You can copy from here when filling out the rest of the page.
Polk County. Balmoral Estates, LP. Davenport, Florida.
PROJECT PURPOSE:
Basic: Recreation.
Overall: Construct an elite-level soccer training facility in the Haines City area.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Balmoral Estates, LP
116 Polo Park East
Davenport, Florida 33897
WATERWAY AND LOCATION: The project would affect waters of the United States associated with wetlands and tributaries in the Lake Hamilton Chain of lakes. The project site is located at 251 South US Highway 27, within Section 30, Township 27 South, Range 27 East, Haines City, Polk County, Florida.
Directions to the site are as follows: From I-4, take US Highway 27 south to Haines City. The site is approximately 0.4 miles south of the Highway 17/US Highway 27 intersection on the left.
APPROXIMATE CENTRAL COORDINATES:
Latitude 28.100993°
Longitude -81.644361°
PROJECT PURPOSE:
Basic: Recreation
Overall: Construct an elite-level soccer training facility in the Haines City area.
EXISTING CONDITIONS: The wetland system consists of a 1.72 acres freshwater wetland system and a series of surface waters totaling 1.34 acres. The onsite vegetation consists of scrub-shrub wetlands, largely dominated by Carolina Willow, Saltbush, Wax myrtle, Primrose willow, etc. Currently the site is used as a mobile home park and undeveloped land. The existing area surrounding the project consists of residential and commercial properties as well as large tracts of undeveloped land.
PROPOSED WORK: The applicant seeks authorization to construct an elite-level soccer training facility. The proposed project would require fill placed in 1.72 acres of wetlands and 1.34 acres of surface waters.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
“The Soccer academy’s site plan went through multiple iterations in order to reduce wetland impacts. The footprint of the soccer fields was geometrically arranged in order to reduce wetland impacts to the greatest extent practicable. The original site plan proposed to impact the entirety of W-1 in order to accommodate the official-sized soccer field and smaller-sized practice fields. For the current site plan the impacts to W-1 have been decreased to 1.72 acres by reworking the practice field orientation and stormwater pond geometry. The stormwater pond could not be reduced any further as it must meet a required minimum size determined by State water quality requirements. The soccer fields are set to a standard size and must be able to facilitate a certain number of players estimated to be enrolled in the academy.”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
The impacts to W-1 occur within a degraded willow and elderberry system with a pervasive amount of exotic vegetation. This low-functioning impact area will be offset by the purchase of credits from the Boran Ranch Mitigation Bank.
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely affect the Eastern Indigo Snake. This determination was made using the 2013 Effect Determination Key for the Eastern Indigo Snake. Pursuant to the key, no further consultation with the U.S. Fish and Wildlife Service is necessary.
The Corps has determined the proposal would have no effect on the Audubon’s Crested Caracara, Wood Stork, Everglades Snail Kite, Florida Scrub-Jay, Florida Grasshopper Sparrow, and the Blue-Tailed or Sank skink or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
10117 PRINCESS PALM AVENUE, SUITE 120
TAMPA, FLORIDA 33610
September 19, 2017
REPLY TO
ATTENTION OF
Regulatory Division
West Branch
Tampa Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2007-05901(SP-CMW)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Balmoral Estates, LP
116 Polo Park East
Davenport, Florida 33897
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with wetlands and tributaries in the Lake Hamilton Chain of lakes. The
project site is located at 251 South US Highway 27, within Section 30, Township 27
South, Range 27 East, Haines City, Polk County, Florida.
Directions to the site are as follows: From I-4, take US Highway 27 south to Haines
City. The site is approximately 0.4 miles south of the Highway 17/US Highway 27
intersection on the left.
APPROXIMATE CENTRAL COORDINATES: Latitude 28.100993°
Longitude -81.644361°
PROJECT PURPOSE:
Basic: Recreation
Overall: Construct an elite-level soccer training facility in the Haines City area.
EXISTING CONDITIONS: The wetland system consists of a 1.72 acres freshwater
wetland system and a series of surface waters totaling 1.34 acres. The onsite
vegetation consists of scrub-shrub wetlands, largely dominated by Carolina Willow,
Saltbush, Wax myrtle, Primrose willow, etc. Currently the site is used as a mobile home
park and undeveloped land. The existing area surrounding the project consists of
residential and commercial properties as well as large tracts of undeveloped land.
PROPOSED WORK: The applicant seeks authorization to construct an elite-level
soccer training facility. The proposed project would require fill placed in 1.72 acres of
wetlands and 1.34 acres of surface waters.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
"The Soccer academy's site plan went through multiple iterations in order to
reduce wetland impacts. The footprint of the soccer fields was geometrically arranged
in order to reduce wetland impacts to the greatest extent practicable. The original site
plan proposed to impact the entirety of W-1 in order to accommodate the officialsized soccer field and smaller-sized practice fields. For the current site plan the
impacts to W-1 have been decreased to 1.72 acres by reworking the practice field
orientation and stormwater pond geometry. The stormwater pond could not be
reduced any further as it must meet a required minimum size determined by State
water quality requirements. The soccer fields are set to a standard size and must
be able to facilitate a certain number of players estimated to be enrolled in the
academy."
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
The impacts to W-1 occur within a degraded willow and elderberry system with
a pervasive amount of exotic vegetation. This low-functioning impact area will be
offset by the purchase of credits from the Boran Ranch Mitigation Bank.
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area. By copy
of this public notice, the Corps is providing information for review. Our final
determination relative to historic resource impacts is subject to review by and
coordination with the State Historic Preservation Officer and those federally recognized
tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely
affect the Eastern Indigo Snake. This determination was made using the 2013 Effect
Determination Key for the Eastern Indigo Snake. Pursuant to the key, no further
consultation with the U.S. Fish and Wildlife Service is necessary.
The Corps has determined the proposal would have no effect on the Audubon's Crested
Caracara, Wood Stork, Everglades Snail Kite, Florida Scrub-Jay, Florida Grasshopper
Sparrow, and the Blue-Tailed or Sank skink or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or Federally managed
2
fisheries. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries
Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Tampa Permits
Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days
from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm
Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at
Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061;
or, by telephone at (813)769-7064.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
3
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
21
..
z
z
llJ
~
ii
UJ
=
...
N
::.
n
~
z
tJ
'<
...
0
2---~
Halnl?s
Cl ty
-
f/)
1r
en
b
=
--
I/)
Q
N
I/)
~
'tl
"':;·
;;i
L~
Rohfns
t;;
-=
S.i
.....
en
'2
VI
0
....
Scenic Hwy
nePark Rd
Legend
~ Balmoral Soccer Site
I
'I
\ ~!!:!~~1~1~~~~!,!~!'c~~~~
2002 E . Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Sources: Esri, HER~, 'Elelorme, USGS, lntermap, increment P Corp., NRCAN,
~sri Japan, METI, Esri ~ttina (!'long Kong), Esri (Thailand), TomTom,
~pmylndia ,
© OpenStreetMap contr butors, and the GIS User Community
Balmoral Soccer Site
Polk County, Florida
Figure 1
Location Map
0.5 Miles
s
Project # : 802-06
Produced By: ST C
D ate: 7 / 26/ 2016
.......
···
Legend
·..
.· Balmoral Soccer Site
I
1/
\ ~!1!:!~~~1~~~~~,!~!'c~~~~
2002 E. Robinson St. Orlando, FL 32803
Ph: 4-07-894-5969 Fax: 4-07-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 2
2014 Aerial Photograph
200 Feet
s
Project #: 802-06
Produced By: STC
D ate: 7 / 26/ 2016
-
}:-
jl
--~
,.,..:W..-
...
(
-=-'
--
-~ -
_,
'
.......
......
Legend
·
· Balmoral Soccer Site
I
I/
\ ~n~~r:!~~~l~~~~~,!~!~c~~~;
2002 E . Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 3
USG S Topography 1vi ap
800 Feet
s
Project # : 802-06
Produced By: ST C
D ate: 7 / 26/ 2016
Legend
C:."J
Balmoral Soccer Sile
NRCS Polk C0LW1ty Soils
mapunt53_M. mapunt53_3
7, POMONA FINE SAND
13, SAMSULA MUCK
23, DNA F NE SAND
35, HONTOON MUCK
61, ARENT S-URBAN LAND COMPLEX; ORGANIC SUBST RATUM
I
1/
\ ~!1~r:!~~~l~~~~~~!~!~c~~~~
2002 E . Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 4
SSURGO Soils Map
200
L-----------' Feet
Project #: 802-06
s
Produced By: STC
D ate: 7 / 25/ 2016
Legend
·····
;.
··J Balmoral Soccer Site
FLUCFCS
FLUCCS_sym, FLUCCS_nam
112, Mobile Home Units
190, Open Land
510, Streams and Waterways
534, Reservoirs less than 10 acres
618, Willow and Elderberry
I
1/
\
~!1~r:!~~~l~~~~~,!~!'c~~~~
2002 E . Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 5
FLUCFCSMap
150 Feet
s
Project #: 802-06
Produced By: STC
Date: 8/ 3/ 2016
.....
Legend
; ...... Balmoral Soccer Site
A
wetland_pts
I
1/
\ ~!1!:!~~~1~~~~~,!~!~c~~~
2002 E. Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 6
Wetland D elineation Map
130 Feet
s
Project # : 802-06
Produced By: ST C
D ate: 8/ 5/ 2016
Legend
1·:.'J
Balmoral Soccer Site
~ weda nd_impact
ff';),tJ secondary_impact
I
1/
\
~!1~r:!~~~l~~~~~,!~!~c~~~;
2002 E. Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Balmoral Soccer Site
Polk County, Florida
Figure 7
ACOE Jurisdictional Impacts
150 Feet
s
Project # : 802-06
Produced By: ST C
D ate: 4/ 4/ 2017
L
i
LEGEND
i
DESCRIPTION
PROPOSED
i
SANITARY SEWER SYSTEM
S TORM SEWER SYSTEM
i
i
·
CONTOUR
LOT NUMBER
DIRECTION OF SURFACE FLOW
0
30'
60'
STOP SIGN IR1 · 1) & 24" BAR
WI DETECTABLE WARNING &
12" CROSSWALK (TYP)
120'
I
I
I
I
I
/
ENTRANCE
I
/
I
I
;
I
I
==--
'
.
..
'".
., '. . .
. ···. .
'
.;·. ' . ··· · ·
· "
.
,.
.I.
·"
'·
' ..··. :
'
. .
'
' ' ·
3'
~
.. :
.
:
·
"
II.
·
···
··
'..
'
'"
,.··.. " .....
', I
____ .__
I
I
/
'
I
'
'
I
'
I
I
I
'
__
i----------225'--+---I
7' SIDEWALK (TYP
,.;
~:
Tl
g:
I
1
~
0
TYP"D"CURB
~
HANDICAP PARKING
SIGNING AND
WHEEL STOP
VOCATIONAL
SCHOOL
~-~-· ..,,_ir - --._
_ _J'
6" THICK 3500 PSI
AIR-ENTRAINED
CONCRETE SLAB WITH
6 x 6 x2.9/2.9 W.W.F. ON
5" GRANULAR BASE
· . ·.
I
I
I
·
" ., ·
a__ _J
I
"
'-----~~-------'
WATERLINE
=. EXTING MH 2 --
WHEEL STOP I POST
PERMANENTLY AFFIXED
'
~1LF ~"PV~
-
j+I
EXISTING MH 1
7' SIDEWALK (TYP)
DUMPSTER
ODIFIED TYPED CURB (TYP)
[
6' HIGH MASONRY I
STOCKADE FENCE
PAINTED TO MATCH
BUILDING
1O'
I I f I ,._)-'l'IJl--'l'---1
sToP SIGN (R1-1) & 24n BAR
WI DETECTABLE WARNING &
12" CROSSWALK (TYP)
I
RIGHT IN I RIGHT OUT
MINIMUM 30"
PEDESTRIAN
GATE WITH
CONC. PAD
(OPT.)
I
~CG
CONNECT TO EXISTING 8" WATER MAIN BY WET
TAP WI TEMP. JUMPER CONNECTION - - - - II
I
SCALE: 1" = 60'
75'RIW
I
~/
1
/
i
i
5
111/L
DIRECTIONAL BORE
90'-8" SDR35 PVC
@0.40%
I
WATER SYS TEM
FIRE HYDRANT
I
"'
OFFICIAL
FIELD
~
I
I I
I I
I I
I I
I I
I I
_,, I
/
/
I
I
/
I
I
/
/
\
~
\
"'·1--1--..-1--+-...µ,
c I
~ I
I
;! I
<:
\
'v'
I
4J:
Rl
ODIFIED TYPE D CURB (TYP)
I
I
I
I
I
I
:J
I~ ~
/
!,
~ .
3" METAL POST
"
1 - - - - . , L - - - - - - 247' - - - - f - - - - j
6' HIGH SWINGING
GATES WITH
LATCHING DEVICE
ALSO WHEELS AND
RODS
DP
489.oo._· ~~
·-l=-~Na"9!2a·2o"E 529.99'
UMPSTER
SINGLE DUMPSTER ENCLOSURE PLAN
DATE:
IHOIO'MO.
1127/2005
SIGN
'"'
PHASE 2'-----'
CE
PHASE 1'-----'
TOP 126.0
'
TOTAL PROJECT AREAS:
2.12 AC.
21.2%
STORMWATER:
0.43 AC.
1.53 AC.
5.92 AC.
10.00AC.
4.3%
IMPERVIOUS AREA:
PERVIOUS AREA:
TOTAL GROSS AREA:
3.65 AC.
6.35 AC.
10.00 AC.
15.3%
59.2%
SITE DATA
36.5%
63.5%
EXISTING ZONING
ADJACENT ZONING
EXISTING LAND USE
PROPOSED LAND USE
DEVELOPMENT PROGRAM
DAVE SCHMITT
ENGINEERING, INC.
12301 Lake Und erhill Road Suite 241
ORLANDO, FL 32828
407-207-9088 FAX 407-207-9089
Certification of Authorization #27471
AREA
1.53 ac.
1.89 ac.
0.52 ac.
0.52 ac.
S-1
N. 1369787.1936
E. 771213.8483
STD SANITARY MH
TOP. EL. 125.8
INV. EL. 120.00 (NE)
INV. EL. 120.10 (SW)
RPUD
R-1-AA, R-1, R-3,
VACANT
RPUD
DESCRIPTION
OWNERSHIP I MAINTAINED
A
POND
POA
B
CANAL
POA
PRIVATE: TO BE OWNED AND MAINTAINED BY POA.
STORMWATER /WETLAND TRACTS
(A,8)
PRIVATE: TO BE OWNED AND MAINTAINED BY THE POA .
DRAINAGE EASEMENTS
PUBLIC: TO BE OWNED AND MAINTAINED BY THE POA WI EASEMENT GRANTED TO HAINES CITY.
UTILITY EASEMENTS
PUBLIC: TO BE OWNED AND MAINTAINED BY THE POA WITH EASEMENT GRANTED TO HAINES CITY.
POTABLE WA TER
PRIVATE: TO BE OWNED AND MAINTAINED BY THE POA WI EASEMENT GRANTED TO HAINES CITY.
CONTRACTOR "AS-BUil TS"
I hereby state that these "As-Builts" were furnished to me by the contractor listed below. I, or an employee under my direct
supervision have reviewed these "As-Builts" and believe them to be in compliance with my knowledge of what was actually
constructed. This statement is based upon site observations of the construction.
Contractor.
S-2 ill
N. 1369823.4078
E. 770810.9839
STD SANITARY MH
TOP. EL. 125.5
INV. EL. 122.62 (NE)
INV. EL. 122.72 (S)
OWNERSHIP/MAINTENANCE
ROADWAYS
Englnee·< - - - - - - - - - - - -
Notvalid wtthout the signature and the original raised seal of a Florida Registered Engineer.
BOT 113.0
TOP126,0
100.00%
TRACT
LAND USE
SCHOOL
OFFICIAL FIELD
FIELD 01,02,
POND
15'
6'
100.00%
------,
L ______ "-
REQUIRED WIDTH:
20'
LOCATION:
FRONT:
REAR:
SIDE:
NWL122.5
I
I
SETBACKS
ROADWAYS:
BUILDING:
OPEN SPACE I AMENITY AREAS:
TOTAL GROSS AREA:
,---
'
EXISTING MH-1
N. 1369803.2510
E. 770803.9822
STD SANITARY MH
TOP. EL. 125.8
INV
1 1
INV. EL. 122.26 (SW)
EXIST S-2
N. 1369852.7704
E. 771270.7170
STD SANITARY MH
TOP. EL. 125.8
INV. EL. 114.48
INV. EL. 119.65 (SW)
REVISIONS
DAVE M. SCHMID
1--DA--TE---""""B"'Y.....------D--Es'"c""R""1"'PT"'1""o"'N----'-T""!'D.;;AT;,;E,._--B,.,Y......-------DE"'s" c'""R"'1P"'T"'1=
o N - - - - - - 1 FLORIDA REG. NUMBER
48274
p
TR
I
I
I
I
I
D\
SWALE
7i
I
I
I
L--_J
RL-1
OVERALL SITE PLAN
CENTRAL FLORIDA R9 SOCCER ACADEMY
1-----l-+--------------1-----+-+-==--=--==--...,.,==-----.-I
03-14-2017
JL
REV PER CLIENT AND SWFWMD COMMENTS
HAINES CITY, FLORIDA
DATE: DECEMBER 2016
PROJECT NO.: FTD-28
DRAWN BY: JL
CHECKED BY: DSE
SCALE: 1"=60'
SHEET: 6 OF 11