous with the Pond Apple Slough, I-595 bridges over the South Fork of the New River Canal, and I-595 bridges over the FP&L Cooling Canal. There is also an I-95 bridge crossing of the South Fork of the New River, however, there is no proposed bridge work at this location. The project area also contains the following:
Swales: Swales with hydrophytic vegetation consist of man-made drainage features with a hydrologic regime that has resulted in a dominance of wetland vegetation and the development of hydric soils. These areas consist entirely of linear man-made features adjacent to and parallel with the highway, which are designed to be approximately one foot above the seasonal high ground water table. This habitat type also includes ponds that are part of the stormwater management system for I-95 and I-595. There are a total of 53 swales with hydrophytic vegetation identified within the I-95 and I-595 corridors. These areas are regularly maintained and support herbaceous vegetation that is adapted to frequent disturbance including but not limited to torpedo grass (Panicum repens), beak sedges (Rhynchospora spp.), flatsedges (Cyperus spp.), smallfruit primrose willow (Ludwigia microcarpa), herb-of-grace (Bacopa monnieri), largeleaf marshpennywort (Hydrocotyle bonariensis), bulltongue arrowhead (Saggitaria lancifolia), and creeping primrose willow (Ludwigia repens). In some locations, woody vegetation occurs within these swales. Woody vegetation includes Carolina willow (Salix carolinensis), primrose willow (Ludwigia peruviana), and Brazilian pepper (Schinus terebinthifolius). These woody species generally occur around the edges of the swales, but in some cases may extend throughout the entire swale. Woody vegetation constitutes less than 25% of the overall vegetative cover in the swales. There are approximately 34.65 acres of swales with hydrophytic vegetation within the project limits. The hydrology in the swales is entirely dependent on stormwater runoff input from the adjacent roadways. Because the bottom of the swales is designed to be above the seasonal high ground water table, the swales remain dry for most of the year. These swale features provide limited foraging habitat for wading birds and other wetland-dependent species such as frogs and aquatic macro-invertebrates. The overall wildlife habitat quality of these features is marginal due to its proximity to a heavily traveled highway in an urban environment as well as a result of routine maintenance of the swales.
Mangroves along the I-95 Corridor: There are four crossings of estuarine channels along the I-95 section of the project, including the C-10 Canal, C-10 Spur Canal, Dania Cutoff Canal, and South Fork of the New River. The mangrove areas within the I-95 corridor can be described as a narrow, discontinuous fringe of small red and white mangroves growing at the river and canal shoreline interface. The mangroves are stunted and are being outcompeted by invasive exotic species including tropical almond (Terminalia cattapa), Brazilian pepper, and seaside mahoe (Thespesia polpunea). The presence of these exotic species is indicative that the mangrove locations are at the upper end of the saltwater tidal influence in the rivers and the canals in the project corridor. The total acreage of mangrove shoreline within the I-95 project limits is 0.93 acres.
Mangroves along the I-595 Corridor: There is a narrow strip of mature white mangroves approximately 40-feet wide that occurs between the existing I-595 eastbound and westbound bridges. This narrow band was originally part of the freshwater forested system that historically existed in Pond Apple Slough. However, stormwater runoff from upstream portions of the watershed has been reduced, and freshwater flow in the South Fork of the New River Canal has decreased from historical levels. This reduction in freshwater flow has allowed the tidal influence to move further west, resulting in the presence of white mangroves within this portion of the South Fork of the New River Canal system. In particular, white mangroves have colonized the area between the existing I-595 bridges and now function as a monoculture forested system. The total acreage of mangroves within the I-595 project limits is 1.57 acres. Mangroves were also observed beneath the I-595 viaduct where the bridge elevation is higher and some sunlight can reach the ground. The diameter of the trunks of these mangroves is quite small, and the limited sunlight results in general poor health of the mangroves that are able to establish. In addition, the substrate where the mangroves occur is quite unstable. As runoff pours down the scuppers from the bridge following storm events, the flow of the water tends to form high energy rivulets that washes away most vegetation that attempts to colonize the mudflats below the bridge. However, a few mangrove shrubs have been able to colonize the site along with some nuisance invasive shoebutton ardesia (Ardesia elliptica). The number of mangroves increases towards the eastern portion of the viaduct where the elevation of the I-595 bridge is the highest. The total acreage of mangroves beneath the bridge is 1.49 acres.
Forested Wetlands: The forested wetland area to the north of the I-595 viaduct is part of a mitigation plan that was implemented by the FDOT for impacts made during construction of the I-95 at Cypress Creek Road Park and Ride project (SAJ-1993-30175). The mitigation site has successfully matured to an established forested wetland community, however, the canopy of the forested wetlands in the vicinity of the I-595 viaduct is undergoing a transition. (It should be noted that no impacts are proposed to occur within this mitigation area.) Historically, this canopy was dominated by freshwater forested species including pond apple (Annona glabra), cypress, red maple (Acer rubrum), and strangler fig (Ficus aurea). The canopy of these forested wetlands along the western 500 feet of the viaduct is still dominated by these freshwater forested species, but the eastern 1,100 linear feet of the corridor is becoming dominated by white mangroves. Since this area is hydraulically connected to the South Fork of the New River Canal, white mangrove seeds are being washed into the system and are becoming established in this historically freshwater system. Since white mangroves can tolerate both freshwater and saltwater, they are able to colonize and thrive in this community. In addition, red and black mangroves have become established in the fringe along the banks of the South Fork of the New River Canal because of the brackish conditions. There are 2.53 acres of these forested wetlands, located entirely within the FDOT right-of-way, on the north side of the I-595 westbound bridge. The forested wetlands to the south of the I-595 eastbound bridge are part of the freshwater forested community that has historically existed within Pond Apple Slough. Following the original I-595 improvements, portions of this system were treated as part of a Consent Order to remove exotic and invasive plant species that had colonized south of the I-595 bridges due to soil disturbance. However, due to the proximity of this system to the South Fork of the New River Canal, white mangroves have become established in the forested community south of the I-595 eastbound bridge. Remnant freshwater forested wetland habitat dominated by pond apple is still present within the western portion near the viaduct, but white mangroves are now the dominant species in the canopy south of the I-595 eastbound bridge. There are 1.37 acres of this mixed forested system within the limited access right-of-way on the south side of I-595 adjacent to Pond Apple Slough.
Mudflats: The areas below the existing I-595 bridges are essentially un-vegetated mud bottoms. No vegetation other than a low percentage of ruderal herbaceous vegetation was observed within the mud bottom areas beneath the existing bridges. The absence of vegetation can be attributed to the lack of sunlight penetration to the substrate because of the shading effects of the overhead bridges. The total acreage of mudflats within the project limits is 3.61 acres.
Surface Waters/Other Surface Waters: The areas of other surface waters included in this category consist of open water in the South Fork of the New River Canal, Dania Cutoff Canal, C-10 Canal, C-10 Spur Canal, the FP&L Cooling Canal, and borrow pits. This category also includes the deeper central zones of the larger stormwater treatment ponds at the intersection of I-95 and I-595. The total acreage of other surface waters within the project limits is 18.22 acres.
PROPOSED WORK: The applicant seeks authorization to discharge dredged and/or fill material into waters of the United States associated with roadway improvements to I 95 and I-595. The project would result in 2.98 acres of permanent mangrove impacts, 0.13 acre of mangrove shading impacts, 2.76 acres of permanent mudflat impacts, 0.32 acre of temporary mudflat impacts, 0.56 acre of permanent other surface water impacts, 2.37 acres of other surface waters shading impacts, 2.10 acre of temporary freshwater forested wetlands impacts*, 0.79 acre of freshwater forested wetlands shading impacts, 2.30 acres of permanent fill within swales, 9.58 acres of reconfigured swales, and 22.96 acres of creation of new swales.
The roadway improvement project includes widening, milling, resurfacing, overbuild, and/or reconstruction along I-95 resulting in two tolled Express Lanes in each direction and widening along I-595 to accommodate the direct connectors and required auxiliary lanes that connect the I-95 and I-595 Express Lanes systems. The number of existing General Purpose lanes along I-95 and I-595 will remain the same. Access to the Express Lanes will be limited to designated ingress and egress locations. The Express Lanes will implement congestion based toll pricing and employ Electronic Toll Collection (ETC) via the Florida’s Turnpike Enterprises (FTE) SunPassSM system. The proposed roadway and bridge improvements include the following:
• Milling, resurfacing, overbuild, and widening of I-95 from south of Hollywood Boulevard to north of Johnson Street to accommodate a southbound ingress and a northbound egress location serving Sheridan Street and interchanges to the north for traffic to and from the south.
• Milling, resurfacing and restriping of I-95 from north of Johnson Street to south of Stirling Road
• Milling, resurfacing, overbuild, and widening of I-95 from south of Stirling Road to SW 42nd Street, to accommodate one additional Express Lane in each direction, as well as a northbound ingress location and a southbound egress location, serving Sheridan Street and interchanges to the south for traffic to and from the north.
• Reconstruction of I-95 from SW 42nd Street to the South Fork of the New River to accommodate I-595 and SR-84 interchange modifications and one additional Express Lane in each direction.
• Milling, resurfacing, and restriping of I-95 from South Fork of the New River to south of Broward Boulevard to provide one additional Express Lane in each direction.
• I-95 bridge widenings over Hollywood Boulevard, Johnson Street, C-10 Canal (southbound only), Taft Street (southbound only), C-10 Spur Canal, Stirling Road (southbound only), Griffin Road, and Dania Cutoff Canal.
• I-95/I-595 Direct Connectors between northbound and southbound 95 Express Lanes and I-595, to and from the west.
• I-95/SR 84 interchange modifications, including new westbound SR 84 over I-95 bridge and widening of the northbound I-95 entrance ramp bridge.
• Median widening along I-595 from SR 7 to the bridge over Pond Apple Slough to accommodate additional auxiliary lanes to/from the Direct Connectors, and other ramp improvements.*
• I-595 westbound bridge widening over eastbound SR 84.
• I-595 viaduct bridge median and outside widening from east of SR 7 to east of SW 26th Terrace to accommodate additional auxiliary lanes to/from the Direct Connectors, ramp improvements, and an additional lane along I-595 westbound from the SB I-95 to WB I-595 entrance ramp to the SR 7/SR 84/Florida’s Turnpike exit ramp (Ramp V-1).
• Reconstruction of I-595 from east of SW 26th Terrace to Ravenswood Road.
• I-595 westbound bridge reconstruction/widening over Ravenswood Road, South Florida Rail Corridor (SFRC), and I-95.
• Painting of 17 existing bridges within the influence of the I-95/SR 84 and I-95/I-595 Interchanges.
• Riprap bank stabilization within the Dania Cutoff Canal, C-10 Canal and C-10 Spur Canal
Other proposed improvements include, but are not limited to, the following: guardrail; barrier wall; attenuators; shoulder gutters; drainage; bridge maintenance repairs; temporary and permanent retaining walls; reconstruction of impacted existing noise walls; sign structures; portable traffic monitoring sites; toll gantry and associated infrastructure including toll equipment building; Intelligent Transportation System (ITS); signing and pavement markings; express lane markers; lighting; ramp (metering) signals; utility relocation; landscape relocation; and any additional items required to provide a complete highway system in accordance with all standard Department policies, procedures, and guidelines.
The proposed drainage improvements include the utilization of existing ponds located within the existing interchanges, in conjunction with expanded linear dry ponds (swales) along the outsides, new dry detention ponds below the I-595 viaduct bridge, and new dry detention ponds along the south side of I-595 and SW 32nd Street between SW 26th Terrace and Ravenswood Road (Angler’s Avenue). The stormwater management facilities will provide treatment and attenuation of runoff prior to discharge into the receiving waterbodies, including the C-10 Canal, C-10 Spur Canal, Dania Cutoff Canal, Osceola Creek, South Fork of the New River Canal, FP&L Cooling Canal, and wetlands contiguous with the Pond Apple Slough. Existing drainage patterns will primarily function in the same manner, however, proposed discharge rates will be slightly reduced due to the proposed storage within the stormwater management facilities.
The proposed bridge widening would result in the installation of approximately 138 new pilings required in the South Fork of the New River Canal (120 new pilings, 12 new concrete drilled shafts, and 6 new fenders); 64 new pilings in the Dania Cutoff Canal (10 new pilings and 54 new fenders); 8 new pilings in the C-10 Spur Canal; 4 new pilings in the C-10 Canal; 102 new pilings in wetlands adjacent to Pond Apple Slough (68 new pilings and 34 new concrete drilled shafts); and 24 new pilings required in the FP&L Cooling Canal. (The Corps is responsible for evaluating the proposed discharges of fill material into waters of the United States associated with the bridges crossing navigable waters. The bridge structures, themselves, are under the jurisdiction of the United States Coast Guard.)
*The work associated with widening the existing I-595 viaduct bridges over wetlands adjacent to Pond Apple Slough west of the South Fork of the New River Canal involves additional pilings on both the north and south sides of the existing bridge alignments. This work requires the construction of temporary roads outside of the current bridge alignment to allow access by heavy equipment for the bridge improvements. These access roads are required along the entire length of bridge improvements to allow access for construction equipment. The construction of the access roads would result in 2.10 acres of temporary freshwater forested wetlands impacts and 0.32 acre of temporary mudflat impacts. Following the completion of the bridge construction activities, the freshwater forested wetlands and mudflats would be restored. A five-year monitoring plan is proposed for the restoration of the freshwater forested wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project has been designed to result in the least impacts to waters of the United States and still meet the project purpose and safety standards. The project utilizes existing ROW which contains waters of the United States. Therefore, total avoidance is not possible. Regarding the bridge widening activities, the applicant initially evaluated the potential for using the existing pilings to allow the widening of each bridge over the wetlands contiguous with the Pond Apple Slough and the South Fork of the New River Canal, but determined that the option would not be structurally feasible due to overstress of the existing bridges. As such, the proposed bridge widenings require the installation of an additional piling on the north and south end of each piling alignment, resulting in the need for additional pilings to support the bridge widenings. Due to the close proximity of the new pilings to the existing footers and the possibility that the vibrations caused by pile driving activities could damage the adjacent existing pilings, these new pilings are all proposed to be drilled shafts which will be augured into place. Other foundations would consist of both spread footings and footings with 24-inch square prestressed concrete piles, laid out consistent with the adjacent, existing footings to remain. Also, swales, which may contain wood stork foraging habitat, would be offset through the realignment and creation of swale area. Additionally, the FDOT would implement the most current versions of the Standard Manatee Conditions for In-Water Work; Standard Protection Measures for the Eastern Indigo Snake; and Sea Turtle and Smalltooth Sawfish Construction Conditions. Time of year in-water construction prohibitions would also be adhered to. Best management construction practices would be implemented during construction, and temporary impacts would be restored and monitored to ensure successful re-establishment.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: Mitigation for direct and secondary impacts to mangrove habitat within the I-95 corridor would be provided through the restoration of 0.04 acre (0.025 mitigation units) of mangrove wetlands from the West Lake Park Permittee Responsible Mitigation Area. Additionally, mitigation for direct and secondary impacts to the mangrove habitat between the I-595 bridges adjacent to Pond Apple Slough, mangroves below the I-595 viaduct, and the mudflats below the I-595 bridges would be provided through the restoration of 3.59 acres (1.84 mitigation units) at the Pond Apple Slough Permittee Responsible Mitigation Area. Regarding the swale impacts, these features may provide wood stork foraging habitat. The total acreage of unavoidable permanent impacts to swales with hydrophytic vegetation is 2.30 acres. Additionally, 9.58 acres of swales would be reconfigured and would be reconstructed with similar parameters as the existing swales (i.e., within twelve inches of the seasonal high groundwater table). The project would result in the creation of 32.54 acres of swales within 12 inches of the seasonal high water table which will fully offset the functional losses of swales from the project (i.e., creation includes 22.96 acres of new swale area plus 9.58 acres of restoration of swales that were temporarily impacted). Therefore, additional mitigation is not proposed for the swale impacts.
CULTURAL RESOURCES: The project was reviewed by the Federal Highway Administration and the State Historic Preservation Officer during the Project Development and Environment Study (PD&E) phase. The findings during PD&E Study phase were that the project would have no adverse effects on historic properties. The scope changed slightly from the initial review and is being reevaluated. By copy of this public notice, the Corps is providing information for additional review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the West Indian manatee (Trichechus manatus), wood stork (Mycteria americana), Eastern Indigo snake (Drymarchon corais couperi), smalltooth sawfish (Pristis pectinata), and swimming sea turtles (green [Chelonia mydas], Kemp’s ridley [Lepidochelys kempii], and loggerhead [Caretta caretta]). The Corps will request U.S. Fish and Wildlife Service and National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act. Finally, the Corps has determined the proposal would have no effect on the Everglade snail kite (Rostrhamus plumbeus).
West Indian Manatee: The Florida Power and Light Cooling Canal is a Warm Water Aggregation Area (WWAA). Use of the Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013, resulted in A > B = may affect. The applicant proposes to utilize The Standard Manatee Conditions for In-Water Work, and to adhere to a time of year in-water construction prohibition within the South Fork of the New River Canal and the Florida Power and Light Cooling Canal from November 15 to March 31. Additionally, the USFWS reviewed the proposed project during the Project Development and Environment Study phase of the project. On May 4, 2016, the USFWS determined that the proposed action is not likely to adversely affect this species, with the project’s adherence to the USFWS Standard Manatee Construction Conditions for In-Water Work during construction and the prohibition of in-water work within the South Fork of the New River and the FP&L Colling Canal between November 15 and March 31.
Wood Stork: According to a review of the USFWS database, the project area is within the wood stork nesting colony buffer of two wood stork colonies. Swales with hydrophytic vegetation adjacent to I-95 and I-595 may provide foraging habitat for wood storks following rain events. The total acreage of swales within the project area that are proposed to be impacted is 11.88 acres (including 2.30 acres of permanent impacts and 9.58 acres of temporary impacts). Based on an analysis of the wood stork forage calculations, there is a projected loss of 4.85 kilograms of wood stork forage biomass as a result of impacts to swales along I-95 and I-595. In addition to the swales along the interstate highways, the mudflats beneath the I-595 bridges also provide foraging habitat for wood storks. Evidence of use of these mudflats by wading birds was observed during the site investigations by the applicant’s consultants. A total of 2.76 acres of mudflats are proposed to be filled for creation of stormwater ponds and access roads. Based on an analysis of the wood stork forage calculations, there is a projected loss of 2.25 kilograms of wood stork forage biomass as a result of the filling of mudflats. The loss of wood stork foraging habitat is proposed to be offset by the creation of 22.96 acres of swales that are within 12 inches of the seasonal high water table. These created swales are anticipated to provide the same forage habitat as currently provided by the existing swales. In addition, 9.58 acres of swales are proposed to be restored as part of the creation of the stormwater management system. These restored swales are also anticipated to provide the same forage habitat as currently provided by the existing swales. Thus, there are a total of 32.54 acres of new and restored swales that are anticipated to provide 13.27 kilograms of wood stork forage biomass. These created and restored swales are all within the wood stork foraging habitat for the two nesting colonies. Based on the wood stork forage calculations, the amount of forage biomass created (13.27 kilograms) is greater than the amount of wood stork forage biomass lost (7.09 kilograms). In consideration of this information, the Corps utilized the Corps of Engineers, Jacksonville District and U.S. Fish and Wildlife Service’s South Florida Ecological Services Office Effect Determination Key for the Wood Stork in South Florida, May 2010, to determine the potential effects upon this species. Use of the key resulted in the sequence A > B > C > E = may affect, not likely to adversely affect this species.
Eastern Indigo Snake: This species is found in a variety of habitats, including swamps, wet prairies, xeric pinelands and scrub areas. It may utilize gopher tortoise (Gopherus polyphemus) burrows for shelter during the winter and to escape the heat during the summer. This species feeds on snakes, frogs, salamanders, toads, small mammals, birds and young turtles. Given the potential for habitat to exist, the applicant would adhere to the USFWS Standard Protection Measures for the Eastern Indigo Snake, August 12, 2013. Based on the above information, the Corps utilized The Eastern Indigo Snake Programmatic Effect Determination Key, August 2013, Revised August 1, 2017. Use of the Eastern Indigo snake key resulted in the following sequential determination: A > B > C > D = may affect, not likely to adversely affect this species.
Everglade Snail Kite: The project limits are within the USFWS consultation area of the Everglade snail kite. Everglade snail kites inhabit large, open, freshwater marshes and lakes, and usually nest over the water in low trees or shrubs, including cabbage palm (Sabal palmetto), coastal plain willow (Salix caroliniana), and buttonbush (Cephalanthus occidentalis). Shallow wetlands with emergent vegetation, such as spikerush (Eleocharis sp.), duck potato (Sagittaria latifolila), and pickerelweed (Pontederia cordata) provide good Everglade snail kite foraging habitat, provided the density of vegetation does not prevent the snail kites from spotting apple snails from above. The proposed project involves the filling of 2.30 acres of roadside swales that include herbaceous wetland habitat for the snail kite. However, the project also includes the creation of 32.54 acres of swales that will provide similar wetland herbaceous wetlands for snail kite forage habitat. Given this information, the Corps has determined that the proposed project would have no effect on the Everglade Snail Kite.
Smalltooth Sawfish: There is potential for the presence of the smalltooth sawfish in the I-595 crossings of the South Fork of the New River Canal and FP&L Cooling Canal and near the I-95 crossings of the C-10 Canal, C-10 Spur Canal, and Dania Cutoff Canal. Since the proposed work is located at the very upper end of the salt water influence within the South Fork of the New River Canal, there is very little habitat suitable for the smalltooth sawfish. Because of the on-going maintenance of the C-10 Canal, C-10 Spur Canal, and Dania Cutoff Canal, limited mangrove habitat is present along the shorelines of these canals. Due to the impacted nature of these shorelines and the prevalence of invasive plant species within the mangrove habitat, the value provided to the smalltooth sawfish is minimal. In addition, the presence of freshwater vegetative species mixed in with the mangroves is a strong indication that the project is located at the western limits of tidal influence at these location. It is therefore not likely that the proposed project will adversely affect the smalltooth sawfish. However, given the potential for access to the site for the smalltooth sawfish, the Standard Smalltooth Sawfish Conditions for In-Water Work would be followed with respect to any in-water construction activities. Therefore, it is anticipated that the project may affect, but is not likely to adversely affect the smalltooth sawfish.
Swimming Sea Turtles: Since the proposed project occurs in rivers and a series of canals that all flow to the Intracoastal Waterway and ultimately to the Atlantic Ocean, waters within the project area are accessible to swimming sea turtles. However, it is anticipated that swimming sea turtles would move away from the work zones during the construction activities. There are suitable aquatic habitats for swimming sea turtles in the Intracoastal Waterway and along the ocean coastline of the Atlantic Ocean for these species to utilize while work on the bridge is occurring. Given the distance from the Intracoastal Waterway, it is not likely that sea turtles would frequent the project site. However, due to the accessibility to the site, the Standard Sea Turtle and Sawfish Construction Conditions would be adhered to during all in-water activity associated with the bridge repairs. Therefore, it is anticipated that the project may affect, but is not likely to adversely affect swimming sea turtles.
ESSENTIAL FISH HABITAT (EFH): The applicant has coordinated directly with the National Marine Fisheries Services regarding EFH. However, this notice initiates Corps consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would result in approximately 2.98 acres of permanent mangrove impacts and approximately 0.13 acre of mangrove shading impacts. The mangroves may be utilized by various life stages of the smalltooth sawfish. Given the applicant’s proposal to mitigate for these proposed impacts, it is our initial determination that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the waters which flow to the Intracoastal Water and eventually the Atlantic Ocean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Mrs. Tarrie Ostrofsky, in writing at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557, by electronic mail at Tarrie.L.Ostrofsky@usace.army.mil, by fax at (561) 626-6971, or by telephone at (561) 472-3519.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PALM BEACH GARDENS OFFICE
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FLORIDA 33410
REPLY TO
ATTENTION OF
Regulatory Division
North Branch
Panama City Permits Section
August 29, 2017
PUBLIC NOTICE
Permit Application No. SAJ-2017-01640 (SP-TLO)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Florida Department of Transportation District 4
Attn: Ms. Hui Shi
3400 West Commercial Boulevard
Fort Lauderdale, Florida 33309
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the C-10 Canal, C-10 Spur Canal, Dania Cutoff Canal (part of the
Central and South Florida Flood Control Project), Pond Apple Slough, South Fork of the
New River Canal, and the Florida Power and Light (FP&L) Cooling Canal. The project
site is located along 9 miles of Interstate (I) 95, from south of Hollywood Boulevard to
Broward Boulevard and along 2 miles of I-595, from State Road (SR) 7 to I-95, in
Sections 8, 9, 16, 17, 18, 19, 20, 21, 28, 29, and 33; Township 50 South; Range 42
East; and in Sections 4, 8, 9, 16, and 17; Township 51 South; Range 42 East, in the city
of Dania Beach, Broward County, Florida.
Directions to the site are as follows: The project site begins along Interstate (I) 95, just
south of Hollywood Boulevard, and ends at Broward Boulevard in Broward County,
including construction along I-595 from SR 7 to I-95.
APPROXIMATE CENTRAL COORDINATES: Latitude 25.999389 °
Longitude -80.166417 °
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to provide additional capacity in order to
accommodate the projected traffic demands, alleviate traffic congestion on local
crossroads, facilitate a hurricane evacuation and other emergency evacuation route,
improve highway safety by addressing speed differences among lanes at interchanges
and lane weaving on cross streets, and provide multi-modal transportation options
within the eastern corridor of Broward County.
EXISTING CONDITIONS: The existing site conditions, as provided by the applicant,
are as follows: The overall project area where work is proposed to occur encompasses
approximately 507 acres. The project corridor consists of land that has previously been
filled to create the current I-95 and I-595 highway system consisting of travel lanes,
shoulders, recovery zones, and stormwater management systems. The project corridor
includes the following crossings over waterbodies: I-95 bridges over the C-10 Canal, I95 bridges over the C-10 Spur Canal, I-95 bridges over the Dania Cutoff Canal, I-595
bridges over wetlands contiguous with the Pond Apple Slough, I-595 bridges over the
South Fork of the New River Canal, and I-595 bridges over the FP&L Cooling Canal.
There is also an I-95 bridge crossing of the South Fork of the New River, however, there
is no proposed bridge work at this location. The project area also contains the
following:
Swales: Swales with hydrophytic vegetation consist of man-made drainage features
with a hydrologic regime that has resulted in a dominance of wetland vegetation and the
development of hydric soils. These areas consist entirely of linear man-made features
adjacent to and parallel with the highway, which are designed to be approximately one
foot above the seasonal high ground water table. This habitat type also includes ponds
that are part of the stormwater management system for I-95 and I-595. There are a
total of 53 swales with hydrophytic vegetation identified within the I-95 and I-595
corridors. These areas are regularly maintained and support herbaceous vegetation
that is adapted to frequent disturbance including but not limited to torpedo grass
(Panicum repens), beak sedges (Rhynchospora spp.), flatsedges (Cyperus spp.),
smallfruit primrose willow (Ludwigia microcarpa), herb-of-grace (Bacopa monnieri),
largeleaf marshpennywort (Hydrocotyle bonariensis), bulltongue arrowhead (Saggitaria
lancifolia), and creeping primrose willow (Ludwigia repens). In some locations, woody
vegetation occurs within these swales. Woody vegetation includes Carolina willow
(Salix carolinensis), primrose willow (Ludwigia peruviana), and Brazilian pepper
(Schinus terebinthifolius). These woody species generally occur around the edges of
the swales, but in some cases may extend throughout the entire swale. Woody
vegetation constitutes less than 25% of the overall vegetative cover in the swales.
There are approximately 34.65 acres of swales with hydrophytic vegetation within the
project limits. The hydrology in the swales is entirely dependent on stormwater runoff
input from the adjacent roadways. Because the bottom of the swales is designed to be
above the seasonal high ground water table, the swales remain dry for most of the year.
These swale features provide limited foraging habitat for wading birds and other
wetland-dependent species such as frogs and aquatic macro-invertebrates. The overall
wildlife habitat quality of these features is marginal due to its proximity to a heavily
traveled highway in an urban environment as well as a result of routine maintenance of
the swales.
Mangroves along the I-95 Corridor: There are four crossings of estuarine channels
along the I-95 section of the project, including the C-10 Canal, C-10 Spur Canal, Dania
2
Cutoff Canal, and South Fork of the New River. The mangrove areas within the I-95
corridor can be described as a narrow, discontinuous fringe of small red and white
mangroves growing at the river and canal shoreline interface. The mangroves are
stunted and are being outcompeted by invasive exotic species including tropical almond
(Terminalia cattapa), Brazilian pepper, and seaside mahoe (Thespesia polpunea). The
presence of these exotic species is indicative that the mangrove locations are at the
upper end of the saltwater tidal influence in the rivers and the canals in the project
corridor. The total acreage of mangrove shoreline within the I-95 project limits is 0.93
acres.
Mangroves along the I-595 Corridor: There is a narrow strip of mature white mangroves
approximately 40-feet wide that occurs between the existing I-595 eastbound and
westbound bridges. This narrow band was originally part of the freshwater forested
system that historically existed in Pond Apple Slough. However, stormwater runoff from
upstream portions of the watershed has been reduced, and freshwater flow in the South
Fork of the New River Canal has decreased from historical levels. This reduction in
freshwater flow has allowed the tidal influence to move further west, resulting in the
presence of white mangroves within this portion of the South Fork of the New River
Canal system. In particular, white mangroves have colonized the area between the
existing I-595 bridges and now function as a monoculture forested system. The total
acreage of mangroves within the I-595 project limits is 1.57 acres. Mangroves were
also observed beneath the I-595 viaduct where the bridge elevation is higher and some
sunlight can reach the ground. The diameter of the trunks of these mangroves is quite
small, and the limited sunlight results in general poor health of the mangroves that are
able to establish. In addition, the substrate where the mangroves occur is quite
unstable. As runoff pours down the scuppers from the bridge following storm events,
the flow of the water tends to form high energy rivulets that washes away most
vegetation that attempts to colonize the mudflats below the bridge. However, a few
mangrove shrubs have been able to colonize the site along with some nuisance
invasive shoebutton ardesia (Ardesia elliptica). The number of mangroves increases
towards the eastern portion of the viaduct where the elevation of the I-595 bridge is the
highest. The total acreage of mangroves beneath the bridge is 1.49 acres.
Forested Wetlands: The forested wetland area to the north of the I-595 viaduct is part
of a mitigation plan that was implemented by the FDOT for impacts made during
construction of the I-95 at Cypress Creek Road Park and Ride project (SAJ-199330175). The mitigation site has successfully matured to an established forested
wetland community, however, the canopy of the forested wetlands in the vicinity of the I595 viaduct is undergoing a transition. (It should be noted that no impacts are proposed
to occur within this mitigation area.) Historically, this canopy was dominated by
freshwater forested species including pond apple (Annona glabra), cypress, red maple
(Acer rubrum), and strangler fig (Ficus aurea). The canopy of these forested wetlands
along the western 500 feet of the viaduct is still dominated by these freshwater forested
species, but the eastern 1,100 linear feet of the corridor is becoming dominated by
white mangroves. Since this area is hydraulically connected to the South Fork of the
New River Canal, white mangrove seeds are being washed into the system and are
3
becoming established in this historically freshwater system. Since white mangroves can
tolerate both freshwater and saltwater, they are able to colonize and thrive in this
community. In addition, red and black mangroves have become established in the
fringe along the banks of the South Fork of the New River Canal because of the
brackish conditions. There are 2.53 acres of these forested wetlands, located entirely
within the FDOT right-of-way, on the north side of the I-595 westbound bridge. The
forested wetlands to the south of the I-595 eastbound bridge are part of the freshwater
forested community that has historically existed within Pond Apple Slough. Following
the original I-595 improvements, portions of this system were treated as part of a
Consent Order to remove exotic and invasive plant species that had colonized south of
the I-595 bridges due to soil disturbance. However, due to the proximity of this system
to the South Fork of the New River Canal, white mangroves have become established
in the forested community south of the I-595 eastbound bridge. Remnant freshwater
forested wetland habitat dominated by pond apple is still present within the western
portion near the viaduct, but white mangroves are now the dominant species in the
canopy south of the I-595 eastbound bridge. There are 1.37 acres of this mixed
forested system within the limited access right-of-way on the south side of I-595
adjacent to Pond Apple Slough.
Mudflats: The areas below the existing I-595 bridges are essentially un-vegetated mud
bottoms. No vegetation other than a low percentage of ruderal herbaceous vegetation
was observed within the mud bottom areas beneath the existing bridges. The absence
of vegetation can be attributed to the lack of sunlight penetration to the substrate
because of the shading effects of the overhead bridges. The total acreage of mudflats
within the project limits is 3.61 acres.
Surface Waters/Other Surface Waters: The areas of other surface waters included in
this category consist of open water in the South Fork of the New River Canal, Dania
Cutoff Canal, C-10 Canal, C-10 Spur Canal, the FP&L Cooling Canal, and borrow pits.
This category also includes the deeper central zones of the larger stormwater treatment
ponds at the intersection of I-95 and I-595. The total acreage of other surface waters
within the project limits is 18.22 acres.
PROPOSED WORK: The applicant seeks authorization to discharge dredged and/or fill
material into waters of the United States associated with roadway improvements to I-95
and I-595. The project would result in 2.98 acres of permanent mangrove impacts, 0.13
acre of mangrove shading impacts, 2.76 acres of permanent mudflat impacts, 0.32 acre
of temporary mudflat impacts, 0.56 acre of permanent other surface water impacts, 2.37
acres of other surface waters shading impacts, 2.10 acre of temporary freshwater
forested wetlands impacts*, 0.79 acre of freshwater forested wetlands shading impacts,
2.30 acres of permanent fill within swales, 9.58 acres of reconfigured swales, and 22.96
acres of creation of new swales.
The roadway improvement project includes widening, milling, resurfacing, overbuild,
and/or reconstruction along I-95 resulting in two tolled Express Lanes in each direction
and widening along I-595 to accommodate the direct connectors and required auxiliary
4
lanes that connect the I-95 and I-595 Express Lanes systems. The number of existing
General Purpose lanes along I-95 and I-595 will remain the same. Access to the
Express Lanes will be limited to designated ingress and egress locations. The Express
Lanes will implement congestion based toll pricing and employ Electronic Toll Collection
(ETC) via the Florida's Turnpike Enterprises (FTE) SunPassSM system. The proposed
roadway and bridge improvements include the following:
· Milling, resurfacing, overbuild, and widening of I-95 from south of Hollywood Boulevard
to north of Johnson Street to accommodate a southbound ingress and a northbound
egress location serving Sheridan Street and interchanges to the north for traffic to and
from the south.
· Milling, resurfacing and restriping of I-95 from north of Johnson Street to south of
Stirling Road
· Milling, resurfacing, overbuild, and widening of I-95 from south of Stirling Road to SW
42nd Street, to accommodate one additional Express Lane in each direction, as well as
a northbound ingress location and a southbound egress location, serving Sheridan
Street and interchanges to the south for traffic to and from the north.
· Reconstruction of I-95 from SW 42nd Street to the South Fork of the New River to
accommodate I-595 and SR-84 interchange modifications and one additional Express
Lane in each direction.
· Milling, resurfacing, and restriping of I-95 from South Fork of the New River to south of
Broward Boulevard to provide one additional Express Lane in each direction.
· I-95 bridge widenings over Hollywood Boulevard, Johnson Street, C-10 Canal
(southbound only), Taft Street (southbound only), C-10 Spur Canal, Stirling Road
(southbound only), Griffin Road, and Dania Cutoff Canal.
· I-95/I-595 Direct Connectors between northbound and southbound 95 Express Lanes
and I-595, to and from the west.
· I-95/SR 84 interchange modifications, including new westbound SR 84 over I-95
bridge and widening of the northbound I-95 entrance ramp bridge.
· Median widening along I-595 from SR 7 to the bridge over Pond Apple Slough to
accommodate additional auxiliary lanes to/from the Direct Connectors, and other ramp
improvements.*
· I-595 westbound bridge widening over eastbound SR 84.
· I-595 viaduct bridge median and outside widening from east of SR 7 to east of SW
26th Terrace to accommodate additional auxiliary lanes to/from the Direct Connectors,
ramp improvements, and an additional lane along I-595 westbound from the SB I-95 to
WB I-595 entrance ramp to the SR 7/SR 84/Florida's Turnpike exit ramp (Ramp V-1).
· Reconstruction of I-595 from east of SW 26th Terrace to Ravenswood Road.
· I-595 westbound bridge reconstruction/widening over Ravenswood Road, South
Florida Rail Corridor (SFRC), and I-95.
· Painting of 17 existing bridges within the influence of the I-95/SR 84 and I-95/I-595
Interchanges.
· Riprap bank stabilization within the Dania Cutoff Canal, C-10 Canal and C-10 Spur
Canal
5
Other proposed improvements include, but are not limited to, the following: guardrail;
barrier wall; attenuators; shoulder gutters; drainage; bridge maintenance repairs;
temporary and permanent retaining walls; reconstruction of impacted existing noise
walls; sign structures; portable traffic monitoring sites; toll gantry and associated
infrastructure including toll equipment building; Intelligent Transportation System (ITS);
signing and pavement markings; express lane markers; lighting; ramp (metering)
signals; utility relocation; landscape relocation; and any additional items required to
provide a complete highway system in accordance with all standard Department
policies, procedures, and guidelines.
The proposed drainage improvements include the utilization of existing ponds located
within the existing interchanges, in conjunction with expanded linear dry ponds (swales)
along the outsides, new dry detention ponds below the I-595 viaduct bridge, and new
dry detention ponds along the south side of I-595 and SW 32nd Street between SW
26th Terrace and Ravenswood Road (Angler's Avenue). The stormwater management
facilities will provide treatment and attenuation of runoff prior to discharge into the
receiving waterbodies, including the C-10 Canal, C-10 Spur Canal, Dania Cutoff Canal,
Osceola Creek, South Fork of the New River Canal, FP&L Cooling Canal, and wetlands
contiguous with the Pond Apple Slough. Existing drainage patterns will primarily
function in the same manner, however, proposed discharge rates will be slightly
reduced due to the proposed storage within the stormwater management facilities.
The proposed bridge widening would result in the installation of approximately 138 new
pilings required in the South Fork of the New River Canal (120 new pilings, 12 new
concrete drilled shafts, and 6 new fenders); 64 new pilings in the Dania Cutoff Canal (10
new pilings and 54 new fenders); 8 new pilings in the C-10 Spur Canal; 4 new pilings in
the C-10 Canal; 102 new pilings in wetlands adjacent to Pond Apple Slough (68 new
pilings and 34 new concrete drilled shafts); and 24 new pilings required in the FP&L
Cooling Canal. (The Corps is responsible for evaluating the proposed discharges of fill
material into waters of the United States associated with the bridges crossing navigable
waters. The bridge structures, themselves, are under the jurisdiction of the United
States Coast Guard.)
*The work associated with widening the existing I-595 viaduct bridges over wetlands
adjacent to Pond Apple Slough west of the South Fork of the New River Canal involves
additional pilings on both the north and south sides of the existing bridge alignments.
This work requires the construction of temporary roads outside of the current bridge
alignment to allow access by heavy equipment for the bridge improvements. These
access roads are required along the entire length of bridge improvements to allow
access for construction equipment. The construction of the access roads would result
in 2.10 acres of temporary freshwater forested wetlands impacts and 0.32 acre of
temporary mudflat impacts. Following the completion of the bridge construction
activities, the freshwater forested wetlands and mudflats would be restored. A five-year
monitoring plan is proposed for the restoration of the freshwater forested wetlands.
6
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The project has been designed to result in the least impacts to
waters of the United States and still meet the project purpose and safety standards.
The project utilizes existing ROW which contains waters of the United States.
Therefore, total avoidance is not possible. Regarding the bridge widening activities, the
applicant initially evaluated the potential for using the existing pilings to allow the
widening of each bridge over the wetlands contiguous with the Pond Apple Slough and
the South Fork of the New River Canal, but determined that the option would not be
structurally feasible due to overstress of the existing bridges. As such, the proposed
bridge widenings require the installation of an additional piling on the north and south
end of each piling alignment, resulting in the need for additional pilings to support the
bridge widenings. Due to the close proximity of the new pilings to the existing footers
and the possibility that the vibrations caused by pile driving activities could damage the
adjacent existing pilings, these new pilings are all proposed to be drilled shafts which
will be augured into place. Other foundations would consist of both spread footings and
footings with 24-inch square prestressed concrete piles, laid out consistent with the
adjacent, existing footings to remain. Also, swales, which may contain wood stork
foraging habitat, would be offset through the realignment and creation of swale area.
Additionally, the FDOT would implement the most current versions of the Standard
Manatee Conditions for In-Water Work; Standard Protection Measures for the Eastern
Indigo Snake; and Sea Turtle and Smalltooth Sawfish Construction Conditions. Time of
year in-water construction prohibitions would also be adhered to. Best management
construction practices would be implemented during construction, and temporary
impacts would be restored and monitored to ensure successful re-establishment.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment: Mitigation for direct and secondary impacts to mangrove habitat within the
I-95 corridor would be provided through the restoration of 0.04 acre (0.025 mitigation
units) of mangrove wetlands from the West Lake Park Permittee Responsible Mitigation
Area. Additionally, mitigation for direct and secondary impacts to the mangrove habitat
between the I-595 bridges adjacent to Pond Apple Slough, mangroves below the I-595
viaduct, and the mudflats below the I-595 bridges would be provided through the
restoration of 3.59 acres (1.84 mitigation units) at the Pond Apple Slough Permittee
Responsible Mitigation Area. Regarding the swale impacts, these features may provide
wood stork foraging habitat. The total acreage of unavoidable permanent impacts to
swales with hydrophytic vegetation is 2.30 acres. Additionally, 9.58 acres of swales
would be reconfigured and would be reconstructed with similar parameters as the
existing swales (i.e., within twelve inches of the seasonal high groundwater table). The
project would result in the creation of 32.54 acres of swales within 12 inches of the
seasonal high water table which will fully offset the functional losses of swales from the
project (i.e., creation includes 22.96 acres of new swale area plus 9.58 acres of
restoration of swales that were temporarily impacted). Therefore, additional mitigation
is not proposed for the swale impacts.
7
CULTURAL RESOURCES: The project was reviewed by the Federal Highway
Administration and the State Historic Preservation Officer during the Project
Development and Environment Study (PD&E) phase. The findings during PD&E Study
phase were that the project would have no adverse effects on historic properties. The
scope changed slightly from the initial review and is being reevaluated. By copy of this
public notice, the Corps is providing information for additional review. Our final
determination relative to historic resource impacts is subject to review by and
coordination with the State Historic Preservation Officer and those federally recognized
tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect,
but is not likely to adversely affect the West Indian manatee (Trichechus manatus),
wood stork (Mycteria americana), Eastern Indigo snake (Drymarchon corais couperi),
smalltooth sawfish (Pristis pectinata), and swimming sea turtles (green [Chelonia
mydas], Kemp's ridley [Lepidochelys kempii], and loggerhead [Caretta caretta]). The
Corps will request U.S. Fish and Wildlife Service and National Marine Fisheries Service
concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act. Finally, the Corps has determined the proposal would have no effect on
the Everglade snail kite (Rostrhamus plumbeus).
West Indian Manatee: The Florida Power and Light Cooling Canal is a Warm Water
Aggregation Area (WWAA). Use of the Corps of Engineers, Jacksonville District, and
the State of Florida Effect Determination Key for the Manatee in Florida, April 2013,
resulted in A > B = may affect. The applicant proposes to utilize The Standard Manatee
Conditions for In-Water Work, and to adhere to a time of year in-water construction
prohibition within the South Fork of the New River Canal and the Florida Power and
Light Cooling Canal from November 15 to March 31. Additionally, the USFWS reviewed
the proposed project during the Project Development and Environment Study phase of
the project. On May 4, 2016, the USFWS determined that the proposed action is not
likely to adversely affect this species, with the project's adherence to the USFWS
Standard Manatee Construction Conditions for In-Water Work during construction and
the prohibition of in-water work within the South Fork of the New River and the FP&L
Colling Canal between November 15 and March 31.
Wood Stork: According to a review of the USFWS database, the project area is within
the wood stork nesting colony buffer of two wood stork colonies. Swales with
hydrophytic vegetation adjacent to I-95 and I-595 may provide foraging habitat for wood
storks following rain events. The total acreage of swales within the project area that are
proposed to be impacted is 11.88 acres (including 2.30 acres of permanent impacts and
9.58 acres of temporary impacts). Based on an analysis of the wood stork forage
calculations, there is a projected loss of 4.85 kilograms of wood stork forage biomass as
a result of impacts to swales along I-95 and I-595. In addition to the swales along the
interstate highways, the mudflats beneath the I-595 bridges also provide foraging
habitat for wood storks. Evidence of use of these mudflats by wading birds was
observed during the site investigations by the applicant's consultants. A total of 2.76
acres of mudflats are proposed to be filled for creation of stormwater ponds and access
8
roads. Based on an analysis of the wood stork forage calculations, there is a projected
loss of 2.25 kilograms of wood stork forage biomass as a result of the filling of mudflats.
The loss of wood stork foraging habitat is proposed to be offset by the creation of 22.96
acres of swales that are within 12 inches of the seasonal high water table. These
created swales are anticipated to provide the same forage habitat as currently provided
by the existing swales. In addition, 9.58 acres of swales are proposed to be restored as
part of the creation of the stormwater management system. These restored swales are
also anticipated to provide the same forage habitat as currently provided by the existing
swales. Thus, there are a total of 32.54 acres of new and restored swales that are
anticipated to provide 13.27 kilograms of wood stork forage biomass. These created
and restored swales are all within the wood stork foraging habitat for the two nesting
colonies. Based on the wood stork forage calculations, the amount of forage biomass
created (13.27 kilograms) is greater than the amount of wood stork forage biomass lost
(7.09 kilograms). In consideration of this information, the Corps utilized the Corps of
Engineers, Jacksonville District and U.S. Fish and Wildlife Service's South Florida
Ecological Services Office Effect Determination Key for the Wood Stork in South
Florida, May 2010, to determine the potential effects upon this species. Use of the key
resulted in the sequence A > B > C > E = may affect, not likely to adversely affect this
species.
Eastern Indigo Snake: This species is found in a variety of habitats, including swamps,
wet prairies, xeric pinelands and scrub areas. It may utilize gopher tortoise (Gopherus
polyphemus) burrows for shelter during the winter and to escape the heat during the
summer. This species feeds on snakes, frogs, salamanders, toads, small mammals,
birds and young turtles. Given the potential for habitat to exist, the applicant would
adhere to the USFWS Standard Protection Measures for the Eastern Indigo Snake,
August 12, 2013. Based on the above information, the Corps utilized The Eastern
Indigo Snake Programmatic Effect Determination Key, August 2013, Revised August 1,
2017. Use of the Eastern Indigo snake key resulted in the following sequential
determination: A > B > C > D = may affect, not likely to adversely affect this species.
Everglade Snail Kite: The project limits are within the USFWS consultation area of the
Everglade snail kite. Everglade snail kites inhabit large, open, freshwater marshes and
lakes, and usually nest over the water in low trees or shrubs, including cabbage palm
(Sabal palmetto), coastal plain willow (Salix caroliniana), and buttonbush (Cephalanthus
occidentalis). Shallow wetlands with emergent vegetation, such as spikerush
(Eleocharis sp.), duck potato (Sagittaria latifolila), and pickerelweed (Pontederia
cordata) provide good Everglade snail kite foraging habitat, provided the density of
vegetation does not prevent the snail kites from spotting apple snails from above. The
proposed project involves the filling of 2.30 acres of roadside swales that include
herbaceous wetland habitat for the snail kite. However, the project also includes the
creation of 32.54 acres of swales that will provide similar wetland herbaceous wetlands
for snail kite forage habitat. Given this information, the Corps has determined that the
proposed project would have no effect on the Everglade Snail Kite.
9
Smalltooth Sawfish: There is potential for the presence of the smalltooth sawfish in the
I-595 crossings of the South Fork of the New River Canal and FP&L Cooling Canal and
near the I-95 crossings of the C-10 Canal, C-10 Spur Canal, and Dania Cutoff Canal.
Since the proposed work is located at the very upper end of the salt water influence
within the South Fork of the New River Canal, there is very little habitat suitable for the
smalltooth sawfish. Because of the on-going maintenance of the C-10 Canal, C-10 Spur
Canal, and Dania Cutoff Canal, limited mangrove habitat is present along the shorelines
of these canals. Due to the impacted nature of these shorelines and the prevalence of
invasive plant species within the mangrove habitat, the value provided to the smalltooth
sawfish is minimal. In addition, the presence of freshwater vegetative species mixed in
with the mangroves is a strong indication that the project is located at the western limits
of tidal influence at these location. It is therefore not likely that the proposed project will
adversely affect the smalltooth sawfish. However, given the potential for access to the
site for the smalltooth sawfish, the Standard Smalltooth Sawfish Conditions for In-Water
Work would be followed with respect to any in-water construction activities. Therefore,
it is anticipated that the project may affect, but is not likely to adversely affect the
smalltooth sawfish.
Swimming Sea Turtles: Since the proposed project occurs in rivers and a series of
canals that all flow to the Intracoastal Waterway and ultimately to the Atlantic Ocean,
waters within the project area are accessible to swimming sea turtles. However, it is
anticipated that swimming sea turtles would move away from the work zones during the
construction activities. There are suitable aquatic habitats for swimming sea turtles in
the Intracoastal Waterway and along the ocean coastline of the Atlantic Ocean for these
species to utilize while work on the bridge is occurring. Given the distance from the
Intracoastal Waterway, it is not likely that sea turtles would frequent the project site.
However, due to the accessibility to the site, the Standard Sea Turtle and Sawfish
Construction Conditions would be adhered to during all in-water activity associated with
the bridge repairs. Therefore, it is anticipated that the project may affect, but is not
likely to adversely affect swimming sea turtles.
ESSENTIAL FISH HABITAT (EFH): The applicant has coordinated directly with the
National Marine Fisheries Services regarding EFH. However, this notice initiates Corps
consultation with the National Marine Fisheries Service on EFH as required by the
Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal
would result in approximately 2.98 acres of permanent mangrove impacts and
approximately 0.13 acre of mangrove shading impacts. The mangroves may be utilized
by various life stages of the smalltooth sawfish. Given the applicant's proposal to
mitigate for these proposed impacts, it is our initial determination that the proposed
action would not have a substantial adverse impact on EFH or federally managed
fisheries in the waters which flow to the Intracoastal Water and eventually the Atlantic
Ocean. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries
Service.
10
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer at the Palm Beach Gardens
Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557
within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Mrs. Tarrie Ostrofsky, in writing at the Palm Beach Gardens Office, 4400 PGA
Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557, by electronic mail at
Tarrie.L.Ostrofsky@usace.army.mil, by fax at (561) 626-6971, or by telephone at (561)
472-3519.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
11
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
12
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
USAGE DREDGE AND
FILL PERMIT SKETCHES
FINANCJAL PROJECT JD 409354-2-52-01
INDEX OF ROADWAY PLANS
SHEET NO.
SHEET DESCRIPTION
1
KEY SHEET
PROJECT LAYOUT
ROADWAY PLAN
SUMMARY OF TOT AL5
2-7
8-52
53-54
BROWARD COUNTY (86070)
1
r
nr::
STATE ROAD NO. 9 (J-95)
I-95 EXPRESS LIWES - PHASE 3C
coru11 cn111u nr uni 1 v1unnn on111 c"Aon
I-95 EXPRESS PHASE 3C
tea
o.,n 1
1- 95 END CONSfRUCTJON
STA 76o+22.10
M.P. 10.477
"''""''
T-49-S
T-50-S
0
2
4
Miles
T-50-S
T-51=5
SKETCHES PREPARED BY:
STANTEC CONSULTING SETNJCES, INC.
900 PONCE DE LEON BOULEVARD - SUITE 900
CORAL GABLES. FL 33134-3070
TEL· (305) 445-2900
FAX: (305) 445-3367
VENDOR NO. 650039493001
FL CERTTFICATE NO. C-9723
1- 595 BEGIN CONSTRUCTION
SfA. 305+54.62
M.P. 4.780
f-595 END CONSTRUCTION
STA 491+52.74
M.P. 10.399
NOTE: THE SCALE OF THESE Pl.A/VS MAY
HAVE CHANGED DUE TO REPRODUCTION.
NOTE:
T HESE PERMIT SKETCHES HAVE BEEN PREPARED FOR T HE SPECIFIC USE BY
THE USACE FOR ILLUSTRATION OF THE PROPOSED IMPACTS TO WETLANDS
AND OTHER SURFACE WATERS.
1-95 BEGIN CONSTRUCTION
STA. 300+00.00
PERMJT SKETCH
H.P. 1.773
ENGINEER OF RECORD: MD MUSHFIQUR RAHMAN, P.E.
P.E. NO.: 65729
CONSTRUCTJON
CONTRACT NO.
mdominguez
l /Z5/ZQ11
l :/9:Z4 PH
FISCAL
SHEET
YEAR
NO.
18
K-1
t :\pwworkln1\tp.t\il0fil2521\KEYSROaI _:JC_USN:E.dgn
Zz
---- -
0 200
1000
Feet
{CONST. SR
®
200
250
N 5" 12' 56" W
N Z' Of! 25" W
BEGIN CONSTRUCTION
STA. 300+00.00 Cl CONST. SR-9
1-95 (SR-9)
REVISIONS
OESCIUl'TION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABl.ES.r. FL 33134
STATB OP FLORIDA
SHEET
DEPARTMENT OF TRANSPORTA170N
305-445-~900
AOAD NO.
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
9
COUNTY
NO.
PROJECT LAYOUT
FINANCIAL PROJECT ID
BROWARD
2
409354-2-52-01
mdomtng~z
7115/2()11
11:43:41 A/II
<:\pwworklng\tpi>\<10611511\PlAYRD _3C_IJSN::E_00.4gn
Za
--- --
0 200
1000
Feet:
I
I.I.I
I.I.I
0::
I
if:
,,.,0
t
~
g
ni
0::
Ll.J
::i::
~
Vl
l
"'
II'\
N 1· 3Z 3t
a..
~
~
N 3" 14' 00" E
~
....
"'...+
...
0\
b
-
'""!
t;
....
<:
'r;(
c::i
IO
<..>
"Q
V')
CONST. SR
......
~
°'
t
VI
....
....
...
\0
i.n
0
t"'"
-
I-.
a..
....co
8
1
450
¥.
N 5· 21' 2r E
(JO
'-a
-.I
<:
I
Vl
<(
0
·~
It\
~
.,,
'~"'
I
l.U
LU
0::
IVl
...
~
...+
q:
<:
I.&..
q:
\J
I
:(?:
J::
0::
0
....,
:::>
Q..
Vl
0
I
\J
1-95 (SR-9)
REVISIONS
STANTEC
OESCIUl'TION
STATB OP FLORIDA
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABl.ES.r. FL 33134
SHEET
DEPARTMENT OF TRANSPORTA170N
305-445-~900
AOAD NO.
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
9
COUNTY
NO.
PROJECT LAYOUT
FINANCIAL PROJECT ID
BROWARD
3
409354-2-52-01
mdomtng~z
7115/2()11
11:43:53 A/II
<:\pwworklng\tpi>\<10611511\PlAYRD _3C_IJSN::E_O I 4gn
0 200
1000
Feet
~
...;;
~
....
gt
it
~
~
i..;
II)
i..;
Cl.
....
"+
\.Q
-"'
CQ
~
@
N 4" 4' 57"
4
V\
VJ
5 0
5
....
i..;
'I
~
~
N 14· 53' 26" W
w
-it."'
Cl
l.u
~
.....
"'....b
z
0
N
q
LI.. ~
LL.. 0
0:: 0::
....
~
U'I
~
1-95 (SR-9)
REVISIONS
OESCIUl'TION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABl.ES.r. FL 33134
STATB OP FLORIDA
SHEET
DEPARTMENT OF TRANSPORTA170N
305-445-~900
AOAD NO.
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
9
COUNTY
NO.
PROJECT LAYOUT
FINANCIAL PROJECT ID
BROWARD
4
409354-2-52-01
mdomtng~z
7/ZS/2011
11:44:05 A/II
<:\pwworklng\tpi>\d0611511\PlAYRD_3C_IJSN::E_014gn
358+50.14
Za
CONST. 1595- WB
- - - --
0 200
1000
Feet
~CONST.
1595-E
PRC S A 382+Pl S T . 384+13.82
486+87.42
0
~
,..;
Cl'\
~
"+,.,.,
V\
@
i
....0
@
'b
....
~
t.ti
:-i
~
°'
~
°'
'I
:""
....
Cl)
0
~
N 4· 48' 05"
\u
+
""'
~
"'
'I
"
@
~ti
Cl..
~
,.,.,
""'
<(
IO
.c
v
v
IO
~
""~
-,...
~
CQ
~
"'l
"'"~
0
~
a;
IO
~
0\
w
N 1· 23' 2Z" VI
~
In
-\
°'~
°'..,,~
u,
w
~
ti)
"-I
VI
).:
~
'I
0
~
r
~
;..,
"'
It
~
:""
~
~
~
'I
"'
IC
~
io
N 1· 35' 0
~
I")
....
\I)
"'
"ti
l"')
n
..
~
700
"'I)
w
41 t;;
...
!'I
OI
0
....' I
IO
1-95 (SR-9)
REVISIONS
OESCIUl'TION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABl.ES.r. FL 33134
STATB OP FLORIDA
SHEET
DEPARTMENT OF TRANSPORTA170N
305-445-~900
AOAD NO.
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
9
COUNTY
NO.
PROJECT LAYOUT
FINANCIAL PROJECT ID
BROWARD
5
409354-2-52-01
mdomtng~z
711512011
11:44:18 A/II
<:\pwworklng\tpi>\d0611511\PlAYRD _3C_IJSN::E_OJ4gn
-----
0 2 00
100 0
Feet
N
"'..,;
"+'O
""
-'Ci
-i
0
+
0
......
r
(f CONST. SR-
u
I-
0..
Ill
6
0..
a:
N
3(1 58' VI
~
-I
~
;i..
.....
.....
~
.....
"J
v.
\Jl
END CONSTRUCT/ON
STA. 760+22.10 Q: CONST. SR-9
1-95 (SR-9)
REVISIONS
OESCIUl'TION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABl.ES.r. FL 3313 4
STATB OP FLORIDA
SHEET
DEPARTMENT OF TRANSPORTA170 N
305-445-~900
AOAD NO.
VENDOR NO. 650039493001
FL CERTIFICATI ON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
9
COUNTY
NO.
PROJECT LAYOUT
FINANCIAL PROJECT ID
BROWARD
6
409354-2-52-01
mdomtng~z
7115/2()11
/1:44:3D A/II
<:\pwworklng\tpi>\<10611511 \PlAYRD _3C_IJSN::E_04.4gn
IJJ
-.J
<
<:(
:::i
l...>
<..:>
<
.._
-.J
u
-.J
Q.
<[_
<
IJJ
n::
::::..
<:(
I
:r:
I
:r:
0
l'Y)
\0
l"\r
~
3!:
(.J')
~
"o:i
c
CONST. 1595-W
.t
C£ 1-595
~
@
ti
·~
C.
Q..
.,,
""'"\
Vi
;r:..
w
"'"'+
oO
"0
"'
If
1000
Feet
IJJ
(.J')
LL
0 200
ex:
I
0
0
-----
(._;
<:(
IJJ
<:(
\()
\()
-i
~
"
u
Q..
ll:)
;t
..
Q\
""~
"""
~@
ll:)
\()
ll:)
.,,
~
-+
r-
" "'o:i
u
Cl...
ii:
bi
a: .
.....
Q..
.,,
Vi
-I
~
w
'....,
.;:'
oO
""'
II)
r-
0
Q..
@
r
Q..
,b
;);.~
T STA. 601+86.0I
~©
....
w ...
"+ ...."
"'
\()
\.vc
"!'-
;._;
e: ~
l.u
:'5
\I)
"
~VI
\()
®
ic
~ .....
®
618+7! . 18
n
Ill
11'1
(J
Q..
.,,
:;:
""c "'
"~
-I
~
Pl ST
0\
c
CONST. 1595-E
POND APPLE
SLOUGH
1-595 (SR-862)
DAT E
DESCRIPTION
RE!IISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES1. FL 3313/f
305-445-L900
VENDOR NO. 6 50039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAliMAN, P.E. NO. 65729
STATE OF FLORIDA
DEPARTJlfE/VT OF TRANSPORTATION
ROAD NO.
9
COUNTY
SHEET
NO.
PROJECT LAYOUT
FTNANC/AL PROJECT ID
7
409354-2-52-01
BROWARD
mdoftl1ngueJ
7125/201 1
1 1:44:4.1 AM
t:\ pwworioing\l pa\ '1061 2527 \ Pl.AYRD _3C. U5ACE_05.ogn
I
0 20
100
Feet
n
L
--
ST A. 300+00.00
D
DATE
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
DESCRIPTION
8 EVJSIONS
DATE
DESCRIPTION
llililiill1
FILL IMPACTS
~
DREDGE IMPACTS
--
--
--
-
-
CONST. SR 9
(::<:<:<>!MITIGATION AREAS CREATED
STANIEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
DEPARTMENT OR TRANSPORTA,170N
COUNTY
9
ROADWAY PLAN
FINANCIAL PROJECT ID
8
409354-2-52-01
BROWARD
mdom1n9ue&
7/ 25/2017
t..\pwz
-----
0 20
JOO
Feet
WC(23A)
-----
-----------
--- ------
--
- - ----
~
- - - - - __,_,
-, Ir
1
-~
- - -- . -- --
--
---
-~-----.... -
.. .. .
'
'
'
·
'
·
~
I
·
'~
- - ---=- - -
'I
RETAIN TNG WALL
D
EXISTING JURISDICTLONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FOREST ED WETLAND
f!EVJS/ ONS
DATE
DESCRIPTION
DATE
DESCRIPTION
·
FILL IMPACTS
~
DREDGE IMPACTS
l::<:<:<:-.1MITIGATION
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 90 0
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
DEPA.RTMEJVT OR TRANSPORTATION
COUNTY
9
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
9
409354-2-52-01
moom1nquer
1r2s12011
1/ :<7:0 1 AM
!:\p'WtYo(~mg\,tf;a\d0612S2l\PUINRD_ PtR!lti_3C _USACE_-42..ogn
Zs
-----
0 20
100
Feet
--
EXIST. LA R/W UNE
-- --
--
WC(23A)
-:_:_~=--=- - -: . -~~, ----~-~~~~-= -
-
I
-
--- --WC{23A)
--- --- ---
40(8)
EXJST. ~A R/W LINE
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THE.R SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
\
'
DATE
DESCRIPTION
REVISJONS
DATE
DESCRIPTION
.....
-· MITIGATION
I
'
AREAS CREATED
!.
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFTCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA.TE OF FLORIDA
SHEET
NO,
DEPARTMENT OF TR.ANSPORTA TION
ROAD NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
10
409354-2·52-01
moarr11ngue,
7(25/2011
11:·8:28 AM
.c:\pwwo rhri9\tf;~\d06 J2 52"/\PUINR.O:_PERUn
_3C _US1,CE_ J.d!J1t
Za
-- - - -
0 20
100
Feet
END BRIDGE
ST A. 343+41.55
Cl CONST. SR 9
BEGIN BRIDGE
STA. 340+57.41
(j_ CONST. SR 9
39(S)
-
-
--
-
-
__ ==~=:;r:===~
y
~----
Cl
x-
I t;
-:---._.......---...-+-........~""=""'=-==-==-=-·2~
RAlif
lijtl -
EXI STING JURISDICTIONAL AREAS
M-MANGROVE
0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW -FORESTED WETLAND
·
~
----d-
-
-
END BRIDGE
BEGIN RETAINI NG
WALL
STA. 343+41.55
Cl CONST. SR 9
EXIST. LA R/ W LINE
D
E.JJTRA/IJCE _
FILL IMPACTS
LA R/ W LINE
DREDGE IMPACTS
!:<:<:<:<:!MITIGATION AREAS CREATED
DATE
DESCRIPTION
J!EVJSIDNS
D ATE
SHEET
N O.
DESCRIPTION
ROADWA Y PLAN
11
409354-2-52-01
BROWA RD
moorrunque F
7r25/2017
11 :50:0 l AM
C:\pW-----
0 20
100
Feet
--------------
EXIST. LA R! W LINE
4(S)
=Li,"
R
a-7
--
r-
"'I
l
··
/
3(S)
D
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
WC(19A)
ffiillIIIIl
Fl LL IMPACTS
~
DREDGE IMPACTS
EXIST. LA R/W LINE
1::.:::..::-:::·.1 MITIGATI ON AREAS CREATED
DATE
DESCRIPTION
8 EVJS/ONS
DATE
DESCRJPT/ON
STANIEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
S TA TB OF FLORW A
DEPARTMENT OH TRANSPORTA,170 N
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
12
409354-2-52-01
BROWARD
mdom1n9Uer
7(25/2017
1/ c51;3 1 AM
t. :\pw¥Yol'k'rng\rpa\d0612S2':1\PLAN.RD_ PERiiii_3C _USACE
3.d~n
Zz
-- - - -
0 20
100
Feet
END BRI DGE
WC(19A)
D
DATE
WC(19A)
EXISTING JURISOICTIONAL AREAS
· M-MANGROVE
O-OTHER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
DE'SCRIPT10N
REVISIONS
DATE
·
FILL IMPACTS
~
DREDGE IMPACTS
!::·::<:<:<:! MITIGATION AREAS CREATED
STANTEC
DESCRIPTION
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 657Z9
STA TE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
13
409354-2-52-01
m aom1 n9u~ ,
7125/ 2017
1/:53 :01 AM
l :\pWtYO(k'tflg\tpa\d0 612S2.1\PU.NP.D PER/Ali
3C _USACt- 4.dgn
Zs
---- -
0 20
100
Feet
EXIST LA
- = = R!WLiNE
---x---x---~-;<---~---...:---x
============
-------- - -
-
------·--a---~---x~A~
K---x---~~~-.
·
X
~
X
~
X
Y
M
___ - - - - - - = = = = = - - - - - - - - - - - - - - - -
·
~
-
S(S)
.>
-
-- ~,...-, - ~~
~~--~~~-
- -- -
~ - --- ,,,....../ . . . . .. ,-...;
. . ._:_ _....~
__
r
·
__ - . -
,. . . . . . __ -..r- ,.
--
D
DATE
EXISTING JURISDICTIONAL AREAS
· M- MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
DESCRIPTION
8EVJSIONS
DATE
DESCRIPTION
·
FILL IMPACTS
~
DRE DGE IMPACTS
l:<:<:-.:\J MITIGATION
AREAS CREATED
STANiEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
J)EPARTMENT OR TRANSPORTATION
ROAD NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
14
409354-2-52-01
BROWARD
tndom1n9ue&
7/ 25/2017
! :\pwwork'tng\r pa\d0611S2.1\PL/INRD_PE.RMJ r _3C_USACE_5.dgn
----
0 20
100
Feet
WC(17A)
---
-.u
G
7(S)
EXIST. LA
R/W LINE
WC(15A)
D
EXISTING JURISDICTIONAL AREAS
M -MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW~FORESTED WETLAND
FILL IMPACTS
DREDGE IMPACTS
[:<:<:<:m
DATE
DESCRIPTION
J!EVJSIONS
DATE
DESCRIPTION
AREAS CREATED
SHADING IMPACTS
STANTEC
901 PONCE DE L.EON BLVD
SUITE 900
CORAL GABLES, FL 3:3134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, ·P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT 01! TRANSPORTA170N
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
15
409354-2-52-01
BROWARD
moom1n9uer
7(25/2017
1/:5~:49
AM
l :\pw·w orlaflg\,tf;a\d0612S21\PUINRD_PtR!Ali _3C _lJSACE_6.dgn
-----
0 20
100
Feet
EXIST. LA R/W LINE
WC(17A}
NE5SR ~ (I-95)
-c.--
P CTLT
WC(15A)
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
EXTST. LA R!W LINE
·
FILL IMPACTS
~
DREDGE IMPACTS
1:.:::.:::.:::.:::1 MITIGATION
DATE
DE'SCRIPT10 N
R EVISIONS
DATE
DESCRIPTION
I
lo
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT OF T.RANSPORTATJ'ON
COUNTY
9
SHEET
NO.
ROADWA Y PLAN
FINANCIAL PROJECT ID
BROWARD
16
409354-2-52-01
maom1n9u~ ,
7125/ 2017
1/:57:12 AM
t :\pwt'York·1 ,.,g\,tf;a\d0612S21\Pl.JINRD_ PtR!Ali _3C _lJSACt_!.t1gn
--- - -
0 20
100
Feet
0
EXIST. LA
R!W LINE
D
EXISTING JURISDICTIONAL AREAS
~=~:~~:°s~~FACE
WATERS
S-SWALE
MF-MUDFLAT
ET LAND
FW-FORESTED W
·
FILL IMPACTS
~
DREDGE IMPACTS
k·::<:<:
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
AREAS CREATED
STANIEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 65003949300~3
FL CERT/FfCATfON N~·/-~b 65729
MD MUSHFIQUR RAHMAN, · ·
·
STATE OF FLORIDA.
SHEET
NO.
J)EPA.RTMENT OH TRANSPORTATION
ROAD N O.
9
COUNTY
ROADWA Y PLAN
FINANCIAL PROJECT ID
17
409354-2-52-01
BROWARD
mdoqunquez
7/25/2017
1/:58:39 AM
<.:\pWWotk·rngVpll\d0612S2.1\l?l./IN RD - PERMJr- 3C - USACE- 8 .dgn
-
-- -- -
0 20
100
feet
BEGIN BARRIER
WALL
ST A. 432+19.0J
END BARRIER WALL
CONNECT TO GUARDRAIL
ST A. 441+88.77
EX IST. LA R/ W LINE
0
a
-
-~
.
,.......
£S£:zl GL£
c:)
0
~
{
- 1
I
C't)
"""
~
I
V)
lJJ
<
......
-J·
:r:
l..J
I
~
~
,--
lJ
2(0J
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
PW-FORESTED WETLAND
IIIlII
~
FILL IMPACTS
DREDGE IMPACTS
I·<<<:<:·] MITIGATION
DATE
Df;SCRIPTION
flEVJSIONS
DATE
DESCRIPTION
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, PE NO. 65729
STATE OF FLORIDA
DEPARTMENT OF TRANS PORTA 170N
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
18
409354-2-52-01
BROWARD
maom1n9u~ ,
7i75i2017
71:59:!;1 AM
c:\pwwodarig\tpa\d0612S2.l \PU.NP.D PERJUT _JC_LJSACt 9.JJ~n
Zs
- - - --
0 20
-
100
Feet
-l
.:t
2.
<(
u
ex::
:::>
10(M)
Q..
V'\
0
......
9(5)
\
u
'
.... -"'
~-__,-
r
= t -_.:= -
8(8)
-l
~
<(
'"
~
I
WC(11A)
u
a:
~
Q..
V'\
D
DATE
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
D E'SCRIPT10N
1'EVISION5
DATE
DESCRIPTION
~
SHADE IMPACTS
·
FILL IMPACTS
~
DREDGE IMPACTS
l<>~:<:<:·I MITIGATION
....
0
I
u
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, PE NO. 65729
STATE OF FLORWA.
DEPARTMENT OR TRANSPORTA 170 1V
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
19
409354-2-52-01
BROWARD
m aom1n9u~ ,
l/75/20]7
/Z;Ol:l.8 PM
.c.:\pwworla rig\tpa\d0 612S2.l \Pl/INP.D_ PER/Ali _ 3C _USACt _1 O.dgn
-
-Z s
----
0 20
100
Feet
/
I
10($)
I
,,, I l
'
.: l
11($)
D
----
EXIST, LA H/W LINE
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL I MPACTS
~
DREDGE IMPACT S
l<>>>~:·I MITIGATION
DATE
·
Df;SCRIPT ION
flEVJSIONS
DATE
DESCRIPTION
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
DEPARTMENT OF T.RANSPOR1'A 170N
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
20
409354-2-52-01
BROWARD
maom1n9u~ ,
7i75i2017
c\pw.-todarig\tf;a\d0612S2.l\Pl.ANP.D_ PERJAJi _3C _LJSAC£'_ l .I .dgn
- - ---
0 20
100
Feet
.....
"'
~~
..."END BRIDGE
BEGIN RETAINING
STA. 480+21.55
Cl. CONST. SR 9
BEGIN BRIDGE
ST A. 478+03.59
Ci. CONST. SR 9
EX IST. LA
R!W LINE
ALL
EX IST. LA
R!W LINE
~
I.I)
~
.
----
-
· - > < r --
.
SOUTH RAMP EXIT
<;(
ti) - - - LU -
- - -
--=--~
------
- - - - -
- _- _- _-
- _- _ - _- _- _,
- _- _- _- _-
\
~ =-=~~--~=::_~=~----=NORTH RAMP EXIT
I
IJ -
~- -
--
-
-
D.
-
-:::::__
~~---::=:.---=;---===-
_!'--'
-
rr--=--...........__
-
~.
-
-
-
-
-
<;(
- · 1-
\/)
~
1
<:
-
- ~-:::--=:__
;;.;;,
-
\
'
I
...
= ....... ~
~
'
~ I\
L
~~~1sLN:
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
~
\\.\
~\
l'
, /
'{
FILL IMPACTS
~
-
~ - -
· · to1o._·
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0 -0THER SURFACE WATERS
·
- -
..;;:
-
--=--=-~ ...--...--~> ....:._,-=--=--=-~ ~dl
--==
'J.t./'='
~ _,j
ti
-
L - - - - - 1.lJ
~~- = -- _- _= ~ -=- ~~ - - -~ -- -~-~ -~ -~ _ - \l
1-
.
-.485 -
-
EXIST. LA
R/W LINE
~
d
DREDGE IMPACTS
-I~
I
I
!<<:<:<:·! MITIGATION AREAS CREATED
I
I
1
t1\
1
'
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
I
I
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
I I·
i>
11
II
STA TE OF FLORIDA
DEPARTMEJVT OH TRANSPORTATION
ROAD N O.
9
COUNTY
SHEET
NO.
ROADWA Y PLAN
FINANCIAL PROJECT ID
BROWARD
21
409354-2·52-01
mdom1nquer
7/25/2017
1,Z :CM:OO PM
!:\pWtYof~tl'lg\t(Jlf\d0612S27\PlAN.RD_ PERMtT
_3C _USACE_ _J 2 .o gn
Zz
- - Feet
-- -
0 20
100
END RETAINING WALL
ST A. 492+22.67
15(5)
EXIST. LA R / W LINE
j
-
·
,...
EXIST. LA R/W LINE
D
DATE
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
D E'SCRIPT10N
J!EVJSIONS
DATE
J
. -..J
END RETAINl NG
WALL WIDENING
STA. 490+65.96
·
FILL IMPACTS
~
DREDGE IMPACTS
t>>~:DESCRIPTION
-
\
1 5
4{ )
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT OR TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
22
409354-2-52-01
BROWARD
maom1n9ue,
1r2s12011
i.z:os:2a PM
l :\pW'tO(k'tflg\,tf;a\d0612S21\Pl.JINRD_ PtR!Al i - 3C USACE_.f 3.ogn
-----
0 20
100
Feet
...
:t
c
c:i
WC(8A)
~
15(S)
: ------
'Z .
·:"'
I
EXI ST. LA R/W LINE
::J
16(S)
16(S)
EX f ST. LA R/W LINE
WC(9A)
WC(9A)
D
.
EXISTING JURI SDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
[::..::<:<>l MITIGATION
DATE
D E'SCRIPT10N
J!EVJSIONS
DATE
AREAS CREATED
STANTEC
DESCRIPTION
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FL.ORlDA
DEPA RTMENT OR TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
23
409354-2 -52-01
BROWARD
maom1n9ue,
1r 2s12011
1.Z:06 ;52 PM
l :\pwtYork·mgVpa\d0612S2l\Pl.J\NRD_PtRMJi _3C _lJSAC£: J4 .qqn
- - Feet
---
0 20
100
WC(BA) ·
'
WC(BA)
~~~~~
-
~
-
:---!
------=------ ~~
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
j
DE'SCRIPT10N
REVISIONS
DATE
DESCRIPTION
-
-
-
l~cl.~~·~-<~·11~
"::f
~ '
LJ
-
Ex 1sr. LA RIW L f.!e
·
FILL IMPACTS
~
DREDGE IMPACTS
t<:<~<DATE
(
'
AREAS CREATED
STANTEC
901 PONCE DE L,EON BLVD
SUITE 900
CORAL GABLES. FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
24
409354-2-52-01
maom1n9u~ ,
7(25/2017
1.2:08:16 PM
c:\pwtYofk'trig\t{;a\d0612S2.l \PU.NP.D_PER/Ali _ 3C _US ACE 75 .dgn
EXIST. LA R/ W LINE
--- --
0 20
Feet
~ END BRIDGE
ST~
100
533+71.79
'*"
~ ~i.--..~..i.
a
a
ac:i
~
~-----='~
- a
_ _ _
~
a
--~- ------~-::=_--=-~--=--~------------ a
0
- ~~~~~~~~~.-r-~-=----r--=""--=--~~~
c1i
: ;
uoNsr:
sR
9:
~
~ l==========~~======~=========================:::;::::::;:~::;\i=======::;;:=======:;::t:;:i:!.:i=;t:::========================================================================::::;t:==================I ~
'
- 54()
~
- ~3()
535 ~
I
V)
_L _ _ _ _ _ _ _
= =-------
:r:
~ - -
- - -
- -
~
:S: - _ _ _ _ _
-
t/i
- .......
~
=
-.I
SR3J {I--g_5)
- - -\~-- ~- -~
_
:r:
- =~
~--
- :s:
---.___
-----------./
EXIST. LA RIW LINE
VIC(22A)
STA.
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
PW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
l:·::<<:<:i MITIGATION
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE L.EON BLVD
SUITE 900
CORAL GABLES, FL 3:3134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
AREAS CREATED
STATE OF FLORIDA
SHEET
NO.
DEP4.RTMEJVT OR TR.ANSPORTA,170 N
COUNTY
9
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
25
409354-2-52-01
moam1n9ueF
1r2s12011
1.Z:!J9:42 PM
l :\pw'tork·1,.,g\,tf;a\d0612S21\Pl.JINRD_ PtRMJi _3C _LJSACt_ J6 .dgn
_,-
-.." " - 4(M)
END BRIDGE
STA. 553+91.47
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
FILL IMPACTS
DREDGE IMPACTS
l:.:::·::<:<:j MITIGATION
DATE
D E'SCRIPT10 N
f!EVJSIONS
DATE
DESCRIPTION
I
I
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 3:113 4
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DE PA RTMENT OR TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWA Y PLAN
FINANCIAL PROJECT ID
BROWARD
26
409354-2-52-01
maom1n9ue,
7(25/2017
12:11:05 PM
l :\ W'tork·1,.,g\,tf;a\d0612S21\ Pl.JINRD PtRMtT 3C USACC 17.ogn
I
I
I
-----
0 20
Feet
I
I
I
I
I
1
\
EX IST. R!W
L-------
ui,ww
LINE~-----------
------ ----
- -
---
---
RJW LINE
-
E XIST.
~ ----
I
J
~EXIST
100
-----
~----=
----=JI._
::::
---- -
-
~ === ===
:::: - - - - .::::
---====- -:::::::-::::.. - =::= ~
- - -
--
---::::::..-:::=--
:::::..
:::::
~----~==
-~-
:::: =:::::- - -::
-_:::::::-::::=
_Q
-
-
"
LINE
---.-.....------
!~XIS~.· l.A R/W LINE
~_,~ -~?~-\_~
WC (5A)
EXIST. RIW LINE
-
____-_------ '
-
-
19($)
-----
D.
EXISTING JURISDICTI ONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
1::<:<:<:.'.:I MITIGATION
DATE
DE'SCRIPT10N
REVISIONS
DATE
DESCRIPTION
-
li
AREAS CREATED
STANTEC
901 PONCE DE l,EON BL,VD
SUITE 9 00
CORAL GABLES, FL 33134
305·445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FL.ORWA
DEPARTMENT OF TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWA Y PLAN
FINANCIAL PROJECT ID
27
409354-2·52·01
BROWARD
maom1n9u~ ,
7(25/ 2017
1.Z:11:30 PM
l :\pW'tO(k'tflg\,tf;a\d0612S21\Pl.JINRD_ PtRMJi- 3C _IJSACE_ ] 8 .ogl'J
-~- - -----
-----------
-- - - .... . ... . · · · ·-·-· - ··
I
.
WC(21A - - -
-
--
-
--
-
D
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
O· OTHER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
[::-:::.:::.:::.::1MITIGATION
DATE
DE'SCRIPTION
J!EVJSIONS
DATE
DESCRIPTION
--:--.-
,.,_
- - - - - - - ..._..
- --=
AREAS CREATED
STANTEC
901 PONCE DE L.EON BL.VD
SUITE 9 00
CORAL. GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
DEPA.RTMEJVT OR TRANSPORTATJ'ON
COUNTY
9
ROADWA Y PLAN
FINANCIAL PROJECT ID
28
409354-2-52-01
BROWARD
moom1nquer
1r2s12011
1.2:13756 PM
l :\pW'tO(k'tflg\,tf;a\d0612 S21\Pl.JINRD_PtRMJi- 3C _lJSACt_J9 .4gn
.- ___.,__ __
~
....
729 0
- --
...-.
....
D
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
· 0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
=
\
·
FILL IMPACTS
~
DREDGE IMPACTS
r....::<:<:--1
MITIGATION AREAS CREATED
DATE
DESCRIPTION
REVJS/ONS
DATE.
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
DEPARTMRJVT OR TRANS PORTA TlON
ROAD NO,
9
COUNTY
SHEET
NO,
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
29
-109354-2-52-01
moamrngue,
7/25/2017
JZ: /5:21 PM
t:\pwworiarig\r{J~\d0612,52l\PLANF\D_l'ERUll
_3C _USACE_20.tign
__
MATCH SHE.Er No
~
)
...
~·-.:...:::.
EXIST/ LA
R!W LINE
0
0
0
-..
-I
\
~
\
\ ~
·
"\
-0
-
.,_'\
.
-~
'l
I
'
\l
~--__......--------~
L
: NB SR 9
--- - ~-- - ~
----~ =- ,.;:; :
--
DATE
DESCRIPTION
- -
~-
~.\
REVJS/ONS
DATE
ll95L
25]5
DESCRIPTION
STANTEC
901 PONCE OE L.EON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
S TA TE OF FLORIDA
-·
--- --
-
-
- _,
--
SHEET
NO,
DEPARTMENT OR TR.ANS PORTA TION
ROAD NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
30
409354-2-52-01
BROWARD
mctom1ngi..1er
l/25/2017
12:16746 PM
c:\pwworktn9\t p~\d0612.S2-,\Pl.ANRO_PER!All _3C _USACE_21 .d,gn
~~-l-~~--1~--=
-----/'
·. ·
..
...,,.
I
)
/
I
(
\
\
"-
0
0
c:i
0
+
!"\J
......
I I
- .J
;:r:
f-
~
~
V)
,I
L!.J
<:
! I
....J
l
I
I'
I I
I'
(.J
f-
I I
I''
I
lJJ
2:
~
I I
.,._ __ II
I
I
I I
J::
(.J
f
I
~
~
1
)
I
''
Zs
- - -- -
I
0 20
I
I I
Feet
I I
I I
I I
"'l
--
.,.-
I I
II
I I
·
FILL IMPACTS
~
I
\
DREDGE IMPACTS
~MITIGATION
~CREATED
I
I I
- " I
AREAS
I
,I
I I
I I
I
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
I
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
J)EPA.RTMENT OF TRANSPORTA.TIQN
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
31
409354-2-52-01
BROWARD
mdoqunquez
7/25/2017
12:18:10 PM
! :\pWWotkff'lg\tpa\d061ZS2.1\J?lANRD _PERUJT _3<; _USACE_.2.IA:d9l't
\
I I
I
I
~
-\ \
J'
I
11
I I
I
I I
ll
I
I
11
I
I
I
I
I
I
I
I
I
~\
_Jj
I
'I
__,
~'\
·
EXISTING
JURISDICTIONAL
AREAS
o
~
LJ
DREDGE IMPACTS
MITIGATION AREAS
CREATED
\
DESCRIPTION
REVISIONS
DATE
I
I I
1 '
I I
I
I
~
I I
\
I
I
I
I
I I I
I
I
l'~I
I i
D
I
I I I
I I I
~
'
I I I
I
I I I
\
~
I
I
I
I
I
I
JI
I
I
I
I
'II I
I I I I
I
I I I I
\\
II
\
II
II
II
II
II
DESCRIPTION
I
\
\
I I I
I
11
I
1I
I l I I
I I I ! 1
1~
I
I
11
I
I
I
I
I
I
I
r
)
\..._..I
Qo
I
I
I
I
1 I
~ 11 I
EXrST/ LA
R/W LINE
I
1
\\
\\
I\
Feet
I
r
l(
II
DATE
I
I
I
I
I
I
I
I
I
I
M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
SFC-SWALE WITH FORESTED
COMPONENT
FW-FORESTED WETLAND
FILL IMPACTS
I
I I
100
----
l
I
C> I
·
I
Zs
0 20
I,
- EXIST/ LA
R/W LINE
D
II
I
:I
I
I
I
I
I I
\I
t I
. d,
I I
\\
I
1
I
I
I
\l
1
lPi
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
SHEET
NO.
J)EPA.RTMENT OH TRANSPORTATION
ROAO NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
32
409354-2 -52-01
BROWARD
mdoqu ngUez
7/25/ 2017
1,2 :19:33 PM
t.:\pwworh ngVpa\d0612S2.1\l?L/INRD_PE.Rf,fJT~3<; _USACt_2 18.dgn
Zs
-----
0 20
JOO
Feet
I
---- - - - ---
I
~
~-
CE RAMP
---
--~.-=------=----------
13Z5
1-ffS
~5
-~
=253{] - -
__
_...
--
----- ----
~--
EXIST. LA
RI W LINE
DA T E
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANiEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-4452900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
DEPARTMENT OH TRANSPORTATION
COUNTY
9
BROWARD
NO.
ROADWAY PLAN
F INANCIAL PROJECT ID
33
409354-2-52-01
7/ 25/ 2017
1,Z:20 :57 PM
f. :\pwffot'kt ng\rpa\ d0612S27\P!/INRD_ PE.RMIT _JC_ USACE_2 2 4 gn
Zz
- - --
0 20
100
Feet
'-----
~~=========================:--~I
(f--
~-----
....__.
A.
, _ j '-(_
.__,.
~"-"'-...- A,J-r
D
EXIST. LA R/W LJNE
EXIST.
DESCRIPTION
REVISIONS
DATE
EXJS~ LA R!W L1'N~
I..
;..J
A
-'
EX /STING JUFjt SDTCTIONAL AREAS
M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW -FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
EXIST. R/W LINE
R/W LINE
DATE
---
-----~~--
1::.:::.::..::..::1 MITIGATION
DESCRIPTION
STANIEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATTON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
AREAS CREATED
STA TE OF FLORIDA
SHEET
NO.
DEPARTMENT OH TRANSPORTATION
COUNTY
9
ROADWAY PLAN
FINANCIAL PROJECT ID
34
409354-2-52-01
BROWARD
mdom1n9Uer
7/25/2017
J,Z :22;2 l .PM
! :\pWtYofk'rng\rpa\d0612S2':1\P!ANRD_ PERMti_3C _USACE_23.ogn
Zz
--- --
0 20
JOO
Feet
.-______
-
I f
__,./
/
)\
__.., 0....__l
-J
0
SOUTH FORK NEW RIVER
[
---
56($)
---------
j
D
lIII1l1
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
~
FILL IMPACTS
DREDGE IMPACTS
(:·-':.<:<:<:!MITIGATION AREAS CREATED
DATE
DESCRIPTION
8 EVJS/ONS
DATE
DESCRIPTION
STANIEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFfQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
DEPARTMENT OH TRANSPORTATION
COUNTY
9
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
35
409354·2·52·01
mdom1n9ue&
7/25/2017
1.2 :2]:<9 PM
t.:\pwZa
-- ---
0 20
100
Feet
SOUTH FORK NEW RIVER
I
==========,: ~~---~~~~~~:~~~:;~~-~~~-~-:~~-~:_======================-a ===================
---= =:.=:-::.::::..:-..=:-::..:::::..=--::...-:::_::.....---==-.=.=
- o0
:::..:-,:::.~ ~.;;_::.;: ::..._--=.._-_.= ;:.::...:;.,..-:..;:- --:-:__::::;_::..:::_ ::..=:--=-:-~~.:::;:-:~ .:::..::--=-:-~ ~
g
-I
~
- 136"5
l.C
iilillh=========='==========='==========='=========='=?"?";======~==========:!:============1 ~
~ ....
E:~~~~~~~~~~~~~~--E~~~~~~
__________________________
_..____________..,.______
~
----
~·
1
l/)
.....
-J
I[ CoNST. :}R 9
17(0)
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0 -0THER SURFACE WATERS
5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
}<_
l:<:<:<:DATE
D E'SCRIPT10N
REVISIONS
DATE
DESCRIPTION
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFTCATTON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 657Z9
STA TE OF FLORIDA.
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
36
409354-2-52-01
m aom1n9u~ ,
1ns12011
12.;2Sc12 PM
t :\pwtYofk't ri g\tf;a\d0 6 12S2.l\Pl.ANP.D_PER/Ali _3C _USACE_2 5.o gn
Zs
- ----
0 20
100
Feet
/
----=================
~/======!-============================---
--------================-·
EXIST. LA R/W .LINE
l(
.,
(_
D
DATE
.
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0 -0THER SURFACE WATERS
5 -SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
·
--:::::::-...
-~(_,__· " '-.".: '.
FILL IMPACTS
80(5)
~
DREDGE IMPACTS
!:<:<:<:<:I MITIGATION
AREAS CREATED
STAN1EC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
SHEET
NO.
J)EPA.RTMENT OH TRANSPORTATION
ROAD N O.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
37
409354-2-52-01
BROWARD
mdoqunquez
7/25/2017
1,Z ;26 ;3 6 .PM
_3,_
t.:\pwwofhngVpa\d0612S2.1\l?L/INRD_ PE.RMJT
USACE_26.dgn
D
·
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
.. - } t - - y ._ _: : < _
-
x.-:ic..
Zs
FILL IMPACTS
1
----
I
0 20
i:<:.<:<:<:·I MITIGATION
~
AREAS CREATED
-
I
Feet
\
DREDGE IMPACTS
-
_ _....- - : x
6' PAVED SHLDR.
~ 1--.---~-+,..----;;-----------+-----_-__-_-_- __-_~::_-_ __-_-_ _ _ _ _ __
<:t:
C
=- = _:::__.:= - __:::::__:::::_::= -L:::; - :=
~:::
.=~.:::::
=
-t...,...r+~1111·~..i.....u.-1
~
------
81($)
---(i)
-.- ------
80(S)
DATE
DESCRIPTION
- ----=--
EXIST. LA R!W UNE
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHF!QUR RAHMAN, P.E. NO. 65729
,.,.
STA TB OF FLORIDA
DBPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
38
409354-2 -52-01
BROWARD
mdom;ngue~
7/25/2017
J2:28:0 3 .PM
c:\pwwol'lang\tpa\d06J252.7\PLANRD_ PER/.fJT _3<;_USACE 27.d(Jn
~
-r
1\1
.D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
---"5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
~---EXIST. LINE~-"---R/W
-
-
><-~- ·-)(--=-;{
EXIST. LA
~-~-'->--~!!
~- <-'><
,._-v
;= - ,.-== T ...=..
... ...
J~>>J_MlTlGATTONAREASCR~ATED ====~
\!':~----=-=-:::- - ><"~o..-
-
---;-·--::t--X--'
...- -
,.
R/W LINE
~ _;-- .= ::r
100
Feet
DREDGE IMPACTS
..
HI
'"
---- -
0 20
____ _ _ _
-
Za
FILL IMPACTS
=
=
1
f
.,.
'¢ · · 1 '"$
llf;; "! tf F,
}
'f
41
:
=
-.L..
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATTON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLOR.IDA
DEPARTMENT OP TRANSPORTA770N
R04D NO.
9
COUNTY
BROWARD
SHEET
NO,
ROADWAY PLAN
FINANCIAL PROJECT ID
39
409354-2-52-01
7/25/2017
12;29~ 5 PM
c:\pwwotkl ng\tpa\d061152!\P£ANRD_ PER!Atr_.3~ _USACE_28.dgn
Zz
-----
0 20
JOO
Feet
--=-
/
'
'
EX IST. LA R/W LINE
D
DATE
EXI STING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
·
FILL IMPACTS
~
DREDGE I MPACTS
i::.:::.::<:AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATTON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLOR.IDA
DEPARTMENT OP TRANSPORTA770N
ROl\D NO.
9
COUNTY
BROWARD
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
40
409354-2-52-01
7/ 25/2017
12:30:49 PM
c:\pwwot'kmg\rpa\d06 J2527\Pl.AA'RD_ PERM J'T_ 3C _USACE_29.dgn
UJ
-
<
.....,
=
FJB Slf_ 9 (l-95)
-.I
- ... -,,
I
w
=
.
.
,
~
-
·
'"
J
I
.,
'H
'
"
REVISIONS
DATE
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
STANTEC
DESCRIPTION
"'
1
-~
:;.,.,--~,,,,
-~LA R/W LINE
D
DESCRIPTION
- ::r:
L>
86(5) ~
,.,
EXIST. LA R/W LINE
DATE
·
wa=
·~
;4
Ll.J
<
- ::.;
- ...,
;a
'
-
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFfCATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
·
FILL IMPACTS
~
DREDGE IMPACTS
CJ
9
COUNTY
'"\.
MITIGATION AREAS CREATED
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTA770N
ROAD NO.
'":.....
, -
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
41
409354-2-52-01
BROWARD
fl'ldom1ng1.1e£
7125/2017
12 .32.12 PM
t:. \pwwor'krng\t pa\d0611521\PlAN RD_ PERIAJT _3~ _USACE_30.dgt'J
-
'.._/
~--
=
144tr
""~·
----- -------- ----- - - - - - ()
Nf!' SR
-g
..
=
{/-!}))
-
0
- ~
--~--------
--------------
_ _ _ _ _ _ _ _ _ _.x__ _ _ _ _ _ _ _
-~
~-
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL IMPACTS
~
DREDGE IMPACTS
l:<:<:<:<:IMITIGATION
EXIST. LA R/W LINE
AREAS CREATED
90(S)
I I
lII
1
~.
::
DA T E
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9 723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
I I
I I
S TA TE OF FLORIDA
DBPARTMENT OF TRANSPORTA170 N
ROAD NO.
9
COUNTY
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
42
4093 54-2·52·01
mdom;ngueL
7/25/2017
12:33:38 P M
c:\pwwor'lang\lptr\d06J 2S27
. \Pl/INRD_ PER/.flT _3<;_USACE_.).1.dgn
ex:
I
~\
Ci: I
S: l
~ \
EXIST LA
END CONSTRUCTION
ST A. 760+22.JO
([ CONST. SR 9
----
0 20
100
Feet
\
\
...._
::c:------
RIW LINE
~
I
--
--
-
-
-=
a
a
c:i
a
;t
\C
"
1'
~
I
I.I)
LlJ
-
I
I
- - - ---
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
c--~--.t1
---.x_
lllIII1
,..
I
==-::::rru=0
~
,~
'~/ l~r
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
FILL IMPACTS
DREDGE IMPACTS
1::<:<:<:··1MITIGATION
AREAS CREATED
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
<
-.
-.I
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
43
409354-2 -52-01
BROWARD
mdommguez
7/25/2017
12:35:04 .PM
c:\pwwol'iang\lptr\d0612S2.1\l?l/INRD_ PERUJT _3<;_USACE _3 2 .dgtJ
EXIST, LA R/ W LINE
--
---------------
- - - - - - -
- - - - - - ---==--::::..·--·-
---
,- ______ _
Feet
'"- - --
~-----
---------------------
========-=======
_ _ _ _ _ _ _ --,,L- ,.,..
__
- =--=-=-~------------
----~~--
-------
E XI ST. LA
R/W LINE
l-595 (SR-862)
DATE
;4 TE OF FLORIDA.
0f;SCRIPT1DN
SHEET
NO.
ST. OR T.RA,1\ 'rsPOR TA1701V
DEPARTMENT
COUNTY
MD
9
FINANCIAL PROJECT ID
ROADWAY PLAN
44
409354-2-52·01
BROWARD
maom1n9u~ ,
7(25/2017
1.Z :3fi:30 PM
l \Pl.ANP.D_ PER/Ali - 3C_IJSACE_3/l..JJgfl
! :\pW'YOr "''"'trig\t"'a\d0612S2.
f"
" "-------
- EX IST. R!W L/NE J
--- --- ----
-:::::-
~~"\'-" J
}
.
~
·-·-·1-.
~R
84
-·
"
- --~
-------
~~-
=~='.'-;w:;:;;~......,==~
~-~=====;;;j
-==- - - 0- - - -
\=-----
---.:::
20 100
wa--
.,,
Feet
~--- -
-
·---·=.:;.:;;-==--=-- :e-=-
;;;·· ~:.;..~:?:r. '.< ~·:::!_·-:_-:.:.,,~. --_-::~~--.--:·: ~----_--_-_-_-_-_-_·-~~--~_::·_-~-_-_-_--_-;__:_-.~--~--~-;--_~- - - -~~--T
_:=a=~~..-;:::-;;;:;:.------·-
-
--
-:-:
- --
EXIST. LA
R/W LINE
a
a
EXJST. LA
R/W LINE
SHADED IMPACTS
D
EXISTING JURI SDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
FILL IMPACTS
DREDGE IMPACTS
l::<\ :<:AREAS CREATED
l-595
DATE
D E'SCRIPT10N
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE L.EON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT OF T.RANSPORTATl'ON
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
45
409354-2-52-01
maom1n9u~ ,
7/25/2017
JZ;3 7:37 PM
C:\pw·' todaflg\tpa\d0612S2.l \ Pl.ANP.D_PER/Ali _3C _lJSACE_35.dgn
~~i
// \\
I
=-::;;::----
~
- -
-
-
-
r
\
-
:J
LI~~ '
- - _
_ __ - O
_
/
~~- - - - - _,,,,. ,~
- -_-_-=-=--- ~
- - - - - - - -
-----~
--~~...:::----~:
- - ::::::::-....._=~-~--==
~.:ft
----.. . . .
----
- ---------.
~
J
- 11____
-------
_""i1 _ _ _ _ _ _ _ _ _ _ _ ::::=.=-==-
- - - - - - - - __ __=:._ - - - _
XIST, R/W
- ---
.) E)~.
0
0 O~... r'"'·
~r_,,----,~-;..._~.;::__......,.______________....!r:-.1:; )__r ~
---
SR 84 WB
MARINA
r-----
1
J
I
--
SR 84 EB
, ::::-=-= - -
--
--
Feet )
-
-
-
....;:::a
BLVD_-::~~~::,,,~~~~-~-~~~-~~-1
~-
--
~~~·J!&JL -
------
~
-==----=--=------- - - -- -------
=:::::=~.,_e
_ __ - - - - - -
20
-
-
A CCESSROAD
--
-
-
- -
-
-
--
- EX /SL
R/W LINE
--
-
-
---
-
31A(FW)
POND APPLE SLOUGH
EXIST. LA R/W LINE
m
SHADE IMPACTS
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
·
FILL lMPACTS
~
DREDGE IMPACTS
TEMPORARY
FILL IMPACTS
!::<:<:<:
DATE
DE'SCRIPT10N
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305·445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, PE NO. 65729
1-5 95 ( SR-862)
STATE OF FLORIDA
DEPARTMENT OF T.RANSPOR1'A 170N
COUNTY
9
FINANCIAL PROJECT ID
SHEET
NO.
ROADWAY PLAN
46
409354-2-52-01
BROWARD
maom1n9u~ ,
12·3 8 :45 PM
.c.:\pwwork'trig\tpa\d0612S2.l \Pl.ANP.D_PER/Ali _3C _USACE _3 6 .dgn
___
0
~· ·,
v,26:= '\' · '~.::ie;J
-- - -
Feet
---- - - - - - - - ; R84WB
--·-
---
(
EXJST. LA R/ W LINE
2a G.s9s :
~
~~~~~~~~~;-~~~;;-;;
) , - -~~~;-~~~~~~
- { CON ST. 1-595 EB
~
1
-
)
/~
"--~;~srrv_____/
~E /
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
5-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
TEMPORARY
FILL IMPACTS
DATE
DESCRIPTION
REVISIONS
DATE
m
II
~
SHADE IMPACTS
/
FILL IMPACTS
DREDGE IMPACTS
1~:<>~:<:<1 MITIGATION
DESCRIPTION
AREAS CREATED
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 3:3134
305-445-2900
VENDOR NO. 650039493001
FL CERT/FfCATfON NO. C-9723
MD MUSHFJQUR RAHMAN, P.E. NO. 65729
1-595 (SR-862)
STA TE OF FLORIDA
SHEET
NO.
DEPARTMENT OR TRANS PORTA Tl'ON
ROAD NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
47
409354-2-52-01
BROWARD
mdom11iqUer
7/25/2017
J,Z :J9:S<1 PM
! :\pWtYofk'rng\r pa\d0612S2':1\P!ANRD_PERMli_3C _USACE_37.dgn
.L*.--
-----
-.;
0 20
,,_..,.,c
100
Feet
E XIST. R/W LINE
I
./
........
...
I
I
.\
r--,
rl " I
)
II
'I
I.
d
/I
l
I
'\
\
'\
'
\
fl
/ff '
"
I
~
,f
-/
I
I
I
,
I
') I
,, /
II/
/,
I
EXIST. LA
R/ W LINE
\\
\,
\\
7(0)
\\
- -- -
::::----- --- --
- -
--~
1-595 (SR-862)
DATE
DE'SCRIPT10 N
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERT IFfCATfON NO. C-9723
MD MUSHFIOUR RAHMAN, P.E. NO. 65729
STA TE OF FLORIDA
DE PA RTM ENT OR TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
BROWARD
48
409354-2-52-01
maom1n9ue,
7(25/2017
1.Z:4 J:2 l PM
! :\pw·work·1,.,9\tpa\d0612S2.l \ PU.NP.D_ PERJAJi _3C _USACE_38.r/gn
D
EXISTING JURISDICTIONAL AREAS
M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
PROPOSED DREDGING
.~
·
~
SHADE IMPACTS
- -- - -
0 20
FILL IMPACTS
DREDGE IMPACTS
'·
(
I
I
100
Feet
I~
I
7(0)
0
0
c:)
0
rt .
-
· · · -.· · · -tr · ·· ·,,. · · · ~
r--..
l'Y)
--t
t)
LU
<:
.._
-.J
J::
~
<:t:
-
~
-
----
(
--- --
30(5)
I
I
I
I
I
\\
I
I
\
\
I-595 (SR-862)
DATE
DE'SCRIPTION
R EVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 3i31.34
305·445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9123
/\1D /\1LJSHFIOUR RAHMAN, P.E. NO. 65729
STArB OF FLORIDA
SHEET
NO,
DEPJlRTbf.E.NT OF TRANSPORTA Tl'OJV
ROAD NO.
9
COUNTY
ROADWAY PLAN
FINANCIAL PROJECT ID
49
409354-2 -52-01
BROWARD
nldarr11ngu~ ,
7/75/2017
JZ:42:4Z PM
t :\owwodarJg\r-pa\d0612.5Zl\PLANR.D_PE.RMn _3C _USACE _39.dgn
--- --
MATCH SHEET No. 49
-- - --
0 20
100
Feet
WC(3A)
D
EXISTING JURJSDI CTIONAL AREAS
·
· M-MANGROVE
0 -0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
~
FILL IMPACTS
DREDGE IMPACTS
l:<:<:<:AREAS CREATED
1-595 (SR-862 )
DATE
Df;SCRIPTION
flEVJSIONS
DATE
DESCRIPTION
srANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFTCATTON NO. C-9723
MD MUSHFIQUR RAHMAN, PE NO. 65729
STA TE OF FLORWA.
DEPARTMENT OR TRANSPORTA 170 1V
COUNTY
9
SHEET
NO.
ROADWAY PLAN
FINANCIAL PROJECT ID
50
409354-2 -52-01
BROWARD
maom1n9u~ ,
l /75/20 ]7
/Z.:· 4 :0 Z PM
c\pwwork'trig\tf;a\rJ0612S2.l \Pl/IN P.D_ PERMJi _JC_USACt_39A.dgt'I
D.
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
5 -SWALE
MF-MUDFLAT
FW~FORESTED WETLAND
FILL IMPACTS
DREDGE IMPACT ·
---- -
0 20
JOO
1' I
-
ltJ
<
- .J
CONST. T-595 EB
I
1-595 (SR-862)
DATE
Dt;SCRIPT'ION
J!EVJSIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFTCATTON NO. C-9723
MD MUSHFIQUR RAHMAN, ·P.E. NO. 65729
STA TE OF FLORIDA
DEPARTMENT OR TRANSPORTATION
COUNTY
9
SHEET
NO.
ROADWA Y PLAN
FINANCIAL PROJECT ID
BROWARD
51
409354-2-52-01
maom1n9ue,
7(25/2017
l :\pWtYO(k'tflg\,r-pa\d0612S2l\Pl.J\NRD_ PtR!Ali- 3C _lJSACE- -4D~dgn
\
\
WC(3A)
GOVQTRLINE
- -- - -
0 20
100
Feet
D
EXISTING JURISDICTIONAL AREAS
· M-MANGROVE
0-0THER SURFACE WATERS
S-SWALE
MF-MUDFLAT
FW-FORESTED WETLAND
Ill
~
' ..
\
\
\
' .. \ '
l
\
DREDGE IMPACTS
. MITIGATION
. ...
..
·
'
FILL IMPACTS
AREAS CREATED
1-5 95 (SR-862)
f{EVISIONS
DATE
DE'SCRIPTION
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFTCATTON NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 657Z9
STA TE OF FLORIDA
DEPARTMENT OF T.RANSPOR1'A 170N
ROAD NO.
9
COUNTY
FINANCIAL PROJECT ID
SHEET
NO.
ROADWA Y PLAN
52
409354-2-52-01
BROWARD
maom1n9u~ ,
12.;46:)4 PAf
.c.:\pwWofk'trig\tpa\d0612S2.l \Pl.ANP.D_PERJAJi _3C _USACt_-40/ld(}l'I
-1
MARINA BLVD.
EXIST.LAR/WLINE .1'.0T.. STA.,-IOIJ+00.00
0
EXIST. LA R/W LINE
TEMP. HAUL ROAD
CONST. 1-695 WB
CONST. l-595 WB
N 88'
345
4' 44· E
CONST. 1-695 EB
POT STA. 103+96.52
EXIST. LA R/W LINIO
EXIST. LA R/W LINE
POND APPLE SLOUGH
\_EXIST. TREE Liiiie
RESTORED TO GRADE WI PLANTING
(POND APPLE, BUTTONWOOD)
~RESTORED
TO GRADE WI PLANTING
~(POND APPLE. BUTTONWOOD
& BLACK
MANGROVES)
~
-----
0
40
~
100
RESTORED TO GRADE WI PLANTING
(RED MANGROVES & BLACK MANGROVES)
~ RESTORED TO
Feet
GRADE NO PLANTING
1-595 (SR-862)
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305·445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
SHEET
NO.
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
RESTORATJION PLAN
FINANCIAL PROJECT ID
1
4093S4-2-52-01
BROWARD
Vl'OSdS
7/27/2017
5 :2 1:45 PM
c:\pwworki ng\tp.:t\d 1017565\PlANRD _POND_ APPLE_3C_0 l .dg()
30
30
20
20
10
10
ROL ND
,, / L f RO~OSt 0tf( f-lrr
(7,,
-
/
1ll5
-
01nn, l..Lf 1n
I
1- r
I
/
OJ, 31
-- -I
-
I
/
~-
1 rin _,_, 11n
--
11.L.~u
I/ I
- -- - --
0 . "9-~
1 LE\ AT/ PN 1.00
r-
- J _ L
-
-
-
- -
-·
-
1 17
-
..LI
--
'n
0. 'Ol
-· . fl
Tl
)1 l
.....
--l
...., . . .rr -r _
I
-
'!""
'1 i--.-,-~
__ _fl..__
I[
, .c_ "4
. ..:i,?l;j
-10
-10
- 20
-20
-30
-30
- 40
-40
JET AIL
:-( L
l ~ I Ill,.,
-50
1000 oq.01
01 11 oq.01 1
01112 oq.01 1
01 13 Ol .01
01114 Ol .01
REVTSTONS
'JP.
I:
J< ~<.H/I'
u·v
u~·c
L.IL. ...::111,, .
n
'I · u n
01 15 oq.01 1
01 16 oq.01 1
01 17, Ol .01
a, Q( .oq
01 1
I
01 19 Q( .01
0 0 Q( .011
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
Vr0$ cl'.S
0 ], 0( .011
0 2, Ol .01
~ ~F
.
'i ~
·
0 3, 0( .01
-50
OJ4i 00.00
SHEET
TYPXCAL TEMP. ROAD
EXXSTXNG PROFXLE NORTH
7/27/Z017
5:22:13 P/4
NO.
2
c:\pwworkrng\lpa\d 1077565\PROFRD01 _3C_POND_APPLE _2 _ 11_EXISTING_PROF llE.dgn
30
30
20
20
JO
JO
,,- PR1
·
O?nn, 1....t.f In! -
I
v
l·jf
0 . '9
-
I
--
-
....,/
?nn
J.../
11n ,
v
' 'I
I
L.L 4
- 4-&L
~ -
PO' ED
£1:
/
-
/
1
Q
;llk
~cig~~
EL EV.I TION 0. JO -
\
-(
lh
/
I
--
i\
.2 4
--I
-
-
-
?n1
,_,_, in
---
/
-J
r
--
-\
- ,_ _
0. 1>2< 5
--
I
_,_
---
0
-
1:l 10
_ ..L _ --
-- ~
---,
'
.o. 0
-10
-10
- 20
-20
-30
-30
- 40
-40
IJ)E
Ttl1L.
-]~ -:2 . .
c'
A
Cf
·
~
~
-1
~
"11
.. J
- 50
-50
2000 oq.01
JOI l]. oq.01
JOI112 oq.01
1
JOI 13 oc .01
JOI114. oc .0(
REVlSlONS
'.IA
C
Jc. Sl..tfll'
u1v
u~·c
L..IL.J\,on
'I
I U l 'I
JOI 15 oq.01
1
JO( 16 oq.01
1
JO( 17, oc .0(
JO( 18, 0( .oq
JO( 19 0( 1.01
JO 0 oq.01
1
STATE OF FLORIDA
DEPARTMENT OP TRANSPORTATION
ROAD NO.
COUNTY
FINANCIAL PROJECT TD
Vr0$ cl'.S
t
JO J, 0( .011
JO 2, oc .01
JO 3, oc .01
JOJ 41 00.00
SHEET
TYPXCAL TEMP. ROAD
EXXSTXNG PROFXLE SOUTH
7/27/201 1
5:22:22 P!4
NO.
3
c:\pw workrng\tpa\d 1071565\PROFRD0 1_3C _POND_APPLE _2 _ 13_EXISTI NG_PROF ll E.dgn
7'-0"
7'-0"
24.5'
CONSTRUCTION ACCESS
4.5'
PROP .
DRILLED
SHAFT
EL. 3.50
TE MPORARY
FILL
4 .0
EL. 0.00
2.0
o . o ~~~~~~----:1~~~~~r-~-r-~~~~~~=7-=~~~:..::..=~=-=-==-=7-=~=r~~~~~~-=--~~~---
------
-2.0
-4.0
EXIST.
ELEVATION
(VARIES)
MUCK
REMOVAL
L. -4.00
TYPICAL CROSS SECTION
TEMPORARY ACCESS ROAD
& SJ
IZ :a
TEMP . FILL
NORTH ENO
MUCK REMOVAL AND TEMP . FILL
NOTE.· NOT TO SCALE
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 3313 4
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFJQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
DEPARTJlfE/llT OP TRANSPORT ATION
ROAD NO.
9
TYPXCAL CROSS SECTXON
TEMP ACCESS ROAD
FTNANC/AL PROJECT ID
COUNTY
BROWARD
409354-2-52-01
vro,s.as
7/27/2011
5:22:34 PH
t :\pwworioing\t pa\ d I 07 7565\TYPDRD03C.DGN
SHEET
NO.
4
30
30
20
20
WE)T
T~1~r uND OF
m~1~rnu 1---+--+--l-l-l--J--+--J--1--1--t--J--J--r-1---+--+--l-l-l--J--+--J--1--1--t--J--J--r-1---+--+--l-l-l--J--+--J--1--1--t--J--J--r-1---+--+--l-l-l--J--+--J--1--1--t--J--J--r-1--t
*
A
~
S'*"'
1 ETIND,_..,,iO~I
T Mf OR~ 1RY WAb
10
~
-10
-20
g -10
- 20
1 ~+--J--+---l--l--l--l--+--l--l-+-+-+---l--l--l---+--+--l--l--+-+--l____,l-l-+-+-+---l--l--l---+--+--l--l-~--+--l____,l-l-+-+-+---l--l--l---+--+--l--l--+--+--l____,l-l-1~+-+---1--1--l---+--+--l--l--+--+--l____,-I
-30
-30
-40
-40
Jt~T AIL
-50
l- - - - + - l - - < - - l -l- - - - + - ! - - < - - l -l- - - - + - ! - - < - - l -l- - - - + - ! - - < - - l -l- - - - + - ! - - < - - l -1- - - - + - ! - - < - - l -l- l - - ! - - < - - l -l- l - - ! - - < - - l -l- l - - ! - - < - - l -l- l - - ! - - < - - l -l- l - - ! - - < - - l -l- l - - ! - - < - - l -I-
1000, oq.01
r
'-l ~ 111',..,1
. i .~
I
001.oc.01
- 50
OJ4-i 00.00
REVISIONS
CIA
£_
:-\:
~ ~F
L..".. J\o.n 'I ,...,,..
STATE OF FLORIDA
SHEET
DEPARTMEJ'vT OP TRANSPORTATION
ROAD NO.
COUNTY
TYPICAL TEMPORARY
ROAD PROFILE NORTH
FINANCIAL PROJECT ID
vro.SJS
7127/2011
S.22.57 PM
NO.
<.\pwwor k1n9\IP·\d 1077565 \PROFRD01 _3C_POND_APPLE _2_ 1 I .d'}n
5
30
30
I
I
I
20
20
I';
p 1
TI MP RA ,~Nf OAL
70
Fl L
~
~'"fSf
"'
.s~
<:l'
ioR.
."Tr'·-:s
T
~I EX~STT~G
TO B
I
\
7.v/
o';~~
~ 0~~"{"(~" ·""- "r--_"\\ 'd' ,"'-.
'"""' \ ),"'("'""0 ~~
,, :\i'-. .". 1,""-~ "~"
""""!'\."'~1,"-..'\ "" " '~~ I ~
'1
: / / ... ./ LI/ ,, /V/'/'~/ / ' i./L, '/ / ' v/
~ ~ ~ i/ v/ /, V/ '/ / '/ / V/V// v/
1
II)
·'
- JO
=ft++
I
._,,,v
I
;
I
IL Cf
.
I TC (' OF
I
ROIJND
/ ·/ I 1
TT~
v
I
-,
.
El EVATIO ~
HAUL ROAD
I f;/:
\t..t\/]10,,
I
'
'"I
\
,_
.
....
w
E1 EV1 TIO
1
,"'-.""-
'"
v
' ,_,
'"' ""
,__ """"'
~
/
N- '.00 .__..
-i
-
"'"
~
,__ -
""
!'. "'
""'
"'" ·"-
""'"""""
+ .....
I
I
ll.
,__
~=
-i
+I
I
!'..~"""~
#
, ,,
·-
"r--.
",
/
j/
/
/
'
~ a·*
'\Jl
0
/
' "l '\: ' " " . . . ' ~· 'c::>~.....
·~
·
I
I" ""-'\.~""-~"i~ ~
fii'
I
,
":-
LU
1-++4,00 )%
,
""·""" >.:,
'~~~
"
/ l/
,...,
"l , ~JO
r-l "'i
o,?O- I\
,
0_~
'-.....' ["""1'." "'-.....
, ,, ~
~vc ~> ~
."'-.
~"' ~ "-~~K r-..'·"""\'.._"
"'" '"J' ~'\
:~1
~,,:"
r-.,'
.....
.,,,'\
,'\
I'\." ,"l..~~'.>,:\ '~~1'~
'\~""-t"( ~" ""1'" ~ I'\..'
l'\.~"'-'r---.."- ~1""
~"''l~ r-.."'
I'\.."
' "''""""""1'"-['(
_j
/
I
'
/ /)( ./ / V/ / V / / / // :/ / / / / )( / '/ / / / / / / l//L]L / ) ( /V//' / / / / V X / I/ / / / V.1 /
/ / / V/ / V / /!/Y r/ V .1 /!/~VA// /
/ v/ [/ }// V v/v/ VY/S '11( /_,,. ,~o!V./ v/ ,1/, / )'/1//(/ V. // . ~/ v/v/~ /A/, V/~/V/ // /, v,,{h'J.(11 ~./~,, v/ V, I// '/ v/v/ V,V/ W /i/ t/ ,, v/ / / /'/ \//,/
0
..;
1
.
"$o. \
±g
~--
END Off
bv
~,
1
..~ ~
MUCK R'cf.le
l
mt+l-1 .,.,
:;:
.._
c
c
<:ti
QI "i-10
_,
ll. LU
~
-20
-20
-30
-30
I
I
I
-40
-40
~~TAI~
- 50
2000" oc .01
'JA
t:
JO ~ 1"
....... ....
O~.oJ
-....... ....,.
J0 ~ 2"
OC1.01
.04
?Oo/3" oc1
JOo/4" oc .01
fl.EV/S/ONS
UAI ~
1..n... .:;tl,,..f'{/r'
l
1
I
JOo/5" OQ.01
.
I
.JOI116"
oq.oq 20~ $ 1
_j_
JOo/81
oq.oq
JO 09, oq.01 ? Ot o, 0 £ .01 ,
1
JO t
STATE OF FLOR IDA.
1U
1Y
DEPA.RTMBNT OP TR.A.NSPO[?'TA TIOJV
ROA D NO.
COUNTY
F INANCIAL PROJECT 10
vrorns
l/71(20]7
z, oq.01 1
G - 1~
:t~
1YT
JO t 21 Q j·Q I
20 J
od.oq
TYPICAL TEMPORARY
ROA D PROFllLE S O UTH
...
-50
20
4, 0 0 .00
SHEET
NO.
6
30
30
20
20
10
10
,
/LfROF OSfD rnoJNo
t~f-A"r~·,H--+-1~-1---1--+--1--1-~___,,__+--1--1--1--+--1~-1---1-~--+--+-~-11~-1---1--1--1--1---1~1---1--1--1
/
-
I, LE'\ AT ION 1.00
1--1--1-~
J.~9~· ~-i--1--1--1--1--1--1---1--J-A-~5~-1--1--!--<--!~1 --1--1--J--~-1--1--J--l--~~
/1--1--J--1--~~1··___.__,__,__~-1--l--l--l--!--1~<--~--1-~1--l--1--1--~-1--l--i--1--~11,/-t--J-,+-n:t-J-ll~--J--J--t--I
-1'.J._ 93
IU. , ·..<·
7 11) _,_,
\
/
/
"1 1/
/ /
/ /
. / /
/ /
/ / / I/
1/ /
/ / i/
v
D. ~4)
/
II)
//
0.."8_
I
/
/ / v
7 17
_,__,
I
(., ...1;!.j
I
11)
a -
//
i'\.
_L
1,.:j {!f'
0· +
2'(p~ 1--i--1--1--1--1 ___,~,"~~.§~1~n,-1--1--1--1-~1---1--1--1--1-I~
1--1--1--1--i--1-~~..._,,.._7
f' 7R,_,_-1~1--1--1--1--i--1 ~1---1. -1
' -1~1--1--1--1--1- 0"'-'-·t1'-"'-'i
b>,__-1--1--1--1--1--1-~1---1--1--1--1--1--1~1--1--1--1--1--1 ~1---1--1--1--1
"'"
-JO
-
"1/N MU~ 2'
r. A' 1r1<
-10
-20
-20
~--1~-1---1--1--1--+--1~1--1--1--1--1--+--l·___,l---l---l--l--l--+--l~l--+--l--l--l--+--l~ l--l--+--l--+-l ___,l~+--1--1--1--+--1~-1---1--1--1--+-~___,,__.1--1--1--1--+-l ~l-+--l--l--l--+--l~-l---l--l--l--+--l___,~I
-30
-30
-40
-40
-50
- 50
1000- oq.01
oo 1- oq.01
0 21 Ol .Ol
003- Ol .01
REVISIONS
0 3, 0( .0(
STATE OF FLORIDA
SHEET
DEPARTMEf\lT OF TRANSPORTATION
ROAD NO.
COUNTY
TYPXCAL TEMP. ROAD
FXNAL PROFXLE NORTH
FfNANCTAL PROJECT TD
vro.sc>.s
OJ41 00.00
7127/21111
5 :23:Ul PM
NO.
7
c:\pwwor k1ng\tpa\d 1071565\PROFRD01_3 C _POND_APPLE _2 _ 11 _FINAL _PROF ILE.dgn
30
30
20
20
JO
10
0
- 10
.._\... M NIM'!JM 2'
OF MUlK
-20
-20
- 30
-30
-40
·~ ·~~·~1+·~1-~·~-1~·~~·-1~~·-1~-1~·~~1~·-~~·-1~~·-1-~1~·-~-·~1-1I
I' /
v /, / /
~! / y /i/ /
I
)1
),1
I
11-1-A+M1 I..
I
,,
t...
-40
r4
G-fF-..-1\ -IJ~ -K-1-+-+-+--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--l--f-l-l-l-l~~·-+-+-+--l--l--l--l--l--l--l~l])
"'Fi'-"IE~T
-=-"'A
~
~IllL ( --- I~
'
I
F
"
lL~!ft:rQ--'U-~
· '#--ill-1---1--1-
JIL "I~ , _i ... u J
1111
-50
2 0 41 00.00
"(IEV/S/ONS
'JA
t:
UAlc.
S TA TE OF FLORIDA
DEPA.RTMJfNT OF TMNSPORTA T IOJV
ROAD NO_
COUNTY
SHEET
TYPllCAL TEMP. ROAD
FJINAL PROFllLE SOUTH
FINANCIAL PROJECT 10
.
vrans
1/77 ( 20 ]7
NO.
8
---==-----~
./
MARINA BLVD
;
TRANSECT 1
-
-
MARI NA BLV~---
EXIST. LA RJW LINE
MARINA BLVD.
_,_
TRANSECT 3
TEMP. HAUL ROAD
N 88"
4' 44" E
TEMP. HAUL ROAD
EXIST. LA RJW LINE
POND APPLE SLOUGH
POND APPLE SLOUGH
-----
0
40
100
Feet
1-595 (SR-862)
DATE
DESCRIPTION
REVISIONS
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIOUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
SHEET
NO.
MONITORING TRANSECTS
FINANCIAL PROJECT ID
9
409354-2-52-01
BROWARD
VfOSilS
7/27/2017
5 :23:36 PM
! :\pwworkit19\tpa\d 1077565\PLANRD_POND_APPLE_TRANSECf S _3C_01 .dgn
MARINA BLVD.
EXIST. LA R/W LINE
TEMP. HAUL ROAD
.·
+
t.,-··' '
!
'' ''
N 88'
.
"c
~' '
4' 44" E
·'
*t.
l:
.
.
-··
-·t. ..·'.. 345
~
·'
.-~,
;-~.
l
,·
·,' ''
'
·'
i
TEMP. FILL
INMl,lOFLATS
POT STA 103+96.52
EXIST. LA R/W LINE
EXIST. LA R/W LINE
POND APPLE SLOUGH
EXI STING JURI SDICTIONAL AREAS
-MANGROVE
-MUDFLAT
·
POND APPLE SLOUGH
TEMPORARY
FILL IMPACTS
~
n
-----
0
40
100
CURVE DATA POND Hffl
Pl STA . = 3013+40.91
A
= 1· IO' 34" (Rr)
Cl
.. o· 30' 12·
SHADE IMPACTS
=
1
L
RC STA.
FILL I MPACTS
116_86
= il33 .10
R
PT STA .
= 11.384 . 21
= 3012+24,05
= 3014+57.76
Feet
1-595 (SR-862 )
DATE
DESCRIPTION
REVlSIONS
DATE
DESCRlPTION
STANTEC
901 PONCE DE LEON BLVD
SUITE 900
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO. 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFIQUR RAHMAN, P.E. NO. 65729
STATE OF FLORIDA
SHEET
NO.
DEPARTMENT OF TRANSPORTATION
ROAD NO.
9
COUNTY
RESTORATJION PLAN
FlNANCIAL PROJECT ID
BROWARD
JO
409354-2-52-01
V l'OS ;JS
7/ 27/2017
5:24:05 PM
c:\pwwor ki ng\ tpa\d 1077565\PLANRD_POND_ APPl..E _3C_01 _HH.dgn
30
30
20
20
10
10
, /"'
E E\/, TIC '/VO 00
1-
v
./
--- -
/
.,V I
0
300( i+QO
-
v
/
v
,...
/
-
-
i _
-
~-
·-
-
v
EX ST! NG
/
:nn
lRo
ND
EU VAi ON
J... j
1n
-
- ,__ -
;....
-
--
~
-
~n1 LLI
--
> -
--
-
in
_.
-
-
,..
-
-
.L
- -" -
~
--
_l -
- - - ......
0
'
-
-JO
-10
- 20
-20
-30
-30
-40
-40
l])E TAIIL
H -H
~ -0 I ~
I
In. ~ ti
-SWOO-
oq.o(
W( 11 oq.01
W( l2 oq.01 1
WI 13 oc .01
WI 114 oc .0(
REVlSlONS
'JP.
I:
Jc ~<.H/I'
u·v
u~·c
L.IL. ...::111,, .
n
'I ·un
W( 15 oc .01 ,
W( 16 oq.01 1 W( 17, oc .01
WI 18, 0( .oq
W( 19 0(
.01
w
0 0( .01 ,
w
STATE OF FLORI DA
DEPARTMENT OP TRANSPORTATION
ROAD NO.
COUNTY
w 21 oc .01
w
3, oc .01
~OJ41 oo.OQ;o
SHEET
TEMP. MUDFLAT
EXISTING PROFILE
FINANCIAL PROJECT ID
vro5as
11 0( .01 ,
r
- "JI ·' 'IL:
7127/2017
5 :24: 16 P/4
NO.
11
c:\pwwork1ng\tpa\d 1077565\PROFRD01 _3C _POND_APPLE _2 _ 15 _EXI STI NG_ P.ROF ll E.dgn
VARIES
CONSTRUCTION ACCESS
10' MIN .
POND
10'.5
BTM.
TO
TOP
12.7' MIN.
TEMP,
FILL
IMPACTS
TO
OF
BERM MUDFLATS
20'
TEfVTP.
HAUL
ROAD
EL. 3 .42
PERMANENT FI LL POND
TEMPORARY FILL
EXIST.
ELEVATION
(VARIES)
MU Ck
REMOVAL
EL. -4.00
&~
~
17 /1
TEMP . FILL
PERMANENT FILL
SOUTH ENO
MUCK REMOVAL AND TEMP . FTLL
NOTE ~
f!EVJSJONS
Dl([E
DESCRIPT10N
DATE
DESCRIPTION
STANTEC
901 PONCE DE LEON BLVD
CORAL GABLES, FL 33134
305-445-2900
VENDOR NO, 650039493001
FL CERTIFICATION NO. C-9723
MD MUSHFJQUR RAHMAN, P.E. NO. 65729
SHEET
ST.4171 OF f"LORlD,f.
D,EP.48TltfENT OP TJUJ\TSPO~TATJQN
SUITE 900
ROAD NO,
9
COUNTY
BROWARD
NOT TO SCALE
TYPllCAL CROSS SECTION
MUDFLATS ACCESS ROAD
FINANCIAL PROJECT 10
409354-2-52-01
7/71(20 /?
f'JO.
12
30
30
I
I
20
20
_w. ~SI. f,f·f.LJJ.f1 -
·f::JJ;;'
~
-
"'
~
+
~
a_
~
,I
(
- tr~ -·-
-
" ./
/
,_ /
+.) -1 -.ODtl-%- .
?"
IR',1 / V _, / I/ i.-·· / ,P" / / /
EVtT/t
0 100
I
I I
I
I
t}. /
t
r
I
x
V I
I
-,./
I
'
,r
Ir
V
- JO
-
~,.,.
'
~- A '~
'° e
+-
I
~
I"'
_ ,__;
I
I
,I
~ ~~" ~ ~ b.o)-0)·2' .:'f~
E
!
.
TIO~
-
I
/
v
1 /
It
.
~ -,
--
' I\
I
I
I
I
"'0
~
\
I
/
.
r-.....
... v- ~
/
ELH AnpN 4.0
._
/ ) / /// /
/.A'/l/ Y / /
/ / ' / V,(/ /
//,/VA>s-VL
+
Fl~L
~ ~
_V / I
I~
~·itlM+D
LE 'ATON
1
"l' ,,·"' ""1.' 0< \. ~'~'
.:\:~'t"'~'
"' r-.
i'.."
I
l
'
/t///
'//,// V
I
I
~-
.-~/
J.,/
Ct)
~
- ~ OCI
a.. _;
lJJ
~
/
/
· ' '~"'" '' ~..,__
.~
. . . :\:f'...."-;....'\~' ¥J'li..~~ 1%""' .!'."
f'....
I
~~~~
/ Y"'
I'\."
~"L' 1'.' "-!""-. ~
"~~"-,.."C\ '"('\~1-."-r\:
-"'+' "'
~
I
10
' ; <'\j
\;2
,1
' "-!'
+t ~
1--=-
"''-'
/ I/ A / / /,1 I / ,V / . /I/ / / / V); / I/
..ll/ y A / 1/,.
/.0(..(Y~'/V,, ~
/ ,/ V/ ///,, V/f/V/ ' / //i°
/
....
+I
I/
I
top OF 'TEMPOJ ~RY
fETr~fNf~4
. /1
....--,--
/¥RZb:
'/
v .-
.' J\. '"-!.'( ""l'~--,~ . . . ." ."-1'."\.."'~
r-.". -l""-1'" ~ '"
~
~
'" '°'r-.."' '"~"' ~"'"1-.~"'"'' ·~>..."-C\ "']...."' "'"l"-.....". .".:\ ,,,,
'"" ~
'<>,> >~
~4' ~
" L""-""-'-\.."- "'1'." '1'.\ -"'. "' ~ ,_J -~;,J:~l" ·'
-
ND OF
-Gf~IJ(\/.1'
El t=V
/ V4,° / VV/ // v / / !/ !/ / //,1 / IG:~
-- ' "L/ ,Y:/i/ / '!i
/,f//I/V,1v/ /YA'/Y/vh ~/ VA/Y~V1. £...fd'v~ /'/ ~~~Vfi/
-r>
-.,_ 1-- .L!"'/ /_,f"'/ /, vL ·~ v.
0
3001J+dd' C\ "''{'" ~ r--.
~ "'" E
v
- &. J.s:P.tNG
/
,I
.JO
~
Jif M , FILL
!FIL ·
TE
RE MO\ AL
I
~
~
/
~g
~~
: JO
~
I"'
-;.'
"
-20
-20
-30
-30
I
I
-40
DETAI L
-Jr- stfJOO" oc 1.oq
Wo/1" oc 1.oq
Wo/2" OC 1.01
Wo/3" oc1.00
,Wo/4"
oc .01
f!EV/S/ONS
.,,. I:
..,... _._.,_. ,
l'\JI
UAI ~
"'-;)\..I .'I · ..,,.
I
,Wo/5" oq.01
'
I
Wi 116"
oq.oq--BoFi oq.o
1
Wo/B, oq.01 1
~o 1i9,
oq.01 1
COUNTY
\,:
o, 00..01 , ,wp, oc,.oq w12, oq.oq f'O 3, oq.oq
} 0141
oo.Q.Qso
SHEET
TE1~1P.
FINANCIAL PROJECT 10
vrarns
c
I
}O
STATE OF FLORID.A
DEPA.RT.MENT OF TR.ANSPORTA TIOJV
ROAO NO"
1H
-40
MUDFLAT
PROPOSED PROFILE
7/?7{20/7
·' . PM
..S...,4:3J
NO.
13
. pWft,o(t'-tng\rpl!\d{OI 1,j6S\fROFR001 _'3C_POND_ A.PPLl:_ 2_ IS.~n
!..\
30
30
20
20
.JO
10
v
/
-·-
,...._
0
3001i+c re\
1"' l"'.:
..v
' '\,
~·
~ ~ r-..' -
I
I
/
~ "'"E
/
v
v
v
/
/
'"'
~'
·"-· ~- k"-~~ I'\>:"-,~1... "-! '
'
I'\
I
-JO
1-
EVAT!d/V 000
I
.
!'-..' \
·
ELf':VAFf"./O
I
:?1n _,_, 1n
,"'.:f'." ~-'\....!"- ~"" :< i"-,'
I
·
p1:>..100 I ED 1GRdUN!
2-FjT
,'\, :-..,, r... "'
"..1'.'i.""
I
''\""""' ""1'I .-\i ' "'"
I
I
_.....,,
"""''
''\l'-,'}..,_"
'"
'.?.n1
)_,_nn
' 1-.'\["1, '{"" '\...'\."-I'\.."1'.._, .''.
I
I I
,, "..I".. '\"'I""- ''\
0
I
'\...!'\...;.... '\!'\...
'
I
'\,.
' '
'
'\
-
Of 1.1¥cK
'\
--
'........_
-10
-20
-20
- 30
-30
- 40
-40
DETAIL
it
c
- 5JJJOO" oc .01 1
'.1.
J30o/ 1" OC 1.oq
...........
.... ,
,Wo/2" OC1.0I
Wo/3"
oc1.oq
BOo/4"
oc OQ
J'.EVJSI0/'15
.
....,.
UAl~·~~n
' I,~,.
·
1
BOo/5"
oq.01 1
I
WI 116" $
;' 80o/71 oq.01 1
Wo/81
oq.oq
~Oo/91
$ , ,w 01 oa.01 }Op1 oq.01 w12,
1
STA TE OF FLORIDA.
DEPARTMENT OF TRA.NSPORTATIQJV
ROAO NO.
v rosa~
·
I
·
t oq.oq w 4, oo.01Jso
TE1l1P. MUDFLAT
FllNAL PROFllLE
FINANCIAL PP,OJECT 10
COUNTY
1
"-'
1m12017
S ;U'.35 PM
SHEET
NO.
14
<"_P:INAL _PROf IL~.dt}~
!.. \pw(r.or~m9\.rp1i\d { 017.565\PROFROD 1_'lC_POND_APPLE_ 2_ I...
I 02'-101/i'
1·-s~·
l(aries Shldr.
1(10' -0'' Min.)
Barrier
Traffic
Railing/Noise
Wall (8'-0")
(Index No. 5210) ---..,
3 Lanes @ 12'-0"
2 Lanes @ 11'-0"
3'-CJ'
2 Lanes @ 11'-CJ'
[
7'-(J'
Shldr.
Widen ing
8'-2"
LEGEND
5'-1%'
3'-0"
Portion of Existing Structure
to be removed.
SOUTHBOUND BRIDGE
97'-ll'
w
--
Op~que
Visual
arner
7'-2 Lanes @ 11'-0"
Shldr.
@ SR 9/[ 1-95
¥:Existing Bridge
I
~
t
---j
3'-!"
t
t
,.
-:·~
3 lanes @ 12'-0"
t
t
Varies Shldr.
t
5'-(J' (Min.)
t
r--;-- Tubular
:
,·......
1
2 Lanes @ 11'-0"
I I
·
.'.·:
· - · · · -- -- . , - . . _ . . . . .
.:~
.:::
1
Marker (Typ.)
· · - · - - · · . · · · · . . .. .
t'tl
- -
,_.
TCHAl'MR
RNG:
42£
SEC:
8/9
11114/20/T
FLORIDA DEPARTMENT OF TRANSPORTATION
~
TYPICAL SECTION
1-95 OVER C-10 CANAL
EX. BRIDGE NO. 860574
PROJECT !.D. No.:
NAME: JIMIN HUANG. P.E.
COUNTY: BROflARD
SIGNATURE:""J""'H_ _ _ _ _ __
EPD
CG
CERTIFICATE No.:
COE
WMD
667tg7
.
-·
·
NORTHBOUND BRIDGE
7WP:
515
. .
.~c · · · ·-·)c··· -- · :i(~ ~= :=.T""- ·-·.:·.··::r-···-·.-.-.-.-_\·:::::.- .·: ~;!=.
)(
Traffic
w /1 (8' CJ'}
·
~Iii;
PROJECT DESCRIPTION: I-95 EXPRESS PHASE 3C
_,.,-
I"
409354-2-52-01
SHEET No.:
x
DATE:
8-2
8/14/2017
SFWMD R/W
Line~ -
J
~
1
~ SFWMD R/W Line
\\
C-10 Canal
.
I
Proposed Swale
I
Ret aining Waif
egm Apprh. Slab 1
End Apprh. Slab 2
Sta. 390+16.08
Sta. 388+57.26
388
--- - - - = :..._:.-
Direction of Stationing ..,_
.- - - - -:gin Br~~ge\
-
FFBW End Bent I
Sta. 388+77.54
Pon/on of Existing Structure
to be removed.
Proposed Rlprap
Existing R/prap
Sod
Cross Sections
,,
"" ow..JW-w-T"
H
·--7'
~
~ ""'---~-- -~
-- - -----. - ........_
······
···
_
--,,;-;;---~
~
-Existing
Directional Boring
_ _
_
--::..-:...-,-~----
- _
\
----._. _ _
\
PLAN
(SCALE: 1"
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
RNG:
5/S
42£
TCHAl'NIR
SEC:
8/9
11114/20/7
\~~·
Traffic Ra/llng/No/se Wall
I~
.~~ ;#:..._\·~--- ~ ----- .:
\
:#'-... .
...._~ ..',
\
- ........
= SO')
FLORIDA DEPARTMENT OF TRANSPORTATION
_
PLAN AND ELEVATION (1 OF 2)
1-95 OVER C-10 CANAL
EX. BRIDGE NO. 860574
PROJECT !.D. No.:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
S/GNATURE:"'"J"'"H_ _ _ _ _ __
EPD
CG
CERTIFICATE No. :
COE
WMD
667'31
409354-2-52-01
SHEET No.:
x
DATE:
8-J
8/14/2017
I 18'-0" Overall Length of Bridge
I Dimensions Along
._.__3_7_'_
- fl'
_ ___,_ _ _4_4_'-0_"--~--3_7'_-0'_'-...i__J { Existing Bridge
Span l
Span 2
Span 3
L
SFWMD R/W Line
!l lnt. Bent 3
Bridge
Begin Bridge
FFBW End Bent 1
SFWHD R/W Line
--I
i
Et'---=-
Int . Bent 2
F 1BW End Bent 4
I
I
I
I
Traffic Railing/Noi se
Wall (8'-0")
(Index No. 5210)
30
30
20
20
10
10
II
II
0
0
II
II
II
II
: ~Proposed
Mi n. Vertical
Clearance
-10
-20
II
II
11
lJ.
~
-10
18" Prest.
Concrete Pi les (ryp.)
- 20
40'- 3YI'
Horiz. Clearance
(Existing/Proposed)
* Existing Vertical Clearance =
Proposed Vertical Clearance
13.62'
13.62'
=
ELEVATION
(REFLECTED VIEW)
(SCALE: 1"
=
1.
40')
Elevations shown on these Plans are
1eferenced to North American Vertical
Datum (NAVD) of 1988.
NGVD - NAVO + 1.61
PROJECT DESCRIP TION: I-95 EXPRESS PHASE 3C
7WP:
5/S
TCHAl'/oRR
RNG:
42£
SEC:
8/9
11114/ 20/T
FLORIDA DEPARTMENT OF TRANSPORTATION
PLAN AND ELEVATION (2 OF 2)
1-95 OVER C-10 CANAL
EX. BRIDGE NO. 860574
PROJECT !.D. No.:
NAME: J/MIN HUANG. P.E.
COUNTY: BROflARD
S/GNA TURE:""J"'H_ _ _ _ _ __
EPD
CG
CERTIF ICATE No.: 667tg7
COE
WMD
409354-2-52 - 01
SHEET No.:
x
DA TE:
8-4
8/14/2017
\ - - SFWMD R/W Line
\
FFBW
\ 't
I <;>
I I 'io I
\
\
SFWMD R/W Line
\'t,J
\
Cl
\
\
I
Cl
I· u
\\ u
I~
Cl
·,~.:I
\
\
\~\,)
I w
\
\
\
Direction of Stationing......,
u
1,
I
LEGEND
FFBW
\
Begin Bridge
FFBW End Bent 1
ft
fnt. Bent 2
Sta. 389+13.24
7WP:
TCHAl'MR
RNG:
42£
SEC:
8/9
11114/20/T
/QlofO:fT /JJI
Proposed 18" Prestressed
Concrete Plies
Sta. 389+58.47
PLAN
5/S
Concrete Piles to Remain
Cl
Int. Bent 3
FOUNDATION LAYOUT
1-95 OVER C-10 CANAL
EX. BRIDGE NO. 860574
(SCALE: 1" = 30')
PROJECT DESCRIP TION: I-95 EXPRESS PHASE 3C
Existing 18" Prestressed
1:::;
Sta, 388+77.54
~
Front Face of Backwall
FLORIDA DEPARTMENT OF TRANSPORTATION
PROJECT !.D. No.:
NAME: J/MIN HUANG. P.E.
COUNTY: BROflARD
S/GNA TURE:""J"""H_ _ _ _ _ __
EPD
CG
CERTIFICATE No.: 667tg7
COE
WMD
409354-2-52-01
SHEET No.:
x
DATE:
8-5
8/14/2017
.,.,,
~.,
7·
am e
~
I /SU
'fJn an
er
I
.,
I
I
.,r
I
I
-
>--
'"'
·- ,_ _ · - -
·~
'I
f.,
IU
!I I
·fl""
TT
Jl
LI ie
'""
I
-
\\
',
I
!I
'{..
"
~
-
~-
-
......
I
I
I\
II
II
II
_,
- - -
/
... '-'
_.,,
I
I
I/
1e
II
II
!J
' .4~ !i
I
I
l
I'
II
'
\
XI r.
·n m n
I
I
_I
1
11
t1
II
II
I
_I
II
.!)(..,
U.l:
"-"' Wf nz
1"= UT v ...
1 "~
I
]f
I
.....
'
"'
.r
11.J
r rw
I
I
I
I
.,
p
i:> R
I
RNG:
42£
SEC:
8/9
.. , "' .
11114/20/7
VF
,_ .
fl. .
I
I
I
I
I
l
I
l
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
1 "'
I
'= ..
n11
''"'
.J
"'
"
."'
I
.!Ill
'l
I
409354-2-52-01
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
S/GNATURE:JH
EPD
CG
COE
WMD
667'31
' /j/
ff /
Air. ·n
...
II \
CERTIFICATE No. :
TCHAl'NIR
HI
,.~
""
PROJECT DESCRIPTION: I - 95 EXPRESS PHASE 3C
TWP:
5/S
-
n
"""""'
_.,.
I
..
II
I
I
·I
II
II
-"
II
II
II
II
I
ii
II
~·-
I
I
I
II
Si
Ii
:...- ~
.,
II
r.
;
::,
I
p
II
!I
II
_,.
-
~
II
"'
II
'""...,
-
I
II
II
II
\,\
~ -
II
II
a
"
II
II
II
_A
I
,,
'\
·
I.
-
J
1
n
--
-·----
I
~
\\,
A
=
I
II
,,.M
- -...
-
"~
=
SHEET No .:
x
DATE:
8-6
8/14/2017
.,.,,
~.,
I
.
-
r ai
IC r~a1
ma No se Ila
I
7·
.,
.,r
I
'"'
f.,
II
II
"'
'Q.
_ IT
, "'
~
Jl
,,.M
I
LI ie
'""
-
,.
II
II
II
,
'II
.d
~
I
n
"''
II
II
· =
,,1e
-·
I '
,....
'
II
II
/J
IT
II
.=; _v· ..,
""
..-:s
II
_,.
,,.,
~
II
_A
I
HI
,.~
IT
ii.
II
-
J.
II
,,
"'Iii
-
r=v ~·
,(
-~
.r~
·~n
"d
_,
II
II
I
-"
.!)(.,
I
'·I
"-"' Wf nz
1"= UT v ...
r"f
... r.a.
_.,,
n
I
I
I
I
.. '"'
"'
I
:1P
I
I
I '"
'""'
~
RNG:
42£
SEC:
8/9
I J
I
I
I
I
l
I
11114/20/7
j
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
S/GNATURE:JH
EPD
CG
COE
WMD
667'31
1 "'
'/j/
ff /
Air. ·n
',, ,, . ,
l
CERTIFICATE No. :
TCHAl'NIR
·
...
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
,_ .
""
VF
11...
""""'""
_.,,
U.l:
1"~
I
'= ..
n11
''"'
.J
"'
"
."'
I
.!/JI
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-7
8/14/2017
.,.,,
~.,
7·
.,
.,r
I
'"'
f.,
~
'
..
11..
Jl
,,.M -
I
LI ie
'""
-
'
-
,(,
"...
.d
· =
-
ll
n
'"
I
I
_A
I
"
--
UO<
~
""
-·
.=; _v· ..,
HI
,.~
I/
1e
~
~
/
.,
/
'
'
_,.
""
-
(
J~
~
r=v ~·
.r~
·~n
_,
I
.!)(.,
U.l:
1"~
"-"'
Wf
1"= UT v ...
-"
... r.a.
_.,,
n
I
I
I
.. '"'
u...
""""'""
_.,,
I
"'
I
:1P
I
I
I '"
·"'
'""'
RNG:
42£
SEC:
8/9
I
I
I
I
l
I
11114/20/7
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
S/GNATURE:JH
EPD
CG
COE
WMD
667'31
'= ..
-~ .
I
CERTIFICATE No. :
TCHAl'NIR
,.,
I
'/j/
ff /
Air. ·n
...
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
,_ .
""
VF
1 "'
nz
I
n11
''"'
.J
"'
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-8
8/14/2017
""' l°RAllS/flON SLOPE IN FRONT
OF END BENT TO l/tTTHlll
INOICATEO UNTTS
f;,¥0 OF WINGWAtL
OVTUNEOf ~~~~~-M
OUTUllE OF EXISTlllG
ENO BENT
PROPOSED
ENO BENT
. -
~o
!j>~
..
LT/.llTS Of Pl!OPOSEO
SANO-CEMENT Rll'RAP
-r --+---+-..---..---.-"'"""'-I
SEE 811/0GE PLANS FOP.
Ul4TTS OF SANO CElllENT
P.IPIUI'
--I..___,__
STAGGER VERTICAL JOINTS
~4)·
11111.
PABUAL PLAN
El/D BENT
*SEE BRIOGE PLANS FOR SLOPES.
FIU E/.IBAllKNENT
11/IJVML GROVllD
FILTER FABRIC
""' FILTER FABRIC
SECTION 8-8
$ECTWN A-A
SLOPE PROTECTION DETAILS
1-95 OVER C-10 CANAL
EX. BRIDGE NO. 860574
SAND-CEMENT BCPBAP PROTECTION
PROJECT DESCRIP TION: I -95 EXPRESS PHASE 3C
7WP:
5/S
TCHAPMR
RNG:
42£
SEC:
8/9
11114/20/T
FLORIDA DEPARTMENT OF TRANSPORTATION
PROJEC T ! .D. No.:
NAME: J/MIN HUANG. P.E.
COUNTY: BROflARD
S/GNA TURE :""'J"""H _ _ _ _ _ __
EPD
CG
CERTIFICATE No.: 667tg7
COE
WMD
PK:VX!lJST'lXXXX!COOCZJOJOJVJ-00.CAO\/IJJl(}BIJZOl..l'rowctl<,n.Foldcr..JA..JBJC\$1rvct'i'crmll..f'l¢nsV-95-1:-I0'8JS/opCPtoteoflo~refe.OON
409354-2-52-01
SHEET No.:
x
DATE:
8-9
8/14/2017
Varies 211'-6%" to 211'-314"
Varies 105'-814" to 105'-6:Y,,"
3 Lanes @ 12'-0"
Varies Shldr.
(10'-0"Min.)
2 Lanes@ 11'-0"
36'-0"
f
f
Widening
Varies
10'-0V.,"
~
f
~
f
22'-0"
2 Lanes@ 11'-0"
22'-0"
~
f
f
1'-4" Barrier
36" Single-Slope
Traffic Railing
(Index No. D427)
"~v
I~
3'-0"
f
10'-0"
I
Shldr.
I
Opaque
I
,:;:~:;J
r[Tubular
Marker
Existing
Traffic
I
Railing~'·
._ Slope: 0.02 Ft/ft
I
--- -- - ------- ----- - - - - - - -- - - - - - - - - - - - -- ---- ---- -- ---- -- ---- -- -------- ----------- -------- ------- -- - -- - ---- -------- - -------- -- -- - - - - - - -- - - - - - - - -- - - - _._'
-- - -- - ------- ---- -- ---- ---- -- ---- -- --------- ------- -- - -------- ----------- -------- -- ---t;;
·;:;:
SOUTHBOUND
..Q
UJ "'
to Vi
(Spans 1-3 Shown)
'
;..,
Varies 211'-6-¥,,'' to 211'-3~"
Varies 105'-101/;," to 105'-B-¥s"
10'-3''
Shldr.
t
2 Lanes @ 11'-0''
I
i - - - - Existing Bridge
=
22'-0"
t
t
3'-0"
2 Lanes@ 11'-0"
=
t
22'-0"
t
3 Lanes @ 12'-0"
t
t
'
~!
rrTubular
Marker
Existing
Traffic
-~~~~;~~- ----
LEGEND
~
·;:;: -Cl
NORTHBOUND
UJ "'
(Spans 1-3 Shown)
re
'
Existing Structure
to be removed.
RNG:
42E
~
;..,
I
1'-4" Barrier
36" Single-Slope
Traffic Railing
(Index No. D427)
Widening
Varies
10'-2'1:/'
K
~
SEC:
4
8/16/2017
9:33:18 AM
TYPICAL SECTIONS
1-95 OVER C-10 SPUR CANAL
EX. BRIDGE NO. 860578
TYPICAL SECTION
FLORIDA DEPARTMENT OF TRANSPORTATION
PROJECT l.D. No.:
NAME: JIMIN HUANG, P.E.
COUNTY: BROiiARD
S/GNATURE:JH
EPD
CG
COE
WMD
CERT/FICA TE No.:
TCHAPARR
t
Slope: 0.02 Ft/Ft ...
PROJECT DESCRIPTION: I-95 EXPRESS PHASE 3C
TWP:
5/S
Varies Shldr.
(10'-0"Min.)
I - - - -- - -- - -- -- - - - - - - - - - - --- - ----------- - - - - - - - - - -- - - -- - - - - - - - - --- - - - - - -- - - - --------- -- - - - - - -- - - -- - - - -- - - - - -- - - - - -- - - - -- ------------ - - - - - -- - -- - - - -- - - - - - - - -- - - - - - - - -- - -- - ------- -- - -- t;;
------- -- - -- - ----
---------- -------- -- - -- - ----
'
= 36'-0''
66797
PN:'{}()735Tvxxx::xxxx:J02/0363"V3.00J:AD"433/081320/...ProductlonJolder JA-38..JC\51 n.1cf\f>ermlf...PlonsV-95J:-/05pur\868rltJQe5r;cflonOl.dQn
409354-2-52-01
SHEET No.:
x
DATE:
B-2
811612017
rLA RIW
- _
-=:=====--=
J. _ _ _ _ _
__ _ _
-
L
\
-
-
-
-
-
'
I
I_
..
-
-
I End Bridge
Begin Apprh. Slab
Sta. 45HJ2.81
End Apprh. Slab
Sta. 452+55.19
i
--=-
\.l:
I ~
I~
1~
r
1
~
,:;;
\
E
-,
:_.
~
I
~-=
..
..
__.: - -_=- J.: _:_
I
I
..
..
PROJECT DESCRIPTION: I-95 EXPRESS PHASE 3C
515
TCHAl'NIR
RNG:
42£
SEC:
4
11/16/20/7
Portion of Existing Structure
..
---------- --=- ==
to be removed.
..
Proposed Rlprap
Existittg Riprap
-=-+
Existing Directional
Boring
TWP:
Direction of Stationing..._
~~-----St---------------------
I
~
SR 91 { 1-95
r-=-----FLORIDA DEPARTMENT OF TRANSPORTATION
Sod
0
PLAN AND ELEVATION (1 OF 2)
1-95 OVER C-10 SPUR CANAL
EX, BRIDGE NO. 860578
PROJECT !.D. No.:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
S/GNATURE:""J""'H _ _ _ _ _ __
EPD
CG
CERTIFICATE No.:
COE
WMD
667'31
Cross Sections
409354-2-52-01
SHEET No.:
x
DATE:
8-J
8/!6/2017
IOZ-0" Overall Length of Bridge
SFWMD RJW Line
l
Begin Bridge
FFBW End Bent I
30
20
3 4'-0"
Span No. 1
3-f-O"
34'-0"
Span (o. 2
Span No. 3
fi.
I
I
lint. Ben~t
2
Guardrail
Dimensions Along
{ Existing Bridge
1
1
1
{ Int. Bent 3
SFWHD RJW Line
End Bridge
FFBW End Bent 4
Guardrail
30
20
10
JO
- - - - - ;t- -
0
0
11
II
II
- 10
-10
..
-20
-20
Min. Vert/cal
Clearance
Horizontal Clearance
(Existing/Proposed)
ELEVATION
(SCALE: 1"
= 40')
* Existing Vertical Clearance .. 5.5ff
Proposed Vertical Clearance
=
5.37'
1.
Elevations shown on these Plans are
referenced to North American Vertical
Datum (NAVD} of 1988.
NGVD = NAVO+ 1.61
PLAN AND ELEVATION (2 OF 2)
1-95 OVER C-10 SPUR CANAL
EX, BRIDGE NO. 860578
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
7WP:
5/S
FLORIDA DEPARTMENT OF TRANSPORTATION
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: BROflARD
4~
4
SIGNATURE :""'J"""H_ _ _ _ _ __
EPD
CG
COE
WMD
CERTIFICATE No.:
TCHAl'MR
PROJECT ! .D. No.:
11116/20/T
667tg7
PK:VX!lJST'<()(J(XX)()OO(ZJOJOJVJ.OQ.C.40\/IJJl(}lllJZOl..l'rowctl<,n.Foldcr..JA..JBJC\$1rvct'i'crmll..1'1¢nsV-95.J:-ll)Spur'8$Plant:IC>CZ.-J9n
409354-2-52-01
SHEET No.:
x
DATE:
8-4
8/16/2017
\~~ ~
~,
\~~ ~ \
~.
\
\,~\~
\ ~~
[ C- 10 Spur Canal
~-a.--_+84.00
St- 451_____ __
'.
SFWMD R/W Line
SFWMD R/W Line
r,.
\
@SR 9 I '
·',,
451
453
Direction of Stationing..,
Begin Bridge
End Bridge
FFBW End Bent 1
Sta. 451+33.00
FFBW End Bent 4
Sta. 452+35.00
Cf. Int. Bent 2
Sta. 451+67.0D
\
\'.
I
\
'
\
[ lnt. Bent 3
Sta. 452+01.00
LEGEND
FFBW
"
\
(SCALE: 1" = 40')
7WP:
515
TCHAl'MR
RNG:
4~
SEC:
4
11116/20/T
FLORIDA DEPARTMENT OF TRANSPORTATION
l _I
Existing 18" Prestressed
Concrete Plies to Remain
D
Proposed 18" Prestressed
Concrete Piles
FOUNDATION LAYOUT
1-95 OVER C-10 SPUR CANAL
EX, BRIDGE NO. 860578
FOUNDATION LAYOUT
PROJECT DESCRIPTION: I-95 EXPRESS PHASE 3C
Front Face of Backwal/
PROJECT ! .D. No.:
NAME: J/MIN HUANG. P.E.
COUNTY: BROflARD
S/GNA TURE:""'J"""H_ _ _ _ _ __
EPD
CG
CERTIFICATE No.: 667tg7
COE
WMD
409354-2-52-01
SHEET No.:
x
DATE:
8-5
8/16/2017
.,.,,
~.,
7·
.,
.,r
I
..
'"'
~
.. n 1l ri
I
nP
-
~
..... ··-
..
'llV
.m~
7 :J
- - -
Jl
I
-
~
.d
'
IW
=
u
/
<::
'
-
- u.
·~
n
\
I
~-
I
/
~~
I
I
"
\
I
'
-R
_,
I
-
'
'
_A
·
-
~
\
\
..
~·
..,,
l ~U
.!)(..,
U.l:
"-"' Wf nz
1"= UT v ...
1"~
-"
_.,,
,_ .
""
VF
Air. ·n
I
_.,,
I
I
I
I
"'
I
I
I
I '"
I
I
I
I
l
I
I\
I
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
CERTIFICATE No. :
TCHAl'NIR
11/16/20/7
9~6;()1AM
n11
"''
'.j U_f
...
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
~'
'/j/
'= ..
ff /
667'31
1 "'
I
''"'
+
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-6
8/!6/2017
.,.,,
~.,
7·
.,
.,r
I
'"'
.r-
.,
I I
1e-
f.,
-
..
~··
ID
llV
I
I
Jl
--
I
A
... ""
.....
......
~
"'
-
n
,.,
-J
-
= v.
'
'
-
r'4t'
~
~-
-
·
J
"
_A
\
I
\
I
_,.
I
.
-,
_,
/
\
\
-
,...
I
'"'
....
m"
"-"' Wf nz
1"= UT v,...
-"
...
_.,,
/
_.,.
I
I
I
I
"'
I
I
I
I '"
TWP:
5/S
"·
"' I
~
VF
I
I
I
I
l
I
.....
l
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
CERTIFICATE No. :
11/16/20/7
9~6:19 ""
667'31
,_ .
1 "'
'/j/
ff /
Air. ·n
...
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TCHAl'NIR
" ,...
1"~
I
'= ..
n11
''"'
./
"'
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-7
8/!6/2017
.,.,,
~.,
7·
.,
. r-vi
wn
RJI
Lt
ie
.,r
I
-
----
::i.r- WM
H
..,
Tn~
'"'
f.,
-
Jl
- -
l
- ..
I
I
'Q.
.d
"
I
n
·r
......-
17
,
~
'II
I
IT
II
5:7
,
I
,, ,,
0
N
-
_v. ~'f
.J
' I
I
,
6
f
II
II
:I
~
I
_A
I
II
II
I
_,.
"
I"
'
II
II
I
I
I
Ill
,
\
\
II
_,
1
II
.\.
-
I
-
II
I
I
"
-"
I
I
I
I
1
II
u..
"""""""
_.,,
:1P
.. JIU
"'
I
I
I
I
"
',..,
.... " ,_
1"~
I
I
n
c.;r
I
I
... r.a.
_.,,
·r: ) St.
111
111
II
unc 11
·"'
'
·r
" I
...
II
II
I11
I 11
I
I
I
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
I
l
I
l
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
TWP:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
5/S
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
CERTIFICATE No.:
TCHAl'NIR
11/16/20/7
667'31
1 "'
'/j/
ff /
Air. ·n
I
Wf
nz
Vr:
,_ .
""
VF
...
II \
"-"'
1"= UT
I
n11
''"'
./
'= .. U/
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-8
8/!6/2017
.,.,,
~.,
7·
,,.Ill MO
Rtl
-
LI rie ,..........
.,
.. ...
::::.r- NM
1n~
I
.,r
-
a e
IS
a1 jar 1e
I
I
1
'"'
I
f.,
I
-
-,
Jl
I
- --
~
-r
- -
.,
~-
I
-,
lo
~
I
I
I
..
l o;:lo
I
I
- -
I
I
II
"'El
II
II
.A
I
'1 .
I
,,
I
....
,I:
II
II
II
IL
'
I
~
I
II
/
II
,f
II
,, '
II
i'1
_,
I
II
II
II
I
,f
I
'
' -1r /
I
I
~
... r.a.
_.,,
- 1 XIS
I
I
I
II
.!)(..,
n
U.l:
1"~ dn'
]f
I
..... n1
'
"'
I
I
.r
I
rrw
I '"
.,
p
J:>R
.a
...
I
I
I
I
I
l
I
l
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
11/16/20/7
91S1118""
667'31
1 "'
nz
,_ .
'/j/
ff /
Air. ·n
_, J
·I
Wf
1"= UT v ...
'I
""
CERTIFICATE No.:
TCHAl'NIR
... ·au
II
II
VF
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
l
II
n
"""" "'
_.,,
'
\
,.
II
,
'\
;1
-"
TT
II
II
_,.
" r,
II
it
J;'
' ' II
II
-
{)
,., - - 1 ,
"' .......
II
,..
~
II
n
IL ,
·~
....
-
I
I
N
II
-
~
l'fi' ii
A
- -
--
I
I
'= ..
n11
''"'
./
"'
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8 -9
8/!6/2017
.,.,,
~.,
7·
.,
.,r
' ff
I
,, 111
II
Lil
e-
'"'
-
.">l"
,._
"
..
...
f.,
I I
-
Jl
-
I
I
""'
I
~
,,
,,
.d
II.,,
"''1L
II
II
n
......-
I
,
.
'1L
,·,
~
II
_A
-
.,
(
-,'
II
II
,,
I
I
..
- ~
11
I
I
TCHAl'NIR
(jf
nc
U.l:
1"~ 11.n' Wf
1"=
UT
.. '"'
u...
I
"'
:1P
I
I
I
I
.,
'""'
VF
· I
, I ..
...
II\
I
I
I
I
I
l
I
I
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
CERTIFICATE No.: 667'31
COE
WMD
11/16/20/7
1 "'
'/j/
ff /
Air. ·n
r ., w
v ...
nz
,_ .
""
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
St.
n
""""'""
I
.!)(..,
t:x
"'
... r.a.
_.,,
-
·,
II
_'\
I
,.
_.,,
17
II
~
II
-"
,
I
..
,.
_,
'
r
"
II
_,.
If
II
_v. ~'l
,,
I
I
./
5:7
'
....
-
~·
I
n11
''"'
./
'= .. U/
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-10
8/16/2017
.,.,,
~.,
7·
.,
.,r
I
'"'
-~
"'
J
... -
-
~ -
.">l"
,._
"
..
...
f.,
Jl
I
·~ O=
.d
-
~
,
<::
"\ j
n
- v.
"~
"
·~
.I
·-
- f
'
'
_A
I
'
I
'
_,.
'
'
'\.
'
_,
I
..
,
'
-
1-rr<;;
.!)(..,
U.l:
"-"' Wf nz
1"= UT v ...
1"~
-"
_.,,
,_ .
""
h
·~
·I
VF
Air. ·n
...,
'/j/
ff /
'= ..
n11
''"'
./
"'
_.,,
I
I
I
I
"'
I
I
I
I '"
...
I
I
I
I
PROJECT DESCRIPTION: I -95 EXPRESS PHASE 3C
TWP:
5/S
I
l
I
I
FLORIDA DEPARTMENT OF TRANSPORTATION
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
CERTIFICATE No. :
TCHAl'NIR
l
PROJECT !.D. No.:
11/16/20/7
91S1:4T All
667'31
1 "'
I
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No.:
x
DATE:
8-ff
8/!6/2017
.,.,,
~.,
7·
.,
.,r
I
'"'
-~
"'
J
... -
-
~ -
.">l"
,._
"
..
...
7 :J
Jl
I
-
.d
n
....
~
-
·~ O=
,
~
<::
-
- u.
·~
I
I
I
"
I
-
-- ·
'
_A
,
'
J
\
I
I,
-R
,,
'
'I
'
_,
~
...
'c:t
r.r ""'
.!)(..,
I
U.l:
"-"' Wf nz
1"= UT v ...
1 "~
-"
_.,,
,
" I
'
_.,,
I
I
I
I
"'
I
I
I
I '"
...
I
I
I
I
PROJECT DESCRIPTION: I - 95 EXPRESS PHASE 3C
TWP:
5/S
I
l
I
...
I\
FLORIDA DEPARTMENT OF TRANSPORTATION
l
PROJECT !.D. No.:
RNG:
SEC:
NAME: JIMIN HUANG. P.E.
COUNTY: Bf/CNIARD
42£
4
S/GNATURE:JH
EPD
CG
COE
WMD
11/16/20/7
9/JUi~.
AJ/
667'31
1 "'
' /j/
n11
'= ..
"''
ff /
Air. ·n
I
CERTIFICATE No. :
TCHAl'NIR
,_ .
""
VF
I
''"'
./
"
."'
I
.!Ill
'l
I
409354-2-52-01
SHEET No .:
x
DATE:
8-12
8/16/2017
""' l°RAllS/flON SLOPE IN FRONT
OF END BENT TO l/tTTHlll
INOICATEO UNTTS
f;,¥0 OF WINGWAtL
OVTUNEOf ~~~~~-M
OUTUllE OF EXISTlllG
ENO BENT
PROPOSED
ENO BENT
. -
~o
!j>~
..
LT/.llTS Of Pl!OPOSEO
SANO-CEMENT Rll'RAP
-r --+---+-..---..---.-"'"""'-I
SEE 811/0GE PLANS FOP.
Ul4TTS OF SANO CElllENT
P.IPIUI'
--I..___,__
STAGGER VERTICAL JOINTS
~4)·
11111.
PABUAL PLAN
El/D BENT
*SEE BRIOGE PLANS FOR SLOPES.
FIU E/.IBAllKNENT
11/IJVML GROVllD
FILTER FABRIC
""' FILTER FABRIC
SECTION 8-8
$ECTWN A-A
SLOPE PROTECTION DETAILS
1-95 OVER C-10 SPUR CANAL
EX, BRIDGE NO. 860578
SAND-CEMENT BCPBAP PROTECTION
PROJECT DESCRIP TION: I -95 EXPRESS PHASE 3C
FLORIDA DEPARTMENT OF TRANSPORTATION
PROJEC T ! .D. No.:
7WP:
RNG:
SEC:
NAME: J/MIN HUANG. P.E.
COUNTY: BROflARD
5/S
4~
4
S/GNA TURE :""'J"""H _ _ _ _ _ __
EPD
CG
CERTIFICATE No. :
COE
WMD
TCHAl'MR
11116/20/T
667tg7
409354-2-52-01
SHEET No.:
x
DATE:
8-13
8/16/2017
Varies 99'-3%" to 97'-2%"
10'- 0"
Shldr.
1'-4"
36" Single Slope
Traffic Ra/Jing
(Index No. 0427)
4 Lanes @ 12'-0"
= 48'-0"
4'-0"
2 Lanes @ 12'-0"
= 24'-0"
1·-2w
Varies
Shoulder
Widening
Varies*
fl
Existing Bridge
2'- 0"
(Span 1-SB)
Varies Varie
6'- 10" 5' -3W
* 14'- 111/' to 12'-634" (Spain 1- SB)
to
to
5'-3-t's" 5'-3-%"
(S an 3 - SB)
10'-3%" to 8'-1114" (Spain 3-SB)
SOUTHBOUND BRIDGE
2 Eq. Spa.
aries 4'- 1Vs"
(Span 1 shown. Span 3 similar)
to 3'- 5*s"
Varies 1 I0'-351s" to 109'-51/e"
1'-2Yl"
Varies
Shoulder
2 Lanes @ 12'-0''
= 24'-0"
Exist. Bridge
Varies
Lane
4 Lanes@ 12'-0''
= 48'-0"
"'"'"' t '"'""' t
t
t
t
t
V
\,..,",' .'::·,...:'.~~: o;o~'~'.:~:;:;:H.. ·.\',!~r;;·.~~':'. ..';~'.':'. .00~~:'.~'. . ~
Traffic
~
4'-0"
w '. '.
t
Marker
'.
'--'
.::.
.::.
·::. .~
.Q
~ .!!!lll
Existing AASHTO
/
Type 111 Beam (Typ.J _ /
'·
,\
·· · · · · ·.
· ::
~
-
"
I
Type II Beam (Typ.)
7'- 271o"
1
-1--1-
7'- 2%"
2 Eq. Spa.
** 16'- 5 :ri6" (Span 1- NBJ
36" Single Slope
Traffic Railing
(Index No. 0427)
;:~,:~":.
1·
.!!~ .
;,
Proposed AASHTO
f...
1'-4"
10'-0"'
Shldr.
(Span 1- NBJ
(Span 3 -NBJ
Varies 7'-0 1o/i 5 to 6'- 10o/i6"
NORTHBOUND BRIDGE
(Span 1 shown. Span 3 similar)
16'-1741" to 15'- 8%" (Span 3-NBJ
LEGEND
TYPICAL SECTION (1 OF 2)
l-95 OVER DAIN/A CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
Portion of Existing Structure
to be removed.
PROJECT DESCRIPTION:
TWP:
50$
1- 95 EXPRESS PHASE 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
RNG:
SEC:
NAME: JIM!N HUANG, P.£ .
42E
28
SIGNATURE:-.J_H_ _ _ _ _ __
C£ RTJF ICAT£ No. :
TCHAPARR
8/9/2017
2:53:28 PU
66797
,~,
PROJECT l .D. No .:
409354-.2-52-01
_B_R_o_w_Al:- -:-D---x-----+--:-~-;:-N-o_.:8_/_:-:-:-0-17-
1-:-:-:-N_TY_:
/>H:'()()7J57'()()()()()(X)(2JOJ5JVJ.IJOJ:A[)VIJJI081J2.0IJ'rodvcJlonJ'oiderJAJ8_JC\SlruolV'ermlfJ'lonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawlngs'818rldgeSeci'lodJl.dgn
Varies 98'-771e" to 97'-9"
J'- 4"
36" Si ngle Slope
Traffic Railing
(Index No. 0427)
10'- 0"
Shldr.
4 Lanes @ 12'-0"
= 48'-0"
idening Varies
12'-634" t o
10'- 334"
~~l: ;:=: : ;:;: : : :; ;<=!m; .
I 13
2'- 0"
I
I
I
·
·
·
;, . · . .. ·
.::~. Pr~~~s~d
Eq. .spa.I
4'-0"
2 Lanes @ 12'-0"
= 2 4'-0"
I
Exi sting
Tubul ar ·
,., k
'~:;.~' . ~:~. tf:~'. ~ . /;~;::!:;:~·,:~, .~·;::
::;;···
AASHTO
,",
'· .·
, ,
· ,
, ,
'·
Traffic
Railing ~
~
·.·.-.-. ;::. ::~·-;b
l ~ Existing
'
:·v;
.\_· -~~isti~~-'AAS~~~
Type II Beam (Typ.)
Vanes
1'-2W'
Varies
Shldr.
·-)<
..
.: ~·
.Q
~
llJ lll
Type Ill Beam (Typ.)
Bridge
~JI
'
""'
3'-6V." to 2'- 9V."
SOUTHBOUND BRIDGE
(Span 2)
Varies 110'- 2%" to 109'-10%"
1'
211:/'
Varies
2 Lanes @ 12'- 0"
Shldr.
= 24'- 0"
t
~
t
4'- 0"
Varies
Lane
4 Lanes@ 12'- 0"
t
t
t
= 48'- 0"
10'- 0''
Shldr.
1'- 4"
Widening Va1·ies
t
16'-57le" to 16' - 11/s"
Exist. Bridge
Proposed AASHTO
Type JI Beam (Typ.)
NORTHBOUND BRIDGE
(Span 2 )
LEGEND
Portion of Existing Struct ure
t o be removed.
PROJECT DESCRIPTION:
TWP:
50S
RNG:
42E
1-95 EXPRESS PHASE 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
8/9/2017
PROJECT l .D. No .:
409354- .2-52-01
NAME: JIMIN HUANG, P .£ .
SEC:
28
SIGNATURE:-.J_H_ _ _ _ _ __
CERTIFICATE No .:
TCHAPARR
TYPI CAL SECTION ( 2 OF 2)
1-95 OVE R DAIN/A CUT-OFF CANAL
EX. BRI DGE NOS. 860109 & 860209
2:53:42 PM
66797
SHEET No .:
x
/>H:'()()7J57'o()()()()Q(X)(2JOJ5JVJ.OO..CAIJVIJJI08132.0l..ProdvcJlon.Foider ..JA..J8 . 3C\Sl r uolV'ermll..PlonsV- 9S.DontoCvtoff'SFWUO Permi t Orawl ngs'818 rldge5 eci'JorlJ2 .dlJO
OAT£ :
8-3
8191 2017
LA R/W
Por tion of Existing Struct ur e
to be removed.
Existing Ripra p to be r emoved
and r eplaced.
Exist i ng Riprap.
@
Cross Sect ions.
- -
@ o utfall Cross Sect ions.
- ~
-,
-
i'Existing
I Edge of w ater.
I
-- -
....
..
_J
/
-/
Begin Apprh. Slab I
Sta. S.52+22.6 0
---~
..
I
..
.{__
,...,.,..._,,.__T.f~--tnffflfiifft::::::::::-::+~r::~±:r----lµ-1-~=!~~'ffm./k--~:..4,:.~::._ ___s4s_s_....:·::::;~-I:- 'i 1-95
SFWMD R/W LINE
I
Exi st. 42" RCP Pipe
I
and Head Wall to remain -
I
Proposed
Retaining Wall
End Bridge
FFBW End Bent 4
St a. 554+23.40
Pr oposed
Control
St r ucture
Proposed Br i dge
Mounted Conduit
Proposed
Retaining Wall
Proposed _.,._....__""=../
Gravit y Wall
Port ion of Exist. Fender
to be removed (Ty p.)
New Fender S stem (T
PROJECT DESCRIPTION:
TWP:
50$
RNG:
42E
1-95 EXPRESS PHASE 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
NAME: JIM!N HUANG, P.£ .
SEC:
28
SIGNATURE:-.J_H_ _ _ _ _ __
C£ RT!F ICAT£ No .:
TCHAPARR
8/9/2017
2:54:06 Pll
66797
PLAN AND ELEVAT/ON (1 OF 2)
1-95 OVER DANIA CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
PROJECT l .D. No .:
409354-.2- 52- 01
~/~)~.'fffr~:;~;~; COUNTY: BROWARD
(~~~~~;-;-£_D_____~~-G_M_D_ __x_ ___ __,~~-:-;-:-N-o_
~- .:_8_/_:-:-;-0-17--
/>H:'()()7J 57'{)()()()Q(X)(X2JOJ5JVJ.OO.CAIJVIJJ I08132.0IJ'rodvcJlon..Foider .JA.38. JC\SlruolV'ermlfJ'lonsV- 95.DontoCvtoff'SFWUO Permi t Orawlngs'IJIPlonEl~ .dgt>
180'- 21/i" Overall Length of Bridge
Dimensions Along
49'-11f4"
80'-11/s"
50'- 1t4"
Span No. 1
Span No. 2
Span No. 3
Begin Bridge
FFBW End Bent 1
<£ Int. Bent 2
<£ Existing Bridge
<£ Int. Bent 3
End Bridge
FFBW End Bent 4
30
30
20
20
IO
-- -*1---.J:...
0
-IO
- 20
IO
MHW EL. 0.44
::"·",.·
~ ~ Dania C~~~off
* Existing Vertical Clearance = 10.98'
I
Proposed Vertical Clearance = 10.98'
0
-10
- 20
SFWMD R/W Line
Min. L.M.E. 11 .42
Canal
60' 0"
Horizontal Clearance
(Exi sting/Proposed)
Retaining Wall
~~Proposed
18" Prest.
Concrete Piles (Typ.)
lJ
..
MLW EL. - 2. .9
SFWMD R/W Line
11
Exist. Canal
Bot tom
ELEVATION
(SCALE: 1"
= 40')
I.
Elevations shown on these Plans are
r eferenced to North American Vertical
Datum (NAVO) of 1988.
NGVD = NAVO + 1.61
PROJECT DESCRIPTION:
1-95 EXPRESS PHASE 3C
PLAN AND ELEVATION (2 OF 2)
1-95 OVER DANIA CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
PROJECT l .D. No .:
PWRlDA DEPARTMENT OF TRANSPORTATION
TWP:
RNG:
SEC:
NAM£ : JIMIN HUANG, P.£ .
505
42E
28
SIGNATURE:-.J_H_ _ _ _ _ __
409354- .2- 52 01
"".,-;·;;;,}ffe'f3····· COUNTY: BROWARD
l ,/...\
~~"\ ,.~
!--------.------·--.....--------
~~. :.::: "i·l l-;-;-:-----r-~G-MD
_ _ _x_,_
CERTIF ICATE No .:
TCHAPARR
8/9/2017
2:54:21PIJ
66797
/>H:'()()7J57'{)()()()Q(X)(X210353VJ.OO..CAIJVIJJI08132.0IJ'rodvcJlonJ'oider -3AJ8_JC\Sfr uolV'ermll-1'1onsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawlngs'81PlonE1~2 4 gn
__,1-~-:-~-;-:-N-o__·8_/:-:-:-0-17
.·
Begin Bridge
FFBW End Bent 1
Sta. 552+43.40
- 3.§2
=-, -=. -
I
1
c
~ -==
II
/I
. Direction of Stationing ....._
~ =-=17-
II
II
I
LEGEND
I,
FFBW
,Front Face of Backwa/I
.Existing 18" Prestressed
!Concrete Piles to Remain
.Ex i st ing 74" Pr est ressed
!Concrete Piles t o Remain
Proposed 18" Prestressed
!Concrete Piles
D
FOUND.AT/ON LAYOUT
1-95 OVER DANIA CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
PROJECT DESCRIPTION:
TWP:
50S
RNG:
42E
1-95 EXPRESS PHASE 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
8/9/2017
409354-.2-52-01
NAME: JIM!N HUANG, P.£ .
SEC:
28
SIGNATURE:-.J_
H _ _ _ _ _ __
C£ RT!FICAT£ No .:
TCHAPARR
PROJECT l .D. No .:
2:5 4:38 PM
66797
SHEET No .:
x
/>H:'()()7J57 '{)()()()()(X)(2JOJ5JVJ.OO..CAIJVIJJIOBIJ2.0IJ'rodvcJlon..Folder -3AJ8_JC\S/ r uolV'ermlfJ'tonsV- 9SJ)ontoCvtoff'SFWMO Permi t Or awlngs'81Four>dt..ayOl .dgn
OAT£ :
8-6
819/ 2017
:u:
,.,
.,,,
-21
">n
l-16
1
O.,f- 1 ML ~
R
rv I
ne
--
~
'
v.
''"
-
- - -
I
'
MO Rt
.'
·~ ""
A
fl
; f111
[17e
-
I
I
-
-A
I
/
-,
/
'
I
I
-R
/
'"" ,_ _ 'I.
~-
I
/
\.
-
- 1
XI
t.
'.JTO
I
na
,.,,
-11
-.,, ·
-
I
_.,,
1
1 "'
PROJECT DESCRIPTION:
TWP:
50S
on
'"
1-95 EXPRESS PHASE 3C
'> I
a·
/-4
f'n
IM
WI
:/:_
JJV
fi
/
...
1 .,..,
ch
1 ;(}
I
PROJECT l .D. No .:
PWRlDA DEPARTMENT OP TRANSPORTATION
SEC:
NAME: JIMIN HUANG, P.£ .
42E
28
SIGNATURE: JH
2:54: 52 PJI
RU
'F ·
I 'ill
VF
nu. '() " f\j
IZ
I
RNG:
8/9/2017
... .
~
"
C£RTJFICAT£ No. :
TCHAPARR
.t .
HQ
1~.Q'.
·r,, ·111 IVE
t?~~:.~~~~·:,
":
66797
1
r
=
\~1-?f.:~i~~~~~l
409354-2-52-01
COUNTY: BROWARD
EPD
CG
CO£
WMD
SHEET No .:
x
/>H:'()()7J57'()()()()Q(X)(X2JOJ53VJ.OO..CAIJVIJJI08132.0l..ProdvcJlonJ'oider..JA..J8_JC\SlruolV'ermll..PlonsV- 9SJ)ontoCvtoff'SFWJIO Permi t Orawlngs'81TypJca!SecllorC/.OAT£ :
8-7
819/2017
:u:
,.,
.,,,
.,,
">n
U6
1
i.-,r
R
l"IL
KJw
-
tne ,____.
n<
~ · ··
A
fl
-
-A
I
I
- --
- -
,,., "
u.
,,
I
I
-R
-
.....
I'
VI
tne
- - -
-
H
I
'
'
57'1VMI
-
.....
I
I
I
I
/
I
I
,(
'\
I
\
-
- 1
~
i=xi st.
I
.ro inti
,.,,
-1 1
-.,, ·
-
/
_.,,
1 01'1
1 "'
PROJECT DESCRIPTION:
TWP:
50S
'"
1-95 EXPRESS PHASE 3C
RU
·F ·
I 'ill
VI'=
nu. '() " f\j
-, I
~.
L~ ·"\ f
~
"
SEC:
NAME: JIMIN HUANG, P.£ .
42£
28
SIGNATURE: JH
2 :55:20 PU
f'n
IM
WI
:/:_
JJV
fi
...
1
ch
1 ;(}
Dl'I
I
RNG:
8/9/2017
IZ
L
PWRlDA DEPARTMENT OP TRANSPORTATION
C£ RTJF ICAT£ No. :
TCHAPARR
.t .
HQ
1~.Q'.
·r,, ·111 IVE
66797
I
PROJECT l .D. No .:
(~~:;~~~~~:~·:) EPD
CG
''·Z~i;i,;f~f-~~~~l
WMD
409354-2-52-01
COUNTY: BROWARD
CO£
SHEET No .:
x
/>H:'()()7J57'{)()()()Q(X)(X210353VJ,IJO..CA[)VIJJI08132.0l..ProdvcJlon..Foider..JA..J8_JC\Slruol\Permll..PtonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawl ngs'81TypJca/SecllorC2.dgr>
DAT£ :
8-8
81912017
:u:
,.,
.,,,
-21
">n
l-16
1
fl!
Mn RI
I
~e
lo
- c: "W/
11
!W I tne
\\
R
x,
i
A
,,
{},HW
-
1.
·1
.'
'
,.
~
fl
v.,,..
I
~~
.....
I
.....
-A
-
/
,
'
"'
-R
-
-
/
I
I
I
\
\
I
-
-1
I
t:X!St. <·rO mo
.'>l
-1 1
-.,, ·
_.,,
r
,_r ,/
= "'
x
1... , .
,..
c: .ll vu
PROJECT DESCRIPTION:
RNG:
42E
'"IV
R
-
,.,., IP
1 01'1
1 "'
TWP:
50S
"{
'"
1-95 EXPRESS PHASE 3C
~I
I~
RU
·F ·
I 'ill
VF
nu. '() " f\j
IZ
f'ln
IM
WI
:I:_
JJV
fi
/
...
1
ch
1 ;(}
Dl"I
I
PWRlDA DEPARTMENT OP TRANSPORTATION
SIGNATURE: JH
2:55:33 PM
~
NAME: JIMIN HUANG, P.£ .
SEC:
28
8/9/2017
a·
"
C£RTJFICAT£ No. :
TCHAPARR
.t .
HQ
1~.Q'.
·r,, ·111 IVE
66797
(~)
I
PROJECT l .D. No .:
409354 -2-52-01
COUNTY: BROWARD
EPD
CG
CO£
WMD
SHEET No .:
x
/>H:'()()7J57'{)()()()Q(X)(X210353VJ.OO..CAIJVIJJI08132.0l..ProdvcJlonJ'oiderJAJ8_JC\SlruolV'ermll..PlonsV- 9SJJontoCvtoff'SFWUO Permi t Orawl ngs'81TypJca!SecllorQJ.dgn
OAT£ :
8-9
819/2017
:u:
,.,
.,,,
-21
">n
I
I
--
--
l-16
I
-
-
-
~
I
I
-
~
-- --
~
I
--
-1.
I
-
-
~
I
I
...
1
~
I
R
SFI
Ml RI N L ne
II
I
/;"I
,.
I
1il
\\
\\
.....
I
,,
\\
II
A
?.
....
I
I
....
I
r
II
II
II
l_I
"
_.,,
".
11
11
,_ ....
I
\
..... <-rl
: .,
v
r -
11
\
II
....·.'
OJ
ti
v
"" ' F'tti
·n
11
,1
."
,I
...
.. .. ,1ll
".
....
'·..'·
· ,'
"
" '
"'
I
s
~.
l j~
' 10·
r ·· r .I
"'
40' HQB.IZ
="'
x
1... , .
<;.II
,..
vu
RNG:
42£
'"IV
R
""
1 01'1
-
a
IP
'"
1-95 EXPRESS PHASE 3C
~I
...... 11.1>1
~
"
111
C£ RTJF ICAT£ No. :
,,,
'IM
~ N !l/f
.j.
66797
""
.6
rl l
...
1 .,.,
ch
PWRlDA DEPARTMENT OF TRANSPORTATION
SIGNATURE: JH
2:55:-46 PM
NC, '()
1 ;(}
I
NAME: JIMIN HUANG, P.£ .
SEC:
28
8/9/2017
D·
\II= ·.,
,_ .
V '"'
PROJECT DESCRIPTION:
TCHAPARR
-
!J
'
.....
:.
1 "'
TWP:
50S
"
Y"'
r::'
-1 1
-.,, ·
-
u.
MD ..B./_W L ne
t1
If
~"
"
" .
f " .
"
~
" '
I
II
II
- 1
Ato
,,., "
.,." '~
I
,;.
.....
..~··.
>FVi
n
I
"-:
a.Q .
'
.. .......
-R
.... ..,
'
~.
fl
-A
~
~
II
II
II
IJill
i
'~)
I
PROJECT l .D. No .:
409354-2-52-01
COUNTY: BROWARD
EPD
CG
CO£
WMD
SHEET No .:
x
/>H:'()()7J57'{)()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJIOBIJ2.0IJ'rodvcJlonJ'oiderJAJ8_JC\SlruolV'ermlfJ'lonsV- 9SJ)ontoCvtoff'SFWMO Permi t Orawlngs'81TypJca!Secllor04.dgn
OAT£ :
8 - 10
819/2017
:u:
,.,
.,,,
-21
">n
l-16
-
llV
D
JV'/
Ur e-
·w
!iliW
Un~
I
I
I
1
~
'I..
t:"
-
~~
R
'
fl
i!
1
.Oc
~ ·~
'
A
'
~
11·1n
~
fl
!!"'
~
'
.
!J
fl
fl
Ii
v.
.....
-A
.....
--
....
'
A
- _....
-R
-
/
-
Ex. ISt .
r>ro !ind
I
-1
.'>l
-11
-.,,·
_.,,
r
·-r ,/
RU
o=o :a
.,..
= ~
x
....
'""
( ,.. Mt: I/
.... ~ "
r
PROJECT DESCRIPTION:
RNG:
42E
I :f JJI
r iv
H
-.,
-
.O.JJ
..,~
1 01'1
1 "'
TWP:
50S
,..,
'"
1-95 EXPRESS PHASE 3C
'> I ia·
8/9/2017
~
...
1
ch
("In
IM
WI
:/:_
JJV
fi
1 ;(}
Dl'I
I
PROJECT l .D. No .:
PWRlDA DEPARTMENT OP TRANSPORTATION
(JJ1
.
SIGNATURE: JH
2:55:59 PM
1\11.
·F ·
I 'ill
'() " f\j
IZ
I
NAME: JIMIN HUANG, P.£ .
SEC:
28
VF
... ,
'""~
"
C£ RTJFICAT£ No. :
TCHAPARR
.t .
HQ
J~.Q'.
·r,, ·111 IVE
66797
409354-2-52-01
COUNTY: BROWARD
.
'
'
EPD
CG
CO£
WMD
SHEET No .:
x
/>H:'()()7J57'{)()()()Q(X)(X210353VJ,IJO..CAIJVIJJI081J2.0l..ProdvcJlon..Foider JAJ8_JC\SlruolV'ermll..PlonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawl ngs'81TypJca!Secllor054gn
OAT£ :
8 - 11
819/2017
:u:
,.,
.,,,
-21
,- -
">n
~
-
I
r
l-16
-- -
~
I~
I
- r
,L
- -~ -
R,,
I
10
I
I
I
..
~
~
,,
...
,I
"~"
'\
-
.tn
,...
II
r- - 'I
II
11
II
I
II
I
..' ".,If
"
' ...
'"
11
:1
II
....
1....
~
'"
-- -
o=o :a
.... lnif
( ,.. Mt:
I/
I :f1-'1
-
h
D.1-'
_.,,
1 01'1
1 "'
PROJECT DESCRIPTION:
TWP:
50S
'"
1-95 EXPRESS PHASE 3C
{
'
~
'
..
I
~· IJ'
I
r,, '
I
c;
./
.,,...
{
l
'!W
I
\
,_
I
H XJ
I'
t. ro nn "
I
I
11
I
I
11
I
_')I
..
a·
.., ...
./
~
"
.t .
HQ
J~_Q'.
·r,, ·111 IVE
..'·
' ·
Ltn°
II
I
".
n
I
HI
I
' '
~ WI
11
~
"'
'1
-F ·
RU
I 'ill
VF
nu. '() " /\J
IZ
f'ln
IM
WI
:/:.._
l.H
...
1
ch
1
Dl'I
JJV
fi
;n
I
PWRlDA DEPARTMENT OF TRANSPORTATION
SEC:
NAME: JIMIN HUANG, P.£ .
42E
28
SIGNATURE: JH
2:56:12 Pl/
I
I
1,' 1
RNG:
8/9/2017
I
'
,,
I
·, '·
..
..
C£RTJFICAT£ No. :
TCHAPARR
I
.... I
""
., I
n
·, ' · I
..
'
I
I
~"
"'
.'
'"
r ·- r ,/
11 11
I
II
:
>-- ._..
" '
.
r
j
' ,,:
..
...
lo
I
-1 1
"' _I
~; '
"'
I
ll
,,..
.
u.
" -- "---
I r- ~:
l
'I
ti
~·
...."
I
II
I
r .... .... _
-
A
i·!
'C.
:1
l
I
~
-
"
~
I
"
-
~
'
-
I
,_,
II
-.,, ·
....
'
I
I
II
- 1
-
-
11
II
-R
....
-
I
I
II
-A
-
- -- -
-~ -
11
II
n
-
~ -
- -
I
II
, t-·A M
>-
II
II
A
~
-
~ ""' , 2
~
R
-
-
,__ ,_ _
I
--
I\.
1
-- - - - -
66797
/~1~~~~~;;-~\
l~?.f~. ~~;~M¥J
I
PROJECT l .D. No .:
409354-2-52-01
COUNTY: BROWARD
EPD
CG
CO£
WMD
SHEET No .:
x
/>H:'()()7J57'{)()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJIOBIJ2.0IYrodvcJlonJ'oiderJAJ8_JC\SlruolV'ermllYtonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawl ngs'81TypJca!Sec1torQ5.<1gn
OAT£ :
8 - 12
819/2017
:u:
,.,
.,,,
-21
">n
l-16
<;
WJ
~n
uw
Ur e
1
R
-
I
....-
I
I
I
I
I
---
--
- -- -- --- -- - ... - -
-- -
-
--_....1.._:c
-
...
-
"'
-
~""
I
I
I
I
...
-
-
,.,
tVI'
~
-~
PROJECT DESCRIPTION:
RNG:
42E
-
/
I
h
1-95 EXPRESS PHASE 3C
8/9/2017
/
-
..... _
T
:
-
,....
/
.J
~. J
' 1
I
1 , --,
1:1
I
Ill
I
-
o
I
I
I-)(
st
firr m r
I
.I
."
I
' '·
!
'"
' ·,
I
,I
I
.'>l
'
' ·,
.t .
HQ
1~.Q'.
·r,, ·111 IVE
IZ
'·
"
'> I ill '
RU
·F ·
VI'=
I
nu. '()
;,u, /
0
"
1ll
f\j
f'n
IM
WI
:I:_
JJV
fi
"'~
...
"
1
ch
1 ;(}
Dl'I
I
PWRlDA DEPARTMENT OP TRANSPORTATION
SIGNATURE: JH
2:56:24 PM
I
... _
C£RTJFICAT£ No. :
TCHAPARR
Li he
IRtl
'
II
.. '7
.. '\
NAME: JIMIN HUANG, P.£ .
SEC:
28
~"' IVl/J
1
1
8
ti ~
~ /
..' " ' "
....
...
"
...' "
r ,_r ,J
1 01'1
I
~
.....
'"
1 "'
·
~
8
II
LJ J ..,_~
'. ~~ It
-11
TWP:
50S
-
"
D.1-'
......._
I
I
.' ."'
."
I :f JJI
tr. , ;
l
'"
-1
( ,.. Mt: I /
I
I
'
I<
....
...,
-R
... "'"
I
~
fl
o=o :a
I I
I
IJj ,
..
-A
,1
--
-~
>'
_.,,
--
>
---'\"
.,..
l
I
I
'
A
-.,,·
11
I
I
II
1 ~-
t
I
I
I
PROJECT l .D. No .:
/;·::~~::~~f~:::\ COUNTY:
EPD
66797
\;~ii?.~~
\~~i) CO£
.............
''·,
409354-2-52-01
BROWARD
SHEET No .:
CG
WMD
x
/>H:'()()7J57'()()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJIOBIJ2.0IJ'rodvcJlon..Foider JAJ8_JC\SlruolV'ermlfJ'lonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawl ngs'81TypJca!SecllorC7.dgn
OAT£:
8 - 13
819/2017
** TRANSITION
SLOPE IN FRONT
OF END BENT TO W/THl/j
END OF WINGIVALL
INDICATED LIMITS
...--....-~.r:
RETAIN/NG WALL
END OF WINGWALL
,___ _ _ _ _~OUTLIN E OF
PROPOSED
END BENT
OUTLINE OF EXISTING
END BENT
90"00'00" _ __,..,,,
OUTLINE OF
PROPOSED
END BENT
OUTLJllE OF EXISTING
ENO BENT
~------1
DRAINAGE
OUTFALL
DITCH
SEE BRIDGE PLANS FOR
UM/TS OF SAND CEMENT
RIPRAP
-----~------STAGGER VERTICAL JOINTS
14/N.
SFWMD RJW LINE
LIMITS OF PROPOSED
SAND-CEMEllT RJPRAP
LIMITS OF PROPOSED
SA/ID-CEMENT RIPRAP
~-0"
f END OF
LIMITS OF PROPOSED
SANO-CEMENT RIPRAP
PARTIAL PLAN
{TYPICAL)
-~---
MIN.
STAGGER VERTICAL JO INTS
OUTFALL DITCH
FL. EL. 0.00
""'-- 5FWNO R/W LINE
FILL EMBANKMENT
PARUAL PLAN
{DRAINAGE OUTFALL DITCH)
l'-6"
CAP EL. 4.75
** FILTER FA8RIC
SECTION C-C
RETAJ/llNG WA LL
FL. EL. 0.00
END BENT
FILTER FABRIC
** FILTl:R FABRIC
*SEE BRID<;E PLANS FOR SLOPES.
5£CTION D-D
SECTI ON A·A
PROJECT DESCRIPTION:
TWP:
50$
RNG:
42£
l - 95 E XPRESS P HA S E 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
NAME: JIM!N HUANG, P.£ .
SEC:
28
SIGNATURE:-.J_H_ _ _ _ _ __
C£RTJFICAT£ No. :
TCHAPARR
8/9/2017
2:56:37 PU
SLOPE PROTECTION DETAILS
1-95 OVER DANIA CUT-OFF CANAL
EX. BRI DGE NOS. 860109 & 860209
SAND-CEMENT RIPRAP PROTECTION
66797
PROJECT l .D. No .:
409354 -,2-52-01
(:~~~~t~~:) 1-~-:-:-N_TY_:_8_R_O_W_A,....~-~--------...-SH_E£_T_N_o-.:-B_ _ _ _ _
14
\~i~f,~;~~t~/
CO£
WMD
x
OAT£:
/>H:'()()7J57'{)()()()Q(X)(X2JOJ53VJ.OO..CAIJVIJJI081J2.0IJ'rodvcJlon.Foider-3AJ8_JC\SlruclV'ermlfJ'lonsV- 9SJ)ontoCvtoff'SFWUO Permi t Orawlngs'81SlopeProlectlorC819/2017
...·.·.:·.·
Plastic Lumber
.. , 6" Post
4
Mark D (Typ.)
Plastic Lumber 8" x 8'
Spacer Blocks
Plastic Lumber 6" x IO"
Mark F (Back FMe, Top)
*
Mark 8 (Typ.}
Plastic Lumber 2" x 12" Decking
Mark E shown. Fiberglass Open
Grating slm//ar (Typ.)
Lighted
Clearance
GauQe
,·h'·"·'·'·"·'·'·'··.·······....·.·. ·.·,... ...... ........ ....:.·. ....... ...... . ......
111'.L.VI = EL. · 1.72'
C
Composite Lumber 1(1' x Ur Wales
Hark A (alon9 F ront F11r:e of Fender) (Typ.)
Pl·scfc Luttlber r .ii 6"
Ugflt Support HMk.:2
*Ot her railing system may be substituted when shown in the Contract Document s .
FENDER DETAILS
~.. g S:airll'tss Sr~~I 8olts
r--t=l::l:=lf=~ Loci-Ing ftut.s & w.-sMrs
(Typ~
:r
Plast1e Lun'lbE1'
x 8'
Ll ghf Support Har« H2
Ori~ntation
Cteattm(e
' - ·1- - "lor'.:'Y Clelanice GcW9e Ught
..........._~Plastic LtlmbN Z" Jl
line for
G«.i~
6~
t-·'<:l=:ji==~~--;' ;z::~n
Plastic Lumber II'" x 8"
Spa16"' e Composlre
Plies
Pl·stlc I.umber 8" x II"
Brae.Ing
N~rt
G
-
-
....u...
P11sr1c Lumb~ l" x 6"
Cltfrt1fl(t Gl)l.lge S11pport
Hark HI (~OC l'I f «,f) - --+t-
w
fJ Sti iAfeS'S Sttfl Bolts.
LO{PIHdCL~r
Clt11tat><~
Width
Gau90
VIH'iu--i=:::::,.__ j
CLEARANCE GAUGE DETAILS
PROJECT 0£SCR!PTJON:
TWP:
RNG:
SEC:
50S
42£
28
TCHAPARR
1- 95 EXPRESS PHASE 3C
8/9/2017
/?~:'.!~~>\
\1,~tff~i1.;~~~~~}
2:56:52 PJI
FENDIER DETAILS
1-95 OVER DAIN/A CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
Conceptual Design-Bu/Id Plans.
The Final Design- Build Project
will not alter t he Navi gational
Clearances shown i n these plans.
r x. fr M1.tr t HJ
PWRlDA DEPARTMENT OF TRANSPORTATION
NAM£ : JIMIN HUANG, P.£ .
SIGNATURE:..;:;J.;..;._
H _ _ _ _ __
CERTIFICATE No. :
66797
PROJECT J.D. No .:
409354 -.2-52-01
COUNTY: BROWARD
NflTE:
£PD
SHEET No. :
CG
WMD
x
/>H:'()()7J57'{)()()()Q(X)(X2JOJ5JVJ.OO.CAIJVIJJI08132.0l.ProdvcJlonJ'oider.JA.38. JC\SlruolV'ermll.PlonsV- 95.DontoCvtoff'SFWJIO Permi t Orawlngs'81Fenr!er0eh'Jl.agn
OAT£ :
8 - 15
819/2017
-><-4
,...,.
(
LJ
'" t:i :z2
-:m4~4-
-'
'
RNl.
4
Rf ONAViGAJIONAL IJGHT
{1800EGRE£ V~181.JlY)
Ga. · GRml CENTERCHANte.
Begin Apprh. stab l
Sta. 552+22.60
UGHT (360 DEGREE Vl!IBIUTYI
rmll Existlr.g Struc:ture
m
to be removed'.
IJtlIJ;.:
Jn accordance with 33CFR Part 18
11nd Bridge Ughting1 G-uide.
Conctptu,I Oesi9n·,8 Ulld PIM$ ,
The Final Design-Build Project
will not alter the N·avl9·tional
Cl~araoces shown in th~se plans.
180.2011
Gv~rafl L~n
th of Brld
~
--,Dimensions Along
_ _ _.,.____
so_.1_·_
1·_ _,_1[ Ex1Stm9 Brtdge
,__
·_9._
97~--+---so_
.o_g_.-
Begin Bridge
30
FFBW End
B~nr
Span No. 1
Span No. 2
Span llo. 3
End Bridge
FFIJ"-11 Efld Btl'lf 4
1
20
10
_,:
f
II-- Pr oJ>Cstd
II
·20
111" Prest.
Coocrete Piles (Typ.J
NAVIGAHONAL LIGHTING
1-95 OVER DAIN/A CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
· 30
PROJECT DESCRIPTION: 1- 95 EXPRESS PHASE 3C
TWP:
RNG:
505
42E
PWRlDA DEPARTMENT OF TRANSPORTATION
NAM£ : JIMIN HUANG, P.£ .
SEC:
28
SIGNATURE:-.J_H_ _ _ _ _ __
CERTIFICATE No. :
TCHAPARR
8/9/2017
2 : 57:09 Pll
66797
PROJECT l .D. No .:
i?t~~~t~-:} £PD
409354-.2-52-01
COUNTY: BROWARD
CG
SHEET No. :
8 - 16
\{~~f.4~~~f.~~! ~C-O-£-----~~W-M_D___X
_____-+-O-A_T_£_:___8_/_9_'/_2_0_17-~
/>H:'()()7J57'{)()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJIOBIJ2.0l..ProdvcJlon.Foider..JA..J8_JC\SfruotV'ermll..PlonsV- 9SJ)on1oCvtoff'SFWUO Permit Oraw1ngs'81Llghllng.d9on
PROP. RETAINING WALL
\
PROP. SAND- CEMENT
\
\
RIPRAP
\
---
\:. il ~;-~1:1/i.W_=_O~-!_
L_ ~~~ ~R~UND
MATCH EXIST. ELEV.
- - - - - - -
\ _ EXlST. 42" PIPE
(TO REMAIN)
OUTFALL CROSS SECTION 0-2
v-
PROP. SAND- CEMENT
RIPRAP
EL. 6.00
SFWMD R!W LINE
PropStruct 13A-9
.,..
.,,
-----------r
EXIST. GROUND_/
OUTFALL CROSS SECTION 0-1
PROJECT DESCRIPTION: 1-95 EXPRESS PHASE 3C
50S
=
t
-
--
- - - -
-
- - - - - - -- - - - - -
EXlST. CANAL BOTTOMJ
rnsr. RUBBLE
28
H_ _ _ _ _ __
SIGNATURE:-.J._
66797
:::,;;,,' - -
- -
(TO BE REMAIN)
EXIST. ENDWALL
(TO REMAIN)
(TO REMAIN)
NAME: JIMIN HUANG, P.E.
8/I0/20/1
-~- -
-= -~ ::r.=1=~
SEC:
2:12:1/ Pll
MHW = 0 .44
-
PWRlDA DEPARTMENT OF TRANSPORTATION
CERTIFICATE No.:
TCHAPARR
EXIST. RUBBLE RIP-RAP
(TO BE REMOVED)
N
POND 13A-9
BOTTOM EL . 1.42
EXIST. ENDVIALL
(TO BE REMOVED)
EXIST. 42" PIPE
RNG:
42E
il
-
PROP. INLET PAVEMENT
TWP:
l
OUTFALL CROSS SECTION DETAILS
1-95 OVER DANIA CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
PROJECT l.D. No.:
409354- .2- 52- 01
SHEE T No.:
x
DATE:
8 - fl
8/9/20f7
/>H:'()()1J51'{)()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJI081320/..ProdvcJlonJ'oider-3AJ8_JC\SfruolV'ermll..PlonsV- 9SJ)onloCvtoff'SFWUO Permit Orawl ngs'VISSPROP. RETAINING WALL
MATCH EXI ST. ELEV.
r
PROP. SANO CEMENT
RIPRAP
EXIST. GROUND
------- --- -·
ENO PROP. DRAINAGE
OUTFALL DITCH
EL. 0.00
OUTFALL CROSS SECTION 0-4
SFWHD RIW UNE
~
END RETAINING WALL
EL. 4.75
EXIST. GROUND
PROP. RETAINING WALL
CAP EL. 4.75
END PROP. DRAINAGE
OUTFALL DITCH
EL. 0 .00
EXIST. GROUND
PROP. SAND- CEMENT
RIPRAP
PROP, SAND-CEMENT
RIPRAP
- - --- --
--- --
MHW = 0.44
~ ~EXIST. ENDWALL
. . ,, __
........
___ /
,,,.,,,.
I"
(TO BE REMOVED)
PROP. BOTTOM OF DRAINAGE
OUTFALL DITCH 138 18
____L_ _ _
OUTFALL CROSS SECTION 0-3
EXIST. CANAL BOTTOM
PROJECT DESCRIPTION: 1-95 EXPRESS PHASE 3C
PWRlDA DEPARTMENT OP TRANSPORTATION
TWP:
RNG:
SEC:
NAME: JIMIN HUANG, P.E.
505
42E
28
SIGNATURE:-.J....
H_ _ _ _ _ __
CERTIFICATE No.:
8/J0/20/1
EXIST. 50" PIPE
(TO BE REMOVED)
1
_)z
1
1
_2_rs5~==================-====================
- \__
TCHAPARR
~
2:11:36 PU
66797
OUTFALL CROSS SECTION DETAILS
1-95 OVER DANIA CUT-OFF CANAL
EX. BRIDGE NOS. 860109 & 860209
PROJECT 1.0. No.:
409354- .2- 52 01
~~:~~'.·: l-:-:-:-N_TY_:_B_RCHf_A+R--M~ -D
+-;-:-~-;-~-N_o__·8_/_9a/-~-:-'1-7
___
x _ __ _
.·
/>H:'()()7J57'{)()()()Q(X)(X2JOJ5JVJ.OO..CAIJVIJJt081J2.0IJ'rodvcJlonJ'oider JAJ8_JC\SlruolV'ermll_f'lonsV- 9SJ)onloCvtoff'SFWllO Permi t Or awlngs'VISS