INSTALLATION OF 8-INCH ETHYLENE PIPELINE UNDERNEATH THE MISSISSIPPI RIVER IN SAINT JAMES PARISH

NAME OF APPLICANT: Boardwalk Louisiana Midstream, LLC, c/o Ramboll Engineering US Corporation, Attn: Alie Nicotera, 1055 St. Charles Avenue, Suite 501, New Orleans, Louisiana 70130 LOCATION OF WORK: Located on an approximate 6.5-acre site, located near Mississippi River mile 166, near Union, Louisiana, located in Saint James Parish, as shown on the enclosed drawings (Latitude 30.07925 N Longitude -90.90711 W). This project is located in the Pontchartrain Basin (Maurepas HUC 080070204). CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the installation and maintenance of an approximate 4.44-mile long 8-inch ethylene pipeline to provide an alternative ethylene source to the existing Americas Styrenics production facility. The 8-inch pipeline would be installed via Horizontal Directional Drilling (HDD) underneath the Mississippi River, near river mile 166, near Union, Louisiana, within Saint James Parish. A spare 8-inch pipeline is also proposed to cross underneath the Mississippi River adjacent to the proposed line. Approximately 15,512 cubic yards of native material would be excavated and backfilled during pipeline installation in the existing right-of-way. Approximately 364 cubic yards of hauled in limestone material and 364 cubic yards of hauled in sand material would be placed onsite during the pipeline installation. Approximately 90 cubic yards of limestone would be temporarily placed as fill during project implementation. Approximately 1.3 acres of jurisdictional forested wetlands would be impacted as a result of the ethylene pipeline installation. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. The applicant is proposing to utilize best management practices during and after the construction phase of the project. The applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank.

JOINT PUBLIC NOTICE September 18, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1217 Project Manager Kenny Blanke Kenneth.G.Blanke@usace.army.mil MVN 2017-0408-CQ

(225) 219-3225 Project Manager Ms. Elizabeth Hill WQC Application Number WQC 170915-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). INSTALLATION OF 8-INCH ETHYLENE PIPELINE UNDERNEATH THE MISSISSIPPI RIVER IN SAINT JAMES PARISH NAME OF APPLICANT: Boardwalk Louisiana Midstream, LLC, c/o Ramboll Engineering US Corporation, Attn: Alie Nicotera, 1055 St. Charles Avenue, Suite 501, New Orleans, Louisiana 70130. LOCATION OF WORK: Located on an approximate 6.5-acre site, located near Mississippi River mile 166, near Union, Louisiana, located in Saint James Parish, as shown on the enclosed drawings (Latitude 30.07925 N Longitude -90.90711 W). This project is located in the Pontchartrain Basin (Maurepas HUC 080070204). CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the installation and maintenance of an approximate 4.44-mile long 8-inch ethylene pipeline to provide an alternative ethylene source to the existing Americas Styrenics production facility. The 8-inch pipeline would be installed via Horizontal Directional Drilling (HDD) underneath the Mississippi River, near river mile 166, near Union, Louisiana, within Saint James Parish. A spare 8-inch pipeline is also proposed to cross underneath the Mississippi River adjacent to the proposed line. Approximately 15,512 cubic yards of native material would be excavated and backfilled during pipeline installation in the existing right-of-way. Approximately 364 cubic yards of hauled in limestone material and 364 cubic yards of hauled in sand material would be placed onsite during the pipeline installation. Approximately 90 cubic yards of limestone would be temporarily placed as fill during project implementation. Approximately 1.3 acres of jurisdictional forested wetlands would be impacted as a result of the ethylene pipeline installation. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent

practicable. The applicant is proposing to utilize best management practices during and after the construction phase of the project. The applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank. The comment period for the Department of Army Permit and the Louisiana Department of Environmental Quality will close in 30 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and State Historic Preservation Officer. Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,

Ecological Services Office, the Corps has determined that the proposed activity would have no effect on any listed species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services, before a permit is issued. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosure

BEGIN STA. 0+00 (NAD 83) N=583,839.88 E=3,429,706.04 LAT.=N30°06'16.58" LONG.=W90°51'45.05" SHEET 3

SHEET 5 SHEET 2 SHEET 4

SHEET 7 SHEET 9

SHEET 6

SHEET 8

SHEET 11

PROPOSED 8" PIPELINE SHEET 10

SHEET 13 END STA. 234+64 (NAD 83) N=574,468.74 E=3,411,626.06 LAT.=N30°04'44.51" LONG.=W90°55'11.28"

SHEET 12

SHEET 14 PROPOSED 8" PIPELINE & 8" SPARE PIPELINE IN MISSISSIPPI RIVER HDD

SHEET 19 SHEET 18

SHEET 16 SHEET 17

SHEET 15

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 61

SEC. 63

STA. 3+29 HDD EXIT

RAPIDAN CANA L

HDD EXIT

SEC. 62

NAL HELVETIA CA

40' x 218' BACKSTRING INTO CANE FIELD

STA. 2+84 (NAD 83) N=583,572.66 E=3,429,609.57 LAT.=N30°06'13.94" LONG.=W90°51'46.16"

4+00

SEC. 60 EXISTING 10" WATERLINE

8+00

10+00

12+00

15'± HWY 3125

PROPOSED 8" PIPELINE

PROPOSED 20'± PERMANENT DRIVEWAY

WETLAND IMPACT NO. 02 (SEE SHEET 27)

70' x 100' VALVE SITE

SEC. 63

. SEC

2+00

40' x 1618' BACKSTRING ALONG DIRT ROAD BETWEEN DITCH AND CANEFIELD

100' x 150' EXTRA TEMP. WORKSPACE

6+00

SEC. 59

STA. 0+00 (NAD 83) N=583,839.88 E=3,429,706.04 LAT.=N30°06'16.58" LONG.=W90°51'45.05"

STA. 0+08 HDD ENTRY

SEC. 57 100' x 200' EXTRA TEMP. WORKSPACE

WETLAND IMPACT NO. 01 (SEE SHEET 27)

STA. 3+29 ELEV. 3.0'

15'± OFFSET ELEV. 3.2'

+20'

P.I. 2+84

STA. 0+08 ELEV. 7.8'

PLAN

+20'

NATURAL GROUND

0'

0' EXISTING 30'' WILLIAMS P/L (3.8' COV.)

15'± COV. -20'

4' MIN. COV. TIE-IN TO EXISTING P/L

-20'

EXISTING 30'' WILLIAMS P/L (3.8' COV.)

-40'

-60' -2+00

30'± COV.

EXISTING 30'' WILLIAMS P/L (2.6' COV.)

0+00

2+00

4+00

6+00

PROFILE

-40'

8+00

10+00

LEGEND

-60' 12+00

57

AD

SEC. 57

RO

SEC. 52

W

IN NI E

12+ 00 14+ 00

NO WETLAND IMPACT IN HDD

STA. 23+60 (NAD 83) N=583,901.10 E=3,427,717.70 LAT.=N30°06'17.27" LONG.=W90°52'07.68"

SEC. 52

STA. 19+67 (NAD 83) N=584,143.94 E=3,428,027.11 LAT.=N30°06'19.66" LONG.=W90°52'04.15"

PROPOSED 8" PIPELINE

16+

00

0 4+

100' x 150' EXTRA TEMP. WORKSPACE

0

2

STEIN

00

+ 22

AL CAN

STA. 23+60 HDD ENTRY

18+

00 +0 20

100' x 150' EXTRA TEMP. WORKSPACE

AL AN

RC BE WE

SEC. 41

HDD ENTRY

0

PROPOSED ACCESS ROUTE (27'± X 43'±)

0

+0

26

30'±

WETLAND IMPACT NO. 03 (SEE SHEET 27)

HW

IN

V TA

N CA

AL

Y3

125

EXISTING 10" WATERLINE

PROPOSED 30'± TEMPORARY DRIVEWAY

Y PE

SEC. 19

30'± OFFSET

4'± CLR.

4'± CLR.

STA. 23+60 ELEV. 3.9'

POWERLINE ELEV. 4.3'

P.I. 19+67

NATURAL GROUND

PEYTAVIN CANAL

+20'

WEBER CANAL

WINNIE ROAD POWERLINE DITCH

PLAN

0'

+20'

0' 6' MIN. COV.

12'' PLASTIC CULVERT

2' MIN. CLR.

30'± COV.

EXISTING GULF SOUTH P/L (9' COV.)

EXISTING 8'' UCAR P/L (11.6' COV.)

-20'

-20'

EXISTING PIPELINE (9' COV.)

-40'

-60' 12+00

-40'

EXISTING 10'' WATERLINE (UNK. COV.) (ON WESTSIDE OF P.I.)

14+00

16+00

18+00

20+00

PROFILE

22+00

24+00

LEGEND

-60' 26+00

G.=W90°52'07.68"

SEC. 52 PROPOSED 8" PIPELINE

26+00

30+00

32+00

34+00

SEC. 42 TE

38+00

NO WETLAND IMPACT IN HDD

40+00

DITC H

M

P. DIT

CH

SEC. 39

PLAN

+20'

NATURAL GROUND

+20'

DITCH

A

36+00

DITCH

TR

DITCH

EX

28+00

0'

0' 30'± COV.

30'± COV.

-20'

-20'

-40'

-40'

-60' 26+00

28+00

30+00

32+00

34+00

PROFILE

36+00

38+00

LEGEND

-60' 40+00

SEC. 52

PEYTAVIN CANAL 40+00

42+00

44+00

DITC H

46+00

48+00

50+00

NO WETLAND IMPACT IN HDD

PROPOSED 8" PIPELINE

52+00

54+00

SEC. 42

SEC. 40

PLAN

+20'

+20' NATURAL GROUND

0'

0'

30'± COV.

30'± COV.

-20'

-20'

-40'

-40'

-60' 40+00

42+00

44+00

46+00

48+00

PROFILE

50+00

52+00

LEGEND

-60' 54+00

STA. 57+76 (NAD 83) N=581,633.67 E=3,425,162.44 LAT.=N30°05'54.93" LONG.=W90°52'36.88"

54+00

56+00

SEC. 52

PEYTAVIN CANAL

58+00

60+00

62+00

64+00

66+00

68+00

BACKSTRING IN R-O-W FOR WOODED AREA HDD (ENTRY 23+60 TO EXIT 57+76) NO WETLAND IMPACT IN HDD

PROPOSED 8" PIPELINE

STA. 57+76 HDD EXIT

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 42

DITCH

+20'

STA. 57+76 ELEV. 5.7'

PLAN

+20' NATURAL GROUND

0'

0' 4' MIN. COV. 30'± COV.

-20'

-20'

-40'

-40'

-60' 54+00

56+00

58+00

60+00

62+00

PROFILE

64+00

66+00

LEGEND

-60' 68+00

STA. 81+59 (NAD 83) N=580,052.36 E=3,423,379.18 LAT.=N30°05'39.34" LONG.=W90°52'57.25"

SEC. 52 PEYTAVIN CANAL

68+00

70+00

72+00

74+00

76+00

78+00

80+00 82+00

BACKSTRING IN R-O-W FOR WOODED AREA HDD (ENTRY 23+60 TO EXIT 57+76)

STA. 84+56 (NAD 83) N=580,274.43 E=3,423,182.25 LAT.=N30°05'41.55" LONG.=W90°52'59.48"

SEC. 42

84+00

PROPOSED 8" PIPELINE

STA. 84+61 HDD ENTRY

DIRT ROAD

PLAN

+20'

+20' NATURAL GROUND

0'

0' 4' MIN. COV.

4' MIN. COV. -20'

-20'

-40'

-40'

-60' 68+00

70+00

72+00

74+00

76+00

PROFILE

78+00

80+00

LEGEND

-60' 82+00

STA. 81+59 (NAD 83) N=580,052.36 E=3,423,379.18 LAT.=N30°05'39.34" LONG.=W90°52'57.25"

SEC. 28 EA OODED AR NG FOR W

RY 23+60

HDD (ENT

+76) TO EXIT 57

CKSTRI

40' x 700' BA

82+00

80+00

E IN

EL

NG

I ST XI

DIRT PILE

6

E

SEC. 27 STA. 88+57 (NAD 83) N=580,049.25 E=3,422,850.60 LAT.=N30°05'39.33" LONG.=W90°53'03.27"

100' x 100' EXTRA TEMP. WORKSPACE

84+00

STA. 84+56 (NAD 83) N=580,274.43 E=3,423,182.25 LAT.=N30°05'41.55" LONG.=W90°52'59.48"

IP "P

86+00

88+00

50' x 405' BACKSTRING FOR DIRT PILE HDD (ENTRY 84+61 TO EXIT 88+52)

100' x 100' EXTRA TEMP. WORKSPACE

STA. 88+52 HDD EXIT

STA. 84+61 HDD ENTRY

90+00

94+00

92+00

STA. 89+95 (NAD 83) N=580,163.47 E=3,422,772.97 SEC. 26 LAT.=N30°05'40.47" LONG.=W90°53'04.15"

96+00 DITCH

PROPOSED 8" PIPELINE

DITCH

STA. 88+52 ELEV. 7.2'

AMANDA ROAD DITCH

+20'

DIRT HILL

STA. 84+61 ELEV. 5.6'

PLAN

+20' NATURAL GROUND

20'± COV.

0'

4' MIN. COV.

4' MIN. COV.

0'

EXISTING 6'' P/L (1.0' COV.)

-20'

-20'

-40'

-40'

-60' 82+00

84+00

86+00

88+00

90+00

PROFILE

92+00

94+00

LEGEND

-60' 96+00

SEC. 27

AMANDA STREET (PROPOSED ACCESS ROUTE)

96+00

98+00

100+00

102+00

104+00

106+00

DITCH

108+00

110+00

DITCH PROPOSED 8" PIPELINE

SEC. 26

AMANDA ROAD

PLAN

+20'

0'

+20' NATURAL GROUND

4' MIN. COV.

4' MIN. COV.

0'

-20'

-20'

-40'

-40'

-60' 96+00

98+00

100+00

102+00

104+00

PROFILE

106+00

108+00

LEGEND

-60' 110+00

SEC. 27

AMANDA STREET (PROPOSED ACCESS ROUTE)

112+00

110+00

114+00

116+00

120+00

118+00

122+00

124+00 DITCH

DITCH PROPOSED 8" PIPELINE

SEC. 26

PLAN

+40'

0'

DIRT ROAD

+20'

DIRT ROAD

+40'

+20'

NATURAL GROUND 4' MIN. COV.

4' MIN. COV.

-20'

-20'

-40' 110+00

0'

112+00

114+00

116+00

118+00

PROFILE

120+00

122+00

LEGEND

-40' 124+00

SEC. 27 AMANDA STREET (PROPOSED ACCESS ROUTE)

100' x 100' EXTRA TEMP. WORKSPACE

100' x 100' EXTRA TEMP. WORKSPACE

124+00

126+00

130+00

128+00

132+00

134+00

138+00

136+00 DITCH

DITCH PROPOSED 8" PIPELINE

ILL

INO IS RA CEN ILR T OA RAL D

SEC. 26

STA. 134+87 HDD ENTRY

STA. 130+07 HDD EXIT

0'

NATURAL GROUND

+40'

STA. 134+87 ELEV. 16.7'

+20'

STA. 130+07 ELEV. 16.3'

+40'

DITCH ILLINOIS CENTRAL RAILROAD DITCH

PLAN

+20'

30'± COV. 25'± COV.

4' MIN. COV.

0'

-20'

-40' 124+00

-20'

126+00

128+00

130+00

132+00

PROFILE

134+00

136+00

LEGEND

-40' 138+00

SEC. 27 AMANDA STREET (PROPOSED ACCESS ROUTE)

STA. 149+45 (NAD 83) N=576,764.67 E=3,418,159.21 LAT.=N30°05'07.00" LONG.=W90°53'56.82"

152+00

150+00

148+00

BEGIN PROPOSED SPARE 8" PIPELINE AT 60' X 100' VALVE SITE

136+00

140+00

138+00

142+00

PROPOSED (2)-8" PIPELINES

146+00

144+00

DITCH

DITCH PROPOSED 8" PIPELINE

STA. 147+28 (NAD 83) N=576,940.96 E=3,418,031.76 LAT.=N30°05'08.75" LONG.=W90°53'58.26"

SEC. 26

PLAN

DITCH

+20'

0'

+40'

DIRT ROAD

+40'

NATURAL GROUND 4' MIN. COV.

0'

-20'

-40' 138+00

+20'

-20'

140+00

142+00

144+00

PROFILE

146+00

148+00

LEGEND

-40' 150+00

SEC. 27

STA. 152+45 HDD ENTRY FOR (2)-8'' P/L'S

150+00

152+00

154+00

AMANDA STREET (PROPOSED ACCESS ROUTE)

156+00

158+00

160+00

162+00

164+00

150' x 250' EXTRA TEMP. WORKSPACE PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERENCE DRAWING PREPARED BY GEO-ENGINEERS)

STA. 152+45 (NAD 83) N=576,589.06 E=3,417,916.28 LAT.=N30°05'05.27" LONG.=W90°53'59.59"

SEC. 26

PLAN +40'

+40'

EXISTING WATERLINE (UNK. COV.) NATURAL GROUND

0'

-20'

4' MIN. COV.

+20'

STA. 152+45 ELEV. 18.2'

+20'

0'

-20'

-40'

-40'

162'± -60'

-60'

-80'

-80'

-100'

-120' 150+00

-140' ELEV. 152+00

154+00

156+00

158+00

PROFILE

160+00

162+00

LEGEND

164+00

HWY 4 4

L EVE E

MISSISSIPPI RIVER

SEC. 27

164+00

166+00

168+00

170+00

172+00

174+00

176+00

178+00

PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERENCE DRAWING PREPARED BY GEO-ENGINEERS)

AMANDA STREET (PROPOSED ACCESS ROUTE)

SEC. 26

PROPOSED 20'± ACCESS ROUTE

EXISTING DRIVEWAY

PLAN +40'

+40'

-20'

HWY. 44 DITCH POWERLINE

0'

DITCH POWERLINE

+20'

-40'

GRAVEL RD. (LEVEE)

WATERLINE (UNK. COV.) +20'

MISSISSIPPI RIVER 0'

-20'

-40'

177'±

-60'

-60'

-80'

-80'

-140' ELEV. 164+00

166+00

168+00

170+00

172+00

PROFILE

174+00

176+00

LEGEND

178+00

MISSISSIPPI RIVER

178+00

180+00

182+00

184+00

186+00

188+00

190+00

192+00

PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERNCE DRAWING PREPARED BY GEO-ENGINEERS)

PLAN +40'

+40'

+20'

+20'

0'

0'

MISSISSIPPI RIVER -20'

-20'

-40'

-40'

-60'

-60'

-80'

-80'

41'± COV. -140' ELEV. 178+00

180+00

182+00

184+00

186+00

PROFILE

188+00

190+00

LEGEND

192+00

SEC. 53

WETLAND IMPACT NO. 04 (SEE SHEET 27)

196+00

204+00

202+00

200+00

EXIST . FACIL AMERICAS IT S NORT Y DRIVEW TRENICS AY H BE US OF P/L X-IN (1613'± ED FO G R ACC WILL ESS)

50' x 4226' BACKSTRING FOR MISS. RIVER HDD

STA. 195+44 (NAD 83) N=573,945.80 E=3,414,525.29 LAT.=N30°04'39.23" LONG.=W90°54'38.30"

SEC. 52 PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD

PROPOSED 8" PIPELINE

198+00

194+00

STA. 200+84 BORE ENTRY

END PROPOSED SPARE 8" PIPELINE AT 60' X 70' VALVE SITE

STA. 199+84 BORE EXIT

STA. 195+44 HDD EXIT FOR (2)-8'' P/L'S

192+00

HWY 18

STA. 197+61 (NAD 83) N=573,774.61 E=3,414,390.34 LAT.=N30°04'37.54" LONG.=W90°54'39.84"

PROPOSED 20'± ACCESS ROUTES

PROPOSED DRIVEWAY & BOARDMAT ROAD

EXISTING DRIVEWAY (PROPOSED 50'± TEMP. DRIVEWAY)

EXISTING DRIVEWAY

PLAN +40'

-20'

4' MIN. COV.

STA. 200+84 ELEV. 13.0'

4' MIN. COV.

DITCH HWY. 18 DITCH POWERLINE

0'

+20'

STA. 199+84 ELEV. 13.0'

NATURAL GROUND

GRAVEL RD.

MISSISSIPPI RIVER

STA. 195+44 ELEV. 20.6'

+20'

GRAVEL RD. (LEVEE)

+40'

0'

-20'

-40'

-40'

-60'

-60'

-80'

-80'

-100'

192+00

194+00

196+00

198+00

PROFILE

200+00

202+00

LEGEND

-120' 204+00

SEC. 53

STA. 205+08 (NAD 83) N=573,277.98 E=3,413,832.21 LAT.=N30°04'32.64" LONG.=W90°54'46.22"

SEC. 52

NG RI DD ST H K C ER BA IV 6' . R 2 S 42 IS 'x M 50 OR F PROPOSED ACCESS ROUTE

STA. 215+42 (NAD 83) N=573,185.74 E=3,412,802.80 LAT.=N30°04'31.77" LONG.=W90°54'57.94"

PROPOSED 8" PIPELINE 206+00

20

208+00

210+00

212+00

214+00

216+0

0

00 4+

00 2+

20

PLAN

+40'

+40'

+20'

0'

+20'

NATURAL GROUND 4' MIN. COV.

0'

-20'

-20'

-40' 204+00

206+00

208+00

210+00

PROFILE

212+00

214+00

LEGEND

-40' 216+00

SEC. 51

SEC. 51

PERMANENT ACCESS USING EXISTING ROAD (20'± WIDE X 3,400'± LONG)

STA. 219+62 (NAD 83) N=573,239.25 E=3,412,386.07 LAT.=N30°04'32.31" LONG.=W90°55'02.68"

PROPOSED 8" PIPELINE

21 8+ 00

220+00

222+00

224+00

226+00

228+00

230+00

PROPOSED 8" PIPELINE

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 50

21 4

+0 0

21 6+ 00

STA. 218+03 (NAD 83) N=573,212.96 E=3,412,542.88 LAT.=N30°04'32.04" LONG.=W90°55'00.89"

STA. 225+10 HDD EXIT

0'

NATURAL GROUND 4' MIN. COV.

4' MIN. COV.

30'± COV.

-20'

-40' 216+00

ASPHALT ROAD

DITCH ASPHALT ROAD DITCH

FENCE

METAL BUILDING

+20'

STA. 225+10 ELEV. 16.2'

DITCH

+40'

DRIVEWAY

FENCE POWERLINE DRIVEWAY

PLAN

+40'

+20'

0'

-20'

218+00

220+00

222+00

PROFILE

224+00

226+00

LEGEND

-40' 228+00

STA. 231+75 (NAD 83) N=574,194.68 E=3,411,638.91 LAT.=N30°04'41.79" LONG.=W90°55'11.14"

SEC. 49

STA. 231+60 HDD ENTRY 228+00

230+00

00 2+ 23

226+00

CP CHEM 80' x 150' METER SITE PROPOSED 8" PIPELINE

SEC. 48

BOARDWALK 80' x 150' METER SITE

STA. 233+99 (NAD 83) N=574,417.47 E=3,411,666.16 LAT.=N30°04'44.00" LONG.=W90°55'10.82"

STA. 234+64 (NAD 83) N=574,468.74 E=3,411,626.06 LAT.=N30°04'44.51" LONG.=W90°55'11.28"

30'± COV.0'

FENCE

DITCH LIMESTONE ROAD DITCH POWERLINE FENCE STA. 231+60 ELEV. 15.2' DITCH

+20'

LIMESTONE ROAD

+40'

DITCH LAPICE ROAD FENCE

ASPHALT ROAD

PLAN

+40'

+20'

NATURAL GROUND 4' MIN. COV.

30'± COV.

0'

-20'

-20'

-40' 228+00

230+00

232+00

234+00

PROFILE

236+00

-40' 238+00

LEGEND

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

PIPE DITCH DETAIL

PIPE DITCH DETAIL

PROPOSED PERMANENT 60' X 100' VALVE SITE AT HWY. 44

PROPOSED PERMANENT 70' X 100' VALVE SITE AT HWY. 3125

PROPOSED TEMPORARY DRIVEWAY FROM HWY. 18 & PROPOSED TEMPORARY DRIVEWAY FROM HWY. 3125

PROPOSED PERMANENT DRIVEWAY FROM HWY. 3125

WETLAND IMPACT TABLE

TOTAL = 1.3275 ACRES

EXCAVATION & FILL CALCULATIONS:

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 61

SEC. 63

STA. 3+29 HDD EXIT

RAPIDAN CANA L

HDD EXIT

SEC. 62

NAL HELVETIA CA

40' x 218' BACKSTRING INTO CANE FIELD

STA. 2+84 (NAD 83) N=583,572.66 E=3,429,609.57 LAT.=N30°06'13.94" LONG.=W90°51'46.16"

4+00

SEC. 60 EXISTING 10" WATERLINE

8+00

10+00

12+00

15'± HWY 3125

PROPOSED 8" PIPELINE

PROPOSED 20'± PERMANENT DRIVEWAY

WETLAND IMPACT NO. 02 (SEE SHEET 27)

70' x 100' VALVE SITE

SEC. 63

. SEC

2+00

40' x 1618' BACKSTRING ALONG DIRT ROAD BETWEEN DITCH AND CANEFIELD

100' x 150' EXTRA TEMP. WORKSPACE

6+00

SEC. 59

STA. 0+00 (NAD 83) N=583,839.88 E=3,429,706.04 LAT.=N30°06'16.58" LONG.=W90°51'45.05"

STA. 0+08 HDD ENTRY

SEC. 57 100' x 200' EXTRA TEMP. WORKSPACE

WETLAND IMPACT NO. 01 (SEE SHEET 27)

STA. 3+29 ELEV. 3.0'

15'± OFFSET ELEV. 3.2'

+20'

P.I. 2+84

STA. 0+08 ELEV. 7.8'

PLAN

+20'

NATURAL GROUND

0'

0' EXISTING 30'' WILLIAMS P/L (3.8' COV.)

15'± COV. -20'

4' MIN. COV. TIE-IN TO EXISTING P/L

-20'

EXISTING 30'' WILLIAMS P/L (3.8' COV.)

-40'

-60' -2+00

30'± COV.

EXISTING 30'' WILLIAMS P/L (2.6' COV.)

0+00

2+00

4+00

6+00

PROFILE

-40'

8+00

10+00

LEGEND

-60' 12+00

57

AD

SEC. 57

RO

SEC. 52

W

IN NI E

12+ 00 14+ 00

NO WETLAND IMPACT IN HDD

STA. 23+60 (NAD 83) N=583,901.10 E=3,427,717.70 LAT.=N30°06'17.27" LONG.=W90°52'07.68"

SEC. 52

STA. 19+67 (NAD 83) N=584,143.94 E=3,428,027.11 LAT.=N30°06'19.66" LONG.=W90°52'04.15"

PROPOSED 8" PIPELINE

16+

00

0 4+

100' x 150' EXTRA TEMP. WORKSPACE

0

2

STEIN

00

+ 22

AL CAN

STA. 23+60 HDD ENTRY

18+

00 +0 20

100' x 150' EXTRA TEMP. WORKSPACE

AL AN

RC BE WE

SEC. 41

HDD ENTRY

0

PROPOSED ACCESS ROUTE (27'± X 43'±)

0

+0

26

30'±

WETLAND IMPACT NO. 03 (SEE SHEET 27)

HW

IN

V TA

N CA

AL

Y3

125

EXISTING 10" WATERLINE

PROPOSED 30'± TEMPORARY DRIVEWAY

Y PE

SEC. 19

30'± OFFSET

4'± CLR.

4'± CLR.

STA. 23+60 ELEV. 3.9'

POWERLINE ELEV. 4.3'

P.I. 19+67

NATURAL GROUND

PEYTAVIN CANAL

+20'

WEBER CANAL

WINNIE ROAD POWERLINE DITCH

PLAN

0'

+20'

0' 6' MIN. COV.

12'' PLASTIC CULVERT

2' MIN. CLR.

30'± COV.

EXISTING GULF SOUTH P/L (9' COV.)

EXISTING 8'' UCAR P/L (11.6' COV.)

-20'

-20'

EXISTING PIPELINE (9' COV.)

-40'

-60' 12+00

-40'

EXISTING 10'' WATERLINE (UNK. COV.) (ON WESTSIDE OF P.I.)

14+00

16+00

18+00

20+00

PROFILE

22+00

24+00

LEGEND

-60' 26+00

G.=W90°52'07.68"

SEC. 52 PROPOSED 8" PIPELINE

26+00

30+00

32+00

34+00

SEC. 42 TE

38+00

NO WETLAND IMPACT IN HDD

40+00

DITC H

M

P. DIT

CH

SEC. 39

PLAN

+20'

NATURAL GROUND

+20'

DITCH

A

36+00

DITCH

TR

DITCH

EX

28+00

0'

0' 30'± COV.

30'± COV.

-20'

-20'

-40'

-40'

-60' 26+00

28+00

30+00

32+00

34+00

PROFILE

36+00

38+00

LEGEND

-60' 40+00

SEC. 52

PEYTAVIN CANAL 40+00

42+00

44+00

DITC H

46+00

48+00

50+00

NO WETLAND IMPACT IN HDD

PROPOSED 8" PIPELINE

52+00

54+00

SEC. 42

SEC. 40

PLAN

+20'

+20' NATURAL GROUND

0'

0'

30'± COV.

30'± COV.

-20'

-20'

-40'

-40'

-60' 40+00

42+00

44+00

46+00

48+00

PROFILE

50+00

52+00

LEGEND

-60' 54+00

STA. 57+76 (NAD 83) N=581,633.67 E=3,425,162.44 LAT.=N30°05'54.93" LONG.=W90°52'36.88"

54+00

56+00

SEC. 52

PEYTAVIN CANAL

58+00

60+00

62+00

64+00

66+00

68+00

BACKSTRING IN R-O-W FOR WOODED AREA HDD (ENTRY 23+60 TO EXIT 57+76) NO WETLAND IMPACT IN HDD

PROPOSED 8" PIPELINE

STA. 57+76 HDD EXIT

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 42

DITCH

+20'

STA. 57+76 ELEV. 5.7'

PLAN

+20' NATURAL GROUND

0'

0' 4' MIN. COV. 30'± COV.

-20'

-20'

-40'

-40'

-60' 54+00

56+00

58+00

60+00

62+00

PROFILE

64+00

66+00

LEGEND

-60' 68+00

STA. 81+59 (NAD 83) N=580,052.36 E=3,423,379.18 LAT.=N30°05'39.34" LONG.=W90°52'57.25"

SEC. 52 PEYTAVIN CANAL

68+00

70+00

72+00

74+00

76+00

78+00

80+00 82+00

BACKSTRING IN R-O-W FOR WOODED AREA HDD (ENTRY 23+60 TO EXIT 57+76)

STA. 84+56 (NAD 83) N=580,274.43 E=3,423,182.25 LAT.=N30°05'41.55" LONG.=W90°52'59.48"

SEC. 42

84+00

PROPOSED 8" PIPELINE

STA. 84+61 HDD ENTRY

DIRT ROAD

PLAN

+20'

+20' NATURAL GROUND

0'

0' 4' MIN. COV.

4' MIN. COV. -20'

-20'

-40'

-40'

-60' 68+00

70+00

72+00

74+00

76+00

PROFILE

78+00

80+00

LEGEND

-60' 82+00

STA. 81+59 (NAD 83) N=580,052.36 E=3,423,379.18 LAT.=N30°05'39.34" LONG.=W90°52'57.25"

SEC. 28 EA OODED AR NG FOR W

RY 23+60

HDD (ENT

+76) TO EXIT 57

CKSTRI

40' x 700' BA

82+00

80+00

E IN

EL

NG

I ST XI

DIRT PILE

6

E

SEC. 27 STA. 88+57 (NAD 83) N=580,049.25 E=3,422,850.60 LAT.=N30°05'39.33" LONG.=W90°53'03.27"

100' x 100' EXTRA TEMP. WORKSPACE

84+00

STA. 84+56 (NAD 83) N=580,274.43 E=3,423,182.25 LAT.=N30°05'41.55" LONG.=W90°52'59.48"

IP "P

86+00

88+00

50' x 405' BACKSTRING FOR DIRT PILE HDD (ENTRY 84+61 TO EXIT 88+52)

100' x 100' EXTRA TEMP. WORKSPACE

STA. 88+52 HDD EXIT

STA. 84+61 HDD ENTRY

90+00

94+00

92+00

STA. 89+95 (NAD 83) N=580,163.47 E=3,422,772.97 SEC. 26 LAT.=N30°05'40.47" LONG.=W90°53'04.15"

96+00 DITCH

PROPOSED 8" PIPELINE

DITCH

STA. 88+52 ELEV. 7.2'

AMANDA ROAD DITCH

+20'

DIRT HILL

STA. 84+61 ELEV. 5.6'

PLAN

+20' NATURAL GROUND

20'± COV.

0'

4' MIN. COV.

4' MIN. COV.

0'

EXISTING 6'' P/L (1.0' COV.)

-20'

-20'

-40'

-40'

-60' 82+00

84+00

86+00

88+00

90+00

PROFILE

92+00

94+00

LEGEND

-60' 96+00

SEC. 27

AMANDA STREET (PROPOSED ACCESS ROUTE)

96+00

98+00

100+00

102+00

104+00

106+00

DITCH

108+00

110+00

DITCH PROPOSED 8" PIPELINE

SEC. 26

AMANDA ROAD

PLAN

+20'

0'

+20' NATURAL GROUND

4' MIN. COV.

4' MIN. COV.

0'

-20'

-20'

-40'

-40'

-60' 96+00

98+00

100+00

102+00

104+00

PROFILE

106+00

108+00

LEGEND

-60' 110+00

SEC. 27

AMANDA STREET (PROPOSED ACCESS ROUTE)

112+00

110+00

114+00

116+00

120+00

118+00

122+00

124+00 DITCH

DITCH PROPOSED 8" PIPELINE

SEC. 26

PLAN

+40'

0'

DIRT ROAD

+20'

DIRT ROAD

+40'

+20'

NATURAL GROUND 4' MIN. COV.

4' MIN. COV.

-20'

-20'

-40' 110+00

0'

112+00

114+00

116+00

118+00

PROFILE

120+00

122+00

LEGEND

-40' 124+00

SEC. 27 AMANDA STREET (PROPOSED ACCESS ROUTE)

100' x 100' EXTRA TEMP. WORKSPACE

100' x 100' EXTRA TEMP. WORKSPACE

124+00

126+00

130+00

128+00

132+00

134+00

138+00

136+00 DITCH

DITCH PROPOSED 8" PIPELINE

ILL

INO IS RA CEN ILR T OA RAL D

SEC. 26

STA. 134+87 HDD ENTRY

STA. 130+07 HDD EXIT

0'

NATURAL GROUND

+40'

STA. 134+87 ELEV. 16.7'

+20'

STA. 130+07 ELEV. 16.3'

+40'

DITCH ILLINOIS CENTRAL RAILROAD DITCH

PLAN

+20'

30'± COV. 25'± COV.

4' MIN. COV.

0'

-20'

-40' 124+00

-20'

126+00

128+00

130+00

132+00

PROFILE

134+00

136+00

LEGEND

-40' 138+00

SEC. 27 AMANDA STREET (PROPOSED ACCESS ROUTE)

STA. 149+45 (NAD 83) N=576,764.67 E=3,418,159.21 LAT.=N30°05'07.00" LONG.=W90°53'56.82"

152+00

150+00

148+00

BEGIN PROPOSED SPARE 8" PIPELINE AT 60' X 100' VALVE SITE

136+00

140+00

138+00

142+00

PROPOSED (2)-8" PIPELINES

146+00

144+00

DITCH

DITCH PROPOSED 8" PIPELINE

STA. 147+28 (NAD 83) N=576,940.96 E=3,418,031.76 LAT.=N30°05'08.75" LONG.=W90°53'58.26"

SEC. 26

PLAN

DITCH

+20'

0'

+40'

DIRT ROAD

+40'

NATURAL GROUND 4' MIN. COV.

0'

-20'

-40' 138+00

+20'

-20'

140+00

142+00

144+00

PROFILE

146+00

148+00

LEGEND

-40' 150+00

SEC. 27

STA. 152+45 HDD ENTRY FOR (2)-8'' P/L'S

150+00

152+00

154+00

AMANDA STREET (PROPOSED ACCESS ROUTE)

156+00

158+00

160+00

162+00

164+00

150' x 250' EXTRA TEMP. WORKSPACE PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERENCE DRAWING PREPARED BY GEO-ENGINEERS)

STA. 152+45 (NAD 83) N=576,589.06 E=3,417,916.28 LAT.=N30°05'05.27" LONG.=W90°53'59.59"

SEC. 26

PLAN +40'

+40'

EXISTING WATERLINE (UNK. COV.) NATURAL GROUND

0'

-20'

4' MIN. COV.

+20'

STA. 152+45 ELEV. 18.2'

+20'

0'

-20'

-40'

-40'

162'± -60'

-60'

-80'

-80'

-100'

-120' 150+00

-140' ELEV. 152+00

154+00

156+00

158+00

PROFILE

160+00

162+00

LEGEND

164+00

HWY 4 4

L EVE E

MISSISSIPPI RIVER

SEC. 27

164+00

166+00

168+00

170+00

172+00

174+00

176+00

178+00

PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERENCE DRAWING PREPARED BY GEO-ENGINEERS)

AMANDA STREET (PROPOSED ACCESS ROUTE)

SEC. 26

PROPOSED 20'± ACCESS ROUTE

EXISTING DRIVEWAY

PLAN +40'

+40'

-20'

HWY. 44 DITCH POWERLINE

0'

DITCH POWERLINE

+20'

-40'

GRAVEL RD. (LEVEE)

WATERLINE (UNK. COV.) +20'

MISSISSIPPI RIVER 0'

-20'

-40'

177'±

-60'

-60'

-80'

-80'

-140' ELEV. 164+00

166+00

168+00

170+00

172+00

PROFILE

174+00

176+00

LEGEND

178+00

MISSISSIPPI RIVER

178+00

180+00

182+00

184+00

186+00

188+00

190+00

192+00

PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD (SEE REFERNCE DRAWING PREPARED BY GEO-ENGINEERS)

PLAN +40'

+40'

+20'

+20'

0'

0'

MISSISSIPPI RIVER -20'

-20'

-40'

-40'

-60'

-60'

-80'

-80'

41'± COV. -140' ELEV. 178+00

180+00

182+00

184+00

186+00

PROFILE

188+00

190+00

LEGEND

192+00

SEC. 53

WETLAND IMPACT NO. 04 (SEE SHEET 27)

196+00

204+00

202+00

200+00

EXIST . FACIL AMERICAS IT S NORT Y DRIVEW TRENICS AY H BE US OF P/L X-IN (1613'± ED FO G R ACC WILL ESS)

50' x 4226' BACKSTRING FOR MISS. RIVER HDD

STA. 195+44 (NAD 83) N=573,945.80 E=3,414,525.29 LAT.=N30°04'39.23" LONG.=W90°54'38.30"

SEC. 52 PROPOSED (2)-8" PIPELINES IN MISSISSIPPI RIVER HDD

PROPOSED 8" PIPELINE

198+00

194+00

STA. 200+84 BORE ENTRY

END PROPOSED SPARE 8" PIPELINE AT 60' X 70' VALVE SITE

STA. 199+84 BORE EXIT

STA. 195+44 HDD EXIT FOR (2)-8'' P/L'S

192+00

HWY 18

STA. 197+61 (NAD 83) N=573,774.61 E=3,414,390.34 LAT.=N30°04'37.54" LONG.=W90°54'39.84"

PROPOSED 20'± ACCESS ROUTES

PROPOSED DRIVEWAY & BOARDMAT ROAD

EXISTING DRIVEWAY (PROPOSED 50'± TEMP. DRIVEWAY)

EXISTING DRIVEWAY

PLAN +40'

-20'

4' MIN. COV.

STA. 200+84 ELEV. 13.0'

4' MIN. COV.

DITCH HWY. 18 DITCH POWERLINE

0'

+20'

STA. 199+84 ELEV. 13.0'

NATURAL GROUND

GRAVEL RD.

MISSISSIPPI RIVER

STA. 195+44 ELEV. 20.6'

+20'

GRAVEL RD. (LEVEE)

+40'

0'

-20'

-40'

-40'

-60'

-60'

-80'

-80'

-100'

192+00

194+00

196+00

198+00

PROFILE

200+00

202+00

LEGEND

-120' 204+00

SEC. 53

STA. 205+08 (NAD 83) N=573,277.98 E=3,413,832.21 LAT.=N30°04'32.64" LONG.=W90°54'46.22"

SEC. 52

NG RI DD ST H K C ER BA IV 6' . R 2 S 42 IS 'x M 50 OR F PROPOSED ACCESS ROUTE

STA. 215+42 (NAD 83) N=573,185.74 E=3,412,802.80 LAT.=N30°04'31.77" LONG.=W90°54'57.94"

PROPOSED 8" PIPELINE 206+00

20

208+00

210+00

212+00

214+00

216+0

0

00 4+

00 2+

20

PLAN

+40'

+40'

+20'

0'

+20'

NATURAL GROUND 4' MIN. COV.

0'

-20'

-20'

-40' 204+00

206+00

208+00

210+00

PROFILE

212+00

214+00

LEGEND

-40' 216+00

SEC. 51

SEC. 51

PERMANENT ACCESS USING EXISTING ROAD (20'± WIDE X 3,400'± LONG)

STA. 219+62 (NAD 83) N=573,239.25 E=3,412,386.07 LAT.=N30°04'32.31" LONG.=W90°55'02.68"

PROPOSED 8" PIPELINE

21 8+ 00

220+00

222+00

224+00

226+00

228+00

230+00

PROPOSED 8" PIPELINE

100' x 150' EXTRA TEMP. WORKSPACE

SEC. 50

21 4

+0 0

21 6+ 00

STA. 218+03 (NAD 83) N=573,212.96 E=3,412,542.88 LAT.=N30°04'32.04" LONG.=W90°55'00.89"

STA. 225+10 HDD EXIT

0'

NATURAL GROUND 4' MIN. COV.

4' MIN. COV.

30'± COV.

-20'

-40' 216+00

ASPHALT ROAD

DITCH ASPHALT ROAD DITCH

FENCE

METAL BUILDING

+20'

STA. 225+10 ELEV. 16.2'

DITCH

+40'

DRIVEWAY

FENCE POWERLINE DRIVEWAY

PLAN

+40'

+20'

0'

-20'

218+00

220+00

222+00

PROFILE

224+00

226+00

LEGEND

-40' 228+00

STA. 231+75 (NAD 83) N=574,194.68 E=3,411,638.91 LAT.=N30°04'41.79" LONG.=W90°55'11.14"

SEC. 49

STA. 231+60 HDD ENTRY 228+00

230+00

00 2+ 23

226+00

CP CHEM 80' x 150' METER SITE PROPOSED 8" PIPELINE

SEC. 48

BOARDWALK 80' x 150' METER SITE

STA. 233+99 (NAD 83) N=574,417.47 E=3,411,666.16 LAT.=N30°04'44.00" LONG.=W90°55'10.82"

STA. 234+64 (NAD 83) N=574,468.74 E=3,411,626.06 LAT.=N30°04'44.51" LONG.=W90°55'11.28"

30'± COV.0'

FENCE

DITCH LIMESTONE ROAD DITCH POWERLINE FENCE STA. 231+60 ELEV. 15.2' DITCH

+20'

LIMESTONE ROAD

+40'

DITCH LAPICE ROAD FENCE

ASPHALT ROAD

PLAN

+40'

+20'

NATURAL GROUND 4' MIN. COV.

30'± COV.

0'

-20'

-20'

-40' 228+00

230+00

232+00

234+00

PROFILE

236+00

-40' 238+00

LEGEND

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

RIGHT-OF-WAY DETAIL

PIPE DITCH DETAIL

PIPE DITCH DETAIL

PROPOSED PERMANENT 60' X 100' VALVE SITE AT HWY. 44

PROPOSED PERMANENT 70' X 100' VALVE SITE AT HWY. 3125

PROPOSED TEMPORARY DRIVEWAY FROM HWY. 18 & PROPOSED TEMPORARY DRIVEWAY FROM HWY. 3125

PROPOSED PERMANENT DRIVEWAY FROM HWY. 3125

WETLAND IMPACT TABLE

TOTAL = 1.3275 ACRES

EXCAVATION & FILL CALCULATIONS:

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas