You can copy from here when filling out the rest of the page.
The City of Hartford requests authorization to construct a road improvement project along an approximately 0.9-mile-long section of Mickelson Road between Patrick Avenue and South Dakota Highway 38. The project consists of grading for roadway embankment, installation of box culverts with riprap at the upstream and downstream ends, and construction of a new roadway. The project will temporarily impact 0.46 acres of wetland and will permanently impact 2.30 acres of wetland and approximately 475 feet of an unnamed tributary. The project is located in Sections 23 and 26, Township 102 North, Range 51 West, Minnehaha County, South Dakota. The purpose of the proposed project is to improve travel safety concerns by replacing the existing gravel road, improving the safe vehicle capacity, and moving the intersection of
Mickelson Road and Highway 38 to the east to allow for a more perpendicular alignment.
The City of Hartford requests authorization to construct a road improvement project along an approximately 0.9-mile-long section of Mickelson Road between Patrick Avenue and South Dakota Highway 38. The project consists of grading for roadway embankment, installation of box culverts with riprap at the upstream and downstream ends, and construction of a new roadway. The project will temporarily impact 0.46 acres of wetland and will permanently impact 2.30 acres of wetland and approximately 475 feet of an unnamed tributary. The project is located in Sections 23 and 26, Township 102 North, Range 51 West, Minnehaha County, South Dakota. The purpose of the proposed project is to improve travel safety concerns by replacing the existing gravel road, improving the safe vehicle capacity, and moving the intersection of Mickelson Road and Highway 38 to the east to allow for a more perpendicular alignment.
PUBLIC NOTICE
US ARMY CORPS
OF ENGINEERS
OMAHA DISTRICT
APPLICANT: CITY OF HARTFORD
APPLICATION NO: NWO-2016-2398-PIE
WATERWAY: UNNAMED TRIBUTARY &
ADJACENT WETLANDS
ISSUE DATE: SEPTEMBER 20, 2017
EXPIRATION DATE: OCTOBER 11, 2017
________________________________________________________________
Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx
_____________________________________________________________________________
21-DAY NOTICE
JOINT NOTICE OF PERMIT PENDING
US ARMY CORPS OF ENGINEERS
AND
SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
The application of the City of Hartford for approval of plans and issuance of a permit under
authority of the Secretary of the Army is being considered by the District Commander, US Army
Engineer District, Omaha, Nebraska. The project described herein is not being proposed by
the Corps, but by the applicant; the Corps will evaluate the proposed work to determine if it
is permittable under current laws and regulations.
Description of Proposed Project: The applicant requests authorization to construct a road
improvement project along an approximately 0.9-mile-long section of Mickelson Road between
Patrick Avenue and South Dakota Highway 38. The project consists of grading for roadway
embankment, installation of box culverts with riprap at the upstream and downstream ends, and
construction of a new roadway. The project will temporarily impact 0.46 acres of wetland and
will permanently impact 2.30 acres of wetland and approximately 475 feet of an unnamed
tributary. See attached design drawings.
Location: The project is located in Sections 23 and 26, Township 102 North, Range 51 West,
Minnehaha County, South Dakota.
Purpose: The purpose of the proposed project is to improve travel safety concerns by replacing
the existing gravel road, improving the safe vehicle capacity, and moving the intersection of
Mickelson Road and Highway 38 to the east to allow for a more perpendicular alignment.
Mitigation: The proposed project alternative was selected to avoid wetlands to the greatest
extent possible. Compensatory mitigation for the 2.30 acres of permanent wetland impacts will
be provided by the purchase of credits from the Tetonka Wetland Mitigation Bank.
Hydrogeomorphic functional assessment scores were calculated to account for the functional loss
of the impacted wetlands. A mitigation ratio of 1 to 1 will be used to compensate for the impacts
and a total of 11.61 credits will be purchased from the mitigation bank.
Existing Conditions: The project area is located along Mickelson Road (a rural gravel road) on
the southeastern edge of the City of Hartford and contains an unnamed tributary of Skunk Creek
and a 4.3-acre wetland. The immediate Mickelson Road right-of-way is heavily disturbed from
previous road and ditch construction and maintenance. The area surrounding the roadway is
disturbed from previous cultivation, railroad construction, and new housing developments.
The South Dakota Department of Environment and Natural Resources, Division of Environmental
Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed
project for state certification in accordance with the provisions of Section 401 of the Clean Water
Act. The certification, if issued, will express the State's opinion that the operations undertaken by
the applicant will not result in a violation of applicable water quality standards. The South Dakota
Department of Environment and Natural Resources hereby incorporates this public notice as its own
public notice and procedures by reference (ARSD 74:51:01).
Omaha District will comply with the National Historic Preservation Act of 1966, as amended.
As a result of a level III cultural resources survey and lack of cultural resources found in the
project area, this project received a determination of "No Historic Properties Affected".
However, we will evaluate input by the State Historic Preservation Officer and the public in
response to this public notice, and we may conduct or require a reconnaissance survey of the
permit area, if warranted.
In compliance with the Endangered Species Act, a preliminary determination has been made that
the described work will not affect species designated as threatened or endangered or adversely affect
critical habitat. In order to complete our evaluation of this activity, comments are solicited from the
U.S. Fish and Wildlife Service and other interested agencies and individuals.
The decision whether to issue a permit will be based on an evaluation of the probable impacts
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The benefit
which reasonably may be expected to accrue from the proposals must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the activity will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food production, and, in general the
needs and welfare of the people. In addition, the evaluation of the impacts of the project on public
interest will include application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230).
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps of
2
Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the proposed
activity.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reason for holding a public hearing. The request must be submitted to the US
Army Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118,
Pierre, South Dakota 57501.
Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian
Tribe, or local association whose interests may be affected by the proposed work) is invited to
submit to this office, written facts, arguments, or objections on or before October 11, 2017. Any
agency or individual having an objection to the proposed work should specifically identify it as an
objection with clear and specific reasons. Comments, both favorable and unfavorable, will be
accepted, made a part of the record and will receive full consideration in subsequent actions on this
permit application. All replies to the public notice should be addressed to the address listed in the
previous paragraph. Cathy Juhas, telephone number (605) 224-8531, may be contacted for
additional information.
Comments received after the close of the business day on the expiration date of this public notice
will not be considered.
This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act.
Drawings showing the location and extent of the work are attached to this notice.
3
NW O· 2016-2398-PIE
Figure 1: Location Map
NW O· 2016-2398-PIE
Figure 2: Project Area
iI
--j
i
!
Stream Permanent
Impact Area
:
0.22 Acres
I
''
'.,
...
'/
'
~
.J
Temporary Impact Area No. 2
0.28 Acres
Storm Sewer
Extension
·.!.·' .
Wetland Impacts
2018 Mickelson Road Improvements Project
'.
Figure 3: Design Plans
:
~~
~
i
--