PROPOSED PUMPING STATION, ACCESS ROAD AND CONVEYANCE CHANNEL ALONG BAYOU PETIT CAILLOU IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801
LOCATION OF WORK: Bayou Petit Caillou in Section 13, Township 19S, Range 18E, in Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.418716 N, Longitude -90.605948 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, fill and excavate to construct a pump station on Bayou Peitit Calliou in order to reduce the flooding caused in the area during prolonged rainfall events, which includes a conveyance channel to connect the pump station to the bayou, installation of culverts with sluice gates for regulating the flow of water to the pump station and an access road to connect the pump station to the Highway. Approximately 18,500 cubic yards of material will be excavated and utilized on site. Additionally, 15,000 cubic yards of fill material will be hauled in for the proposed project. A preliminary analysis has determined that the proposed project would impact approximately 3.5 acres of forested wetlands; however, the exact extent of coverage and impacts is undetermined at this time pending a wetland delineation.
It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would not meet engineering and construction standards at the project site. The applicant will compensate for unavoidable wetland impacts by purchasing credits from an approved mitigation bank.
JOINT PUBLIC NOTICE
05 September 17
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1588
Project Manager
Glenn E. Dobson Jr.
glenn.e.dobson@usace.army.mil
MVN-2017-01059-CC
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 170828-04
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
PROPOSED PUMPING STATION, ACCESS ROAD AND CONVEYANCE CHANNEL
ALONG BAYOU PETIT CAILLOU IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS
Engineering, LLC, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801.
LOCATION OF WORK: Bayou Petit Caillou in Section 13, Township 19S, Range 18E, in
Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit
(HUC 08090302), as shown on the attached drawings (Latitude 29.418716 N, Longitude
-90.605948 W).
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, grade, fill and excavate to construct a pump station on Bayou Peitit
Calliou in order to reduce the flooding caused in the area during prolonged rainfall events,
which includes a conveyance channel to connect the pump station to the bayou,
installation of culverts with sluice gates for regulating the flow of water to the pump station
and an access road to connect the pump station to the Highway. Approximately 18,500
cubic yards of material will be excavated and utilized on site. Additionally, 15,000 cubic
yards of fill material will be hauled in for the proposed project. A preliminary analysis has
determined that the proposed project would impact approximately 3.5 acres of forested
wetlands; however, the exact extent of coverage and impacts is undetermined at this time
pending a wetland delineation.
2
It is presumed that the applicant has designed the project to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable. Any further reduction
would not meet engineering and construction standards at the project site. The applicant
will compensate for unavoidable wetland impacts by purchasing credits from an approved
mitigation bank.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
3
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and the State
Historic Preservation Officer.
The New Orleans District has determined that the proposed project is located in waters
known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing Standard
Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated
October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish
and Wildlife Service, Ecological Services Office, the Corps has determined that with the
inclusion of the Standard Manatee Conditions for In-Water Activities, proposed work is not
likely to adversely affect the West Indian Manatee.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 0 acres of EFH. Our initial determination is
that the proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts
and the need for mitigation measures is subject to review by and coordination with the
National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
4
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program (Louisiana Coastal Zone Application P20170483). The
Department of the Army permit will not be issued unless the applicant received approval or
a waiver of the Coastal Use Permit by the Department of Natural Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
HOUMA
N
Project Location
VICINITY MAP
SCALE: N.T.S.
REVISIONS
No.
Description
Date
.4
13
S
LE
MI
PROJECT LOCATION
N
PROJECT LOCATION
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
500'
0'
500'
1000'
1500'
VICINITY MAP
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VICINITY MAP
6000'
0'
6000'
12000'
XXX
Checked by
18000'
August 2, 2017
Plot Date
01
N
APP
ARE
NT
PRO
PER
APP
APP
TY
ARE
NT
ARE
NT
PER
REVISIONS
TY L
INE
No.
E
PRO
PRO
APPARENT
PROPERTY LINE
LIN
PER
PER
TY L
INE
Date
TY L
BUILDING
CONC. SLAB
BUILDING
INE
FENCE
LEVEE TOE
TREE
LOU
ANCHOR & GUY WIRE
PET
ITE
CAIL
TOP OF BANK
TOP OF BANK
EDGE OF BERM
TOP OF BERM
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
BAY
OU
LEVEE CROWN
LEVEE CROWN
LEVEE TOE
Description
Y 56
ARE
PRO
HW
APP
NT
EXISTING SITE PLAN
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
LEGEND
- STRUCTURES TO BE REMOVED
NOTE:
EXISTING SITE PLAN
100'
0'
100'
200'
300'
1.
THE ROAD SURFACE WILL BE TEMPORARILY REMOVED
FOR LAYING THE CULVERT AND WILL BE RESURFACED.
2.
WOOD DEBRIS WILL BE SENT TO THE LAND FILL FOR
DISPOSAL.
MAC
Checked by
XXX
Checked by
August 2, 2017
Plot Date
02
50'x72' 250# CLASS RIP RAP
PROPOSED 48'Ø
DISCHARGE
PIPE (TYP.)
PROPOSED 72"x205' CULVERTS
N
PROPOSED GENERATOR
PROPOSED 4000 GAL.
FUEL TANK
PROPOSED PUMP
STATION
10.0
0
REVISIONS
2+0
0
1+0
0
0+0
0
PROPOSED 300'x150'
STAGING AREA
Description
Date
5+0
0
PROPOSED ACCESS ROAD
(15' WIDE)
16+
00
15+
00
13+
00
11+
00
PROPOSED 60" HDPE
DRAIN PIPE WITH SLUICE
GATE (TYP. 4)
14+
00
PROPOSED HEADWALL
12+
00
AUXILIARY CHANNEL
P
CON ROPO
VEY SED
CHA ANCE
NNE
L
10+
00
PROJECT START
LAT: 29° 25' 09.81"
LONG: -90° 36' 28.48"
9+0
0
8+0
0
7+0
0
6+0
0
10.0
0
4+0
0
3+0
0
No.
PROPOSED 6'x6'
BOX CULVERT
WITH SLUICE GATE
(TYP. 4)
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PROJECT END
LAT: 29° 25' 04.44"
LONG: -90° 36' 11.45"
PROPOSED SITE PLAN
LEGEND
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
- PROPOSED ACCESS ROAD (1,030 FT)
Drawn by
- AREA DREDGED (2.11 ACRES) (18,500 CY)
Checked by
MAC,JJS
MAC
Checked by
PROPOSED SITE PLAN
100'
0'
100'
200'
300'
- AREA FILLED (1.93 ACRES) (32,500 CY)
- STAGING AREA (1.03 ACRES)
- RIP RAP (0.08 ACRES) (300 CY)
XXX
August 11, 2017
Plot Date
03
PROPOSED 300'x150'
STAGING AREA
PROPOSED 72"x120'
CULVERTS
PROPOSED PUMP STATION
PROPOSED ACCESS ROAD
(15' WIDE)
REVISIONS
Description
Date
PROPOSED CONVEYANCE CHANNEL
10.00'
PROPOSED 48'Ø
DISCHARGE PIPE
(TYP.)
No.
10.00'
250# CLASS
RIPRAP
PROPOSED
HEADWALL
PROPOSED 60" HDPE DRAIN PIPE
WITH SLUICE GATE (TYP. 4)
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
ENLARGED SITE PLAN
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
- STAGING AREA
MAY 2017
DMM
MAC,JJS
Drawn by
MAC
Checked by
ENLARGED SITE PLAN
- PROPOSED ACCESS ROAD
- AREA FILLED
39130-1022
Date
Designed by
LEGEND
- AREA DREDGED
Project number
XXX
Checked by
50'
0'
50'
100'
150'
August 11, 2017
Plot Date
04
PROPOSED ACCESS ROAD
(15' WIDE)
PROPOSED CONVEYANCE CHANNEL
REVISIONS
No.
Description
Date
PROPOSED 6'x6' BOX CULVERT
WITH SLUICE GATE (TYP. 4)
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
ENLARGED SITE PLAN
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
- STAGING AREA
MAY 2017
DMM
MAC,JJS
Drawn by
50'
0'
50'
100'
MAC
Checked by
ENLARGED SITE PLAN
- PROPOSED ACCESS ROAD
- AREA FILLED
39130-1022
Date
Designed by
LEGEND
- AREA DREDGED
Project number
XXX
Checked by
150'
August 11, 2017
Plot Date
05
1+0
0
0+0
0
N
2+0
0
REVISIONS
No.
Description
Date
16+
00
15+
00
13+
00
11+
00
10+
00
CHANNEL
BOTTOM
14+
00
PROPOSED
CONVEYANCE
CHANNEL
12+
00
AUXILIARY
CHANNEL
'
00
0.
R6
20.0
0'
9+0
0
8+0
0
7+0
0
6+0
0
20.0
0'
5+0
0
4+0
0
3+0
0
PROPOSED TOP
BANK
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PROPOSED DREDGING
PLAN
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
LEGEND
- AREA DREDGED (2.11 ACRES)
100'
0'
100'
200'
XXX
Checked by
PROPOSED DREDGING PLAN
August 2, 2017
Plot Date
300'
06
LEGEND
- AREA DREDGED
- AREA FILLED
- STAGING AREA
REVISIONS
No.
Description
Date
PLAN
10+53
30
10+00
9+00
225'
8+00
5+00
150'
7+00
75'
6+00
0'
4+00
3+00
2+00
1+00
0+00
75'
30
25
25
20
20
15
15
10
10
5
5
10+53
10+00
5+00
3+00
9+00
-25
8+00
-25
7+00
-20
6+00
-15
-20
4+00
-10
-15
2+00
-5
-10
1+00
0
0+00
0
-5
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PLAN AND PROFILE
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
LEGEND
- DREDGED MATERIAL
- FILLED MATERIAL
MAC
Checked by
PROFILE
XXX
Checked by
August 11, 2017
Plot Date
VERTICAL SCALE
15'
0'
15'
30'
45'
75'
0'
75'
150'
225'
HORIZONTAL SCALE
07
REVISIONS
No.
Description
Date
LEGEND
- AREA DREDGED
PLAN
16+00
225'
15+00
150'
14+00
75'
13+00
0'
12+00
11+00
10+53
75'
30
30
25
25
20
20
15
15
10
10
5
5
-25
16+00
-25
15+00
-20
14+00
-15
-20
13+00
-10
-15
12+00
-5
-10
11+00
0
10+53
0
-5
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PLAN AND PROFILE
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
LEGEND
- DREDGED MATERIAL
XXX
Checked by
PROFILE
August 11, 2017
Plot Date
VERTICAL SCALE
15'
0'
15'
30'
45'
75'
0'
75'
150'
225'
HORIZONTAL SCALE
08
REVISIONS
No.
Description
Date
PLAN
16+00
225'
15+00
150'
14+00
75'
13+00
0'
12+00
11+00
10+53
75'
30
30
25
25
20
20
15
15
10
10
5
5
-25
16+00
-25
15+00
-20
14+00
-15
-20
13+00
-10
-15
12+00
-5
-10
11+00
0
10+53
0
-5
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PLAN AND PROFILE
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
PROFILE
LEGEND
- FILL MATERIAL
0'
75'
0'
MAC
Checked by
VERTICAL SCALE
15'
MAC,JJS
Drawn by
15'
30'
45'
75'
150'
225'
HORIZONTAL SCALE
XXX
Checked by
Plot Date
August 11, 2017
08A
N
250# CLASS RIPRAP
0+0
0
PROPOSED 300'x150'
STAGING AREA
1+0
0
PROPOSED PUMP STATION
2+0
0
REVISIONS
3+0
0
No.
Description
Date
A
16+
00
15+
00
14+
00
13+
00
PROPOSED
CONVEYANCE
CHANNEL
AUXILIARY
CHANNEL
12+
00
10+
00
9+0
0
C
11+
00
B
8+0
0
7+0
0
6+0
0
5+0
0
4+0
0
PROPOSED ACCESS ROAD (15' WIDE)
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PLAN AND TYPICAL
SECTIONS
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
MAY 2017
DMM
MAC,JJS
Drawn by
MAC
Checked by
- PROPOSED ACCESS ROAD
PLAN
XXX
Checked by
August 11, 2017
Plot Date
- AREA DREDGED
100'
- STAGING AREA
39130-1022
Date
Designed by
LEGEND
- AREA FILLED
Project number
0'
100'
200'
300'
09
C
CONVEYANCE AND AUXILIARY CHANNEL TYPICAL SECTION
SCALE: N.T.S.
REVISIONS
No.
B
Description
Date
ACCESS ROAD TYPICAL SECTION
SCALE: N.T.S.
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PLAN AND TYPICAL
SECTIONS
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
XXX
Checked by
A
CONVEYANCE CHANNEL TYPICAL SECTION
SCALE: N.T.S.
July 26, 2017
Plot Date
10
2+72.26
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
20
20
10
10
0
0
-10
-10
-20
-20
REVISIONS
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
No.
Description
Date
1+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
0+31.63
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VERTICAL SCALE
20'
0'
20'
0'
20'
40'
60'
20'
40'
60'
LEGEND
- EXISTING GROUND
- AREA DREDGED
XXX
Checked by
HORIZONTAL SCALE
July 26, 2017
Plot Date
11
5+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REVISIONS
No.
4+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
Description
Date
170
30
30
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
3+50.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-20
-20
-30
-30
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VERTICAL SCALE
20'
0'
20'
0'
20'
40'
60'
20'
40'
60'
LEGEND
- EXISTING GROUND
- AREA DREDGED
XXX
Checked by
HORIZONTAL SCALE
July 26, 2017
Plot Date
12
8+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
20
20
10
10
0
0
-10
-10
-20
-20
REVISIONS
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
No.
Description
Date
7+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
6+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VERTICAL SCALE
20'
0'
20'
0'
20'
40'
60'
20'
40'
60'
LEGEND
- EXISTING GROUND
- AREA DREDGED
XXX
Checked by
HORIZONTAL SCALE
July 26, 2017
Plot Date
13
11+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REVISIONS
No.
10+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
Description
Date
170
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
9+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VERTICAL SCALE
20'
0'
20'
0'
20'
40'
60'
20'
40'
60'
LEGEND
- EXISTING GROUND
- AREA DREDGED
XXX
Checked by
HORIZONTAL SCALE
July 26, 2017
Plot Date
14
14+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
REVISIONS
No.
Description
Date
13+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
12+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
20
20
10
10
0
0
-10
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
VERTICAL SCALE
20'
0'
20'
0'
20'
40'
60'
20'
40'
60'
LEGEND
- EXISTING GROUND
- AREA DREDGED
XXX
Checked by
HORIZONTAL SCALE
July 26, 2017
Plot Date
15
REVISIONS
No.
Description
Date
15+00.00
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
10
10
0
0
-10
-10
-20
-20
-130 -120 -110 -100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
LEGEND
- EXISTING GROUND
- AREA DREDGED
VERTICAL SCALE
20'
0'
20'
40'
60'
20'
0'
20'
40'
60'
HORIZONTAL SCALE
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
CROSS SECTIONS
Project number
39130-1022
Date
MAY 2017
DMM
Designed by
MAC,JJS
Drawn by
MAC
Checked by
XXX
Checked by
July 26, 2017
Plot Date
16
REVISIONS
No.
Description
Date
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
Project number
39130-1022
Date
MAY 2017
Designed by
Drawn by
Checked by
Checked by
PUMP STATION PLAN
SCALE: 3/32" = 1'-0"
Plot Date
DMM
MAC,JJS
MAC
XXX
July 26, 2017
REVISIONS
No.
Description
Date
TERREBONNE PARISH
CONSOLIDATED GOVERNMENT
PETIT CAILLOU DRAINAGE AND
RESILIENCY PROJECT
PUMP STATION ELEV.
SCALE: 3/32" = 1'-0"
Project number
39130-1022
Date
MAY 2017
Designed by
Drawn by
LEGEND
- CRUSHED STONE (0.09 ACRES) (150 CY)
- CONCRETE TREMIE SLAB (0.09 ACRES) (250 CY)
Checked by
Checked by
Plot Date
DMM
MAC,JJS
MAC
XXX
August 2, 2017