The applicant has requested to discharge approximately 30

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant has requested to discharge approximately 30,038 cubic yards of dredged and/or fill material into approximately 0.25 acres of five wetlands, 150 linear feet of one intermittent stream, 485 linear feet of four ephemeral streams, and 1.53 acres of open water ponds in association with the construction of the Reserve at Deer Run, Phase II, Residential Development project.

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ (Corps) request to the Ohio Environmental Protection Agency (OEPA) to act on the Section 401 Water Quality Certification for the following application.

APPLICANT: Mr. David Brooks KMA Westside Development, Inc. 1250 Springfield Pike Cincinnati, Ohio 45215

LOCATION: As depicted on the attached Figure 3: U.S.G.S. Addyston, Ohio 7.5 minute topographical quadrangle map showing the location of the Reserve at Deer Run Phase II Property (Sheet 1 of 7), the proposed 142-acre project site would be located within the watershed of the Ohio River, at Pickway Drive, in Cincinnati, Hamilton County, Ohio (Latitude 39.139125, Longitude -84.701375). The proposed discharges of dredged and/or fill material would take place within five wetlands, one intermittent stream, four ephemeral streams, and three open water ponds. All of the streams are tributaries of Muddy Creek. Muddy Creek is a tributary to the Ohio River, a traditional navigable water of the United States.

PROJECT HISTORY: The Crooked Tree Preserve property is part of a 165-acre tract of land that was formerly used as the Deer Run Golf Course, which closed operations in 2014. Phase I of the Reserve at Deer Run residential property includes the 23-acre portion of the 165-acre property and is currently under construction for residential use. The Phase I development is under construction and does not involve a discharge of dredged and/or fill material into waters of the United States. The proposed Phase II project area includes the remaining 142-acre portion of the 165 acre property.

DESCRIPTION OF PROPOSED WORK: The applicant has requested a DA authorization to discharge approximately 30,038 cubic yards of dredged and/or fill material into approximately 0.25 acres of five wetlands, 150 linear feet of one intermittent stream, 485 linear feetof four ephemeral streams, and 1.53 acres of open water ponds in association with the construction of the Reserve at Deer Run, Phase II, Residential Development project (see Table 1 below). The proposed project would consist of lot filling and grading and the construction of 151 single family homes with associated roadways, utilities, a storm water management system, and 90-acres of designated greenspace. The design plans (see attached Figure 18 - 22: Design Plan for Phase II of the Reserve at Deer Run [Sheets 2-6 of 7]) for the proposed project are attached to this notice.

ALTERNATIVES ANALYSIS: A total of approximately 0.25 acre of five wetlands (Wetlands 1,2,3,6 and 8), approximately 150 linear feet of one intermittent stream (Stream C), approximately 485 linear feet of four ephemeral streams (Streams A1, B, C and D) and 1.53 acres of three open water ponds (Ponds 1, 2, and 3) would be filled as a result of the proposal. The project does not require access or proximity to, or siting within, the wetlands to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state for non-water dependent activities, practicable alternatives that do not involve wetlands are presumed to be available, unless clearly demonstrated otherwise. The applicant is required to provide an alternatives analysis that must overcome this presumption prior to receiving authorization for the discharge of dredge and/or fill material. The applicant has submitted an alternatives analysis and it is currently under review. A complete copy of the applicant’s alternatives analysis can be reviewed by appointment at the above address. No permit will be issued until our office determines practicable upland alternatives are not available to achieve the overall project purpose based upon the applicant’s alternative analysis.

AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on these sites. If waters of the United States cannot be avoided, then the impacts must be minimized. Approximately 1.7 acres of eight wetlands, 1,450 linear feet of one perennial stream, 1,775 linear feet of six intermittent streams, 2,255 linear feet of eight ephemeral streams and 3.68 acres of five open water ponds are located within the proposed 142-acre Phase II project area. According to the applicant, alternative plans were considered. Due to the topography of the project area, the Phase II property is landlocked on three sides by steep hillsides. In addition, an existing agreement between the applicant and the residents of the adjacent Deer Run subdivision requires a greenspace buffer of at least 300 feet between the existing subdivision and the proposed Reserve at Deer Run Phase II development. Avoidance and minimization efforts were incorporated into the proposal to reduce the footprint of the proposed project. The Phase II development, as currently designed, would occupy approximately 50 acres of the 142-acre project site, and 92 acres of the property would be designated as greenspace and would not be developed. The applicant’s project would avoid 85 % of the wetlands (approximately 1.45 acres), 100 % of the perennial stream (approximately 1,450 linear feet), 92 % of intermittent streams (approximately 1,625 linear feet), 77% of ephemeral streams (approximately 1,770 linear feet), and 59 % of the open water ponds on-site (approximately 2.15 acres). Stormwater management planning would incorporate best management practices and water pollution controls necessary to maintain compliance with the Federal Water Pollution Control Act and Ohio Water Pollution Control Act. Construction activities would be performed during low flow conditions. Stormwatermanagement and erosion control systems would be implemented during construction, including silt fences, mulch and/or earthen berms, temporary seeding, hay bales, inlet protection, temporary collection basins, diversion ditches, and construction entrances. All disturbed areas would be seeded and/or revegetated with native plant species and native seed mixes after completion of construction activities.

COMPENSATORY MITIGATION PLAN: To compensate for the losses of waters of the United States associated with the proposed project, the applicant proposes to construct 2,450 linear feet of stormwater management swales onsite to mitigate for the proposed impacts to ephemeral streams (see attached Figure 23: Example Cross-Sections for the Proposed Post-Construction Stormwater Management Swales, to provide mitigation for 485 linear ft of ephemeral stream impacts on the Deer Run Phase II Property [Sheet 7 of 7]). In addition, the applicant would purchase 300 stream credits (2:1 ratio) and 0.4 acre of wetland mitigation credit (1.5:1 ratio) from the Ohio Nature Conservancy In-Lieu Fee program.

WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification may be required for this project. It is the applicant’s responsibility to obtain a certification from the OEPA.

HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP that would be indirectly or directly affected by the proposed work. The majority of the project area has been disturbed and used historically as a golf course and for residential development. The Corps has determined the proposed project would have no effect on historic properties eligible or potentially eligible for inclusion on the NRHP. A copy of this Public Notice will be furnished to Ohio State Historic Preservation Office for their review. Comments concerning archaeological sensitivity of the project area should be based on collected data.

THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the following federally-protected species: the endangered Indiana bat (Myotis sodalis), the threatened northern long-eared bat (Myotis septentrionalis), the endangered rayed bean mussel (Villosa fabailis), the endangered fanshell mussel (Cyprogenia stegaria), the endangered pink mucket pearly mussel (Lampsilis abrupta), the endangered snuffbox mussel (Epioblasma triquetra), the endangered sheepnose mussel (Plethobasus cyphyus), and the endangered running buffalo clover (Trifolium stoloniferum). The Corps has consulted the most recently available information. The proposed project site has an estimated total of approximately 65 acres of forested area consisting of a mixture of hardwood species and conifer species, and multiple dead or dying trees are scattered throughout the property and would be considered potential roosting habitat for the endangered Indiana bat (Myotis sodalis), the threatened northern long-eared bat (Myotis septentrionalis). Based on the proposed implementation of the seasonal tree clearing restrictions, we have determined the proposed project may affect, but would not likely to adversely affect either the Indiana bat (Myotis sodalis) or the northern long-eared bat (Myotis septentrionalis). Based on the project location, avoidance of impacts to the perennial unnamed tributary to Muddy Creek (Stream A), the lack of suitable habitat in the intermittentand ephemeral streams where impacts are proposed, and the applicant’s proposal to perform construction activities during low flow conditions and to use best management practices during construction activities to reduce impacts to downstream resources, we have determined the proposed project may affect, but would not likely adversely affect the rayed bean mussel (Villosa fabailis), the fanshell mussel (Cyprogenia stegaria), the pink mucket pearly mussel (Lampsilis abrupta), the snuffbox mussel (Epioblasma triquetra), and the sheepnose mussel (Plethobasus cyphyus). Based on the lack of suitable habitat on the project site, we have determined the proposed project would have no effect on the running buffalo clover (Trifolium stoloniferum).

Based on this information, the proposed project is not likely to adversely affect the continued existence of any endangered species or threatened species, or result in the destruction or adverse modification of habitat of such species which has been determined to be critical. This Public Notice serves as a request for concurrence from the United States Fish and Wildlife Service with the aforementioned effect determinations and for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the United States Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR part 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both the protection and the utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered, including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations ofproperty ownership and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, the Federal, state, and local agencies and officials, the Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether toissue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:

United States Army Corps of Engineers ATTN: CELRH-RD-N Public Notice No. LRH-2017-646-OHR 502 Eighth Street Huntington, West Virginia 25701-2070.

Please note names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s water resources. If you have any questions concerning this Public Notice, please contact Laurie Moore of the North Branch at (513) 825-1901, by mail at the above address, or by email at: laurie.a.moore@usace.army.mil.

Table 1.0 Proposed Discharges of Dredged and/or Fill material into Waters of the United States at the Proposed Reserve at Deer Run Phase II Residential Development Site, Cincinnati, Hamilton County, Ohio (39.139125, -84.701375)

Aquatic Resource

Type

Estimated amount of aquatic resource in review area

Proposed Impact

Impact Type

Stream A, UT Muddy Creek

Perennial Stream

1,450 linear feet

0

N/A

Stream A1, UT Muddy Creek

Intermittent/Seasonal Stream

400 linear feet

0

N/A

Stream C, UT Muddy Creek

Intermittent/Seasonal Stream

495 linear feet

150 linear feet

Fill

Stream E, UT Muddy Creek

Intermittent/Seasonal Stream

310 linear feet

0

N/A

Stream G, UT Muddy Creek

Intermittent/Seasonal Stream

175 linear feet

0

N/A

Stream G1, UT Muddy Creek

Intermittent/Seasonal Stream

200 linear feet

0

N/A

Stream I, UT Muddy Creek

Intermittent/Seasonal Stream

195 linear feet

0

N/A

Stream A1, UT Muddy Creek

Ephemeral Stream

280 linear feet

95 linear feet

Fill

Stream A1A, UT Muddy Creek

Ephemeral Stream

230 linear feet

0

N/A

Stream A2, UT Muddy Creek

Ephemeral Stream

410 linear feet

0

N/A

Stream B, UT Muddy Creek

Ephemeral Stream

585 linear feet

0

N/A

Stream C, UT Muddy Creek

Ephemeral Stream

80 linear feet

80 linear feet

Fill

Stream D, UT Muddy Creek

Ephemeral Stream

295 linear feet

150 linear feet

Fill

Stream F, UT Muddy Creek

Ephemeral Stream

225 linear feet

0

N/A

Stream H, UT Muddy Creek

Ephemeral Stream

150 linear feet

0

N/A

Wetland 1

Category 1 Non-forested Wetland

0.01 acre

0.01 acre

Fill

Wetland 2

Category 1 Non-forested Wetland

0.06 acre

0.06 acre

Fill

Wetland 3

Category 1 Non-forested Wetland

0.10 acre

0.10 acre

N/A

Wetland 4

Category 1 Non-forested Wetland

1.20 acres

0

N/A

Wetland 5

Category 1 Non-forested Wetland

0.10 acre

0

N/A

Wetland 6

Category 1 Non-forested Wetland

0.02 acre

0.02 acre

N/A

Wetland 7

Category 1 Non-forested Wetland

0.15 acre

0

N/A

Wetland 8

Category 1 Non-forested Wetland

1.06 acre

0.06 acre

N/A

Pond 1

Open water

0.7 acre

0.7 acre

Fill

Pond 2

Open water

0.24 acre

0.24 acre

Fill

Pond 3

Open water

0.59 acre

0.59 acre

Fill

Pond 4

Open water

0.77 acre

0

N/A

Pond 5

Open water

0.1 acre

0

N/A

Total Proposed Impacts

Perennial Stream

0

intermittent Stream

150 linear feet

Ephemeral Stream

485 linear feet

Wetland

0.25 acres

Open Water Pond

1.53 acres

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas