Polk County. Balmoral Estates, LP. Davenport, Florida. PROJECT PURPOSE: Basic: Recreation. Overall: Construct an elite-level soccer training facility in the Haines City area.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Balmoral Estates, LP

116 Polo Park East

Davenport, Florida 33897

WATERWAY AND LOCATION: The project would affect waters of the United States associated with wetlands and tributaries in the Lake Hamilton Chain of lakes. The project site is located at 251 South US Highway 27, within Section 30, Township 27 South, Range 27 East, Haines City, Polk County, Florida.

Directions to the site are as follows: From I-4, take US Highway 27 south to Haines City. The site is approximately 0.4 miles south of the Highway 17/US Highway 27 intersection on the left.

APPROXIMATE CENTRAL COORDINATES:

Latitude 28.100993°

Longitude -81.644361°

PROJECT PURPOSE:

Basic: Recreation

Overall: Construct an elite-level soccer training facility in the Haines City area.

EXISTING CONDITIONS: The wetland system consists of a 1.72 acres freshwater wetland system and a series of surface waters totaling 1.34 acres. The onsite vegetation consists of scrub-shrub wetlands, largely dominated by Carolina Willow, Saltbush, Wax myrtle, Primrose willow, etc. Currently the site is used as a mobile home park and undeveloped land. The existing area surrounding the project consists of residential and commercial properties as well as large tracts of undeveloped land.

PROPOSED WORK: The applicant seeks authorization to construct an elite-level soccer training facility. The proposed project would require fill placed in 1.72 acres of wetlands and 1.34 acres of surface waters.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: “The Soccer academy’s site plan went through multiple iterations in order to reduce wetland impacts. The footprint of the soccer fields was geometrically arranged in order to reduce wetland impacts to the greatest extent practicable. The original site plan proposed to impact the entirety of W-1 in order to accommodate the official-sized soccer field and smaller-sized practice fields. For the current site plan the impacts to W-1 have been decreased to 1.72 acres by reworking the practice field orientation and stormwater pond geometry. The stormwater pond could not be reduced any further as it must meet a required minimum size determined by State water quality requirements. The soccer fields are set to a standard size and must be able to facilitate a certain number of players estimated to be enrolled in the academy.”

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The impacts to W-1 occur within a degraded willow and elderberry system with a pervasive amount of exotic vegetation. This low-functioning impact area will be offset by the purchase of credits from the Boran Ranch Mitigation Bank.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the Eastern Indigo Snake. This determination was made using the 2013 Effect Determination Key for the Eastern Indigo Snake. Pursuant to the key, no further consultation with the U.S. Fish and Wildlife Service is necessary.

The Corps has determined the proposal would have no effect on the Audubon’s Crested Caracara, Wood Stork, Everglades Snail Kite, Florida Scrub-Jay, Florida Grasshopper Sparrow, and the Blue-Tailed or Sank skink or designated critical habitat.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610

September 19, 2017

REPLY TO ATTENTION OF

Regulatory Division West Branch Tampa Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2007-05901(SP-CMW) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Balmoral Estates, LP 116 Polo Park East Davenport, Florida 33897 WATERWAY AND LOCATION: The project would affect waters of the United States associated with wetlands and tributaries in the Lake Hamilton Chain of lakes. The project site is located at 251 South US Highway 27, within Section 30, Township 27 South, Range 27 East, Haines City, Polk County, Florida. Directions to the site are as follows: From I-4, take US Highway 27 south to Haines City. The site is approximately 0.4 miles south of the Highway 17/US Highway 27 intersection on the left. APPROXIMATE CENTRAL COORDINATES: Latitude 28.100993° Longitude -81.644361° PROJECT PURPOSE: Basic: Recreation Overall: Construct an elite-level soccer training facility in the Haines City area. EXISTING CONDITIONS: The wetland system consists of a 1.72 acres freshwater wetland system and a series of surface waters totaling 1.34 acres. The onsite vegetation consists of scrub-shrub wetlands, largely dominated by Carolina Willow, Saltbush, Wax myrtle, Primrose willow, etc. Currently the site is used as a mobile home park and undeveloped land. The existing area surrounding the project consists of residential and commercial properties as well as large tracts of undeveloped land. PROPOSED WORK: The applicant seeks authorization to construct an elite-level soccer training facility. The proposed project would require fill placed in 1.72 acres of wetlands and 1.34 acres of surface waters.

AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: "The Soccer academy's site plan went through multiple iterations in order to reduce wetland impacts. The footprint of the soccer fields was geometrically arranged in order to reduce wetland impacts to the greatest extent practicable. The original site plan proposed to impact the entirety of W-1 in order to accommodate the officialsized soccer field and smaller-sized practice fields. For the current site plan the impacts to W-1 have been decreased to 1.72 acres by reworking the practice field orientation and stormwater pond geometry. The stormwater pond could not be reduced any further as it must meet a required minimum size determined by State water quality requirements. The soccer fields are set to a standard size and must be able to facilitate a certain number of players estimated to be enrolled in the academy." COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The impacts to W-1 occur within a degraded willow and elderberry system with a pervasive amount of exotic vegetation. This low-functioning impact area will be offset by the purchase of credits from the Boran Ranch Mitigation Bank. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the Eastern Indigo Snake. This determination was made using the 2013 Effect Determination Key for the Eastern Indigo Snake. Pursuant to the key, no further consultation with the U.S. Fish and Wildlife Service is necessary. The Corps has determined the proposal would have no effect on the Audubon's Crested Caracara, Wood Stork, Everglades Snail Kite, Florida Scrub-Jay, Florida Grasshopper Sparrow, and the Blue-Tailed or Sank skink or designated critical habitat. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed 2

fisheries. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, 3

and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

21

..

z

z

llJ ~

ii

UJ

= ... N

::.

n ~

z

tJ

'<

...

0 2---~

Halnl?s

Cl ty

-

f/)

1r

en

b

=

--

I/)

Q

N

I/)

~ 'tl

"':;· ;;i

L~

Rohfns

t;;

-=

S.i .....

en

'2

VI

0 ....

Scenic Hwy

nePark Rd

Legend ~ Balmoral Soccer Site I

'I

\ ~!!:!~~1~1~~~~!,!~!'c~~~~

2002 E . Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Sources: Esri, HER~, 'Elelorme, USGS, lntermap, increment P Corp., NRCAN, ~sri Japan, METI, Esri ~ttina (!'long Kong), Esri (Thailand), TomTom, ~pmylndia ,

© OpenStreetMap contr butors, and the GIS User Community

Balmoral Soccer Site Polk County, Florida Figure 1 Location Map

0.5 Miles

s

Project # : 802-06 Produced By: ST C D ate: 7 / 26/ 2016

....... ···

Legend

·..

.· Balmoral Soccer Site

I

1/

\ ~!1!:!~~~1~~~~~,!~!'c~~~~

2002 E. Robinson St. Orlando, FL 32803 Ph: 4-07-894-5969 Fax: 4-07-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 2 2014 Aerial Photograph

200 Feet

s

Project #: 802-06 Produced By: STC D ate: 7 / 26/ 2016

- }:-

jl

--~

,.,..:W..-

...

( -=-'

--

-~ -

_,

'

....... ......

Legend

·

· Balmoral Soccer Site

I

I/

\ ~n~~r:!~~~l~~~~~,!~!~c~~~;

2002 E . Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 3 USG S Topography 1vi ap

800 Feet

s

Project # : 802-06 Produced By: ST C D ate: 7 / 26/ 2016

Legend

C:."J

Balmoral Soccer Sile

NRCS Polk C0LW1ty Soils

mapunt53_M. mapunt53_3 7, POMONA FINE SAND 13, SAMSULA MUCK 23, DNA F NE SAND 35, HONTOON MUCK 61, ARENT S-URBAN LAND COMPLEX; ORGANIC SUBST RATUM

I

1/

\ ~!1~r:!~~~l~~~~~~!~!~c~~~~

2002 E . Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 4 SSURGO Soils Map

200

L-----------' Feet Project #: 802-06 s

Produced By: STC D ate: 7 / 25/ 2016

Legend

····· ;. ··J Balmoral Soccer Site FLUCFCS

FLUCCS_sym, FLUCCS_nam 112, Mobile Home Units 190, Open Land 510, Streams and Waterways 534, Reservoirs less than 10 acres 618, Willow and Elderberry

I

1/ \

~!1~r:!~~~l~~~~~,!~!'c~~~~

2002 E . Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 5 FLUCFCSMap

150 Feet

s

Project #: 802-06 Produced By: STC Date: 8/ 3/ 2016

.....

Legend

; ...... Balmoral Soccer Site

A

wetland_pts

I

1/

\ ~!1!:!~~~1~~~~~,!~!~c~~~

2002 E. Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 6 Wetland D elineation Map

130 Feet

s

Project # : 802-06 Produced By: ST C D ate: 8/ 5/ 2016

Legend

1·:.'J

Balmoral Soccer Site

~ weda nd_impact

ff';),tJ secondary_impact I

1/ \

~!1~r:!~~~l~~~~~,!~!~c~~~;

2002 E. Robinson St. Orlando, FL 32803 Ph: 407-894-5969 Fax: 407-894-5970 www.bio-techconsulting.com

Balmoral Soccer Site Polk County, Florida Figure 7 ACOE Jurisdictional Impacts

150 Feet

s

Project # : 802-06 Produced By: ST C D ate: 4/ 4/ 2017

L i

LEGEND i DESCRIPTION

PROPOSED

i

SANITARY SEWER SYSTEM S TORM SEWER SYSTEM

i i

·

CONTOUR LOT NUMBER DIRECTION OF SURFACE FLOW

0

30'

60'

STOP SIGN IR1 · 1) & 24" BAR WI DETECTABLE WARNING & 12" CROSSWALK (TYP)

120'

I

I

I I

I

/

ENTRANCE

I

/

I

I ;

I

I

==--

'

.

.. '".

., '. . .

. ···. .

'

.;·. ' . ··· · · · "

. ,.

.I.

·"

'·

' ..··. :

'

. .

'

' ' ·

3'

~

.. :

.

: ·

"

II.

·

···

··

'..

'

'"

,.··.. " .....

',

I

____ .__

I

I

/

'

I

' '

I

'

I I

I

'

__

i----------225'--+---I

7' SIDEWALK (TYP

,.;

~: Tl

g:

I

1 ~

0

TYP"D"CURB

~

HANDICAP PARKING SIGNING AND WHEEL STOP

VOCATIONAL SCHOOL

~-~-· ..,,_ir - --._

_ _J'

6" THICK 3500 PSI AIR-ENTRAINED CONCRETE SLAB WITH 6 x 6 x2.9/2.9 W.W.F. ON 5" GRANULAR BASE

· . ·.

I

I

I

·

" ., ·

a__ _J

I

"

'-----~~-------'

WATERLINE

=. EXTING MH 2 --

WHEEL STOP I POST PERMANENTLY AFFIXED '

~1LF ~"PV~

-

j+I

EXISTING MH 1

7' SIDEWALK (TYP)

DUMPSTER

ODIFIED TYPED CURB (TYP) [

6' HIGH MASONRY I STOCKADE FENCE PAINTED TO MATCH BUILDING

1O'

I I f I ,._)-'l'IJl--'l'---1

sToP SIGN (R1-1) & 24n BAR WI DETECTABLE WARNING & 12" CROSSWALK (TYP)

I

RIGHT IN I RIGHT OUT

MINIMUM 30" PEDESTRIAN GATE WITH CONC. PAD (OPT.)

I

~CG

CONNECT TO EXISTING 8" WATER MAIN BY WET TAP WI TEMP. JUMPER CONNECTION - - - - II

I

SCALE: 1" = 60'

75'RIW

I

~/ 1 / i i

5

111/L

DIRECTIONAL BORE 90'-8" SDR35 PVC @0.40%

I

WATER SYS TEM FIRE HYDRANT

I

"'

OFFICIAL FIELD

~

I I I I I I I I I I I I I _,, I

/

/

I I /

I I / /

\

~

\

"'·1--1--..-1--+-...µ, c I ~ I I ;! I

<:

\

'v'

I

4J:

Rl

ODIFIED TYPE D CURB (TYP)

I I I I I I

:J

I~ ~

/

!,

~ .

3" METAL POST

"

1 - - - - . , L - - - - - - 247' - - - - f - - - - j

6' HIGH SWINGING GATES WITH LATCHING DEVICE ALSO WHEELS AND RODS

DP

489.oo._· ~~

·-l=-~Na"9!2a·2o"E 529.99' UMPSTER

SINGLE DUMPSTER ENCLOSURE PLAN

DATE:

IHOIO'MO.

1127/2005

SIGN

'"'

PHASE 2'-----'

CE

PHASE 1'-----' TOP 126.0

'

TOTAL PROJECT AREAS: 2.12 AC.

21.2%

STORMWATER:

0.43 AC. 1.53 AC. 5.92 AC. 10.00AC.

4.3%

IMPERVIOUS AREA: PERVIOUS AREA: TOTAL GROSS AREA:

3.65 AC. 6.35 AC. 10.00 AC.

15.3% 59.2%

SITE DATA

36.5% 63.5%

EXISTING ZONING ADJACENT ZONING EXISTING LAND USE PROPOSED LAND USE

DEVELOPMENT PROGRAM

DAVE SCHMITT ENGINEERING, INC. 12301 Lake Und erhill Road Suite 241

ORLANDO, FL 32828 407-207-9088 FAX 407-207-9089 Certification of Authorization #27471

AREA 1.53 ac. 1.89 ac. 0.52 ac. 0.52 ac.

S-1 N. 1369787.1936 E. 771213.8483 STD SANITARY MH TOP. EL. 125.8 INV. EL. 120.00 (NE) INV. EL. 120.10 (SW)

RPUD R-1-AA, R-1, R-3, VACANT RPUD

DESCRIPTION

OWNERSHIP I MAINTAINED

A

POND

POA

B

CANAL

POA

PRIVATE: TO BE OWNED AND MAINTAINED BY POA.

STORMWATER /WETLAND TRACTS (A,8)

PRIVATE: TO BE OWNED AND MAINTAINED BY THE POA .

DRAINAGE EASEMENTS

PUBLIC: TO BE OWNED AND MAINTAINED BY THE POA WI EASEMENT GRANTED TO HAINES CITY.

UTILITY EASEMENTS

PUBLIC: TO BE OWNED AND MAINTAINED BY THE POA WITH EASEMENT GRANTED TO HAINES CITY.

POTABLE WA TER

PRIVATE: TO BE OWNED AND MAINTAINED BY THE POA WI EASEMENT GRANTED TO HAINES CITY.

CONTRACTOR "AS-BUil TS" I hereby state that these "As-Builts" were furnished to me by the contractor listed below. I, or an employee under my direct supervision have reviewed these "As-Builts" and believe them to be in compliance with my knowledge of what was actually constructed. This statement is based upon site observations of the construction.

Contractor.

S-2 ill N. 1369823.4078 E. 770810.9839 STD SANITARY MH TOP. EL. 125.5 INV. EL. 122.62 (NE) INV. EL. 122.72 (S)

OWNERSHIP/MAINTENANCE ROADWAYS

Englnee·< - - - - - - - - - - - -

Notvalid wtthout the signature and the original raised seal of a Florida Registered Engineer.

BOT 113.0

TOP126,0

100.00% TRACT

LAND USE SCHOOL OFFICIAL FIELD FIELD 01,02, POND

15' 6'

100.00%

------,

L ______ "-

REQUIRED WIDTH: 20'

LOCATION: FRONT: REAR: SIDE:

NWL122.5

I I

SETBACKS

ROADWAYS: BUILDING: OPEN SPACE I AMENITY AREAS: TOTAL GROSS AREA:

,---

'

EXISTING MH-1 N. 1369803.2510 E. 770803.9822 STD SANITARY MH TOP. EL. 125.8 INV 1 1 INV. EL. 122.26 (SW) EXIST S-2 N. 1369852.7704 E. 771270.7170 STD SANITARY MH TOP. EL. 125.8 INV. EL. 114.48 INV. EL. 119.65 (SW)

REVISIONS DAVE M. SCHMID 1--DA--TE---""""B"'Y.....------D--Es'"c""R""1"'PT"'1""o"'N----'-T""!'D.;;AT;,;E,._--B,.,Y......-------DE"'s" c'""R"'1P"'T"'1= o N - - - - - - 1 FLORIDA REG. NUMBER 48274

p

TR I I I

I I

D\

SWALE

7i I I I

L--_J

RL-1

OVERALL SITE PLAN CENTRAL FLORIDA R9 SOCCER ACADEMY

1-----l-+--------------1-----+-+-==--=--==--...,.,==-----.-I 03-14-2017

JL

REV PER CLIENT AND SWFWMD COMMENTS

HAINES CITY, FLORIDA

DATE: DECEMBER 2016 PROJECT NO.: FTD-28 DRAWN BY: JL CHECKED BY: DSE SCALE: 1"=60' SHEET: 6 OF 11

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas