PROJECT PURPOSE:
Basic: Housing
Overall: Construct a single family home in Collier County
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Andrew Schmidt
409 SW Redwood Cove
Port St. Lucie, FL 34986
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Horsepen Slough. The project site is located at PIN 38503240009, 35th Ave, NE. Naples, Section 15, Township 48S, Range 27E, Collier County, Florida.
Directions to the site are as follows: I-75 to the Immokalee Road proceed east. Turn left on 33rd Ave NE, then right on Wilson Blvd. North. Take the first right on 35th Ave NW. The parcel will be on the right.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.296548º
Longitude -81.604442º
PROJECT PURPOSE:
Basic: Housing
Overall: Construct a single family home in Collier County
EXISTING CONDITIONS: The onsite vegetation defined by the Florida Land Use, Cover and Forms Classification System is described as 419 Other Pine Upland 1.16 acres and 621 Cypress Wetland 3.61 acres. The existing area surrounding the project area consists of similar vegetation with sparse single family homes in the area.
PROPOSED WORK: The applicant seeks authorization to discharge fill in 0.21 acres of forested wetlands for the construction of a single family home and associated infrastructure.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
“CONSTRUCTION AND CLEARING WILL BE DONE TO MINIMIZE EFFECTS ON THE WETLAND AREA.”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
Purchase of 0.05 credit acres from either Panther Island or Corkscrew Regional Mitigation Bank.
CULTURAL RESOURCES:
By letter dated August 25, 2017 to the applicant from the Florida Master Site File, Florida Master Site File lists no archeological sites and no other cultural resources recorded at the parcel.
The Corps has determined the permit area the activity is of such limited scope there is little likelihood of impact upon a historic property; therefore, the proposed project would have “No Potential to Cause Effect”.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely affect the Florida Bonneted Bat (Eumops floridanus), Red-Cockaded Woodpecker (Picoides borealis), Florida Scrub Jay (Aphelocoma coerulescens), Wood stork (Mycteria americana), Florida Panther (Puma concolor coryi), Eastern Indigo Snake (Drymarchon corais couperi). The Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): The Corps has determined that the proposed action would not have substantial adverse impact on EFH or Federally managed fisheries since the work is above mean high water.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of District Engineer through the 1520 Royal Palm Square, Suite 310, Ft. Myers, Florida 33919 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Allison C. Murphy, in writing at the Ft. Myers Permits Section, 1520 Royal Palm Square Blvd., Ft. Myers, Florida, 33919; by electronic mail at Allison.C.Murphy@usace.army.mil; by facsimile transmission at (239)334-0797; or, by telephone at (239)334-1975 ext. 0008.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the completed work, the Department of the Army has not recommended legal action at this time. Final determination regarding legal action will be made after review of the project through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
1520 ROYAL PALM SQUARE BLVE, SUITE 310
FORT MYERS, FLORIDA
REPLY TO
ATTENTION OF
September 1, 2017
Regulatory Division
West Permits Branch
Fort Myers Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-2017-01723 (SP-ACM)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Andrew Schmidt
409 SW Redwood Cove
Port St. Lucie, FL 34986
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Horsepen Slough. The project site is located at PIN 38503240009, 35th
Ave, NE. Naples, Section 15, Township 48S, Range 27E, Collier County, Florida.
Directions to the site are as follows: I-75 to the Immokalee Road proceed east. Turn
left on 33rd Ave NE, then right on Wilson Blvd. North. Take the first right on 35th Ave
NW. The parcel will be on the right.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.296548º
Longitude -81.604442
PROJECT PURPOSE:
Basic: Housing
Overall: Construct a single family home in Collier County
EXISTING CONDITIONS: The onsite vegetation defined by the Florida Land Use,
Cover and Forms Classification System is described as 419 Other Pine Upland 1.16
acres and 621 Cypress Wetland 3.61 acres. The existing area surrounding the project
area consists of similar vegetation with sparse single family homes in the area.
PROPOSED WORK: The applicant seeks authorization to discharge fill in 0.21 acres of
forested wetlands for the construction of a single family home and associated
infrastructure.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
"CONSTRUCTION AND CLEARING WILL BE DONE TO MINIMIZE EFFECTS ON THE
WETLAND AREA."
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
Purchase of 0.05 credit acres from either Panther Island or Corkscrew Regional
Mitigation Bank.
CULTURAL RESOURCES:
By letter dated August 25, 2017 to the applicant from the Florida Master Site File,
Florida Master Site File lists no archeological sites and no other cultural resources
recorded at the parcel.
The Corps has determined the permit area the activity is of such limited scope there is
little likelihood of impact upon a historic property; therefore, the proposed project would
have "No Potential to Cause Effect".
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely
affect the Florida Bonneted Bat (Eumops floridanus), Red-Cockaded Woodpecker
(Picoides borealis), Florida Scrub Jay (Aphelocoma coerulescens), Wood stork
(Mycteria americana), Florida Panther (Puma concolor coryi), Eastern Indigo Snake
(Drymarchon corais couperi). The Corps will request U.S. Fish and Wildlife
concurrence with this determination pursuant to Section 7 of the Endangered Species
Act.
ESSENTIAL FISH HABITAT (EFH): The Corps has determined that the proposed
action would not have substantial adverse impact on EFH or Federally managed
fisheries since the work is above mean high water.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
2
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of District Engineer through the 1520 Royal Palm
Square, Suite 310, Ft. Myers, Florida 33919 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Allison C. Murphy, in writing at the Ft. Myers Permits Section, 1520 Royal Palm Square
Blvd., Ft. Myers, Florida, 33919; by electronic mail at
Allison.C.Murphy@usace.army.mil; by facsimile transmission at (239)334-0797; or, by
telephone at (239)334-1975 ext. 0008.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the
completed work, the Department of the Army has not recommended legal action at this
time. Final determination regarding legal action will be made after review of the project
through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
3
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
PROJECT LOCATION DETAIL MAP
PROJECT: SCHMIT
U36 T46
COLLIER CO, FL
Figure 2. Project Location Detail Map.
RAMSEY INC.
SCHMIT PARCEL; South of 35th Ave NE, Collier Co ;, Naples, FL
Sec 15; Twn 48; Age 27 ; totaling 5.0 acres
PIO 38503240009
Environmental Consulting
2631 41h St NW
Naples FL, 34120
239.564.1660
Ramsey.Inc@embarqmail.com
SOIL MAP
,002.$/((
%2&$ +
PROJECT: SCHMIT
U36 T46
COLLIER CO, FL
Figure 3. Soil Map
RAMSEY INC.
SCHMIT PARCEL; South of 35th Ave NE, Collier Co;, Naples, FL
Sec 15; Twn 48; Rge 27; totaling 5.0 acres
PID 38503240009
Environmental Consulting
2631 4th St. NW
Naples FL, 34120
239.564.1660
Ramsey.Inc@embarqmail.com
FLUCFCS I VEGETATION MAP
419 OTHER PINE
DEP/SFWMD UPLAND
USACOE UPLAND
1.16 AC
621 CYPRESS
DEP/SFWMD JURIS WETL
USACOE JURIS WETLANE
3.61 AC
0
37.5 75
P-.~-
150
225
1
I
300
I Feet
PROJECT: SCHMIT
U36 T46
COLLIER CO, FL
Figure 4. FLUCFCS I Vegetation Map.
RAMSEY INC.
SCHMIT PARCEL; South of 35th Ave NE, Collier Co;, Naples, FL
Sec 15; Twn 48; Rge 27; totaling 5.0 acres
PIO 38503240009
Environmental Consulting
.2631 41h St. NW
Naples FL, 34120
239.564.1660
Ramsey. lnc@embarqmail.com
AERIAL I FLUCFCS I VEGETATION MAP
0
37.5
75
150
225
300
~P-'l~-~-~-~~~~-----m111; Feet
PROJECT: SCHMIT
U36 T46
COLLIER CO, FL
Figure 5. Aerial I FLUCFCS I Vegetation Map.
SCHMIT PARCEL; South of 35th Ave NE, Collier Co ;, Naples, FL
Sec 15; Twn 48; Rge 27; totaling 5.0 acres
PIO 38503240009
RAMSEY INC.
E nvironmental Consulting
2631 4th St. NW
Naples FL, 34120
239.564.1660
Ramsey.lnc@embarqmail.com
ZOOM OUT AERIAL MAP
PROJECT: SCHMIT
U36 T46
COLLIER CO, FL
Figure 6. Zoom Out Aerial Map.
RAMSEY INC.
SCHMIT PARCEL; South of 35th Ave NE, Collier Co ;, Naples, FL
Sec 15; Twn 48; Rge 27 ; totaling 5.0 acres
PIO 38503240009
Environmental Consulting
2631 41h St. NW
Naples FL, 34120
239.564.1660
Ramsey. lnc@embarqmail.com