PERMIT MODIFICATION FOR PIPELINE REPLACEMENT IN ST. MARY PARISH
NAME OF APPLICANT: Shell Pipeline Company, Post Office Box 2648, OSP 41082B, Houston, Texas 77252-2648
LOCATION OF WORK: Bateman Island, crossing Atchafalaya River and Bayou Shaffer, located in the community of Morgan City, in St. Mary Parish, Louisiana, as shown on the enclosed drawings.
Location: POB: Latitude: 29°40ʹ52ʺ N / Longitude: -91°13ʹ31ʺ W, POE: Latitude: 29°40ʹ47ʺ N / Longitude: -91°11ʹ21ʺ W, Hydrologic Unit Code for West of Bayou Shaffer: 08080101 – Atchafalaya River Basin, Hydrologic Unit Code for East of Bayou Shaffer: 08090302 – Terrebonne, West-Central Louisiana Coastal Basin.
CHARACTER OF WORK: Shell is requesting amendment of their original permit issued December 20, 2016, to include the following work stated below.
Amended Bateman Island Segment: Replace 2,980 linear feet of pipeline between two HDD exit sites while using one 4-foot deep flotation channel. The existing pipeline between the drill sites would be abandoned in place, increasing the total length of abandoned pipeline to approximately 12,205 feet. Approximately 2,980 feet of new pipeline would be installed between the drill exit sites. Shell would install an additional 50-foot wide by 1,289 foot long workspace between the Bayou Shaffer HDD exit site and the dock, and install one 15-foot wide by 3,665-foot long flotation ditch in a new pipeline Right-of-Way. A barge would be placed in a 35-foot wide by 400-foot long back string space, which only 0.77 of an acre out of the 1.61 acres permitted for the dock were cleared. Theback string workspace would be constructed within the cleared area. Temporary mats would beplaced in an approximately 30-foot wide by 1,740-foot long equipment access area. No clearing would be needed for the equipment access area. Shell would install five 25-foot wide by 100-foot long road turnoffs to allow equipment to travel, in which approximately 0.29 of an acre of additional forested wetland would be cleared. Shell would lower a 600 foot section of pipeline an additional 4-feet deep. Amended Bayou Shaffer Segment: Shell would add sand and cement bags under permitted rip rap in the Atchafalaya River and Bayou Shaffer, and conduct dredging operations within a 120-foot wide by 240-foot long area in Bayou Shaffer near the dock location, to restore Bateman Island work areas to original contours. Work completed includes the installation of 4,350 feet of pipeline from Bayou Shaffer HDD from Avoca Island to Bateman Island. Overall, approximately 33,000 cubic yards of fill material would be excavated, approximately 41,069 cubic yards of excavated and hauled-in material and 6,883 cubic yards of chipped trees would be placed onsite. The total amount of wetland impacts from the permit modification would be 11.92 acres, which is less than the originally permitted and mitigated amount of 14.1 acres of jurisdictional wetlands. Therefore, the applicant has not proposed to mitigate due to the reduction in overall project impacts from the modified plans.
JOINT PUBLIC NOTICE
September 18, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118-3651
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2284
Sara.B.Fortuna@usace.army.mil
Project Manager
Sara Fortuna
Permit Application Number
MVN-2015-01060-WKK
(225) 219-3225
Elizabeth.Hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC 160330-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
PERMIT MODIFICATION FOR PIPELINE REPLACEMENT IN ST. MARY PARISH
NAME OF APPLICANT: Shell Pipeline Company, Post Office Box 2648, OSP 41082B, Houston,
Texas 77252-2648.
LOCATION OF WORK: Bateman Island, crossing Atchafalaya River and Bayou Shaffer, located in
the community of Morgan City, in St. Mary Parish, Louisiana, as shown on the enclosed drawings.
Location: POB: Latitude: 29°4052 N / Longitude: -91°1331 W, POE: Latitude: 29°4047 N /
Longitude: -91°1121 W, Hydrologic Unit Code for West of Bayou Shaffer: 08080101 Atchafalaya
River Basin, Hydrologic Unit Code for East of Bayou Shaffer: 08090302 Terrebonne, West-Central
Louisiana Coastal Basin
CHARACTER OF WORK: Shell is requesting amendment of their original permit issued December
20, 2016, to include the following work stated below.
Amended Bateman Island Segment: Replace 2,980 linear feet of pipeline between two HDD exit
sites while using one 4-foot deep flotation channel. The existing pipeline between the drill sites would
be abandoned in place, increasing the total length of abandoned pipeline to approximately 12,205
feet. Approximately 2,980 feet of new pipeline would be installed between the drill exit sites. Shell
would install an additional 50-foot wide by 1,289 foot long workspace between the Bayou Shaffer
HDD exit site and the dock, and install one 15-foot wide by 3,665-foot long flotation ditch in a new
pipeline Right-of-Way. A barge would be placed in a 35-foot wide by 400-foot long back string space,
which only 0.77 of an acre out of the 1.61 acres permitted for the dock were cleared. The
back string workspace would be constructed within the cleared area. Temporary mats would be
-2placed in an approximately 30-foot wide by 1,740-foot long equipment access area. No clearing
would be needed for the equipment access area. Shell would install five 25-foot wide by 100-foot
long road turnoffs to allow equipment to travel, in which approximately 0.29 of an acre of additional
forested wetland would be cleared. Shell would lower a 600 foot section of pipeline an additional 4feet deep. Amended Bayou Shaffer Segment: Shell would add sand and cement bags under
permitted rip rap in the Atchafalaya River and Bayou Shaffer, and conduct dredging operations within
a 120-foot wide by 240-foot long area in Bayou Shaffer near the dock location, to restore Bateman
Island work areas to original contours. Work completed includes the installation of 4,350 feet of
pipeline from Bayou Shaffer HDD from Avoca Island to Bateman Island. Overall, approximately
33,000 cubic yards of fill material would be excavated, approximately 41,069 cubic yards of
excavated and hauled-in material and 6,883 cubic yards of chipped trees would be placed onsite.
The total amount of wetland impacts from the permit modification would be 11.92 acres, which is less
than the originally permitted and mitigated amount of 14.1 acres of jurisdictional wetlands. Therefore,
the applicant has not proposed to mitigate due to the reduction in overall project impacts from the
modified plans.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number
and be mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the proposed work
by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be
specific and substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time extension will be
continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
-3The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of
this public notice are being sent to the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
The New Orleans District has determined that out of the 18.53 acre project footprint, 0.31 of an
acre is located in waters known to be utilized by the pallid sturgeon (Scaphirhynchus albus) and the
West Indian Manatee (Trichechus manatus) and determined the activity is not likely to adversely
affect these species based on the Standard Local Operating Procedure for Endangered Species in
Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New
Orleans and U.S. Fish and Wildlife Service, Ecological Services Office. If this permit is issued, the
applicant has agreed to the following conditions provided in the SLOPES manual: Standard Manatee
Conditions for In-Water Activities.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.31 of an acre of EFH utilized by various life stages of red drum and
penaeid shrimp. Our initial determination is that the proposed action would not have a substantial
adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination
relative to project impacts and the need for mitigation measures is subject to review by and
coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
STEP 5 PERMIT AMENDMENT
Shell has completed the 4350' Bayou Shaffer HDD from Avoca Island to Bateman
Island. Because of Corps restrictions limiting work when the Mississippi River is +11 on
the Carrollton Gage and hurricane season, the second HDD has been delayed until
November. Shell would like to amend the permits to allow for improvements in the work
conditions on site and changes to the scope of the project.
Shell requests the following changes to the permit:
1. Shell proposes replacing the 2980' of pipeline between the two HDD exit sites.
The permits allow two, 2' deep floatation ditches to float pipe between the HDD
exits. Since Shell was unable to perform both drills during one mobilization, Shell
elected to use only one floatation channel. After the second HDD pipe is
installed, the floatation ditch will be deepened to allow the new pipe between the
exit sites to be installed 4' deep. Sheets 6-9 & 17 show the new pipeline
segment to be installed. Excavation and fill impacts will increase.
2. The existing pipeline between the drill sites will be abandoned in place increasing
the total length of pipeline abandoned in place to 12,205'. The POB of
abandoned pipe is on Sheet 4 of the drawings. The POE is on Sheet 11.
3. An additional 2980' of pipe will be brought onto Bateman Island to install the new
pipe segment between the drill exits. Shell will be pushing almost 8000' of 22"
pipe from Bayou Shaffer to the Atchafalaya River HDD Exit. The permit allows
two floatation channels (2860' X 10' X 2' and 2860' X 2' X 15'). An additional
1289' X 50' workspace is between the Bayou Shaffer HDD exit and a 1.61 acre
dock. Shell proposes reconfiguring the Bateman Island workspaces.
a. Shell proposes one floatation ditch (new pipeline ROW) 3665' X 15' X 7'.
b. Sheet 9 shows a new 400' X 35' wide pipe back string to the bank of
Bayou Shaffer. The barge will be stationed adjacent to the new 400' X 35'
back string space. This reconfiguration allows the pipe to be pushed off
the barge in a straight line, rather than the curved line originally permitted
from the dock to the Bayou Shaffer Exit. During the Bayou Shaffer drill,
the pipe fell off the barge as the workers tried to curve the string to stay
within the permitted workspace. Pushing the pipe straight from the barge
in to the new, proposed back string workspace is a safer alternative. Only
0.77 acres of the 1.61 acres permitted at the dock were cleared. Adding
the new back string workspace is impact neutral.
4. Bateman Island soils are mostly soft clay over a layer of organics that is 60%
water and 3.5' thick. The worksite between the HDD exits is muddy and slick. It
is difficult to for equipment and personnel to maneuver safely.
a. Shell proposes using the 30' pipeline right of way between the Atchafalaya
River and the Atchafalaya River HDD Exit as additional access. Mats will
be used as needed. No clearing is required. Sheets 5 and 6 show the
proposed, 1740' X 30' equipment access. The area immediately adjacent
to the river is shown as non-wetlands on the wetlands delineation.
b. Five, new road turnoffs 25' X 100' are proposed to allow equipment to
pass safely. The turnoffs require 0.29 acres of additional tree clearing.
The cleared area between the HDDs on Bateman Island was permitted at
5.49 acres. The actual amount cleared was 4.33 acres. The five new
turnoffs will not increase tree impacts above the permitted amount.
5. The pipeline at the tie-in location on Avoca Island is only 2' deep. The stopple
that will be used to connect the new pipe to the existing pipe will extend at least 1'
above the pipe. One foot of cover is not adequate to protect the stopple. Adding
fill or lowering the pipeline is required to complete the project. Shell proposes
lowering 600' of pipeline an additional 4'. All work will take place within the
existing pipeline right of way. Sheets 11 & 19 show the lowering details.
6. Shell proposes adding sand/cement bags under the rip rap permitted to be added
in Atchafalaya River and Bayou Shaffer. (Sheet 19)
7. Shell and the landowner agree the Bateman Island worksites are unlikely to
return to their original contours without additional fill. Shell proposes dredging a
240' X 120' area in Bayou Shaffer near the dock location to restore the Bateman
Island work areas to original contours. (Sheet 20)
The project, as depicted on the revised drawings, impacts 11.92 acres of trees. The
permits allow 14.44 acres of tree clearing.
All new excavation and fill occur east of the Berwick Floodwall.
30 15
M
Texas
is
si
ss
ip
p
i
Arkansas
0
30
60
Scale - Miles
L o u i s i a n a
LOCATION
Coastal Zone
Boundary
Gulf
of
Mexico
PROJECT LOCATION:
X = 3,326,623' (NAD 83)
Y = 429,082' (NAD 83)
LAT: 29° 40' 47" (NAD 83)
LONG: 91° 11' 21" (NAD 83)
PROJECT LOCATION:
X = 3,315,147' (NAD 83)
Y = 429,574' (NAD 83)
LAT: 29° 40' 52" (NAD 83)
LONG: 91° 13' 31" (NAD 83)
P.O.B./ BEGIN PROPOSED
PIPELINE INSTALLATION/ TIE-IN/
PROPOSED EXCAVATION
X = 3,315,147'
Y = 429,574'
LAT = 29° 40' 52"
LONG = 91° 13' 31"
NAD 83
NAD 83
BEGIN PROPOSED EXCAVATION
/PROPOSED TIE-IN/ P.O.E.
X = 3,326,623'
Y = 429,082'
LAT = 29° 40' 47"
LONG = 91° 11' 21"
NAD 83
NAD 83
PROJECT
VICINITY
SCALE: 1" = 20,000'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
20,000'
10,000'
0'
20,000'
SHEET 1 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93851 00
MHW =
MLW =
+3.0'
+1.0'
A
AY
AL
AF R
CH VE
AT RI
SITE A:
(1) PIPELINE EXCAVATION1,140'±X40'±X7.5'±
(2) TIE-IN PIT EXCAVATION50'±X40'±X7.5'±
(3) WORK SPACE- 200'±X200'±
SITE F:
(1) PIPELINE EXCAVATION415'±X40'±X7.5'±
(2) TIE-IN PIT EXCAVATION50'±X40'±X7.5'±
(3) LOWERING EXCAVATION600'±X10'±X6'±
(4) WORK SPACE- 200'±X200'±
END PROPOSED EXCAVAION/
PROPOSED POINT OF ENTRY
X = 3,314,573'
Y = 430,177'
LAT = 29° 40' 58"
LONG = 91° 13' 37"
END PROPOSED EXCAVATION/
PROPOSED POINT OF ENTRY
NAD 83
NAD 83
X = 3,326,190'
Y = 429,172'
LAT = 29° 40' 48"
LONG = 91° 11' 26"
END PROPOSED EXCAVATION/
PROPOSED POINT OF EXIT
X = 3,321,850'
Y = 428,970'
LAT = 29° 40' 46.26"
LONG = 91° 12' 15.01"
SHEET 3 & 4
NAD 83
NAD 83
NAD 83
NAD 83
SITE D:
(1) PIPELINE EXCAVATION40'±X40'±X7.5'±
(2) TIE-IN PIT EXCAVATION50'±X40'±X7.5'±
(3) WORK SPACE- 200'±X200'±
PROPOSED EQUIPMENT
ACCESS- 6,450'± X 30'±
SHEET 9 & 10
SHEET 6
SHEET 5
P.O.B./ BEGIN PROPOSED
PIPELINE INSTALLATION/ TIE-IN/
PROPOSED EXCAVATION
NAD 83
NAD 83
SHEET 11
SHEET 8
AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
DUE TO EQUIPMENT ACCESS
(10± YDS/ 0.02± ACRES)
PROPOSED EQUIPMENT
ACCESS- 3,660'± X 30'±
SITE C:
(1) FLOTATION CHANNEL3,665'±X15'±X7'±
(2) EXISTING ROW- 30'±
(3) WORK SPACE2,860'±X80'±
SITE B:
(1) PIPELINE EXCAVATION150'±X40'±X7.5'±
(2) TIE-IN PIT EXCAVATION50'±X40'±X7.5'±
(3) WORK SPACE- 250'±X250'±
U
BAYO
X = 3,315,147'
Y = 429,574'
LAT = 29° 40' 52"
LONG = 91° 13' 31"
SHEET 7
SHAF
PROPOSED POINT OF EXIT/
END PROPOSED EXCAVATION
BEGIN EXCAVATION/TIE-IN/ END
PIPELINE ABANDONMENT/P.O.E.
X = 3,326,661'
Y = 429,095'
LAT = 29° 40' 47.43"
LONG = 91° 11' 20.46"
NAD 83
NAD 83
FER
X = 3,318,765'
Y = 428,547'
LAT = 29° 40' 42.10"
LONG = 91° 12' 49.98"
SITE E:
(1) WORK SPACE- 1,800'±X80'±
NAD 83
NAD 83
NOTE:
ONLY THE 4 TRENCHED AREAS OF THE PROPOSED PIPELINE WILL BE SUBJECT TO PHYSICAL INSPECTION IN THE FUTURE. THESE AREAS ARE:
·
THE 1,120' SEGMENT FROM BERWICK STATION TO THE ATCHAFALAYA RIVER HDD ENTRY TIE-IN
·
THE 60' TIE-IN OF THE BAYOU SHAFFER HDD EXIT TO THE EXISTING PIPELINE ON BATEMAN ISLAND
·
THE 415' TIE-IN OF THE BAYOU SHAFFER DRILL TO THE EXISTING PIPELINE ON AVOCA ISLAND
THE TYPE OF EQUIPMENT AND CLEARING REQUIREMENTS WILL DEPEND ON THE NATURE OF THE REPAIR.
SCALE: 1" = 2000'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
2000'
1000'
0'
2000'
SHEET 2 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93852 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
EXISTING SHELL PIPELINE
TO REMAIN IN PLACE
PROPOSED TEMPORARY SPOIL
PLACEMENT- 115'± X 85'± X 20'±
(4,275± CY/ 0.22± ACRES)
WORK AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
(300± CY/ 0.74± ACRES)
20
0'±
20
0'±
PROPOSED BORE PIT
EXCAVATION- 50'± X 40'±
SEE SHEET 15 FOR DETAIL
PROPOSED 22-INCH PIPELINE
TO BE INSTALLED- 1,120'±
PROPOSED TEMPORARY SPOIL
PLACEMENT- 60'± X 60'± X 10'±
(900± CY/ 0.08± ACRES)
END PROPOSED EXCAVATION/
PROPOSED POINT OF ENTRY
X = 3,314,573'
Y = 430,177'
LAT = 29° 40' 58"
LONG = 91° 13' 37"
75'±
NAD 83
EXISTING SHELL FACILITY
NAD 83
WORK AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
(182± CY/ 0.45± ACRES)
PROPOSED EXCAVATION
(1,140'± X 40'±)
SEE SHEET 12 & 18 FOR DETAIL
P.O.B./ BEGIN PROPOSED
PIPELINE INSTALLATION/ TIE-IN/
PROPOSED EXCAVATION/
BEGIN PIPELINE ABANDONMENT
X = 3,315,147'
Y = 429,574'
LAT = 29° 40' 52"
LONG = 91° 13' 31"
NAD 83
NAD 83
PROPOSED TEMPORARY SPOIL
PLACEMENT- 90'± X 75'± X 15'±
(2,650± CY/ 0.15± ACRES)
NOTE: PROPOSED TIMBER MATS TO BE USED
FOR EQUIPMENT ACCESS. THIS SHEET TO
SHOW LOOP CONNECTION ONLY. SEE SHEET 4
FOR HDD INSTALLATION PLAN VIEW.
EXISTING SHELL PIPELINE TO BE CUT,
CAPPED, & ABANDONED IN PLACE- 12,205'±
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 3 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93853 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
EXISTING SHELL PIPELINE
TO REMAIN IN PLACE
PROPOSED TEMPORARY SPOIL
PLACEMENT- 115'± X 85'± X 20'±
(4,275± CY/ 0.22± ACRES)
WORK AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
(300± CY/ 0.74± ACRES)
20
0'±
20
0'±
PROPOSED BORE PIT
EXCAVATION- 50'± X 40'±
SEE SHEET 15 FOR DETAIL
PROPOSED TEMPORARY SPOIL
PLACEMENT- 60'± X 60'± X 10'±
(900± CY/ 0.08± ACRES)
END PROPOSED EXCAVATION/
PROPOSED POINT OF ENTRY
X = 3,314,573'
Y = 430,177'
LAT = 29° 40' 58"
LONG = 91° 13' 37"
75'±
NAD 83
EXISTING SHELL FACILITY
NAD 83
WORK AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
(182± CY/ 0.45± ACRES)
PROPOSED 22-INCH HDD PIPELINE
TO BE INSTALLED- 4,860'±
PROPOSED TEMPORARY SPOIL
PLACEMENT- 90'± X 75'± X 15'±
(2,650± CY/ 0.15± ACRES)
NOTE: PROPOSED TIMBER MATS TO BE USED
FOR EQUIPMENT ACCESS. THIS SHEET TO
SHOW HDD INSTALLATION ONLY. SEE SHEET 3
FOR LOOP CONNECTION PLAN VIEW.
EXISTING SHELL PIPELINE TO BE CUT,
CAPPED, & ABANDONED IN PLACE- 12,205'±
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 4 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93854 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
RI
V
ER
PALUSTRINE EMERGENT WETLANDS
A
TC
H
A
FA
LA
Y
A
PROPOSED SAND BAGS & RIP
RAP MATERIAL- 75'± X 30'±
(120± CY/ 0.05± ACRES)
SEE SHEET 19 FOR DETAIL
PROPOSED SAND BAGS & RIP
RAP MATERIAL- 230'± X 30'±
(245± CY/ 0.16± ACRES)
SEE SHEET 19 FOR DETAIL
EXISTING SHELL PIPELINE TO BE
CUT, CAPPED, & ABANDONED IN
PLACE- 12,205'±
30'±
PROPOSED 22-INCH HDD PIPELINE
TO BE INSTALLED- 4,860'±
EMERGENT WETLANDS/ EXISTING
SHELL ROW UTILIZED DUE TO
EQUIPMENT ACCESS- 1,740'± X 30'±
(1.03± ACRES)
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 5 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93855 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
INSTALLED 22-INCH
PIPELINE- 2,980'±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(1,745± CY/ 4.33± ACRES)
EXISTING 30' CLEARED ROW
PROPOSED EXCAVATION
/PROPOSED TIE-IN
X = 3,318,907'
Y = 428,566'
LAT = 29° 40' 42.29"
LONG = 91° 12' 48.37"
NAD 83
EQUIPMENT ACCESS &
FLOATATION CHANNEL
SEE SHEET 17 FOR DETAIL
NAD 83
EMERGENT WETLANDS/ EXISTING
SHELL ROW TO BE UTILIZED DUE
TO EQUIPMENT ACCESS- 1,740'± X
30'± (1.03± ACRES)
PROPOSED 22-INCH PIPELINE TO
BE INSTALLED- 145'±
132'±
30'±
EXISTING SHELL PIPELINE
TO BE CUT, CAPPED, &
ABANDONED IN PLACE12,205'±
250'±
MATCHLINE A
250'±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(475± CY/ 1.17± ACRES)
PROPOSED BORE PIT
EXCAVATION- 50'± X 40'±
SEE SHEET 15 FOR DETAIL
PROPOSED EXCAVATION150'± X 40'±
SEE SHEET 18 FOR DETAIL
PROPOSED 22-INCH HDD PIPELINE
TO BE INSTALLED- 4,860'±
PROPOSED POINT OF EXIT/
END PROPOSED EXCAVATION
X = 3,318,765'
Y = 428,547'
LAT = 29° 40' 42.10"
LONG = 91° 12' 49.98"
NAD 83
NAD 83
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 6 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93856 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
FLOATATION CHANNEL EXCAVATION
(9,165± CY/ 1.22± ACRES)
SEE SHEET 17 FOR DETAIL
PROPOSED ROAD TURNOFF TYP.- 100'± X 25'±
(0.29 ACRES TOTAL TO BE CLEARED,
CHIPPED, & USED AS FILL)
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(1,745± CY/ 4.33± ACRES)
EXISTING 30' CLEARED ROW
MATCHLINE A
EXISTING SHELL PIPELINE TO BE
CUT, CAPPED, & ABANDONED IN
PLACE- 12,205'±
INSTALLED 22-INCH PIPELINE- 2,980'±
MATCHLINE B
80'±
TEMPORARY SPOIL
PLACEMENT- 2,860'± X 10'±
(7,415± CY/ 0.66± ACRES)
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 7 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93857 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
INSTALLED 22-INCH HDD
PIPELINE- 4,350'±
BORE PIT EXCAVATION- 50'± X 40'±
SEE SHEET 15 FOR DETAIL
END EXCAVATION/
POINT OF EXIT
X = 3,321,850'
Y = 428,970'
LAT = 29° 40' 46.26"
LONG = 91° 12' 15.01"
NAD 83
NAD 83
TEMPORARY SPOIL
PLACEMENT- 75'± X 75'± X 15'±
(460± CY/ 0.13± ACRES)
INSTALLED 22-INCH
PIPELINE- 2,980'±
EQUIPMENT ACCESS &
FLOATATION CHANNEL
SEE SHEET 17 FOR DETAIL
200'±
80'±
80'±
MATCHLINE B
MATCHLINE C
200'±
EXISTING SHELL PIPELINE TO BE
CUT, CAPPED, & ABANDONED IN
PLACE- 12,205'±
EXCAVATION- 40'± X 40'±
SEE SHEET 18 FOR DETAIL
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(1,745± CY/ 4.33± ACRES)
EXISTING 30' CLEARED ROW
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(215± CY/ 0.53± ACRES)
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(370± CY/ 0.91± ACRES)
EXISTING 30' CLEARED ROW
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 8 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93858 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
WORK AREA
SEE SHEET 10 FOR DETAIL
ADDITIONAL WORK AREA
CLEARED, CHIPPED, & USED AS FILL
(60± CY/ 0.15± ACRES)
WORK AREA- 640'± X 80'±
20
0'
±
35
0'
±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(370± CY/ 0.91± ACRES)
WORK AREA- 660'± X 50'±
50'±
80'±
WORK AREA TO BE CLEARED,
CHIPPED, & USED AS FILL
(125± CY/ 0.31± ACRES)
35'±
ER
INSTALLED 22-INCH
HDD PIPELINE- 4,350'±
Y
O
U
SH
A
FF
EXISTING SHELL PIPELINE TO BE
CUT, CAPPED, & ABANDONED IN
PLACE- 12,205'±
BA
MATCHLINE C
PROPOSED BACK STRING
TEMPORARY SPOIL
PLACEMENT- 620'± X 10'±
(1,750± CY/ 0.14± ACRES)
PROPOSED SAND BAGS & RIP
RAP MATERIAL- 155'± X 30'±
(240± CY/ 0.10± ACRES)
SEE SHEET 19 FOR DETAIL
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 9 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93859 00
MHW =
MLW =
+3.0'
+1.0'
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
PALUSTRINE EMERGENT WETLANDS
±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(310± YDS/ 0.77± ACRES)
35
0'
20
0'
±
PROPOSED BACK STRING
O
U
SH
A
FF
ER
INSTALLED 22-INCH HDD PIPELINE- 4,350'±
BA
Y
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
SCALE: 1" = 100'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
100'
50'
0'
100'
SHEET 10 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
03/11/2015
TBS-2014.0525
SPLC-GOM-HE-SA-90918 01
MHW =
MLW =
+3.0'
+1.0'
END EXCAVATION/
POINT OF ENTRY
X = 3,326,190'
Y = 429,172'
LAT = 29° 40' 48"
LONG = 91° 11' 26"
NAD 83
EXISTING SHELL PIPELINE
TO REMAIN IN PLACE
TEMPORARY SPOIL
PLACEMENT- 125'± X 75'± X 20'±
(3,025± CY/ 0.22± ACRES)
200'±
BORE PIT EXCAVATION- 50'± X 40'±
SEE SHEET 15 FOR DETAIL
NAD 83
200'±
INSTALLED 22-INCH HDD
PIPELINE- 4,350'±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(170± CY/ 0.42± ACRES)
90'±
WORK AREA CLEARED,
CHIPPED, & USED AS FILL
(490± CY/ 0.92± ACRES)
30'±
EXCAVATION- 415'± X 40'±
SEE SHEET 18 FOR DETAIL
BEGIN EXCAVATION/TIE-IN/ END
PIPELINE ABANDONMENT/P.O.E.
X = 3,326,661'
Y = 429,095'
LAT = 29° 40' 47.43"
LONG = 91° 11' 20.46"
30'±
INSTALLED 22-INCH
PIPELINE- 485'±
EXISTING SHELL PIPELINE TO BE
CUT, CAPPED, & ABANDONED IN
PLACE- 12,205'±
NAD 83
NAD 83
PROPOSED LOWERING600'± X 10'±
SEE SHEET 19 FOR DETAIL
PROPOSED TEMPORARY SPOIL
PLACEMENT- 600'± X 10'± X 6'±
(1,000± CY/ 0.14± ACRES)
EMERGENT WETLANDS/ EXISTING
SHELL ROW UTILIZED DUE TO
EQUIPMENT ACCESS- 3,375'± X 30'±
(2.44± ACRES)
WETLAND LEGEND:
PALUSTRINE FORESTED WETLANDS
NOTE: PROPOSED TIMBER MATS TO
BE USED FOR EQUIPMENT ACCESS
PALUSTRINE EMERGENT WETLANDS
SCALE: 1" = 200'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
200'
100'
0'
200'
SHEET 11 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93860 01
MHW =
MLW =
+3.0'
+1.0'
P.O.B./ BEGIN PROPOSED
PIPELINE INSTALLATION/ TIE-IN/
PROPOSED EXCAVATION
X = 3,315,147'
Y = 429,574'
LAT = 29° 40' 52"
LONG = 91° 13' 31"
END PROPOSED EXCAVATION/
PROPOSED POINT OF ENTRY
X = 3,314,573'
Y = 430,177'
LAT = 29° 40' 58"
LONG = 91° 13' 37"
NAD 83
NAD 83
NAD 83
NAD 83
1,140'±
NATURAL GROUND
PROPOSED 22" SHELL
PIPELINE TO BE INSTALLED
4' MIN.
EXSITING 22" SHELL PIPELINE
TO REMAIN IN PLACE
PROPOSED EXCAVATION
(7,640± YDS³/ 1.02± ACRES)
7.5'±
EXSITING DRAINAGE DITCH
PROPOSED 22" HDD PIPELINE
TO BE INSTALLED
PIPELINE EXCAVATION PROFILE
BERWICK STATION TIE-IN PIPE
NOT TO SCALE
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
SHEET 12 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93861 00
MHW =
MLW =
+3.0'
+1.0'
END PROPOSED EXCAVAION/
PROPOSED POINT OF ENTRY
PROPOSED POINT OF EXIT/
END PROPOSED EXCAVATION
X = 3,314,573'
Y = 430,177'
LAT = 29° 40' 58"
LONG = 91° 13' 37"
X = 3,318,765'
Y = 428,547'
LAT = 29° 40' 42.10"
LONG = 91° 12' 49.98"
NAD 83
NAD 83
EXISTING LEVEE &
FLOOD WALL
NAD 83
NAD 83
NATURAL GROUND
ATCHAFALAYA RIVER
PROPOSED 22-INCH HDD PIPELINE
TO BE INSTALLED- 4,860'±
HORIZONTAL SCALE: 1" = 600'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
600'
300'
0'
VERTICAL SCALE: 1" = 100'
600'
100'
50'
100'
0'
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
SHEET 13 OF 21
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93862 00
MHW =
MLW =
+3.0'
+1.0'
HDD COMPLETED
END EXCAVATION/
POINT OF EXIT
X = 3,321,850'
Y = 428,970'
LAT = 29° 40' 46.26"
LONG = 91° 12' 15.01"
END EXCAVATION/
POINT OF ENTRY
X = 3,326,190'
Y = 429,172'
LAT = 29° 40' 48"
LONG = 91° 11' 26"
NAD 83
NAD 83
NAD 83
NAD 83
EXISTING LEVEE
NATURAL GROUND
BAYOU SHAFFER
INSTALLED 22-INCH HDD
PIPELINE- 4,350'±
HORIZONTAL SCALE: 1" = 600'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
600'
300'
0'
VERTICAL SCALE: 1" = 100'
600'
100'
50'
100'
0'
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
SHEET 14 OF 21
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93863 00
PROPOSED 22" HDD PIPELINE
TO BE INSTALLED
50'±
40'±
PROPOSED BORE PIT
EXCAVATION
(185± YDS³/ 0.05± ACRES)
40'±
4' MIN.
PROPOSED BORE PIT
EXCAVATION
(185± YDS³/ 0.05± ACRES)
10'±
7.5'±
PROPOSED 22" HDD PIPELINE
TO BE INSTALLED
Proposed temporary spoil placement to be
stockpiled within workspace and used as backfill.
See plan views for location & dimensions.
EXCAVATION DETAIL- BORE PIT
SCALE: 1" = 20'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
20'
10'
0'
20'
SHEET 15 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93864 00
+3.0'
+1.0'
20'±
MHW =
MLW =
185'±
250'±
20'±
250'±
20'±
20'±
160'±
PROPOSED TEMPORARY
RING LEVEE
(2,495± YDS³/ 0.35± ACRES)
PROPOSED EXCAVATION
FOR RING LEVEE
CONSTRUCTION
(1,150± YDS³/ 0.33± ACRES)
250'±
20'±
5'±
20'±
NATURAL GROUND
20'±
160'±
PROPOSED TEMPORARY
RING LEVEE
(2,495± YDS³/ 0.35± ACRES)
5'±
20'±
PROPOSED EXCAVATION
FOR RING LEVEE
CONSTRUCTION
(1,150± YDS³/ 0.33± ACRES)
Approximately 330± yds³ of native material
to be used for ring levee construction will
derive from bore pit & tie-in excavation.
EXCAVATION DETAIL- RING LEVEE
SCALE: 1" = 20'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
20'
10'
0'
20'
SHEET 16 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93865 00
MHW =
MLW =
+3.0'
+1.0'
EXISTING 30' ROW
(CLEARED)
25'±
45'±
15'±
ROAD
TURNOFF
EQUIPMENT
ACCESS
5'±
FLOATATION CHANNEL
EXCAVATION
(9,165± YDS³/ 1.22± ACRES)
TIMBER MATS
TEMPORARY
SPOIL PLACEMENT
(7,415± YDS³/ 0.66± ACRES)
INSTALLED 22-INCH PIPELINE
105'±
25'±
EXISTING SHELL PIPELINE
TO BE ABANDONED IN PLACE
EXISTING 30' ROW
(CLEARED)
PROPOSED
FLOATATION
CHANNEL
EQUIPMENT
ACCESS
ROAD
TURNOFF
15'±
10'±
2,860'±
100'±
105'±
45'±
15'±
5'±
15'±
10'±
7'±
TIMBER MATS
FLOTATION CHANNEL
EXCAVATION
(9,165± YDS³/ 1.22± ACRES)
5'±
4' MIN.
5'±
INSTALLED 22-INCH PIPELINE
TEMPORARY
SPOIL PLACEMENT
(7,415± YDS³/ 0.66± ACRES)
EXISTING SHELL PIPELINE
TO BE ABANDONED IN PLACE
EXCAVATION DETAIL- FLOATATION CHANNEL
SCALE: 1" = 20'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
20'
10'
0'
20'
SHEET 17 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93866 00
Pipeline Installation Excavations:
Sheet 3
1,140'Lx40'W
7,640± yds³
Sheet 6
150'Lx40'W
1,030± yds³
Sheet 8
40'Lx40'W
275± yds³
Sheet 11
415'Lx40'W
2,840± yds³
1.02± acres
0.14± acres
0.03± acres
0.37± acres
VARIES
40'±
PROPOSED EXCAVATION FOR
PIPELINE INSTALLATION
PROPOSED 22" PIPELINE
TO BE INSTALLED
NATURAL GROUND
40'±
7.5'±
4' MIN.
PROPOSED EXCAVATION FOR
PIPELINE INSTALLATION
10'±
PROPOSED 22" PIPELINE
TO BE INSTALLED
Proposed temporary spoil placement to be
stockpiled within workspace and used as backfill.
See plan views for location & dimensions.
EXCAVATION DETAIL- ON LAND
SCALE: 1" = 10'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
10'
5'
0'
10'
SHEET 18 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93867 00
MHW =
MLW =
+3.0'
+1.0'
2'±
4'±
1.5'±
PROPOSED
SAND BAG PLACEMENT
PROPOSED
RIP RAP MATERIAL
EXISTING MUDLINE
EXISTING 22" PIPELINE
TO BE ABANDONED
RIP RAP DETAIL
5'±
NATURAL GROUND
10'±
10'±
6'±
PROPOSED EXCAVATION
(1,000± YDS³/ 0.14± ACRES)
EXISTING 22" PIPELINE
TO BE LOWERED
6'±
5'±
PROPOSED TEMPORARY
SPOIL PLACEMENT
(1,000± YDS³/ 0.14± ACRES)
5'±
LOWERING DETAIL
PROPOSED TIMBER MATS
VARIES
Temporary board mats will be used
as needed to minimize impacts.
NATURAL GROUND
PROPOSED EXCAVATION
TIMBER MAT DETAIL
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
NOT TO SCALE
SHEET 19 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93868 00
MHW =
MLW =
+3.0'
+1.0'
PROPOSED BORROW PIT
(9,160± CY/ 0.66 ACRES)
ACCESS ROUTE AND OFFLOADING AREA TO
BE RECLAIMED WITH BORROW MATERIAL
(4,110± CY/ 0.97 ACRES)
20
12
0'
0'
±
24
0'
35
0'
±
ACCESS ROUTE- 1,300'± X 40'± TO BE
RECLAIMED WITH BORROW MATERIAL.
APPROXIMATELY 85% OF AREA TO BE RESTORED
(5,050± CY / 1.19 ACRES)
40'±
200'±
35'±
WORK AREA TO BE CLEARED
(SEE SHEET 9)
200'±
YO
U
SH
AF
F
ER
INSTALLED 22-INCH
HDD PIPELINE- 4,350'±
BA
ARMORING
(SEE SHEET 9)
SCALE: 1" = 300'
NOTE: ±9,160 CY OF BORROW MATERIAL DREDGED FROM BAYOU
SHAFFER TO BE PLACED WITHIN ACCESS ROUTE AND OFFLOADING
AREA TO RESTORE WORK AREA TO PRE-EXISTING CONDITIONS.
APPROXIMATELY 1.5' OF FILL REQUIRED TO RESTORE WORK AREA.
300'
150'
0'
300'
EXISTING BANK LINE
50.0'
120.0'
1
PROPOSED BORROW
PIT EXCAVATION
1
10.0'
100.0'
EXISTING GRADE
SECTION VIEW - BORROW PIT
SCALE: 1" = 40'
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
SHEET 20 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93869 00
NOTES
SEE EXHIBIT "A" FOR TOTAL IMPACTS
TOTAL IMPACTS
EQUIPMENT
EXCAVATIONS
FILL AREAS
FILL MATERIALS
THESE PLATS ARE TO BE USED EXCLUSIVELY FOR
THE ACQUISITION OF REGULATORY PERMITS.
SHEET 21 OF 21
HOUMA-ERATH CRUDE
PL SEG-BERWICK TO HOUMA
PROPOSED HORIZONTAL DIRECTIONAL DRILL ACROSS
ATCHAFALYA RIVER & BAYOU SHAFFER
ST. MARY PARISH, LOUISIANA
04/09/2015
TBS-2014.0525
SPLC-GOM-HE-SA93870 01
EXHIBIT "A"
PERMITTED PROJECT IMPACTS
WEST OF
RIVER
EXCAVATIONS
Non-Vegetated Water 80 CYS
Bottoms
0.01 ACS
4425 CY
Wetlands
0.623 ACS
3400 CY
Non-Wetlands
0.46 ACS
Fill Excavated
Material
2650 CY
0.15 ACS
Non-Wetlands
5255 CY
Wetlands
0.3 ACS
Chipped Trees
906 CY
Wetlands
1.84 ACS
74 CY
Non-Wetlands
0.15 ACS
EAST OF
RIVER
EXCAVATIONS
Non-Vegetated
Water Bottoms
10,970 CY
2.897 ACS
Wetlands
Non-Wetlands
Fill Excavated
Material
Non-Wetlands
10,970 CY
3.33 ACS
6402 CY
12.29 ACS
82 CY
0.16 ACS
Rip Rap
Non-Vegetated Water
Bottoms
PROPOSED AMENDED PROJECT IMPACTS
WEST OF
EAST OF
RIVER
RIVER
605 CY
0.31 ACS
Wetlands
Chipped Trees
Wetlands
Non-Wetlands
Rip Rap/Sand
Bags
Non-Vegetated
Water Bottoms
80 CYS
0.01 ACS
4425 CY
0.623 ACS
3400 CY
0.44 ACS
9160 CYS
0.66 ACS
15,935 CY
3.37 ACS
2650 CY
0.15 ACS
5255 CY
0.3 ACS
25,095 CY
5.43 ACS
906 CY
1.84 ACS
74 CY
0.15 ACS
6402 CY
12.29 ACS
82 CY
0.16 ACS
605 CY
0.31 ACS