You can copy from here when filling out the rest of the page.
INSTALLATION OF 8-INCH ETHYLENE PIPELINE UNDERNEATH THE MISSISSIPPI RIVER IN SAINT JAMES PARISH
NAME OF APPLICANT: Boardwalk Louisiana Midstream, LLC, c/o Ramboll Engineering US Corporation, Attn: Alie Nicotera, 1055 St. Charles Avenue, Suite 501, New Orleans, Louisiana 70130
LOCATION OF WORK: Located on an approximate 6.5-acre site, located near Mississippi River mile 166, near Union, Louisiana, located in Saint James Parish, as shown on the enclosed drawings (Latitude 30.07925 N Longitude -90.90711 W). This project is located in the Pontchartrain Basin (Maurepas HUC 080070204).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the installation and maintenance of an approximate 4.44-mile long 8-inch ethylene pipeline to provide an alternative ethylene source to the existing Americas Styrenics production facility. The 8-inch pipeline would be installed via Horizontal Directional Drilling (HDD) underneath the Mississippi River, near river mile 166, near Union, Louisiana, within Saint James Parish. A spare 8-inch pipeline is also proposed to cross underneath the Mississippi River adjacent to the proposed line. Approximately 15,512 cubic yards of native material would be excavated and backfilled during pipeline installation in the existing right-of-way. Approximately 364 cubic yards of hauled in limestone material and 364 cubic yards of hauled in sand material would be placed onsite during the pipeline installation. Approximately 90 cubic yards of limestone would be temporarily placed as fill during project implementation. Approximately 1.3 acres of jurisdictional forested wetlands would be impacted as a result of the ethylene pipeline installation. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. The applicant is proposing to utilize best management practices during and after the construction phase of the project. The applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank.
JOINT PUBLIC NOTICE
September 18, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1217
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
MVN 2017-0408-CQ
(225) 219-3225
Project Manager
Ms. Elizabeth Hill
WQC Application Number
WQC 170915-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS30:2074 A(3), and provisions of Section 401 of the Clean
Water Act (P.L.95-17).
INSTALLATION OF 8-INCH ETHYLENE PIPELINE UNDERNEATH
THE MISSISSIPPI RIVER IN SAINT JAMES PARISH
NAME OF APPLICANT: Boardwalk Louisiana Midstream, LLC, c/o Ramboll Engineering US
Corporation, Attn: Alie Nicotera, 1055 St. Charles Avenue, Suite 501, New Orleans, Louisiana
70130.
LOCATION OF WORK: Located on an approximate 6.5-acre site, located near Mississippi
River mile 166, near Union, Louisiana, located in Saint James Parish, as shown on the enclosed
drawings (Latitude 30.07925 N Longitude -90.90711 W). This project is located in the
Pontchartrain Basin (Maurepas HUC 080070204).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit
authorization for the installation and maintenance of an approximate 4.44-mile long 8-inch
ethylene pipeline to provide an alternative ethylene source to the existing Americas Styrenics
production facility. The 8-inch pipeline would be installed via Horizontal Directional Drilling
(HDD) underneath the Mississippi River, near river mile 166, near Union, Louisiana, within Saint
James Parish. A spare 8-inch pipeline is also proposed to cross underneath the Mississippi
River adjacent to the proposed line. Approximately 15,512 cubic yards of native material would
be excavated and backfilled during pipeline installation in the existing right-of-way.
Approximately 364 cubic yards of hauled in limestone material and 364 cubic yards of hauled in
sand material would be placed onsite during the pipeline installation. Approximately 90 cubic
yards of limestone would be temporarily placed as fill during project implementation.
Approximately 1.3 acres of jurisdictional forested wetlands would be impacted as a result of the
ethylene pipeline installation. The applicant has claimed that the project has been designed to
avoid and minimize direct and secondary adverse wetland impacts to the maximum extent
practicable. The applicant is proposing to utilize best management practices during and after
the construction phase of the project. The applicant is proposing to compensate for the
unavoidable impact by purchasing mitigation credits from an approved mitigation bank.
The comment period for the Department of Army Permit and the Louisiana Department of
Environmental Quality will close in 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this notice are being sent to the State Archeologist and State Historic
Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Utilizing Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office, the Corps has determined that the proposed activity would have no
effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 0 acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services, before a permit is
issued.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
BEGIN STA. 0+00
(NAD 83)
N=583,839.88
E=3,429,706.04
LAT.=N30°06'16.58"
LONG.=W90°51'45.05"
SHEET 3
SHEET 5
SHEET 2
SHEET 4
SHEET 7
SHEET 9
SHEET 6
SHEET 8
SHEET 11
PROPOSED 8" PIPELINE
SHEET 10
SHEET 13
END STA. 234+64
(NAD 83)
N=574,468.74
E=3,411,626.06
LAT.=N30°04'44.51"
LONG.=W90°55'11.28"
SHEET 12
SHEET 14
PROPOSED 8" PIPELINE & 8"
SPARE PIPELINE IN
MISSISSIPPI RIVER HDD
SHEET 19
SHEET 18
SHEET 16
SHEET 17
SHEET 15
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 61
SEC. 63
STA. 3+29
HDD EXIT
RAPIDAN CANA
L
HDD EXIT
SEC. 62
NAL
HELVETIA CA
40' x 218' BACKSTRING
INTO CANE FIELD
STA. 2+84
(NAD 83)
N=583,572.66
E=3,429,609.57
LAT.=N30°06'13.94"
LONG.=W90°51'46.16"
4+00
SEC. 60
EXISTING 10"
WATERLINE
8+00
10+00
12+00
15'±
HWY 3125
PROPOSED 8"
PIPELINE
PROPOSED 20'±
PERMANENT DRIVEWAY
WETLAND
IMPACT NO. 02
(SEE SHEET 27)
70' x 100' VALVE SITE
SEC. 63
.
SEC
2+00
40' x 1618'
BACKSTRING
ALONG DIRT
ROAD
BETWEEN
DITCH AND
CANEFIELD
100' x 150'
EXTRA TEMP.
WORKSPACE
6+00
SEC. 59
STA. 0+00
(NAD 83)
N=583,839.88
E=3,429,706.04
LAT.=N30°06'16.58"
LONG.=W90°51'45.05"
STA. 0+08
HDD ENTRY
SEC. 57
100' x 200'
EXTRA TEMP.
WORKSPACE
WETLAND IMPACT NO. 01
(SEE SHEET 27)
STA. 3+29
ELEV. 3.0'
15'± OFFSET
ELEV. 3.2'
+20'
P.I. 2+84
STA. 0+08
ELEV. 7.8'
PLAN
+20'
NATURAL GROUND
0'
0'
EXISTING 30'' WILLIAMS
P/L (3.8' COV.)
15'± COV.
-20'
4' MIN.
COV.
TIE-IN TO
EXISTING P/L
-20'
EXISTING 30'' WILLIAMS
P/L (3.8' COV.)
-40'
-60'
-2+00
30'± COV.
EXISTING 30'' WILLIAMS
P/L (2.6' COV.)
0+00
2+00
4+00
6+00
PROFILE
-40'
8+00
10+00
LEGEND
-60'
12+00
57
AD
SEC. 57
RO
SEC. 52
W
IN
NI
E
12+
00
14+
00
NO WETLAND
IMPACT IN HDD
STA. 23+60
(NAD 83)
N=583,901.10
E=3,427,717.70
LAT.=N30°06'17.27"
LONG.=W90°52'07.68"
SEC. 52
STA. 19+67
(NAD 83)
N=584,143.94
E=3,428,027.11
LAT.=N30°06'19.66"
LONG.=W90°52'04.15"
PROPOSED 8"
PIPELINE
16+
00
0
4+
100' x 150'
EXTRA TEMP.
WORKSPACE
0
2
STEIN
00
+
22
AL
CAN
STA. 23+60
HDD ENTRY
18+
00
+0
20
100' x 150'
EXTRA TEMP.
WORKSPACE
AL
AN
RC
BE
WE
SEC. 41
HDD
ENTRY
0
PROPOSED
ACCESS ROUTE
(27'± X 43'±)
0
+0
26
30'±
WETLAND
IMPACT NO. 03
(SEE SHEET 27)
HW
IN
V
TA
N
CA
AL
Y3
125
EXISTING 10"
WATERLINE
PROPOSED 30'±
TEMPORARY DRIVEWAY
Y
PE
SEC. 19
30'± OFFSET
4'±
CLR.
4'±
CLR.
STA. 23+60
ELEV. 3.9'
POWERLINE
ELEV. 4.3'
P.I. 19+67
NATURAL GROUND
PEYTAVIN CANAL
+20'
WEBER CANAL
WINNIE ROAD
POWERLINE
DITCH
PLAN
0'
+20'
0'
6' MIN. COV.
12'' PLASTIC CULVERT
2' MIN.
CLR.
30'± COV.
EXISTING GULF
SOUTH P/L (9' COV.)
EXISTING 8'' UCAR
P/L (11.6' COV.)
-20'
-20'
EXISTING PIPELINE (9' COV.)
-40'
-60'
12+00
-40'
EXISTING 10'' WATERLINE (UNK. COV.)
(ON WESTSIDE OF P.I.)
14+00
16+00
18+00
20+00
PROFILE
22+00
24+00
LEGEND
-60'
26+00
G.=W90°52'07.68"
SEC. 52
PROPOSED 8" PIPELINE
26+00
30+00
32+00
34+00
SEC. 42
TE
38+00
NO WETLAND
IMPACT IN HDD
40+00
DITC
H
M
P.
DIT
CH
SEC. 39
PLAN
+20'
NATURAL GROUND
+20'
DITCH
A
36+00
DITCH
TR
DITCH
EX
28+00
0'
0'
30'± COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
26+00
28+00
30+00
32+00
34+00
PROFILE
36+00
38+00
LEGEND
-60'
40+00
SEC. 52
PEYTAVIN CANAL
40+00
42+00
44+00
DITC
H
46+00
48+00
50+00
NO WETLAND
IMPACT IN HDD
PROPOSED 8" PIPELINE
52+00
54+00
SEC. 42
SEC. 40
PLAN
+20'
+20'
NATURAL GROUND
0'
0'
30'± COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
40+00
42+00
44+00
46+00
48+00
PROFILE
50+00
52+00
LEGEND
-60'
54+00
STA. 57+76
(NAD 83)
N=581,633.67
E=3,425,162.44
LAT.=N30°05'54.93"
LONG.=W90°52'36.88"
54+00
56+00
SEC. 52
PEYTAVIN CANAL
58+00
60+00
62+00
64+00
66+00
68+00
BACKSTRING IN R-O-W FOR WOODED
AREA HDD (ENTRY 23+60 TO EXIT 57+76)
NO WETLAND
IMPACT IN HDD
PROPOSED 8" PIPELINE
STA. 57+76
HDD EXIT
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 42
DITCH
+20'
STA. 57+76
ELEV. 5.7'
PLAN
+20'
NATURAL GROUND
0'
0'
4' MIN.
COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
54+00
56+00
58+00
60+00
62+00
PROFILE
64+00
66+00
LEGEND
-60'
68+00
STA. 81+59
(NAD 83)
N=580,052.36
E=3,423,379.18
LAT.=N30°05'39.34"
LONG.=W90°52'57.25"
SEC. 52
PEYTAVIN CANAL
68+00
70+00
72+00
74+00
76+00
78+00
80+00
82+00
BACKSTRING IN R-O-W FOR WOODED
AREA HDD (ENTRY 23+60 TO EXIT 57+76)
STA. 84+56
(NAD 83)
N=580,274.43
E=3,423,182.25
LAT.=N30°05'41.55"
LONG.=W90°52'59.48"
SEC. 42
84+00
PROPOSED 8" PIPELINE
STA. 84+61
HDD ENTRY
DIRT ROAD
PLAN
+20'
+20'
NATURAL GROUND
0'
0'
4' MIN.
COV.
4' MIN.
COV.
-20'
-20'
-40'
-40'
-60'
68+00
70+00
72+00
74+00
76+00
PROFILE
78+00
80+00
LEGEND
-60'
82+00
STA. 81+59
(NAD 83)
N=580,052.36
E=3,423,379.18
LAT.=N30°05'39.34"
LONG.=W90°52'57.25"
SEC. 28
EA
OODED AR
NG FOR W
RY 23+60
HDD (ENT
+76)
TO EXIT 57
CKSTRI
40' x 700' BA
82+00
80+00
E
IN
EL
NG
I
ST
XI
DIRT
PILE
6
E
SEC. 27
STA. 88+57
(NAD 83)
N=580,049.25
E=3,422,850.60
LAT.=N30°05'39.33"
LONG.=W90°53'03.27"
100' x 100'
EXTRA TEMP.
WORKSPACE
84+00
STA. 84+56
(NAD 83)
N=580,274.43
E=3,423,182.25
LAT.=N30°05'41.55"
LONG.=W90°52'59.48"
IP
"P
86+00
88+00
50' x 405' BACKSTRING FOR DIRT PILE
HDD (ENTRY 84+61 TO EXIT 88+52)
100' x 100'
EXTRA TEMP.
WORKSPACE
STA. 88+52
HDD EXIT
STA. 84+61
HDD ENTRY
90+00
94+00
92+00
STA. 89+95
(NAD 83)
N=580,163.47
E=3,422,772.97
SEC. 26
LAT.=N30°05'40.47"
LONG.=W90°53'04.15"
96+00
DITCH
PROPOSED 8" PIPELINE
DITCH
STA. 88+52
ELEV. 7.2'
AMANDA ROAD
DITCH
+20'
DIRT HILL
STA. 84+61
ELEV. 5.6'
PLAN
+20'
NATURAL GROUND
20'± COV.
0'
4' MIN.
COV.
4' MIN.
COV.
0'
EXISTING 6'' P/L (1.0' COV.)
-20'
-20'
-40'
-40'
-60'
82+00
84+00
86+00
88+00
90+00
PROFILE
92+00
94+00
LEGEND
-60'
96+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
96+00
98+00
100+00
102+00
104+00
106+00
DITCH
108+00
110+00
DITCH
PROPOSED 8" PIPELINE
SEC. 26
AMANDA ROAD
PLAN
+20'
0'
+20'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
0'
-20'
-20'
-40'
-40'
-60'
96+00
98+00
100+00
102+00
104+00
PROFILE
106+00
108+00
LEGEND
-60'
110+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
112+00
110+00
114+00
116+00
120+00
118+00
122+00
124+00
DITCH
DITCH
PROPOSED 8" PIPELINE
SEC. 26
PLAN
+40'
0'
DIRT ROAD
+20'
DIRT ROAD
+40'
+20'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
-20'
-20'
-40'
110+00
0'
112+00
114+00
116+00
118+00
PROFILE
120+00
122+00
LEGEND
-40'
124+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
100' x 100'
EXTRA TEMP.
WORKSPACE
100' x 100'
EXTRA TEMP.
WORKSPACE
124+00
126+00
130+00
128+00
132+00
134+00
138+00
136+00
DITCH
DITCH
PROPOSED 8" PIPELINE
ILL
INO
IS
RA CEN
ILR
T
OA RAL
D
SEC. 26
STA. 134+87
HDD ENTRY
STA. 130+07
HDD EXIT
0'
NATURAL GROUND
+40'
STA. 134+87
ELEV. 16.7'
+20'
STA. 130+07
ELEV. 16.3'
+40'
DITCH
ILLINOIS
CENTRAL
RAILROAD
DITCH
PLAN
+20'
30'±
COV.
25'±
COV.
4' MIN.
COV.
0'
-20'
-40'
124+00
-20'
126+00
128+00
130+00
132+00
PROFILE
134+00
136+00
LEGEND
-40'
138+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
STA. 149+45
(NAD 83)
N=576,764.67
E=3,418,159.21
LAT.=N30°05'07.00"
LONG.=W90°53'56.82"
152+00
150+00
148+00
BEGIN PROPOSED SPARE 8" PIPELINE
AT 60' X 100' VALVE SITE
136+00
140+00
138+00
142+00
PROPOSED (2)-8"
PIPELINES
146+00
144+00
DITCH
DITCH
PROPOSED 8" PIPELINE
STA. 147+28
(NAD 83)
N=576,940.96
E=3,418,031.76
LAT.=N30°05'08.75"
LONG.=W90°53'58.26"
SEC. 26
PLAN
DITCH
+20'
0'
+40'
DIRT ROAD
+40'
NATURAL GROUND
4' MIN.
COV.
0'
-20'
-40'
138+00
+20'
-20'
140+00
142+00
144+00
PROFILE
146+00
148+00
LEGEND
-40'
150+00
SEC. 27
STA. 152+45
HDD ENTRY FOR
(2)-8'' P/L'S
150+00
152+00
154+00
AMANDA STREET
(PROPOSED ACCESS ROUTE)
156+00
158+00
160+00
162+00
164+00
150' x 250'
EXTRA TEMP.
WORKSPACE
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERENCE DRAWING
PREPARED BY GEO-ENGINEERS)
STA. 152+45
(NAD 83)
N=576,589.06
E=3,417,916.28
LAT.=N30°05'05.27"
LONG.=W90°53'59.59"
SEC. 26
PLAN
+40'
+40'
EXISTING WATERLINE (UNK. COV.)
NATURAL GROUND
0'
-20'
4' MIN.
COV.
+20'
STA. 152+45
ELEV. 18.2'
+20'
0'
-20'
-40'
-40'
162'±
-60'
-60'
-80'
-80'
-100'
-120'
150+00
-140' ELEV.
152+00
154+00
156+00
158+00
PROFILE
160+00
162+00
LEGEND
164+00
HWY 4
4
L EVE E
MISSISSIPPI RIVER
SEC. 27
164+00
166+00
168+00
170+00
172+00
174+00
176+00
178+00
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERENCE DRAWING
PREPARED BY GEO-ENGINEERS)
AMANDA STREET
(PROPOSED
ACCESS ROUTE)
SEC. 26
PROPOSED 20'±
ACCESS ROUTE
EXISTING DRIVEWAY
PLAN
+40'
+40'
-20'
HWY. 44
DITCH
POWERLINE
0'
DITCH
POWERLINE
+20'
-40'
GRAVEL RD. (LEVEE)
WATERLINE (UNK. COV.)
+20'
MISSISSIPPI RIVER
0'
-20'
-40'
177'±
-60'
-60'
-80'
-80'
-140' ELEV.
164+00
166+00
168+00
170+00
172+00
PROFILE
174+00
176+00
LEGEND
178+00
MISSISSIPPI RIVER
178+00
180+00
182+00
184+00
186+00
188+00
190+00
192+00
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERNCE DRAWING
PREPARED BY GEO-ENGINEERS)
PLAN
+40'
+40'
+20'
+20'
0'
0'
MISSISSIPPI RIVER
-20'
-20'
-40'
-40'
-60'
-60'
-80'
-80'
41'± COV.
-140' ELEV.
178+00
180+00
182+00
184+00
186+00
PROFILE
188+00
190+00
LEGEND
192+00
SEC. 53
WETLAND
IMPACT NO. 04
(SEE SHEET 27)
196+00
204+00
202+00
200+00
EXIST
.
FACIL AMERICAS
IT
S
NORT Y DRIVEW TRENICS
AY
H
BE US OF P/L X-IN (1613'±
ED FO
G
R ACC WILL
ESS)
50' x 4226' BACKSTRING
FOR MISS. RIVER HDD
STA. 195+44
(NAD 83)
N=573,945.80
E=3,414,525.29
LAT.=N30°04'39.23"
LONG.=W90°54'38.30"
SEC. 52
PROPOSED (2)-8"
PIPELINES IN
MISSISSIPPI RIVER HDD
PROPOSED
8" PIPELINE
198+00
194+00
STA. 200+84
BORE ENTRY
END PROPOSED
SPARE 8"
PIPELINE
AT 60' X 70'
VALVE SITE
STA. 199+84
BORE EXIT
STA. 195+44
HDD EXIT FOR
(2)-8'' P/L'S
192+00
HWY 18
STA. 197+61
(NAD 83)
N=573,774.61
E=3,414,390.34
LAT.=N30°04'37.54"
LONG.=W90°54'39.84"
PROPOSED 20'±
ACCESS ROUTES
PROPOSED DRIVEWAY
& BOARDMAT ROAD
EXISTING DRIVEWAY
(PROPOSED 50'± TEMP.
DRIVEWAY)
EXISTING DRIVEWAY
PLAN
+40'
-20'
4' MIN.
COV.
STA. 200+84
ELEV. 13.0'
4' MIN.
COV.
DITCH
HWY. 18
DITCH
POWERLINE
0'
+20'
STA. 199+84
ELEV. 13.0'
NATURAL GROUND
GRAVEL RD.
MISSISSIPPI RIVER
STA. 195+44
ELEV. 20.6'
+20'
GRAVEL RD. (LEVEE)
+40'
0'
-20'
-40'
-40'
-60'
-60'
-80'
-80'
-100'
192+00
194+00
196+00
198+00
PROFILE
200+00
202+00
LEGEND
-120'
204+00
SEC. 53
STA. 205+08
(NAD 83)
N=573,277.98
E=3,413,832.21
LAT.=N30°04'32.64"
LONG.=W90°54'46.22"
SEC. 52
NG
RI DD
ST H
K
C ER
BA IV
6' . R
2
S
42 IS
'x M
50 OR
F
PROPOSED
ACCESS ROUTE
STA. 215+42
(NAD 83)
N=573,185.74
E=3,412,802.80
LAT.=N30°04'31.77"
LONG.=W90°54'57.94"
PROPOSED 8" PIPELINE
206+00
20
208+00
210+00
212+00
214+00
216+0
0
00
4+
00
2+
20
PLAN
+40'
+40'
+20'
0'
+20'
NATURAL GROUND
4' MIN.
COV.
0'
-20'
-20'
-40'
204+00
206+00
208+00
210+00
PROFILE
212+00
214+00
LEGEND
-40'
216+00
SEC. 51
SEC. 51
PERMANENT ACCESS
USING EXISTING ROAD
(20'± WIDE X 3,400'± LONG)
STA. 219+62
(NAD 83)
N=573,239.25
E=3,412,386.07
LAT.=N30°04'32.31"
LONG.=W90°55'02.68"
PROPOSED 8" PIPELINE
21
8+
00
220+00
222+00
224+00
226+00
228+00
230+00
PROPOSED
8" PIPELINE
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 50
21
4
+0
0
21
6+
00
STA. 218+03
(NAD 83)
N=573,212.96
E=3,412,542.88
LAT.=N30°04'32.04"
LONG.=W90°55'00.89"
STA. 225+10
HDD EXIT
0'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
30'± COV.
-20'
-40'
216+00
ASPHALT ROAD
DITCH
ASPHALT ROAD
DITCH
FENCE
METAL BUILDING
+20'
STA. 225+10
ELEV. 16.2'
DITCH
+40'
DRIVEWAY
FENCE
POWERLINE
DRIVEWAY
PLAN
+40'
+20'
0'
-20'
218+00
220+00
222+00
PROFILE
224+00
226+00
LEGEND
-40'
228+00
STA. 231+75
(NAD 83)
N=574,194.68
E=3,411,638.91
LAT.=N30°04'41.79"
LONG.=W90°55'11.14"
SEC. 49
STA. 231+60
HDD ENTRY
228+00
230+00
00
2+
23
226+00
CP CHEM
80' x 150'
METER SITE
PROPOSED
8" PIPELINE
SEC. 48
BOARDWALK
80' x 150'
METER SITE
STA. 233+99
(NAD 83)
N=574,417.47
E=3,411,666.16
LAT.=N30°04'44.00"
LONG.=W90°55'10.82"
STA. 234+64
(NAD 83)
N=574,468.74
E=3,411,626.06
LAT.=N30°04'44.51"
LONG.=W90°55'11.28"
30'± COV.0'
FENCE
DITCH
LIMESTONE ROAD
DITCH
POWERLINE
FENCE
STA. 231+60
ELEV. 15.2'
DITCH
+20'
LIMESTONE ROAD
+40'
DITCH
LAPICE ROAD
FENCE
ASPHALT ROAD
PLAN
+40'
+20'
NATURAL GROUND
4' MIN.
COV.
30'± COV.
0'
-20'
-20'
-40'
228+00
230+00
232+00
234+00
PROFILE
236+00
-40'
238+00
LEGEND
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
PIPE DITCH DETAIL
PIPE DITCH DETAIL
PROPOSED PERMANENT 60' X 100' VALVE SITE AT HWY. 44
PROPOSED PERMANENT 70' X 100' VALVE SITE AT HWY. 3125
PROPOSED TEMPORARY DRIVEWAY FROM HWY. 18
&
PROPOSED TEMPORARY DRIVEWAY FROM HWY. 3125
PROPOSED PERMANENT DRIVEWAY FROM HWY. 3125
WETLAND IMPACT TABLE
TOTAL = 1.3275 ACRES
EXCAVATION & FILL CALCULATIONS:
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 61
SEC. 63
STA. 3+29
HDD EXIT
RAPIDAN CANA
L
HDD EXIT
SEC. 62
NAL
HELVETIA CA
40' x 218' BACKSTRING
INTO CANE FIELD
STA. 2+84
(NAD 83)
N=583,572.66
E=3,429,609.57
LAT.=N30°06'13.94"
LONG.=W90°51'46.16"
4+00
SEC. 60
EXISTING 10"
WATERLINE
8+00
10+00
12+00
15'±
HWY 3125
PROPOSED 8"
PIPELINE
PROPOSED 20'±
PERMANENT DRIVEWAY
WETLAND
IMPACT NO. 02
(SEE SHEET 27)
70' x 100' VALVE SITE
SEC. 63
.
SEC
2+00
40' x 1618'
BACKSTRING
ALONG DIRT
ROAD
BETWEEN
DITCH AND
CANEFIELD
100' x 150'
EXTRA TEMP.
WORKSPACE
6+00
SEC. 59
STA. 0+00
(NAD 83)
N=583,839.88
E=3,429,706.04
LAT.=N30°06'16.58"
LONG.=W90°51'45.05"
STA. 0+08
HDD ENTRY
SEC. 57
100' x 200'
EXTRA TEMP.
WORKSPACE
WETLAND IMPACT NO. 01
(SEE SHEET 27)
STA. 3+29
ELEV. 3.0'
15'± OFFSET
ELEV. 3.2'
+20'
P.I. 2+84
STA. 0+08
ELEV. 7.8'
PLAN
+20'
NATURAL GROUND
0'
0'
EXISTING 30'' WILLIAMS
P/L (3.8' COV.)
15'± COV.
-20'
4' MIN.
COV.
TIE-IN TO
EXISTING P/L
-20'
EXISTING 30'' WILLIAMS
P/L (3.8' COV.)
-40'
-60'
-2+00
30'± COV.
EXISTING 30'' WILLIAMS
P/L (2.6' COV.)
0+00
2+00
4+00
6+00
PROFILE
-40'
8+00
10+00
LEGEND
-60'
12+00
57
AD
SEC. 57
RO
SEC. 52
W
IN
NI
E
12+
00
14+
00
NO WETLAND
IMPACT IN HDD
STA. 23+60
(NAD 83)
N=583,901.10
E=3,427,717.70
LAT.=N30°06'17.27"
LONG.=W90°52'07.68"
SEC. 52
STA. 19+67
(NAD 83)
N=584,143.94
E=3,428,027.11
LAT.=N30°06'19.66"
LONG.=W90°52'04.15"
PROPOSED 8"
PIPELINE
16+
00
0
4+
100' x 150'
EXTRA TEMP.
WORKSPACE
0
2
STEIN
00
+
22
AL
CAN
STA. 23+60
HDD ENTRY
18+
00
+0
20
100' x 150'
EXTRA TEMP.
WORKSPACE
AL
AN
RC
BE
WE
SEC. 41
HDD
ENTRY
0
PROPOSED
ACCESS ROUTE
(27'± X 43'±)
0
+0
26
30'±
WETLAND
IMPACT NO. 03
(SEE SHEET 27)
HW
IN
V
TA
N
CA
AL
Y3
125
EXISTING 10"
WATERLINE
PROPOSED 30'±
TEMPORARY DRIVEWAY
Y
PE
SEC. 19
30'± OFFSET
4'±
CLR.
4'±
CLR.
STA. 23+60
ELEV. 3.9'
POWERLINE
ELEV. 4.3'
P.I. 19+67
NATURAL GROUND
PEYTAVIN CANAL
+20'
WEBER CANAL
WINNIE ROAD
POWERLINE
DITCH
PLAN
0'
+20'
0'
6' MIN. COV.
12'' PLASTIC CULVERT
2' MIN.
CLR.
30'± COV.
EXISTING GULF
SOUTH P/L (9' COV.)
EXISTING 8'' UCAR
P/L (11.6' COV.)
-20'
-20'
EXISTING PIPELINE (9' COV.)
-40'
-60'
12+00
-40'
EXISTING 10'' WATERLINE (UNK. COV.)
(ON WESTSIDE OF P.I.)
14+00
16+00
18+00
20+00
PROFILE
22+00
24+00
LEGEND
-60'
26+00
G.=W90°52'07.68"
SEC. 52
PROPOSED 8" PIPELINE
26+00
30+00
32+00
34+00
SEC. 42
TE
38+00
NO WETLAND
IMPACT IN HDD
40+00
DITC
H
M
P.
DIT
CH
SEC. 39
PLAN
+20'
NATURAL GROUND
+20'
DITCH
A
36+00
DITCH
TR
DITCH
EX
28+00
0'
0'
30'± COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
26+00
28+00
30+00
32+00
34+00
PROFILE
36+00
38+00
LEGEND
-60'
40+00
SEC. 52
PEYTAVIN CANAL
40+00
42+00
44+00
DITC
H
46+00
48+00
50+00
NO WETLAND
IMPACT IN HDD
PROPOSED 8" PIPELINE
52+00
54+00
SEC. 42
SEC. 40
PLAN
+20'
+20'
NATURAL GROUND
0'
0'
30'± COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
40+00
42+00
44+00
46+00
48+00
PROFILE
50+00
52+00
LEGEND
-60'
54+00
STA. 57+76
(NAD 83)
N=581,633.67
E=3,425,162.44
LAT.=N30°05'54.93"
LONG.=W90°52'36.88"
54+00
56+00
SEC. 52
PEYTAVIN CANAL
58+00
60+00
62+00
64+00
66+00
68+00
BACKSTRING IN R-O-W FOR WOODED
AREA HDD (ENTRY 23+60 TO EXIT 57+76)
NO WETLAND
IMPACT IN HDD
PROPOSED 8" PIPELINE
STA. 57+76
HDD EXIT
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 42
DITCH
+20'
STA. 57+76
ELEV. 5.7'
PLAN
+20'
NATURAL GROUND
0'
0'
4' MIN.
COV.
30'± COV.
-20'
-20'
-40'
-40'
-60'
54+00
56+00
58+00
60+00
62+00
PROFILE
64+00
66+00
LEGEND
-60'
68+00
STA. 81+59
(NAD 83)
N=580,052.36
E=3,423,379.18
LAT.=N30°05'39.34"
LONG.=W90°52'57.25"
SEC. 52
PEYTAVIN CANAL
68+00
70+00
72+00
74+00
76+00
78+00
80+00
82+00
BACKSTRING IN R-O-W FOR WOODED
AREA HDD (ENTRY 23+60 TO EXIT 57+76)
STA. 84+56
(NAD 83)
N=580,274.43
E=3,423,182.25
LAT.=N30°05'41.55"
LONG.=W90°52'59.48"
SEC. 42
84+00
PROPOSED 8" PIPELINE
STA. 84+61
HDD ENTRY
DIRT ROAD
PLAN
+20'
+20'
NATURAL GROUND
0'
0'
4' MIN.
COV.
4' MIN.
COV.
-20'
-20'
-40'
-40'
-60'
68+00
70+00
72+00
74+00
76+00
PROFILE
78+00
80+00
LEGEND
-60'
82+00
STA. 81+59
(NAD 83)
N=580,052.36
E=3,423,379.18
LAT.=N30°05'39.34"
LONG.=W90°52'57.25"
SEC. 28
EA
OODED AR
NG FOR W
RY 23+60
HDD (ENT
+76)
TO EXIT 57
CKSTRI
40' x 700' BA
82+00
80+00
E
IN
EL
NG
I
ST
XI
DIRT
PILE
6
E
SEC. 27
STA. 88+57
(NAD 83)
N=580,049.25
E=3,422,850.60
LAT.=N30°05'39.33"
LONG.=W90°53'03.27"
100' x 100'
EXTRA TEMP.
WORKSPACE
84+00
STA. 84+56
(NAD 83)
N=580,274.43
E=3,423,182.25
LAT.=N30°05'41.55"
LONG.=W90°52'59.48"
IP
"P
86+00
88+00
50' x 405' BACKSTRING FOR DIRT PILE
HDD (ENTRY 84+61 TO EXIT 88+52)
100' x 100'
EXTRA TEMP.
WORKSPACE
STA. 88+52
HDD EXIT
STA. 84+61
HDD ENTRY
90+00
94+00
92+00
STA. 89+95
(NAD 83)
N=580,163.47
E=3,422,772.97
SEC. 26
LAT.=N30°05'40.47"
LONG.=W90°53'04.15"
96+00
DITCH
PROPOSED 8" PIPELINE
DITCH
STA. 88+52
ELEV. 7.2'
AMANDA ROAD
DITCH
+20'
DIRT HILL
STA. 84+61
ELEV. 5.6'
PLAN
+20'
NATURAL GROUND
20'± COV.
0'
4' MIN.
COV.
4' MIN.
COV.
0'
EXISTING 6'' P/L (1.0' COV.)
-20'
-20'
-40'
-40'
-60'
82+00
84+00
86+00
88+00
90+00
PROFILE
92+00
94+00
LEGEND
-60'
96+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
96+00
98+00
100+00
102+00
104+00
106+00
DITCH
108+00
110+00
DITCH
PROPOSED 8" PIPELINE
SEC. 26
AMANDA ROAD
PLAN
+20'
0'
+20'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
0'
-20'
-20'
-40'
-40'
-60'
96+00
98+00
100+00
102+00
104+00
PROFILE
106+00
108+00
LEGEND
-60'
110+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
112+00
110+00
114+00
116+00
120+00
118+00
122+00
124+00
DITCH
DITCH
PROPOSED 8" PIPELINE
SEC. 26
PLAN
+40'
0'
DIRT ROAD
+20'
DIRT ROAD
+40'
+20'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
-20'
-20'
-40'
110+00
0'
112+00
114+00
116+00
118+00
PROFILE
120+00
122+00
LEGEND
-40'
124+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
100' x 100'
EXTRA TEMP.
WORKSPACE
100' x 100'
EXTRA TEMP.
WORKSPACE
124+00
126+00
130+00
128+00
132+00
134+00
138+00
136+00
DITCH
DITCH
PROPOSED 8" PIPELINE
ILL
INO
IS
RA CEN
ILR
T
OA RAL
D
SEC. 26
STA. 134+87
HDD ENTRY
STA. 130+07
HDD EXIT
0'
NATURAL GROUND
+40'
STA. 134+87
ELEV. 16.7'
+20'
STA. 130+07
ELEV. 16.3'
+40'
DITCH
ILLINOIS
CENTRAL
RAILROAD
DITCH
PLAN
+20'
30'±
COV.
25'±
COV.
4' MIN.
COV.
0'
-20'
-40'
124+00
-20'
126+00
128+00
130+00
132+00
PROFILE
134+00
136+00
LEGEND
-40'
138+00
SEC. 27
AMANDA STREET
(PROPOSED ACCESS ROUTE)
STA. 149+45
(NAD 83)
N=576,764.67
E=3,418,159.21
LAT.=N30°05'07.00"
LONG.=W90°53'56.82"
152+00
150+00
148+00
BEGIN PROPOSED SPARE 8" PIPELINE
AT 60' X 100' VALVE SITE
136+00
140+00
138+00
142+00
PROPOSED (2)-8"
PIPELINES
146+00
144+00
DITCH
DITCH
PROPOSED 8" PIPELINE
STA. 147+28
(NAD 83)
N=576,940.96
E=3,418,031.76
LAT.=N30°05'08.75"
LONG.=W90°53'58.26"
SEC. 26
PLAN
DITCH
+20'
0'
+40'
DIRT ROAD
+40'
NATURAL GROUND
4' MIN.
COV.
0'
-20'
-40'
138+00
+20'
-20'
140+00
142+00
144+00
PROFILE
146+00
148+00
LEGEND
-40'
150+00
SEC. 27
STA. 152+45
HDD ENTRY FOR
(2)-8'' P/L'S
150+00
152+00
154+00
AMANDA STREET
(PROPOSED ACCESS ROUTE)
156+00
158+00
160+00
162+00
164+00
150' x 250'
EXTRA TEMP.
WORKSPACE
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERENCE DRAWING
PREPARED BY GEO-ENGINEERS)
STA. 152+45
(NAD 83)
N=576,589.06
E=3,417,916.28
LAT.=N30°05'05.27"
LONG.=W90°53'59.59"
SEC. 26
PLAN
+40'
+40'
EXISTING WATERLINE (UNK. COV.)
NATURAL GROUND
0'
-20'
4' MIN.
COV.
+20'
STA. 152+45
ELEV. 18.2'
+20'
0'
-20'
-40'
-40'
162'±
-60'
-60'
-80'
-80'
-100'
-120'
150+00
-140' ELEV.
152+00
154+00
156+00
158+00
PROFILE
160+00
162+00
LEGEND
164+00
HWY 4
4
L EVE E
MISSISSIPPI RIVER
SEC. 27
164+00
166+00
168+00
170+00
172+00
174+00
176+00
178+00
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERENCE DRAWING
PREPARED BY GEO-ENGINEERS)
AMANDA STREET
(PROPOSED
ACCESS ROUTE)
SEC. 26
PROPOSED 20'±
ACCESS ROUTE
EXISTING DRIVEWAY
PLAN
+40'
+40'
-20'
HWY. 44
DITCH
POWERLINE
0'
DITCH
POWERLINE
+20'
-40'
GRAVEL RD. (LEVEE)
WATERLINE (UNK. COV.)
+20'
MISSISSIPPI RIVER
0'
-20'
-40'
177'±
-60'
-60'
-80'
-80'
-140' ELEV.
164+00
166+00
168+00
170+00
172+00
PROFILE
174+00
176+00
LEGEND
178+00
MISSISSIPPI RIVER
178+00
180+00
182+00
184+00
186+00
188+00
190+00
192+00
PROPOSED (2)-8" PIPELINES IN
MISSISSIPPI RIVER HDD
(SEE REFERNCE DRAWING
PREPARED BY GEO-ENGINEERS)
PLAN
+40'
+40'
+20'
+20'
0'
0'
MISSISSIPPI RIVER
-20'
-20'
-40'
-40'
-60'
-60'
-80'
-80'
41'± COV.
-140' ELEV.
178+00
180+00
182+00
184+00
186+00
PROFILE
188+00
190+00
LEGEND
192+00
SEC. 53
WETLAND
IMPACT NO. 04
(SEE SHEET 27)
196+00
204+00
202+00
200+00
EXIST
.
FACIL AMERICAS
IT
S
NORT Y DRIVEW TRENICS
AY
H
BE US OF P/L X-IN (1613'±
ED FO
G
R ACC WILL
ESS)
50' x 4226' BACKSTRING
FOR MISS. RIVER HDD
STA. 195+44
(NAD 83)
N=573,945.80
E=3,414,525.29
LAT.=N30°04'39.23"
LONG.=W90°54'38.30"
SEC. 52
PROPOSED (2)-8"
PIPELINES IN
MISSISSIPPI RIVER HDD
PROPOSED
8" PIPELINE
198+00
194+00
STA. 200+84
BORE ENTRY
END PROPOSED
SPARE 8"
PIPELINE
AT 60' X 70'
VALVE SITE
STA. 199+84
BORE EXIT
STA. 195+44
HDD EXIT FOR
(2)-8'' P/L'S
192+00
HWY 18
STA. 197+61
(NAD 83)
N=573,774.61
E=3,414,390.34
LAT.=N30°04'37.54"
LONG.=W90°54'39.84"
PROPOSED 20'±
ACCESS ROUTES
PROPOSED DRIVEWAY
& BOARDMAT ROAD
EXISTING DRIVEWAY
(PROPOSED 50'± TEMP.
DRIVEWAY)
EXISTING DRIVEWAY
PLAN
+40'
-20'
4' MIN.
COV.
STA. 200+84
ELEV. 13.0'
4' MIN.
COV.
DITCH
HWY. 18
DITCH
POWERLINE
0'
+20'
STA. 199+84
ELEV. 13.0'
NATURAL GROUND
GRAVEL RD.
MISSISSIPPI RIVER
STA. 195+44
ELEV. 20.6'
+20'
GRAVEL RD. (LEVEE)
+40'
0'
-20'
-40'
-40'
-60'
-60'
-80'
-80'
-100'
192+00
194+00
196+00
198+00
PROFILE
200+00
202+00
LEGEND
-120'
204+00
SEC. 53
STA. 205+08
(NAD 83)
N=573,277.98
E=3,413,832.21
LAT.=N30°04'32.64"
LONG.=W90°54'46.22"
SEC. 52
NG
RI DD
ST H
K
C ER
BA IV
6' . R
2
S
42 IS
'x M
50 OR
F
PROPOSED
ACCESS ROUTE
STA. 215+42
(NAD 83)
N=573,185.74
E=3,412,802.80
LAT.=N30°04'31.77"
LONG.=W90°54'57.94"
PROPOSED 8" PIPELINE
206+00
20
208+00
210+00
212+00
214+00
216+0
0
00
4+
00
2+
20
PLAN
+40'
+40'
+20'
0'
+20'
NATURAL GROUND
4' MIN.
COV.
0'
-20'
-20'
-40'
204+00
206+00
208+00
210+00
PROFILE
212+00
214+00
LEGEND
-40'
216+00
SEC. 51
SEC. 51
PERMANENT ACCESS
USING EXISTING ROAD
(20'± WIDE X 3,400'± LONG)
STA. 219+62
(NAD 83)
N=573,239.25
E=3,412,386.07
LAT.=N30°04'32.31"
LONG.=W90°55'02.68"
PROPOSED 8" PIPELINE
21
8+
00
220+00
222+00
224+00
226+00
228+00
230+00
PROPOSED
8" PIPELINE
100' x 150'
EXTRA TEMP.
WORKSPACE
SEC. 50
21
4
+0
0
21
6+
00
STA. 218+03
(NAD 83)
N=573,212.96
E=3,412,542.88
LAT.=N30°04'32.04"
LONG.=W90°55'00.89"
STA. 225+10
HDD EXIT
0'
NATURAL GROUND
4' MIN.
COV.
4' MIN.
COV.
30'± COV.
-20'
-40'
216+00
ASPHALT ROAD
DITCH
ASPHALT ROAD
DITCH
FENCE
METAL BUILDING
+20'
STA. 225+10
ELEV. 16.2'
DITCH
+40'
DRIVEWAY
FENCE
POWERLINE
DRIVEWAY
PLAN
+40'
+20'
0'
-20'
218+00
220+00
222+00
PROFILE
224+00
226+00
LEGEND
-40'
228+00
STA. 231+75
(NAD 83)
N=574,194.68
E=3,411,638.91
LAT.=N30°04'41.79"
LONG.=W90°55'11.14"
SEC. 49
STA. 231+60
HDD ENTRY
228+00
230+00
00
2+
23
226+00
CP CHEM
80' x 150'
METER SITE
PROPOSED
8" PIPELINE
SEC. 48
BOARDWALK
80' x 150'
METER SITE
STA. 233+99
(NAD 83)
N=574,417.47
E=3,411,666.16
LAT.=N30°04'44.00"
LONG.=W90°55'10.82"
STA. 234+64
(NAD 83)
N=574,468.74
E=3,411,626.06
LAT.=N30°04'44.51"
LONG.=W90°55'11.28"
30'± COV.0'
FENCE
DITCH
LIMESTONE ROAD
DITCH
POWERLINE
FENCE
STA. 231+60
ELEV. 15.2'
DITCH
+20'
LIMESTONE ROAD
+40'
DITCH
LAPICE ROAD
FENCE
ASPHALT ROAD
PLAN
+40'
+20'
NATURAL GROUND
4' MIN.
COV.
30'± COV.
0'
-20'
-20'
-40'
228+00
230+00
232+00
234+00
PROFILE
236+00
-40'
238+00
LEGEND
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
RIGHT-OF-WAY DETAIL
PIPE DITCH DETAIL
PIPE DITCH DETAIL
PROPOSED PERMANENT 60' X 100' VALVE SITE AT HWY. 44
PROPOSED PERMANENT 70' X 100' VALVE SITE AT HWY. 3125
PROPOSED TEMPORARY DRIVEWAY FROM HWY. 18
&
PROPOSED TEMPORARY DRIVEWAY FROM HWY. 3125
PROPOSED PERMANENT DRIVEWAY FROM HWY. 3125
WETLAND IMPACT TABLE
TOTAL = 1.3275 ACRES
EXCAVATION & FILL CALCULATIONS: