Home

Galveston District

Run scraper

Sunoco Pipeline

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to convert the previously verified SWG-2015-00172, temporary workspace areas for pipeline installation to a permanent access road.

Full Public Notice Project Plans Attachment A Attachment B PROJECT DESCRIPTION: The applicant proposes to convert the previously verified, SWG-2015-00172, temporary workspace areas for pipeline installation to a permanent access road. The applicant proposes to permanently discharge 384 cubic yards of fill material into 0.81 acre of Wetland AA during the construction of the permanent access road starting at Pinetop Road and continuing 2,500 linear feet west and terminating at the existing valve site adjacent to Star Lake Ditch

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas