You can copy from here when filling out the rest of the page.
Proposed Shoreline Renovation in the Detroit River at Detroit, Michigan
Please open the attachment to view the full Public Notice.
US Army Corps
of Engineers
Public Notice
Detroit District
Applicant:
Detroit Historical Society: Attn. Alease Johnson
In Reply Refer To:
Corps File No. LRE-1998-70020-S17
Date: September
Expires: October
22, 2017
13, 2017
Proposed Shoreline Renovation in the Detroit River at Detroit, Michigan
Applicant: Alease Johnson
Detroit Historical Society
5401 Woodward Ave
Detroit, MI 48202
Project Location: The site is located at the Dossin Great Lakes Museum, 100 Strand
Drive, Belle Isle, Detroit, Section 28, Township 1 S, Range 12 E, Wayne County,
Michigan, 48207.
Federal Authority: The applicant has applied for a Department of the Army permit
under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean
Water Act.
State Authority: Section 401 of the Clean Water Act requires that all discharges of
dredged or fill material must be certified by the State as complying with applicable
effluent limitations and water quality standards. Coastal Zone Management
Certification (or waiver thereof) is required from the State of Michigan if this proposed
activity would occur within the designated coastal zone.
Project Description: As shown on the attached plans, as part of the renovation of the
Dossin Great Lakes Museum, the applicant proposes work along an approximately 600
foot long section of the Detroit River shoreline. The proposed activities would include
reshaping parts of the shoreline and river bottom to decrease the slope in order to
provide river access by kayakers and pedestrians to a small cove known as "The
Haven" and to enhance upland event gathering spaces to support vital museum
functions. Specific activities proposed waterward of the Ordinary High Water Mark
(OHWM) and requiring Corps of Engineers authorization include the following:
Mechanically excavate approximately 45 cubic yards of material in an approximately
900 square foot area to reshape the slope of "The Haven" and mechanically excavate
approximately 130 cubic yards of concrete to install new riprap for shoreline
stabilization; discharge approximately 210 cubic yards of stone riprap in three areas
covering approximately 2,750 square feet to protect the shoreline from erosion;
File No. LRE-1998-70020-S17
September 22, 2017
discharge approximately 50 cubic yards of crushed stone in an approximately 100 foot
long by 8 foot wide area to construct a sloped kayak access path; place approximately
55 cubic yards of limestone steps in a 30 foot by 12 foot area to create a pedestrian
walkway to access the water; place approximately 45 cubic yards of limestone blocks to
construct retaining walls; discharge approximately 260 cubic yards of a sand and gravel
mix in an approximately 4,600 square foot area; install a 230 foot long by 2 fot wide
concrete cap on top of an existing steel seawall; install approximately 10 cubic yards of
heavy stone riprap in a 105 foot long by 2 foot wide area at the toe of slope of the
proposed sand and gravel mix fill area; in an approximately 260 foot by 16 foot area,
rubblize (break up) all existing concrete riprap exceeding 36 inches in any direction, by
breaking them down to 6-inch to 18-inch pieces and removing all steel rebar. In total, a
combined total of approximately 630 cubic yards of stone riprap, sand and gravel,
crushed limestone and limestone steps would be discharged waterward of the OHWM
in an approximately 10,420 square foot area.
The purpose of the proposed work is "The Detroit Historical Society would like to
strengthen the Dossin Great Lakes Museum as one of the landmark destinations on
Belle Isle by reinforcing the physical identity of the museum and creating exterior
improvements that engage the water that will attract and retain both spontaneous and
intentional visitors. Exterior improvements are desired to create spaces where visitors
can safely experience the riverfront and provide safe water access to supplement and
enhance the recent interior improvements completed at the museum. A new drop-off
lane and improved entry walkways are also proposed. Shoreline stabilization measures
needed to repair and clean up existing banks that are eroding in some areas and
remove overgrown vegetation that inhibits water access. A small amount of floodplain
fill would be associated with the improvements to improve the shape of the existing inlet
cove from the river, referred to "The Haven". The re-shaping of The Haven would
provide larger exterior event space areas that are critical to the museum's continued
success. As a non-profit organization, the Detroit Historical Society relies primarily on
private donations and events to provide funding to maintain the Dossin Great Lakes
Museum for the benefit of the public. Exterior improvements for spaces for visitors to
safely view and engage with the water would provide key engagement with the focus of
the museum the Great Lakes that is currently lacking at the site."
Avoidance & Minimization: The applicant has stated the following concerning
avoidance and minimization of impacts to Waters of the United States: "The existing
lawn area between the building and The Haven is currently the only outdoor space
available for visitors and events. Currently, the lawn area exhibits poor subgrade
conditions when used for events and is not large enough to handle typical event sizes
(approximately 150-250 people). The proposed lawn event space is designed to
accommodate a 30' by 60' tent that could host functions of 150-250 people. The event
space was required to be in close proximity to the existing building to allow for shared
functions (particularly the restrooms) and also adjacent to the water since most events
at the museum are related to the Great Lakes. In addition to the physical area needed
2
File No. LRE-1998-70020-S17
September 22, 2017
for event space, a loading/maintenance access drive is still needed that can provide
service trucks access to the existing loading doors on the north façade of the building.
In order to provide required loading/maintenance access to the building and event
space, the banks of The Haven are proposed to be re-graded to a more uniform shape
within the cove and adequate upland space beyond the top of bank. The proposed
bank re-shaping results in a small amount of floodplain fill, approximately 599 cubic
yards, which would have negligible impact on the floodplain within the Detroit River.
Additionally, all of the fill is located within The Haven cove area and not along the main
banks of the Detroit River. The floodplain fill volume also includes installing an access
path lined by limestone block walls and steps from the top of bank to approximately the
ordinary high water mark and a sand/gravel mix below at a shallower slope within the
water. This proposed water access area is proposed to provide safe, accessible
pedestrian access to the river for visitor experience, engagement and education as well
as the ability to launch kayaks to promote recreational opportunities that would connect
to other launch areas along the river.
Alternative locations for the larger event lawn were considered. The property limits
managed by the Detroit Historical Society are approximately 40' to the west of the
existing building and at the eastern edge of the parking lot. The Detroit Historical
Society requested additional land from the DNR in 2016 to the west of the museum
building outside the current property limits but the DNR denied the request since the
State already uses the space for specific events already programmed on Belle Isle. The
area immediately west of the existing building was determined to be unsuitable since it
was not adjacent to the riverfront which is a vital visual and physical connection needed
for events at a museum whose focus is the Great Lakes. Areas to the east of The
Haven were determined to be unsuitable due to being too far away from the museum to
allow for shared use functions of the building and outside of the property limits.
After it was determined that the best location for the event lawn was immediately east
of the museum between the building and The Haven, alternative designs were
considered that would limits impacts to the river. Alternative designs considered where
providing smaller event spaces to reduce impacts but these spaces would not
adequately support the size of events that the museum needs to be financially
sustainable. Other design alternatives considered were stabilizing the banks in their
current slope condition or using a stepped stabilization approach but these scenarios
would not provide a universally accessible design solution. The proposed design
provides the least amount of impact while also providing the exterior space and
accessibility needs for the museum.
The limits of bank restoration along the main channel of the Detroit River is limited to
rubblization of existing concrete riprap down to elevation 573.2 feet (IGLD85) and no
change to the slope is proposed; therefore there should be negligible impact to littoral
habitat within the main river channel. The improvements within The Haven could
provide improved littoral habitat with the removal of large debris and overgrown
3
File No. LRE-1998-70020-S17
September 22, 2017
vegetation and replacement with clean riprap and sand/gravel. The Haven will still
function as a calmer, shallower area along the river providing fish habitat. The project
should have no impact on existing threatened and endangered species known within
Wayne County."
The Corps has not verified the adequacy of the applicant's avoidance and minimization
statement at this time.
Compensatory Mitigation: The applicant has stated that compensatory mitigation is
not necessary or appropriate for the proposed work because: "The project results in
minimal floodplain fill within an inlet off the main channel of the river. Considering the
wide width of the floodplain along the river and that the fill is not located along the main
channel, it is considered to have negligible impact on the floodplain elevation and
therefore no compensatory volume is provided."
The Corps has not verified the adequacy of this mitigation proposal at this time.
Other Authorizations:
A permit is required from the Michigan Department of Environmental Quality under
applicable provisions of the Natural Resources and Environmental Protection Act
(NREPA), 1994 PA 451.) The State file submission number is 2R8-WM5V-2BHM.
Comments: We are publishing this notice in compliance with Title 33 Code of Federal
Regulations Parts 320-332. Comments on the project should be submitted in writing
and postmarked or delivered by the expiration date of this public notice. Comments of
a positive or negative nature may be submitted. All responses must refer to file number
LRE-1998-70020-S17. We will interpret a lack of response as meaning that there is no
objection to the permit application. Comments should be filed with:
Eric J. Warda
Chief, Permit Evaluation Eastern Branch
Regulatory Office
Detroit District, Corps of Engineers
477 Michigan Avenue
Detroit, Michigan 48226-2550
Comments may be e-mailed to: Robert.L.Morningstar@usace.army.mil , but must
include a name and mailing address.
Public Hearing: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this application.
Requests for public hearings shall state, with particularity, the reasons for holding a
public hearing.
4
File No. LRE-1998-70020-S17
September 22, 2017
Evaluation: The decision whether to issue the Department of the Army permit will be
based on evaluation of the probable impacts of the proposed activity on the public
interest. That decision will reflect the national concerns for both protection and
utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property ownership,
and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps of Engineers to determine whether to issue, modify, condition
or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public
interest of the proposed activity.
This activity involves the discharge of dredged or fill material into waters of the United
States. Therefore, the U.S. Army Corps of Engineers' evaluation of the impact of the
activity on the public interest will include application of the guidelines promulgated by
the Administrator of the Federal Environmental Protection Agency, under the authority
of Section 404(b)(1) of the Clean Water Act.
Endangered Species: We will review this application for the potential impact on
threatened or endangered species pursuant to Section 7 of the Endangered Species
Act as amended. We invite information and/or comments regarding the potential
presence of, or impacts to, any listed species or critical habitat.
Cultural Resources: The District Staff has reviewed existing information on historic
properties potentially affected by the proposed project, including the National Register
of Historic Places. There are no recorded historic properties within the permit area.
The proposed work is of such a limited nature and extent that little likelihood exists for
the project to impinge upon an unrecorded historic property.
5
File No. LRE-1998-70020-S17
September 22, 2017
The District Engineer invites responses to this public notice from federal, state and local
agencies, historical and archaeological societies, Indian tribes, and other parties likely
to have knowledge of or concerns with historic properties in the area.
Additional Information: This public notice and drawings are also available for
viewing/printing at:
http://www.lre.usace.army.mil/Missions/RegulatoryProgramandPermits/PublicNotices.as
px. Questions concerning this application may be directed to Robert Morningstar at the
Corps of Engineers address listed above, or telephone number (313) 226-2015.
FOR THE DISTRICT ENGINEER:
Eric J. Warda
Chief, Permit Evaluation Eastern Branch
Regulatory Office
NOTICE TO POSTMASTERS:
We request that the above notice be conspicuously and continuously posted for the
time period of this notice.
6
N
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
LOCATION MAP
DRAWING TITLE
PERMIT DRAWINGS
ISSUED WITH
DRAWING REFERENCE
O
DETR
IT RIV
ER
N.T.S
DRAWING SCALE
06-21-17
PROJECT SITE
DATE
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
21112.001
PROJECT NUMBER
C-1
DRAWING NUMBER
N
LAKE TACOMA
ST
INSELRUHE
AVE.
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ST
W
THEAREA A
SEE ENLARGEMENT
STRAND
ZONE AE
ZONE X
ZONE AE
ST
W
ZONE X
ZONE X
L
ZONE AE
ST
LIMITS OF PROPERTY
MANAGED BY DETROIT
HISTORICAL SOCIETY
DROPOFF
ZONE X
RECONSTRUCTED PARKING LOT
100
FALLEN SAILOR MEMORIAL
PEDESTRIAN WATER ACCESS
SLOPED KAYAK ACCESS
S
98.00
97.90
0
10
96.30
99.45
98.98
ZONE X
99
96.30
98.00
100
100
96
98
EXISTING
BUILDING
AE
90' RIPRAP
(FILL)
AREA B
NE
D
P
RA
RIP L)
90' FIL
(NO EA E
AR
100'
STONE
(FILL)
C
"THE AREA
HAVEN"
ZO
93
92
E
15' SAND/GRAVEL (FILL)
AREA D
ZONE AE
X
97
94
NE
ZO
SEE ENLARGEMENT AREA B
96.30
95
ZONE X
100-YEAR FLOODPLAIN (98.3' CDD)
OHWM (96.5' CDD) AND
APPROX. WATER ELEV. MAY/JUNE 2017
RESTORATION PLAN - OVERALL
DRAWING TITLE
ZONE AE
100
100
WATER ELEVATION
AT TIME OF SURVEY,
FEB. 2016 (94.8' CDD)
100
PERMIT DRAWINGS
ISSUED WITH
ZONE X
EVENT SPACE
20' RIPRAP
(NO FILL)
AREA A
DRAWING REFERENCE
TURBIDITY CURTAIN
1" = 50'
DRAWING SCALE
260'
RUBBLIZE EX
ISTING RIPRA
P
(NO FILL)
AREA F
06-21-17
DATE
DOSSIN GREAT LAKES MUSEUM
DATUM CONVERSION (CCD)
100 YEAR FLOODPLAIN = 98.3'
OHWM
= 96.5'
LWD
= 92.4'
1
(IGLD85)
577.5'
575.7'
571.6'
PROJECT NAME
21112.001
PROJECT NUMBER
C-2
OVERALL SITE PLAN
SCALE: 1" = 100'
DRAWING NUMBER
THE
STRAND
N
ZONE AE
ZONE X
ST
W
ZONE X
L
ZONE AE
ST
LIMITS OF PROPERTY
MANAGED BY THE DETROIT
HISTORICAL SOCIETY
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
ZONE X
LAWN
100
CONCRETE WALK, TYP.
LIMESTONE STEPS FOR
PEDESTRIAN WALK ACCESS
S
98.00
98.00
97.90
0
10
96.30
LIMESTONE WALLS
98.98
ZONE X
99
96.30
CRUSHED STONE SURFACE
99.45
100
98
100
97
E
SECTION 5
SECTION 4
SAND + GRAVEL
MIX SHORELINE
SECTION 3A
SECTION 6
ZONE AE
ZONE X
AE
92
END OF GRADING
EX
N
ZO
93
NE
ZO
EVENT
LAWN
96.30
96
95
94
MDOT HEAVY
RIPRAP
PLAN ENLARGEMENT - AREA A
DRAWING TITLE
"THE HAVEN"
D
OHWM (96.5' CDD) AND
APPROX. WATER ELEVATION MAY/JUNE 2017
SECTION 3
100-YEAR FLOODPLAIN (98.3' CDD)
MDOT HEAVY RIPRAP @ TOP OF SLOPE
500-YEAR FLOODPLAIN (99.0' CDD)
RUBBLIZE EXISTING CONCRETE RIPRAP
ZONE AE
PERMIT DRAWINGS
ISSUED WITH
DRAWING REFERENCE
100
12" HDPE END SECTION, INV. 96.0
1" = 30'
100
MDOT HEAVY RIPRAP
ZONE X
LANDSCAPE
VEGETATION TYP.
DRAWING SCALE
WATER ELEVATION AT TIME OF
SURVEY, FEB. 2016 (94.8' CDD)
CONCRETE CAP ON EXISTING
SHEET PILE WITH STEEL CABLE RAILING
06-21-17
DATE
TURBIDITY CURTAIN
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
CONCRETE WALK
IMESTONE BENDCHES
STONE RESERVOIR FOR STORMWATER
TREATMENT FROM LAWN AREA LOCATED BENEATH
STABILIZED LAWN
DETROIT RIVER
SECTION 2
21112.001
PROJECT NUMBER
1
ENLARGEMENT AREA A
SCALE: 1" = 30'
C-3
DRAWING NUMBER
N
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
LIMITS OF PROPERTY
MANAGED BY THE DETROIT
HISTORICAL SOCIETY
CRUSHED STONE SURFACE
SECTION 7
PAVERS
20.00'
SECTION 1
CONCRETE CAP WITH CABLE RAILING
LIMESTONE BENDCHES
MDOT HEAVY RIPRAP, ELEV. 94.0 TO 99.0, MIN 2' THICK
WATER ELEVATION AT TIME OF SURVEY, FEB. 2016 (94.8' CDD)
OHWM (96.5' CDD) AND
APPROX. WATER ELEVATION MAY/JUNE 2017
100-YEAR FLOODPLAIN (98.3' CDD)
500-YEAR FLOODPLAIN (99.0' CDD)
DETROIT RIVER
2
ENLARGEMENT AREA B
SCALE: 1" = 20'
PLAN ENLARGEMENT - AREA B
DRAWING TITLE
PERMIT DRAWINGS
ISSUED WITH
DRAWING REFERENCE
1" = 20'
DRAWING SCALE
06-21-17
DATE
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
21112.001
PROJECT NUMBER
C-4
DRAWING NUMBER
CROSS SECTION 1
110
110
FUTURE GRADE
105
MDOT HEAVY RIPRAP, ELEV.
94.0 TO 99.0, MATCH EXISTING
SLOPE, MIN 2' THICK
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
105
100
100
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
EXISTING GRADE
95
95
LWD = 92.4'
90
90
85
85
0+00
0+50
CROSS SECTION 2
110
110
RUBBLIZE EXISTING CONCRETE RIPRAP FROM ELEVATION 94.0' TO 96.20'-97.50'
(MATCH TOP ELEVATION OF EXISTING CONCRETE).
BREAK UP ALL CONCRETE SLABS THAT EXCEED 36" IN ANY DIMENSION.
BREAK DOWN TO 6" - 18" PIECES AND REMOVE ALL STEEL. MATCH EXISTING SLOPE.
105
EXISTING GRADE
100
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
95
105
100
95
LWD = 92.4'
90
90
85
85
0+00
0+50
1+00
CROSS SECTION 3
110
110
8.5'
CONCRETE WALK 4' LANDSCAPE VEGETATION
105
105
SAND + GRAVEL MIX SHORELINE,
MIN 1.5' THICK
2
100
ELEVATION
PERMIT DRAWINGS
ISSUED WITH
EVENT LAWN
FUTURE GRADE
95
1
100
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
7
LWD = 92.4'
EXISTING GRADE
DRAWING SCALE
06-21-17
90
MDOT HEAVY RIPRAP
AT TOE OF SLOPE
MDOT HEAVY RIPRAP, MIN 2' THICK
DRAWING REFERENCE
1" = 10'
95
1
90
SECTIONS
DRAWING TITLE
DATE
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
85
85
0+00
0+50
1+00
21112.001
PROJECT NUMBER
C-5
DRAWING NUMBER
CROSS SECTION 3A
110
110
CONCRETE WALK LANDSCAPE VEG.
105
FUTURE GRADE
105
SAND + GRAVEL MIX SHORELINE,
MIN 1.5' THICK
2
100
1
100
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
7
1
95
95
LWD = 92.4'
EXISTING GRADE
90
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
MDOT HEAVY RIPRAP, MIN 2' THICK
90
MDOT HEAVY RIPRAP
AT TOE OF SLOPE
85
85
0+00
0+50
1+00
CROSS SECTION 4
110
110
CRUSHED STONE SURFACE
105
105
LIMESTONE WALL
SAND AND GRAVEL MIX SHORELINE,
MIN. 1.5' THICK
LANDSCAPE VEGETATION
100
7
1
95
MDOT HEAVY RIPRAP AT
TOE OF SLOPE
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
100
95
LWD = 92.4'
EXISTING GRADE
90
90
FUTURE GRADE
85
85
0+00
0+50
1+00
CROSS SECTION 5
110
110
SECTIONS
DRAWING TITLE
CONCRETE WALK
PERMIT DRAWINGS
LIMESTONE STEPS
105
105
LIMESTONE STEPS
100
FUTURE GRADE
100
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
7
1
95
ISSUED WITH
DRAWING REFERENCE
1" = 10'
20'
DRAWING SCALE
95
06-21-17
LWD = 92.4'
CRUSHED STONE SURFACE
DATE
90
90
EXISTING GRADE
DOSSIN GREAT LAKES MUSEUM
MDOT HEAVY RIPRAP AT
TOE OF SLOPE
PROJECT NAME
85
85
0+00
0+50
SAND AND GRAVEL
MIX SHORELINE, MIN 1.5' THICK
1+00
21112.001
PROJECT NUMBER
C-6
DRAWING NUMBER
CROSS SECTION 6
110
110
LANDSCAPE RESTORATION
MDOT HEAVY RIPRAP, MIN 2' THICK
FROM ELEVATION 94.0' TO 96.20'
105
105
FUTURE GRADE
SAND AND GRAVEL MIX SHORELINE,
MIN. 1.5' THICK
MDOT HEAVY RIPRAP AT
TOE OF SLOPE
100
95
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
100
95
LWD = 92.4'
EXISTING GRADE
90
90
85
85
0+00
0+50
1+00
CROSS SECTION 7
110
110
FUTURE GRADE
105
CONCRETE CAP W/ CABLE RAILING
105
EXISTING SHEETPILE WALL
100
100
EXISTING GRADE
100-YR FLOODPLAIN = 98.3'
OHWM = 96.5'
95
95
LWD = 92.4'
90
90
SECTIONS
DRAWING TITLE
85
85
PERMIT DRAWINGS
0+00
0+50
ISSUED WITH
DRAWING REFERENCE
1" = 10'
DRAWING SCALE
06-21-17
DATE
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
21112.001
PROJECT NUMBER
C-7
DRAWING NUMBER
5
6
4
4.00'
APPROX.ELEV. 99.50-96.20
(VARIES)
1
2 MAX.
1
MDOT HEAVY RIPRAP
2
EXISTING GRADE
3
SEPARATION GEOTEXTILE FABRIC
4
LANDSCAPE RESTORATION PER PLAN
5
CONCRETE SIDE WALK
6
AGGREGATE BASE
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
2
VARIES
ELEV. APPROX. 96.50'
2.0
MI 0 '
N.
1
7 TYP.
1.50'
4
1
1
ELEV. 92.00'
2
APPROX ELEV. 94.00
(VARIES)
3
TYPICAL RIPRAP SECTION
FINISH GRADE VARIES FROM 99.2' TO 98.0'
3
± 2.00'
± 8.00'
1.5%
ELEV: 96.30'
7
0.50'
1
STONE SEATWALL (5' x 5' x 2')
3
CRUSHED STONE SURFACE
4
AGREGGATE BASE
5
SEPARATION GEOTEXTILE FABRIC
6
SUBGRADE
7
CLEAN FILL
8
SAND AND GRAVEL MIX
9
LANDSCAPE RESTORATION PER
PLAN, REFER TO PLANTING PLAN
4
MDOT HEAVY RIPRAP AT TOE OF SLOPE
3
TYPICAL SAND & GRAVEL SECTION
N.T.S.
8
T/W ELEV: 98.25'
6
5
2
8
4
7
0.83'
3.00'
2
± 8.00'
± 2.00'
ELEV: 96.30'
1
NOTE:
1.
STONES SHALL BE SAME MATERIAL AS
SUPPLIED FOR LIMESTONE BENCHES
TYPICAL WALL SECTION AT SLOPED KAYAK ACCESS - EAST
6
7
3
1
3
3.00'
TYP.
6
TYP.
T/W ELEV: 98.25'
1.5%
3
4
FINISH GRADE VARIES FROM 97.90' TO 96.30'
FINISH GRADE VARIES FROM
98.00' TO 96.42'
± 2.00'
TYP.
1.00'
STONE SEATWALL (3.5' x 5' x 2')
2
SEPARATION GEOTEXTILE FABRIC
± 2.00'
T/W ELEV: 99.25'
4
1
LIMESTONE SEATWALL OR STEPS
3
N.T.S.
4
0.83'
TYP.
FINISH GRADE VARIES FROM 97.90' TO 99.10'
2
0.50'
T/W ELEV: 99.25'
9
3
2
N.T.S.
SAND AND GRAVEL MIX
1.00'
1
1
1
STONE SEATWALL (4' x 5' x 2')
2
CRUSHED STONE
3
AGREGGATE BASE
4
SEPARATION GEOTEXTILE FABRIC
5
SUBGRADE
6
CLEAN FILL
7
SAND AND GRAVEL MIX
8
LANDSCAPE RESTORATION PER
PLAN, REFER TO PLANTING PLAN
NOTE:
1.
STONES SHALL BE SAME MATERIAL AS
SUPPLIED FOR LIMESTONE BENCHES
TYPICAL WALL SECTION AT SLOPED KAYAK ACCESS - WEST
N.T.S.
ELEV. 99.50'
3
2'-0"
ELEV. 99.00'
ELEV. 98.50'
6"
6
1
3
9'-0"
9
6
2'-0"
ELEV. 97.90'
ELEV. 97.40'
ELEV. 98.0'
1.5%
ELEV. 96.90'
5
7
1'-6"
2
CONCRETE SIDE WALK
2
SEPARATION GEOTEXTILE FABRIC
3
AGGREGATE BASE
4
SAND AND GRAVEL MIX
5
SUBGRADE
6
TOP STONE (5.5' X 2' X 0.5')
7
MIDDLE STONE (5.5' X 3' X 0.5')
DRAWING REFERENCE
8
BOTTOM STONE (5.5' X 3' X 1.5')
NOT TO SCALE
9
CRUSHED STONE SURFACE
DRAWING SCALE
DETAILS
DRAWING TITLE
ELEV. 96.30'
8
1
PERMIT DRAWINGS
ISSUED WITH
3'-0"
7
4
8
06-21-17
NOTES:
DATE
1.
CUT EXISTING GRADE TO SUBGRADE ELEVATIONS TO INSTALL PROPOSED RESTORATION SECTIONS.
2.
STONES SHALL BE SAME MATERIAL AS SUPPLIED FOR LIMESTONE BENCHES.
3.
THE TYPICAL STONES REQUIRED SHALL BE GENERALLY FLAT ON TOP AND BOTTOM AS SHOWN ON THE
DRAWINGS. STONES SHALL BE SET SO THAT THEY DO NOT ROCK. CHINKING IS PERMITTED TO ELIMINATE
ROCKING AND TO FILL LARGE GAPS BETWEEN STONES. SIDES SHALL BE FLAT AND SMOOTH AND SUITABLE
FOR PLACING END TO END WITH A MAXIMUM GAP BETWEEN STONES OF 1" FOR ALL TOP OR EXPOSED
SURFACE STONES. STONES SHALL BE SET GENERALLY FLAT SO THAT THE NATURAL BED GRAIN OF THE
STONES ARE HORIZONTAL. QUARRY MARKS SUCH AS DRILL HOLES ARE NOT PERMITTED.
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
5
TYPICAL STONE STEP SECTION
N.T.S.
21112.001
PROJECT NUMBER
C-8
DRAWING NUMBER
MH-103
RIM: 99.90'
NW INV: 96.15' 12"
S INV: 96.15' 12"
E INV: 96.06' 12"
201 DEPOT STREET
SECOND FLOOR
ANN ARBOR, MI 48104
734.662.4457
www.smithgroupjjr.com
RIPRAP SLOPE
HANDRAIL
CONNECTION
TOP OF CAP ELEV. 100.60
12" HDPE END
SECTION,
INV. 96.0
2'-0"
1" CHAMFER
1'-0" TYP.
HEIGHT OF CAP WILL
VARY TO PROVIDE
CONSISTENT 100.60
TOP ELEVATION
(4) #5 WITH #4
TIES @ 12"
O.C.
TIES AT 12" O.C. CONCRETE
PAVERS
CURB HEIGHT VARIES
(0"-4"), REFER TO GRADING
PLANS FOR DETAILS
1" DIA. BOLT
GRADE A325
SHIM PLATE (A36)
3" X 12" TYP.
5 LF - 12" @ 0.71%
ISOLATION
JOINT
EXISTING SHEETPILE
WALL.
TOP ELEVATION VARIES
(APPROX. 99.6 - 99.8)
GENERAL SITE FILL
L3" X 3" X 38" CLIP ANGLE
W24 X 68
1
STORM OUTFALL
2
N.T.S.
CONCRETE CAP ON EXISTING SHEETPILE WALL
N.T.S.
6' MAX SPACING
OR PER MFR'S
REQUIREMENTS
CONCRETE OR HELICAL
ANCHOR TYP
DETAILS
PRE-FABRICATED PVC
TURBIDITY CURTAIN
DRAWING TITLE
METAL POSTS
METAL POSTS
FLOTATION COLLAR
FLOTATION COLLAR
WATER LEVEL
PERMIT DRAWINGS
ORDINARY
HIGH
WATER
LEVEL
ISSUED WITH
FLOTATION COLLAR
TURBIDITY CURTAIN
RIVER
16 GA. WIRE STAYS
EXISTING SHORELINE/
WORK AREA
DRAWING REFERENCE
NOT TO SCALE
DRAWING SCALE
EXISTING RIVER BANK
OR SHORE LINE
EXISTING RIVER BANK
OR SHORE LINE
CHAIN ANCHOR WEIGHT ENCLOSED
IN CURTAIN BOTTOM
06-21-17
SECTION
DATE
ELEVATION
NOTES:
3
1.
SUBMIT MANUFACTURER'S PRODUCT DATA SHEET FOR APPROVAL
BY A/E PRIOR TO INSTALLATION.
2.
LOCATION AND WIDTH OF TURBIDITY CURTAIN TO BE DETERMINED
IN THE FIELD. CONFIRM LOCATION AND WIDTH WITH A/E PRIOR TO
CONSTRUCTION.
DOSSIN GREAT LAKES MUSEUM
PROJECT NAME
21112.001
PROJECT NUMBER
TURBIDITY CURTAIN
N.T.S.
C-9
DRAWING NUMBER