The applicant has requested a Department of the Army permit to remove accumulated sediment via mechanical maintenance dredging from the Leipsic Tax Ditch located in Leipsic

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant has requested a Department of the Army permit to remove accumulated sediment via mechanical maintenance dredging from the Leipsic Tax Ditch located in Leipsic, Kent County, Delaware. Tax ditches require the removal of accumulated sediment every 15 to 20 years. Accumulated sediment was previously removed from the Leipsic Tax Ditch in 1990. The applicant proposes to utilize a land based excavator equipped with a grading bucket as to minimize soil disturbance. The operator will remove accumulated sediment from the bottom of the tax ditch by reaching to the far side of the ditch, and in one motion, dragging the front edge of the bucket across the original bottom contour to the near side, filling the bucket to approximately 80% to 85% capacity to avoid spilling material from the bucket. The excavated material will be placed in the agriculture field behind a berm as to prevent re-deposition of the excavated sediment. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by Sept. 29, 2017.

The applicant has requested a Department of the Army permit to removeaccumulated sediment via mechanical maintenance dredging from the Leipsic Tax Ditch locatedin Leipsic, Kent County, Delaware. Tax ditches require the removal of accumulated sedimentevery 15 to 20 years. Accumulated sediment was previously removed from the Leipsic TaxDitch in 1990. The applicant proposes to utilize a land based excavator equipped with a gradingbucket as to minimize soil disturbance. The operator will remove accumulated sediment fromthe bottom of the tax ditch by reaching to the far side of the ditch, and in one motion, draggingthe front edge of the bucket across the original bottom contour to the near side, filling the bucketto approximately 80% to 85% capacity to avoid spilling material from the bucket. The excavatedmaterial will be placed in the agriculture field behind a berm as to prevent re-deposition of theexcavated sediment. More details are available in the "Public Notice & Plan Details" attachment. Public comments are due by Sept. 29, 2017.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas