County. Indian River. APPLICANT: Indian River Land Trust. Vero Beach, Florida. PROJECT PURPOSE: Basic: Recreation. Overall: Provide additional parking, improve flushing and provide additional recreational opportunities at the Indian River County Mosquito Impoundment.
TO WHOM IT MAY CONCERN: This district has received an application for a
Department of the Army permit pursuant to Section 404 of the Clean Water Act (33
U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403)
as described below:
APPLICANT:Indian River Land Trust
80 Royal Palm Pointe, Suite 301
Vero Beach, Florida 32960
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the Indian River Lagoon. The project site is situated on the west side of
State Road A-1-A, 0.8 miles north of the Indian River/St. Lucie County line in Sections
33 and 34, Township 33S, Range 40E, Indian River County.
Directions to the site are as follows: From Jacksonville head south of Interstate 95 to
State Road 60 in Vero Beach and go east to State Road A-1-A and go south
approximately 5 miles to the project site on the west side of road.
APPROXIMATE CENTRAL COORDINATES:
Latitude 27.5658°
Longitude -80.3279°
PROJECT PURPOSE:
Basic: Recreation
Overall: Provide additional parking, improve flushing and provide additional recreational
opportunities at the Indian River County Mosquito Impoundment.
EXISTING CONDITIONS: The project site is an existing maintained mosquito
impoundment managed by the Indian River County Mosquito Control District. The site is
primarily mangroves with a perimeter road and limited parking at the main entrance
gate.
PROPOSED WORK: The applicant seeks authorization to fill 0.18 acres of Brazilian
pepper dominated freshwater wetlands for the construction of a parking area adjacent to
an Indian River Mosquito Impoundment known as the Oyster Marsh Bar Trail to
facilitate increased recreational use. The work also includes construction within the
impoundment of three boardwalks and two observation decks: (106’ x 5’), (351’ x 6’ with
a 249’ x 5‘wide extension and an 8’ x 20’ deck), (66’ x 5’ with an 8’ x 20’ deck). Other
work includes the installation of two 30” culverts in the mosquito impoundment dike to
improve water flow and quality.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The project has been designed around the environmental
constraints of the project site by minimizing impacts to natural wetland areas. Seagrass
surveys were conducted to facilitate the location of the observation pier in an area that
avoids impacts to seagrasses and the boardwalks and culverts have been designed and
located to have minimal impacts to mangroves as much as possible while still providing
increased recreational opportunities and increased water flow to the impoundment.
COMPENSATORY MITIGATION: The boardwalks and observations decks will provide
improved recreational access to the impoundments which will create some temporary
disturbances to the area but conditions should return to normal once the work is
complete. The parking area impacts a low quality, non-native Brazilian pepper
dominated marginal wetland area whose primary source of water input is from road run
off and discharge from an adjacent stormwater pond. The culverts will improve water
quality and flow and are expected to result in an overall net improvement to the area for
water quality and wildlife.
CULTURAL RESOURCES: The Corps has determined the permit area has been
extensively modified by previous work and there is little likelihood a historic property
may be affected and the activity is of such limited scope there is little likelihood of
impact upon a historic property; therefore, the proposed project would have “No
Potential to Cause Effect”.
ENDANGERED SPECIES:
The Corps evaluated the proposed work utilizing NMFS’s Statewide Programmatic
Biological Opinion (SWPBO) dated 4 December 2015. The SWPBO analyzes the
effects from 11 categories of activities on sea turtles (loggerhead, leatherback, Kemp's
ridley, hawksbill, and green); smalltooth sawfish; Johnson's seagrass; sturgeon (Gulf,
shortnose, and Atlantic); corals (elkhorn, staghorn, boulder star, mountainous star,
lobed star, rough cactus, and pillar); North Atlantic right whales; and designated critical
habitat for Johnson's seagrass, smalltooth sawfish, Gulf sturgeon, loggerhead sea
turtle, North Atlantic right whale, and elkhorn and staghorn corals in accordance with
Section 7 of the ESA. Based on past permitting practices of the Corps and review of
consultations with similar in-water construction activities, Project Design Criteria (PDCs)
were identified in the SWPBO that typically have been applied to permitted in-water
construction activities. These PDCs ensure effects of in-water construction activities
are minimal in nature and do not result in adverse effects to listed species or to
essential features of designated CH. For this verification, the Corps conducted a project
specific review to ensure that all of the PDCs were met.
Manatee: Potential impacts to the endangered West Indian manatee were also
evaluated using “The Corps of Engineers, Jacksonville District, and the State of Florida
Effect Determination Key for the Manatee in Florida” dated April 2013. Use of the
Manatee key resulted in the following sequential determination: A (In waters accessible
to Manatee) > B (Project other than listed.) > C (Project not in IMA) > G (No new access
for watercraft) >N (No effect to SAV) >O (Permittee/Applicant will adhere to Manatee
Construction Guidelines) >P (other than) = “May affect, not likely to adversely affect” is
appropriate and no further consultation with the Service is necessary.
Atlantic Salt Marsh Snake: The project site is within the consultation area for this
species according to the USFWS Web Site. At the time of its listing, the Atlantic salt
marsh snake was thought to include salt marsh snakes as far south as Indian River
County (FWS 1977). Its distribution may actually be much more restricted, limited to the
brackish, coastal marshes of Volusia County. If this is the case, the Atlantic salt marsh
snakes vulnerability to habitat destruction and modification is even greater than
previously realized (FWS 1993). The Atlantic Salt Marsh Snake inhabits coastal salt
marshes and mangrove swamps. Specifically, it occurs along tidal creek and pool, in
saline environment ranging from brackish to full strength. The proposed project does
not permanently alter any know habitats for the saltmarsh snake and does not impact
any critical habitat for the Salt Marsh Snake. Based on SLOPES and other information
as cited above the Corps has determined that the project will not jeopardize the
continued existence of this species or adversely modify any critical habitat for the Salt
Marsh Snake and therefore in accordance with Sections 7(a)-(d) [U.S.C. 1536(a)-(d)] of
the Endangered Species Act of 1973 as amended (“Act”) the Corps has determined a
No Effect for the salt marsh snake.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposed boardwalks and observation
decks would impact approximately 0.1 acres of mangrove and shallow open water
utilized by various life stages of coral, snapper and grouper. Our initial determination is
that the proposed action would not have a substantial adverse impact on EFH or
Federally managed fisheries in the Indian River Lagoon. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by the
National Marine Fisheries Service.
NAVIGATION: Based on the Florida State Plane coordinates provided by the applicant,
the waterward edge of the proposed structure nearest the Intracoastal Waterway
Federal (ICW) is over 4000 feet away from the near bottom edge of the Intracoastal
Waterway Federal channel.
AUTHORIZATION FROM OTHER AGENCIES: The project is also being reviewed by
the State of Florida.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Cocoa Permits
Section, at the letterhead address within 15 days from the date of this notice.
If you have any questions concerning this application, you may contact Jim Carr at the
letterhead address, by electronic mail at james.l.carr@usace.army.mil , or by telephone
at 321-504-3771, extension 26.
The decision whether to issue or deny this permit application will be based on the
information received from this coordination and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as any compensatory mitigation proposed.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
COCOA REGULATORY FIELD OFFICE
400 HIGHPOINT DRIVE, SUITE 600
COCOA, FLORIDA 32926
REPLY TO
ATTENTION OF
September 18, 2017
Regulatory Division
North Permits Branch
Cocoa Permits Section
Permit Application Number SAJ-2017-02459 (IP-JLC)
TO WHOM IT MAY CONCERN: This district has received an application for a
Department of the Army permit pursuant to Section 404 of the Clean Water Act (33
U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403)
as described below:
APPLICANT: Ken Grudens
Indian River Land Trust
80 Royal Palm Pointe, Suite 301
Vero Beach, Florida 32960
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the Indian River Lagoon. The project site is situated on the west side of
State Road A-1-A, 0.8 miles north of the Indian River/St. Lucie County line in Sections
33 and 34, Township 33S, Range 40E, Indian River County.
Directions to the site are as follows: From Jacksonville head south of Interstate 95 to
State Road 60 in Vero Beach and go east to State Road A-1-A and go south
approximately 5 miles to the project site on the west side of road.
APPROXIMATE CENTRAL COORDINATES:
Latitude
27.5658°
Longitude -80.3279°
PROJECT PURPOSE:
Basic: Recreation
Overall: Provide additional parking, improve flushing and provide additional recreational
opportunities at the Indian River County Mosquito Impoundment.
EXISTING CONDITIONS: The project site is an existing maintained mosquito
impoundment managed by the Indian River County Mosquito Control District. The site is
primarily mangroves with a perimeter road and limited parking at the main entrance
gate.
PROPOSED WORK: The applicant seeks authorization to fill 0.18 acres of Brazilian
pepper dominated freshwater wetlands for the construction of a parking area adjacent to
an Indian River Mosquito Impoundment known as the Oyster Marsh Bar Trail to
facilitate increased recreational use. The work also includes construction within the
impoundment of three boardwalks and two observation decks: (106' x 5'), (351' x 6' with
a 249' x 5`wide extension and an 8' x 20' deck), (66' x 5' with an 8' x 20' deck). Other
work includes the installation of two 30" culverts in the mosquito impoundment dike to
improve water flow and quality.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The project has been designed around the environmental
constraints of the project site by minimizing impacts to natural wetland areas. Seagrass
surveys were conducted to facilitate the location of the observation pier in an area that
avoids impacts to seagrasses and the boardwalks and culverts have been designed and
located to have minimal impacts to mangroves as much as possible while still providing
increased recreational opportunities and increased water flow to the impoundment.
COMPENSATORY MITIGATION: The boardwalks and observations decks will provide
improved recreational access to the impoundments which will create some temporary
disturbances to the area but conditions should return to normal once the work is
complete. The parking area impacts a low quality, non-native Brazilian pepper
dominated marginal wetland area whose primary source of water input is from road run
off and discharge from an adjacent stormwater pond. The culverts will improve water
quality and flow and are expected to result in an overall net improvement to the area for
water quality and wildlife.
CULTURAL RESOURCES: The Corps has determined the permit area has been
extensively modified by previous work and there is little likelihood a historic property
may be affected and the activity is of such limited scope there is little likelihood of
impact upon a historic property; therefore, the proposed project would have "No
Potential to Cause Effect".
ENDANGERED SPECIES:
The Corps evaluated the proposed work utilizing NMFS's Statewide Programmatic
Biological Opinion (SWPBO) dated 4 December 2015. The SWPBO analyzes the
effects from 11 categories of activities on sea turtles (loggerhead, leatherback, Kemp's
ridley, hawksbill, and green); smalltooth sawfish; Johnson's seagrass; sturgeon (Gulf,
shortnose, and Atlantic); corals (elkhorn, staghorn, boulder star, mountainous star,
lobed star, rough cactus, and pillar); North Atlantic right whales; and designated critical
habitat for Johnson's seagrass, smalltooth sawfish, Gulf sturgeon, loggerhead sea
turtle, North Atlantic right whale, and elkhorn and staghorn corals in accordance with
Section 7 of the ESA. Based on past permitting practices of the Corps and review of
consultations with similar in-water construction activities, Project Design Criteria (PDCs)
were identified in the SWPBO that typically have been applied to permitted in-water
construction activities. These PDCs ensure effects of in-water construction activities
are minimal in nature and do not result in adverse effects to listed species or to
essential features of designated CH. For this verification, the Corps conducted a project
specific review to ensure that all of the PDCs were met.
Manatee: Potential impacts to the endangered West Indian manatee were also
evaluated using "The Corps of Engineers, Jacksonville District, and the State of Florida
Effect Determination Key for the Manatee in Florida" dated April 2013. Use of the
Manatee key resulted in the following sequential determination: A (In waters accessible
to Manatee) > B (Project other than listed.) > C (Project not in IMA) > G (No new access
for watercraft) >N (No effect to SAV) >O (Permittee/Applicant will adhere to Manatee
Construction Guidelines) >P (other than) = "May affect, not likely to adversely affect" is
appropriate and no further consultation with the Service is necessary.
Atlantic Salt Marsh Snake: The project site is within the consultation area for this
species according to the USFWS Web Site. At the time of its listing, the Atlantic salt
marsh snake was thought to include salt marsh snakes as far south as Indian River
County (FWS 1977). Its distribution may actually be much more restricted, limited to the
brackish, coastal marshes of Volusia County. If this is the case, the Atlantic salt marsh
snakes vulnerability to habitat destruction and modification is even greater than
previously realized (FWS 1993). The Atlantic Salt Marsh Snake inhabits coastal salt
marshes and mangrove swamps. Specifically, it occurs along tidal creek and pool, in
saline environment ranging from brackish to full strength. The proposed project does
not permanently alter any know habitats for the saltmarsh snake and does not impact
any critical habitat for the Salt Marsh Snake. Based on SLOPES and other information
as cited above the Corps has determined that the project will not jeopardize the
continued existence of this species or adversely modify any critical habitat for the Salt
Marsh Snake and therefore in accordance with Sections 7(a)-(d) [U.S.C. 1536(a)-(d)] of
the Endangered Species Act of 1973 as amended ("Act") the Corps has determined a
No Effect for the salt marsh snake.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposed boardwalks and observation
decks would impact approximately 0.1 acres of mangrove and shallow open water
utilized by various life stages of coral, snapper and grouper. Our initial determination is
that the proposed action would not have a substantial adverse impact on EFH or
Federally managed fisheries in the Indian River Lagoon. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by the
National Marine Fisheries Service.
NAVIGATION: Based on the Florida State Plane coordinates provided by the applicant,
the waterward edge of the proposed structure nearest the Intracoastal Waterway
Federal (ICW) is over 4000 feet away from the near bottom edge of the Intracoastal
Waterway Federal channel.
AUTHORIZATION FROM OTHER AGENCIES: The project is also being reviewed by
the State of Florida.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Cocoa Permits
Section, at the letterhead address within 15 days from the date of this notice.
If you have any questions concerning this application, you may contact Jim Carr at the
letterhead address, by electronic mail at james.l.carr@usace.army.mil , or by telephone
at 321-504-3771, extension 26.
The decision whether to issue or deny this permit application will be based on the
information received from this coordination and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as any compensatory mitigation proposed.
James Carr
Project Manager
Project Location
Indian River County
FOR PERMIT APPROVAL ONLY
Location Maps Not To Scale
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Cover and Location Map
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
Stephen W. Boehning, P.E.
FL. PE No. 52201
TB
SWB
08/31/17
1
10
1491701
2.8
3.0
6.4
3.6
6.0
3.0
2.6
3.2
3.8
2.8
2.3
2.2
0
4.5
4.2
2.4
2.4
2.2
3.0
2.4
2.8
5.0
6.5
5.0
6.0
6.6
3.6
3.4
2.2
2.2
500
1000
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
Survey Data: William B. Zentz and Associates (June 2017)
Total Wetland and Surface Water Impacts = 0.26 acres
FOR PERMIT APPROVAL ONLY
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Overall Site Plan
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
2
10
1491701
0
30
60
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
FOR PERMIT APPROVAL ONLY
Survey Data: William B. Zentz and Associates (June 2017)
Disturbed Wetland Impact from Access/Parking = 0.18 acres
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Entrance and Parking Plan View
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
3
10
1491701
0
20
40
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
Surface Water Impacts = 0.01 acres
FOR PERMIT APPROVAL ONLY
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Lagoon Overlook Plan View
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
4
10
1491701
0
50
100
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
Mangrove Wetland Impacts from Boardwalk = 0.06 acres
FOR PERMIT APPROVAL ONLY
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
West Boardwalk and Overlook Plan View
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
5
10
1491701
0
50
100
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
Mangrove Wetland Impacts from Boardwalk = 0.01 acres
FOR PERMIT APPROVAL ONLY
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
East Bordwalk Plan View and Boardwalk Details
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
6
10
1491701
10'
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
2" X 6" DECKING
OR GRATED
DECKING
(SEE NOTE
BELOW)
2" X 2" PICKETS
(COMPOSITE PLASTIC)
2" X 4" TOE RAIL
WOOD TREATED
WITH 0.60 LBS/ C.F. OF C.C.A
2" X 6" TOP EDGE
(COMPOSITE PLASTIC)
4"
3'-6"
2" X 4"
TOE RAIL
(COMPOSITE PLASTIC)
2" X 10" WOOD
STRINGERS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
5/8" STAINLESS STEEL
RODS W/ WASHERS AND
NUTS COUNTERSUNK
3' MINIMUM
Boardwalk Details
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
3' MINIMUM OR
AS REQUIRED
FOR BEARING
2" X 6" TOP
(COMPOSITE PLASTIC)
2" X 6" TOP EDGE
WOOD TREATED WITH 0.60 LBS/
C.F. OF C.C.A
5'
3'-4"
2" X 6" TOP
(COMPOSITE PLASTIC)
NATURAL GROUND/
APPROXIMATE
SEASONAL HIGH
WATER LINE
* NOTE: GRATED DECKING SHALL BE USED
IN BOARDWALK SEGMENTS OVER THE
INDIAN RIVER LAGOON WATERS.
2" X 12" WOOD
BENTS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
ALL PILINGS ARE TO BE WRAPPED
WITH AN IMPERMEABLE, FLEXIBLE
PVC SLEEVE AT LEAST 6" ABOVE
S.H.W. AND AT LEAST 6" BELOW
THE SUBSTRATE.
2" X 10" WOOD
STRINGERS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
NATURAL GROUND/APPROXIMATE
SEASONAL HIGH WATER LINE
6" DIAMETER WOOD PILES TREATED
IN ACCORDANCE WITH A.W.P.A.
STANDARD C-18. PILES TO EXTEND
A MINIMUM 3 FT EMBEDMENT
PENETRATION DEPTH (TYP.).
ADDITIONAL EMBEDMENT DEPTH MAY
BE REQUIRED FOR BEARING
DEPENDING ON SOIL CONDITIONS.
5/8" DIAMETER STAINLESS
STEEL RODS W/ WASHERS
AND NUTS COUNTERSUNK
ALL PILINGS ARE TO BE WRAPPED
WITH AN IMPERMEABLE, FLEXIBLE
PVC SLEEVE AT LEAST 6" ABOVE
S.H.W. AND AT LEAST 6" BELOW
THE SUBSTRATE.
6" DIAMETER WOOD PILES TREATED
IN ACCORDANCE WITH A.W.P.A.
STANDARD C-18. PILES TO EXTEND
A MINIMUM 3 FT EMBEDMENT
PENETRATION DEPTH (TYP.).
ADDITIONAL EMBEDMENT DEPTH MAY
BE REQUIRED FOR BEARING
DEPENDING ON SOIL CONDITIONS.
5' WIDE ELEVATED MANGROVE BOARDWALK
5' WIDE ELEVATION VIEW
MATERIALS SPECIFICATIONS
SILT FENCE INSTALLED ALONG
BOTH SIDS OF BOARDWALK WHILE
UNDER CONSTRUCTION (TYP.)
WOOD: ALL WOOD MEMBERS SHALL BE NO.1 SOUTHERN YELLOW PINE
(UNLESS OTHERWISE SPECIFIED), PRESSURE TREATED IN
ACCORDANCE WITH A.W.P.A. STANDARD C-18 FOR MARINE
CONSTRUCTION. THE PRESERVATIVE USED SHALL BE A WATERBORNE
TYPE SUCH AS `B' OR `C' AS COVERED IN FEDERAL SPEC. TT-W-535,
AND A.W.P.A. STANDARDS P5, C2, AND C14. ALL WOOD TO BE
STRAIGHT, TRUE, AND FREE FROM SPLINTS, WANE OR OTHER
OBJECTIONABLE DEFECTS. BOLT HOLES SHALL BE DRILLED TO THE
BOLT DIAMETER AND THEN HAMMERED INTO PLACE.
PILINGS SHALL BE 6 INCHES IN DIAMETER AND TREATED WITH NOT
LESS THAN 2.5 LBS./C.F. OF C.C.A. PRESERVATIVE SALTS IN
ACCORDANCE WITH A.W.P.A. STANDARD C-18.
10'
5'-6"
TB
VERTICAL RAILING SUPPORT WOOD MEMBERS (2" X 6") SHALL BE
TREATED WITH NO MORE THAN 0.60 LBS./C.F. OF C.C.A. PRESERVATIVE
SALTS PER A.W.P.A. STANDARD C-18.
2" X 6" DECKING
(COMPOSITE
PLASTIC)
Coastal
Waterways
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
5'-8"
1'-5"CENTER TO
CENTER
7
FOR PERMIT APPROVAL ONLY
10
1491701
Stephen W. Boehning, P.E.
FL. PE No. 52201
SWB
08/31/17
HARDWARE: ALL BOLTS, WASHERS, PLATES, NUTS, NAILS, ETC. SHALL
BE STAINLESS STEEL. FOR SECURING THE COMPOSITE DECKING TO
THE STRINGERS 3" STAINLESS STEEL SQUARE DRIVE TRIM HEAD
SCREWS SHALL BE USED.
ALL PILE CAP CONNECTIONS ARE TO BE CONNECTED TO THE PILES
WITH COUNTERSUNK 5/8" DIAMETER STAINLESS STEEL RODS,
WASHERS AND NUTS.
FOR ALL DECKING AND ALL RAILINGS INCLUDING THE 2" X 6" TOP
RAILING AND 2" X 6" TOP EDGE, 2" X 6" SAFETY RAIL, AND 2" X 4" TOE
RAIL EVERGRAIN COMPOSITE MADE WITH RECYCLED PLASTIC WITH
WOOD GRAIN TEXTURE AND CAPE CODE GREY COLORING SHALL BE
USED. DECKING OVER LAGOON SHALL BE GRATED COMPOSITE
DECKING, AS APPROVED BY THE ENGINEER.
2" X 10" WOOD
STRINGERS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
6" DIAMETER WOOD PILES TREATED IN ACCORDANCE
WITH A.W.P.A. STANDARD C-18. PILES TO EXTEND A
MINIMUM 3 FT EMBEDMENT PENETRATION DEPTH (TYP.).
ADDITIONAL EMBEDMENT DEPTH MAY BE REQUIRED FOR
BEARING DEPENDING ON SOIL CONDITIONS.
5' WIDE ELEVATED BOARDWALK PLANVIEW
5/8"STAINLESS STEEL
RODS W/ WASHERS AND
NUTS COUNTERSUNK
Coastal
Waterways
13'
4'-10"
4'-10"
4'-10"
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
NOTE: ROOF IS PROPOSED FOR THE OVERLOOK THAT
IS LOCATED WITHIN THE IMPOUNDMENT AREA. A
ROOF IS NOT PROPOSED ON THE OVERLOOK THAT IS
LOCATED OVER THE INDIAN RIVER LAGOON.
1'
10'
4"
8'
3" X 12" WOOD
BENTS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
2" X 6" TOP
(COMPOSITE PLASTIC)
2" X 6" TOP EDGE
(COMPOSITE PLASTIC)
4"
Overlook Details
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
10'
8'
3/4" DIAMETER STAINLESS
3" X 12" WOOD
STEEL RODS W/ WASHERS
BENTS TREATED AND NUTS COUNTERSUNK
WITH 0.60 LBS/
C.F. OF C.C.A
5'
4"
2" X 10" WOOD
STRINGERS TREATED
WITH 0.60 LBS/
C.F. OF C.C.A
APPROXIMATE SEASONAL
HIGH WATER LINE
ALL PILINGS ARE TO BE WRAPPED
WITH AN IMPERMEABLE, FLEXIBLE
PVC SLEEVE AT LEAST 6" ABOVE
S.H.W. AND AT LEAST 6" BELOW
THE SUBSTRATE.
NATURAL GROUND
TB
8
FOR PERMIT APPROVAL ONLY
10
1491701
Stephen W. Boehning, P.E.
FL. PE No. 52201
SWB
08/31/17
8" DIAMETER WOOD PILES TREATED
IN ACCORDANCE WITH A.W.P.A.
STANDARD C-18. PILES TO EXTEND
A MINIMUM 3 FT EMBEDMENT
PENETRATION DEPTH (TYP.).
ADDITIONAL EMBEDMENT DEPTH MAY
BE REQUIRED FOR BEARING
DEPENDING ON SOIL CONDITIONS.
ELEVATION VIEW FOR OVERLOOK
.4
6
.5
6
.0
6
A
4
3
.0
3
2
.2
4
.6
3
.4
3
.8
3
.0
3
.0
.8
2
.8
2
.6
.0
5
.5
.8
.2
3
2
.6
.0
6
.0
5
.6
3
6
A
2
.4
2
2
2
.4
.2
2
.3
.2
2
.2
2
.4
.2
2
0
30
60
Scale in Feet
Aerial Photo: Florida Department of Environmental Protection 2015
FOR PERMIT APPROVAL ONLY
Survey Data: William B. Zentz and Associates (June 2017)
Existing Elevations
Stephen W. Boehning, P.E.
FL. PE No. 52201
.6 Proposed Elevations
3
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Parking Area Fill and Wetland
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
9
10
1491701
5
Proposed Parking
Area Surface
Elevation (feet NAVD)
4
Silt Fence
(Typ.)
3
2
3:1 Slope to
Existing Grade
(Typ.)
1
0
-30 -20 -10
0
10
Existing Grade
20
30
40
50
60
Distance (feet)
SECTION A - A
TURBIDITY CURTAINS:
1. IF TURBIDITY EXTENDS BEYOND BARRIERS,
CONSTRUCTION MUST CEASE UNTIL
TURBIDITY LEVELS RETURN TO NORMAL
LEVELS.
2. DOUBLE TURBIDITY BARRIERS MUST BE
PLACED PRIOR TO CONSTRUCTION AROUND
PIER.
3. TURBIDITY CURTAINS ARE TO REMAIN IN
PLACE FOR A PERIOD OF TIME NOT LESS
THAN SEVEN (7) DAYS AFTER WORK HAS
BEEN COMPLETED OR UNTIL TURBIDITY
LEVELS HAVE RETURNED TO BACKGROUND
N.T.U. LEVELS.
FOR PERMIT APPROVAL ONLY
Stephen W. Boehning, P.E.
FL. PE No. 52201
Coastal
Waterways
601 21st Street
Suite 300
Vero Beach, FL 32960
(772) 473-4099
www.coastalwde.com
C.A. No. 28071
COASTAL ENGINEERING · ENVIRONMENTAL PERMITTING
EMERGENCY MANAGEMENT · WATERFRONT DEVELOPMENT
Details
Oyster Bar Marsh Trail Improvements
Applicant: Indian River Land Trust/Indian River County
Indian River County, Florida
TB
SWB
08/31/17
10
10
1491701
#1
#2
#1: Lat 27.571198
Long -80.336222
#2: Lat 27.5685
Long -80.33817
Culvert in Dike Configuration
Mangrove Fringe
Riprap
Annular Corrugation
Riser w/Flapgate
Width Varies
Existing Dike
LAGOON
30" dia
MHWL 0.96' NGVD
Invert Elevation -1.0"
IMPOUNDMENT
Filter Cloth
32'
Manatee Excluder
Culvert
#
1
2
Rip Rap Dimensions
Lagoon Side (L X W)
Impoundment
Total
Side (L x W)
Area
Left of
Right of Left of Right of of Rip
Rap
Culvert
Culvert Culvert Culvert
2
2
2
2
15 ft
15 ft
15 ft
15 ft
60 ft2
2
2
2
2
15 ft
15 ft
15 ft
15 ft
60 ft2
*Total Area of Rip Rap 120 ft2
Area of Mangrove Impact
Lagoon Side
Impoundment
Side
2
10 ft
75 ft2
2
70 ft
10 ft2
Total Area of Impact
Total Area of
Impact
85 ft2
80 ft2
165 ft2
Flapgate