PROPOSED PUMPING STATION, ACCESS ROAD AND CONVEYANCE CHANNEL ALONG BAYOU PETIT CAILLOU IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801 LOCATION OF WORK: Bayou Petit Caillou in Section 13, Township 19S, Range 18E, in Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.418716 N, Longitude -90.605948 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, fill and excavate to construct a pump station on Bayou Peitit Calliou in order to reduce the flooding caused in the area during prolonged rainfall events, which includes a conveyance channel to connect the pump station to the bayou, installation of culverts with sluice gates for regulating the flow of water to the pump station and an access road to connect the pump station to the Highway. Approximately 18,500 cubic yards of material will be excavated and utilized on site. Additionally, 15,000 cubic yards of fill material will be hauled in for the proposed project. A preliminary analysis has determined that the proposed project would impact approximately 3.5 acres of forested wetlands; however, the exact extent of coverage and impacts is undetermined at this time pending a wetland delineation. It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would not meet engineering and construction standards at the project site. The applicant will compensate for unavoidable wetland impacts by purchasing credits from an approved mitigation bank.

JOINT PUBLIC NOTICE 05 September 17 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1588 Project Manager Glenn E. Dobson Jr. glenn.e.dobson@usace.army.mil MVN-2017-01059-CC

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC # 170828-04

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. PROPOSED PUMPING STATION, ACCESS ROAD AND CONVEYANCE CHANNEL ALONG BAYOU PETIT CAILLOU IN TERREBONNE PARISH NAME OF APPLICANT: Terrebonne Parish Consolidated Government, c/o GIS Engineering, LLC, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801. LOCATION OF WORK: Bayou Petit Caillou in Section 13, Township 19S, Range 18E, in Chauvin, Louisiana, in Terrebonne Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.418716 N, Longitude -90.605948 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, fill and excavate to construct a pump station on Bayou Peitit Calliou in order to reduce the flooding caused in the area during prolonged rainfall events, which includes a conveyance channel to connect the pump station to the bayou, installation of culverts with sluice gates for regulating the flow of water to the pump station and an access road to connect the pump station to the Highway. Approximately 18,500 cubic yards of material will be excavated and utilized on site. Additionally, 15,000 cubic yards of fill material will be hauled in for the proposed project. A preliminary analysis has determined that the proposed project would impact approximately 3.5 acres of forested wetlands; however, the exact extent of coverage and impacts is undetermined at this time pending a wetland delineation.

2 It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would not meet engineering and construction standards at the project site. The applicant will compensate for unavoidable wetland impacts by purchasing credits from an approved mitigation bank. The comment period for the Department of Army will close in 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

3 The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and the State Historic Preservation Officer. The New Orleans District has determined that the proposed project is located in waters known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that with the inclusion of the Standard Manatee Conditions for In-Water Activities, proposed work is not likely to adversely affect the West Indian Manatee. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0 acres of EFH. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

4 The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program (Louisiana Coastal Zone Application P20170483). The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosures

HOUMA

N

Project Location VICINITY MAP SCALE: N.T.S.

REVISIONS No.

Description

Date

.4

13 S

LE

MI

PROJECT LOCATION

N

PROJECT LOCATION

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

500'

0'

500'

1000'

1500'

VICINITY MAP

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VICINITY MAP 6000'

0'

6000'

12000'

XXX

Checked by

18000'

August 2, 2017

Plot Date

01

N

APP

ARE

NT

PRO

PER

APP

APP

TY

ARE

NT

ARE

NT

PER

REVISIONS

TY L

INE

No.

E

PRO

PRO

APPARENT PROPERTY LINE

LIN

PER

PER

TY L

INE

Date

TY L

BUILDING CONC. SLAB

BUILDING

INE

FENCE LEVEE TOE

TREE

LOU

ANCHOR & GUY WIRE

PET

ITE

CAIL

TOP OF BANK TOP OF BANK EDGE OF BERM TOP OF BERM

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

BAY

OU

LEVEE CROWN LEVEE CROWN LEVEE TOE

Description

Y 56

ARE

PRO

HW

APP

NT

EXISTING SITE PLAN

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

LEGEND - STRUCTURES TO BE REMOVED

NOTE:

EXISTING SITE PLAN 100'

0'

100'

200'

300'

1.

THE ROAD SURFACE WILL BE TEMPORARILY REMOVED FOR LAYING THE CULVERT AND WILL BE RESURFACED.

2.

WOOD DEBRIS WILL BE SENT TO THE LAND FILL FOR DISPOSAL.

MAC

Checked by

XXX

Checked by

August 2, 2017

Plot Date

02

50'x72' 250# CLASS RIP RAP PROPOSED 48'Ø DISCHARGE PIPE (TYP.) PROPOSED 72"x205' CULVERTS

N

PROPOSED GENERATOR PROPOSED 4000 GAL. FUEL TANK PROPOSED PUMP STATION

10.0 0

REVISIONS

2+0 0

1+0 0

0+0 0

PROPOSED 300'x150' STAGING AREA

Description

Date

5+0 0

PROPOSED ACCESS ROAD (15' WIDE)

16+ 00

15+ 00

13+ 00

11+ 00

PROPOSED 60" HDPE DRAIN PIPE WITH SLUICE GATE (TYP. 4)

14+ 00

PROPOSED HEADWALL

12+ 00

AUXILIARY CHANNEL

P CON ROPO VEY SED CHA ANCE NNE L

10+ 00

PROJECT START LAT: 29° 25' 09.81" LONG: -90° 36' 28.48"

9+0 0

8+0 0

7+0 0

6+0 0

10.0 0

4+0 0

3+0 0

No.

PROPOSED 6'x6' BOX CULVERT WITH SLUICE GATE (TYP. 4)

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PROJECT END LAT: 29° 25' 04.44" LONG: -90° 36' 11.45"

PROPOSED SITE PLAN

LEGEND

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

- PROPOSED ACCESS ROAD (1,030 FT)

Drawn by

- AREA DREDGED (2.11 ACRES) (18,500 CY)

Checked by

MAC,JJS MAC

Checked by

PROPOSED SITE PLAN 100'

0'

100'

200'

300'

- AREA FILLED (1.93 ACRES) (32,500 CY) - STAGING AREA (1.03 ACRES) - RIP RAP (0.08 ACRES) (300 CY)

XXX August 11, 2017

Plot Date

03

PROPOSED 300'x150' STAGING AREA PROPOSED 72"x120' CULVERTS

PROPOSED PUMP STATION

PROPOSED ACCESS ROAD (15' WIDE)

REVISIONS Description

Date

PROPOSED CONVEYANCE CHANNEL

10.00'

PROPOSED 48'Ø DISCHARGE PIPE (TYP.)

No.

10.00'

250# CLASS RIPRAP

PROPOSED HEADWALL

PROPOSED 60" HDPE DRAIN PIPE WITH SLUICE GATE (TYP. 4)

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

ENLARGED SITE PLAN

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

- STAGING AREA

MAY 2017 DMM MAC,JJS

Drawn by

MAC

Checked by

ENLARGED SITE PLAN

- PROPOSED ACCESS ROAD

- AREA FILLED

39130-1022

Date Designed by

LEGEND

- AREA DREDGED

Project number

XXX

Checked by

50'

0'

50'

100'

150'

August 11, 2017

Plot Date

04

PROPOSED ACCESS ROAD (15' WIDE) PROPOSED CONVEYANCE CHANNEL REVISIONS No.

Description

Date

PROPOSED 6'x6' BOX CULVERT WITH SLUICE GATE (TYP. 4)

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

ENLARGED SITE PLAN

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

- STAGING AREA

MAY 2017 DMM MAC,JJS

Drawn by

50'

0'

50'

100'

MAC

Checked by

ENLARGED SITE PLAN

- PROPOSED ACCESS ROAD

- AREA FILLED

39130-1022

Date Designed by

LEGEND

- AREA DREDGED

Project number

XXX

Checked by

150'

August 11, 2017

Plot Date

05

1+0 0

0+0 0

N

2+0 0

REVISIONS No.

Description

Date

16+ 00

15+ 00

13+ 00

11+ 00

10+ 00

CHANNEL BOTTOM

14+ 00

PROPOSED CONVEYANCE CHANNEL

12+ 00

AUXILIARY CHANNEL

' 00 0. R6

20.0 0'

9+0 0

8+0 0

7+0 0

6+0 0

20.0 0'

5+0 0

4+0 0

3+0 0

PROPOSED TOP BANK

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PROPOSED DREDGING PLAN

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

LEGEND - AREA DREDGED (2.11 ACRES)

100'

0'

100'

200'

XXX

Checked by

PROPOSED DREDGING PLAN

August 2, 2017

Plot Date

300'

06

LEGEND - AREA DREDGED - AREA FILLED - STAGING AREA

REVISIONS No.

Description

Date

PLAN

10+53

30

10+00

9+00

225'

8+00

5+00

150'

7+00

75'

6+00

0'

4+00

3+00

2+00

1+00

0+00

75'

30 25

25 20

20

15

15

10

10

5

5

10+53

10+00

5+00

3+00

9+00

-25 8+00

-25 7+00

-20

6+00

-15

-20

4+00

-10

-15

2+00

-5

-10

1+00

0

0+00

0 -5

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PLAN AND PROFILE Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

LEGEND - DREDGED MATERIAL - FILLED MATERIAL

MAC

Checked by

PROFILE

XXX

Checked by

August 11, 2017

Plot Date

VERTICAL SCALE 15'

0'

15'

30'

45'

75'

0'

75'

150'

225'

HORIZONTAL SCALE

07

REVISIONS No.

Description

Date

LEGEND - AREA DREDGED

PLAN

16+00

225'

15+00

150'

14+00

75'

13+00

0'

12+00

11+00

10+53

75'

30

30

25

25

20

20

15

15

10

10

5

5

-25 16+00

-25 15+00

-20

14+00

-15

-20

13+00

-10

-15

12+00

-5

-10

11+00

0

10+53

0 -5

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PLAN AND PROFILE Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

LEGEND - DREDGED MATERIAL

XXX

Checked by

PROFILE

August 11, 2017

Plot Date

VERTICAL SCALE 15'

0'

15'

30'

45'

75'

0'

75'

150'

225'

HORIZONTAL SCALE

08

REVISIONS No.

Description

Date

PLAN

16+00

225'

15+00

150'

14+00

75'

13+00

0'

12+00

11+00

10+53

75'

30

30

25

25

20

20

15

15

10

10

5

5

-25 16+00

-25 15+00

-20

14+00

-15

-20

13+00

-10

-15

12+00

-5

-10

11+00

0

10+53

0 -5

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PLAN AND PROFILE Project number

39130-1022

Date

MAY 2017 DMM

Designed by

PROFILE LEGEND - FILL MATERIAL

0'

75'

0'

MAC

Checked by

VERTICAL SCALE 15'

MAC,JJS

Drawn by

15'

30'

45'

75'

150'

225'

HORIZONTAL SCALE

XXX

Checked by Plot Date

August 11, 2017

08A

N 250# CLASS RIPRAP

0+0 0

PROPOSED 300'x150' STAGING AREA

1+0 0

PROPOSED PUMP STATION

2+0 0

REVISIONS

3+0 0

No.

Description

Date

A

16+ 00

15+ 00

14+ 00

13+ 00

PROPOSED CONVEYANCE CHANNEL

AUXILIARY CHANNEL

12+ 00

10+ 00

9+0 0

C

11+ 00

B

8+0 0

7+0 0

6+0 0

5+0 0

4+0 0

PROPOSED ACCESS ROAD (15' WIDE)

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PLAN AND TYPICAL SECTIONS

NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.

MAY 2017 DMM MAC,JJS

Drawn by

MAC

Checked by

- PROPOSED ACCESS ROAD

PLAN

XXX

Checked by

August 11, 2017

Plot Date

- AREA DREDGED 100'

- STAGING AREA

39130-1022

Date Designed by

LEGEND

- AREA FILLED

Project number

0'

100'

200'

300'

09

C

CONVEYANCE AND AUXILIARY CHANNEL TYPICAL SECTION SCALE: N.T.S. REVISIONS No.

B

Description

Date

ACCESS ROAD TYPICAL SECTION SCALE: N.T.S.

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PLAN AND TYPICAL SECTIONS Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

XXX

Checked by

A

CONVEYANCE CHANNEL TYPICAL SECTION SCALE: N.T.S.

July 26, 2017

Plot Date

10

2+72.26

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

20

20

10

10

0

0

-10

-10

-20

-20

REVISIONS

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

No.

Description

Date

1+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

-10 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

0+31.63

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VERTICAL SCALE 20'

0'

20'

0'

20'

40'

60'

20'

40'

60'

LEGEND - EXISTING GROUND - AREA DREDGED

XXX

Checked by

HORIZONTAL SCALE

July 26, 2017

Plot Date

11

5+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

20

20

10

10

0

0 -10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

REVISIONS No.

4+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

Description

Date

170

30

30

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

3+50.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

-10

-20

-20

-30

-30 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VERTICAL SCALE 20'

0'

20'

0'

20'

40'

60'

20'

40'

60'

LEGEND - EXISTING GROUND - AREA DREDGED

XXX

Checked by

HORIZONTAL SCALE

July 26, 2017

Plot Date

12

8+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

20

20

10

10

0

0

-10

-10

-20

-20

REVISIONS

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

No.

Description

Date

7+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0 -10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

6+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VERTICAL SCALE 20'

0'

20'

0'

20'

40'

60'

20'

40'

60'

LEGEND - EXISTING GROUND - AREA DREDGED

XXX

Checked by

HORIZONTAL SCALE

July 26, 2017

Plot Date

13

11+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170 REVISIONS No.

10+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

Description

Date

170

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

9+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VERTICAL SCALE 20'

0'

20'

0'

20'

40'

60'

20'

40'

60'

LEGEND - EXISTING GROUND - AREA DREDGED

XXX

Checked by

HORIZONTAL SCALE

July 26, 2017

Plot Date

14

14+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

REVISIONS No.

Description

Date

13+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

12+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

20

20

10

10

0

0

-10

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

VERTICAL SCALE 20'

0'

20'

0'

20'

40'

60'

20'

40'

60'

LEGEND - EXISTING GROUND - AREA DREDGED

XXX

Checked by

HORIZONTAL SCALE

July 26, 2017

Plot Date

15

REVISIONS No.

Description

Date

15+00.00

-130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

10

10

0

0

-10

-10

-20

-20 -130 -120 -110 -100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

LEGEND - EXISTING GROUND - AREA DREDGED

VERTICAL SCALE 20'

0'

20'

40'

60'

20'

0'

20'

40'

60'

HORIZONTAL SCALE

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

CROSS SECTIONS Project number

39130-1022

Date

MAY 2017 DMM

Designed by

MAC,JJS

Drawn by

MAC

Checked by

XXX

Checked by

July 26, 2017

Plot Date

16

REVISIONS No.

Description

Date

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

Project number

39130-1022

Date

MAY 2017

Designed by Drawn by Checked by Checked by

PUMP STATION PLAN SCALE: 3/32" = 1'-0"

Plot Date

DMM MAC,JJS MAC XXX July 26, 2017

REVISIONS No.

Description

Date

TERREBONNE PARISH CONSOLIDATED GOVERNMENT PETIT CAILLOU DRAINAGE AND RESILIENCY PROJECT

PUMP STATION ELEV. SCALE: 3/32" = 1'-0"

Project number

39130-1022

Date

MAY 2017

Designed by Drawn by

LEGEND - CRUSHED STONE (0.09 ACRES) (150 CY) - CONCRETE TREMIE SLAB (0.09 ACRES) (250 CY)

Checked by Checked by Plot Date

DMM MAC,JJS MAC XXX August 2, 2017

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice