The purpose of this notice is to advise the public that the U.S. Army Corps of Engineers, Jacksonville District, will implement alternative/emergency permitting procedures in response to conditions resulting from Hurricane IRMA. These alternate procedures will be utilized for a period of 6 months from the date of this Notice, or 7 Sep 2018.
Please follow this link http://www.saj.usace.army.mil/Missions/Regulatory/Public-Notices/
to the Jacksonville District Public Notice webpage to view the public notice in its entirety.
If additional information is needed, please contact the appropriate Field Office, within the Jacksonville District Regulatory Division, U.S. Army Corps of Engineers, as provided in the following link:
http://www.saj.usace.army.mil/Missions/Regulatory/Office-Locations/
The purpose of this notice is to advise the public that the U.S. Army Corps of Engineers, Jacksonville District, will initiate alternative permitting procedures in response to conditions resulting from Hurricane Irma. These alternate procedures will be utilized for a period of 6 months from the date of this Notice, or 7 March 2018:
1. In accordance with 33 CFR 325.2(e)(4), an "emergency" is a situation which would result in an unacceptable hazard to life, a significant loss of property, or an immediate, unforeseen, and significant economic hardship if corrective action requiring a permit is not undertaken within a time period less than the normal time needed to process the permit application under standard procedures.
2. Most permitting will likely be accomplished through the nationwide permit (NWP) program. For example, containment/clean up/restoration operations may be authorized under NWP #38. Additionally, bank stabilization activities may be authorized under NWP #13. These activities would be accomplished under the authorities of Section 1O of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344).
3. For those actions which do not qualify for authorization under the terms and conditions of the NWP program, the following procedures will be used:
a. Requests for expedited permits associated with Hurricane Irma will be reviewed to determine if there is truly an emergency associated with the request.
b. If the action is determined to be an emergency, descriptions of the proposed action will be transmitted to representatives from each of the commenting agencies, including the State/Commonwealth agencies responsible for Section 401 Water Quality Certification and Coastal Zone Management Consistency if required.
c. The District will make a permit decision after considering/addressing any comments submitted by the agencies. It is anticipated that this process can be finalized within 24-48 hours for most actions.
4. If additional information is needed, please contact Mr. Dale E. Beter of the Regulatory Division, U.S. Army Corps of Engineers. Mr. Beter may be reached at 904.232.1361, or by email at: dale.e.beter@usace.army.mil.
Please follow this link http://www.saj.usace.army.mil/Missions/Regulatory/Public-Notices/
to the Jacksonville District Public Notice webpage to view the public notice in its entirety.
If additional information is needed, please contact the appropriate Field Office, within the Jacksonville District Regulatory Division, U.S. Army Corps of Engineers, as provided in the following link:
http://www.saj.usace.army.mil/Missions/Regulatory/Office-Locations/
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P.O. BOX4970
Jacksonville, Florida 32232-0019
REPLY TO
ATTENTION OF
7 September 2017
Regulatory Division
PUBLIC NOTICE
ALTERNATIVE PERMIT APPL/CATION PROCESSING PROCEDURES FOR
ACTIVITIES IN RESPONSE TO HURRICANE IRMA
The purpose of this notice is to advise the public that the U.S. Army Corps of
Engineers, Jacksonville District, will initiate alternative permitting procedures in
response to conditions resulting from Hurricane Irma. These alternate procedures
will be utilized for a period of 6 months from the date of this Notice, or 7 March
2018:
1. In accordance with 33 CFR 325.2(e)(4), an "emergency" is a situation which would
result in an unacceptable hazard to life, a significant loss of property, or an immediate,
unforeseen, and significant economic hardship if corrective action requiring a permit is
not undertaken within a time period less than the normal time needed to process the
permit application under standard procedures.
2. Most permitting will likely be accomplished through the nationwide permit (NWP)
program. For example, containment/clean up/restoration operations may be authorized
under NWP #38. Additionally, bank stabilization activities may be authorized under
NWP #13. These activities would be accomplished under the authorities of Section 1O
of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean
Water Act (33 U.S.C. 1344).
3. For those actions which do not qualify for authorization under the terms and
conditions of the NWP program, the following procedures will be used:
a. Requests for expedited permits associated with Hurricane Irma will be reviewed
to determine if there is truly an emergency situation associated with the request.
b. If the action is determined to be an emergency, descriptions of the proposed
action will be transmitted to representatives from each of the commenting agencies,
including the State/Commonwealth agencies responsible for Section 401 Water Quality
Certification and Coastal Zone Management Consistency if required.
c. The District will make a permit decision after considering/addressing any
comments submitted by the agencies. It is anticipated that this process can be finalized
within 24-48 hours for most actions.
-2-
4. If additional information is needed, please contact Mr. Dale E. Beier of the
Regulatory Division, U.S. Army Corps of Engineers. Mr. Beier may be reached at
904.232.1361, or by email at: dale.e.beter@usace.army.mil.
Donnie W. Kinard
Chief, Regulatory Division