Home

New Orleans District

Run scraper

Fourth Louisiana Resource (mitigation bank)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED CHACAHOULA BAYOU MITIGATION BANK IN TERREBONNE PARISH

NAME OF APPLICANT: Fourth Louisiana Resource, LLC c/o Resource Environmental Solutions, LLC Attention: Mr. Richard Greig, 412 North Fourth Street, Suite 300, Baton Rouge, LA 70802 LOCATION OF WORK: The proposed site is located in Section 108, Township 16 South, Range 16 East, Sections 37, 38, 39 and 40, Township 16 South, Range 15 East, Sections 27 and 28, Township 17 South, Range 15 East, and Sections 32, 33, and 34, Township 17 South, Range 16 East. The 1,123.4-acre site is located approximately 10.6 miles from Gibson, Louisiana. From LA 20 in Gibson, Louisiana head east for 5.0 miles, turn right onto Bull Run Road and travel 5.6 miles, the site is on the south side of Bull Run Road. The site is centered on the point 29° 38’ 08.45” N, -90° 52’ 17.75’’ W, located in Hydrologic Unit Code 08090302, as shown in the attached prospectus. CHARACTER OF WORK: Site restoration shall be accomplished through hydrological restoration and afforestation of the native vegetative community. This includes abandoning farming operations, gapping the interior perimeter levee, plugging field drains, removing or plugging culverts, backfilling ditches, site preparation, elimination of invasive species, and replanting of appropriate species in order to generate bottomland hardwood and cypress-tupelo swamp credits that could be used as compensation for unavoidable impacts to wetlands associated with Department of the Army (DA) permits authorized under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act.

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118 REPLY TO ATTENTION OF

09/25/2017

Operations Division Regulatory Branch Project Manager: Stephen Pfeffer stephen.d.pfeffer@usace.army.mil (504) 862-2099 SUBJECT: MVN-2016-01058-MS PUBLIC NOTICE Public Notice Purpose: Pursuant to Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403) and Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344), the U.S. Army Corps of Engineers, New Orleans District, Regulatory Branch is soliciting comments from all interested parties on the development, utilization and long-term management of a proposed mitigation bank. The purpose of this mitigation bank is to provide compensatory mitigation for unavoidable impacts to wetland resources, including other waters of the United States, that result from projects authorized through the Department of the Army permit program. PROPOSED CHACAHOULA BAYOU MITIGATION BANK IN TERREBONNE PARISH NAME OF APPLICANT: Fourth Louisiana Resource, LLC c/o Resource Environmental Solutions, LLC Attention: Mr. Richard Greig, 412 North Fourth Street, Suite 300, Baton Rouge, LA 70802 LOCATION OF WORK: The proposed site is located in Section 108, Township 16 South, Range 16 East, Sections 37, 38, 39 and 40, Township 16 South, Range 15 East, Sections 27 and 28, Township 17 South, Range 15 East, and Sections 32, 33, and 34, Township 17 South, Range 16 East. The 1,123.4-acre site is located approximately 10.6 miles from Gibson, Louisiana. From LA 20 in Gibson, Louisiana head east for 5.0 miles, turn right onto Bull Run Road and travel 5.6 miles, the site is on the south side of Bull Run Road. The site is centered on the point 29° 38' 08.45" N, -90° 52' 17.75'' W, located in Hydrologic Unit Code 08090302, as shown in the attached prospectus. CHARACTER OF WORK: Site restoration shall be accomplished through hydrological restoration and afforestation of the native vegetative community. This includes abandoning farming operations, gapping the interior perimeter levee, plugging field drains, removing or plugging culverts, backfilling ditches, site preparation, elimination of invasive species, and replanting of appropriate species in order to generate bottomland hardwood and cypress-tupelo swamp credits that could be used as compensation for

-2unavoidable impacts to wetlands associated with Department of the Army (DA) permits authorized under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. The Corps of Engineers is soliciting written comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties. The comment period will close 30 days from the date of this public notice advertisement. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this prospectus. Letters must reference the applicant's name and the subject number, be addressed and mailed to the above address, ATTENTION: REGULATORY BRANCH. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Martin S. Mayer Chief, Regulatory Branch Enclosure

Final Prospectus Chacahoula Bayou Mitigation Bank Terrebonne Parish, Louisiana PREPARED FOR U.S. Army Corps of Engineers, New Orleans District

PREPARED AND SUBMITTED BY Fourth Louisiana Resource, LLC c/o Resource Environmental Solutions, LLC 412 N. Fourth Street, Suite 300 Baton Rouge, Louisiana 70802

DATE: June 8, 2017

Table of Contents 1

2

3

INTRODUCTION .............................................................................................................. 1 1.1

PROJECT DESCRIPTION ..................................................................................................... 1

1.2

SITE LOCATION ................................................................................................................. 1

PROJECT GOALS AND OBJECTIVES ................................................................................... 2 2.1

GOALS ............................................................................................................................... 2

2.2

OBJECTIVES ....................................................................................................................... 3

ECOLOGICAL SUITABILITY OF THE BANK SITE ................................................................... 3 3.1

HISTORICAL ECOLOGICAL CHARCTERISTICS OF THE SITE................................................. 3

3.2

CURRENT ECOLOGICAL CHARCTERISTICS OF THE SITE .................................................... 3

3.2.1

HISTORICAL HYDROLOGY ...................................................................................................... 4

3.2.2

EXISTING HYDROLOGY .......................................................................................................... 4

3.2.2

PARISH CLIMATE DATA ......................................................................................................... 5

3.2.3

PHYSICAL SUITABILITY OF THE SITE....................................................................................... 5

3.2.4

SOIL SURVEY .......................................................................................................................... 6

3.2.5

CHEMICAL SUITABILITY OF THE BANK................................................................................... 7

3.2.6

BIOLOGICAL SUITABILITY OF THE BANK ................................................................................ 7

3.2.7

VEGETATION SURVEY ............................................................................................................ 7

3.2.8

ENDANGERED AND THREATENED SPECIES AND HABITATS .................................................. 8

3.2.9

PRELIMINARY JURISDICTIONAL DETERMINATION ................................................................ 9

3.3

GENERAL NEED FOR THE PROJECT IN THIS AREA ............................................................ 9

3.3.1

4

WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE .............................. 9

3.4

TECHNICAL FEASIBILITY .................................................................................................. 11

3.5

CULTURAL RESOURCES ................................................................................................... 11

3.6

PROPERTY CONSTRAINTS ............................................................................................... 11

3.7

ZONING AND ADJACENT PROPERTY DEVELOPMENT ..................................................... 12

ESTABLISHMENT OF THE MITIGATION BANK ................................................................. 12 4.1

SITE RESTORATION PLAN ............................................................................................... 12

4.1.1

RESTORATION OVERVIEW ................................................................................................... 12

4.1.2

HYDROLOGICAL RESTORATION ........................................................................................... 13

4.1.3

SOIL PREPARATION ............................................................................................................. 13

4.1.4

VEGETATIVE PLANTINGS ..................................................................................................... 13

4.1.5

INVASIVE/NOXIOUS PLANT CONTROL ................................................................................ 15

4.1.6

MONITORING ...................................................................................................................... 15

4.2

5

4.2.1

THREATS WITHIN THE BANK ............................................................................................... 15

4.2.2

RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS.............................................. 15

4.2.3

ENCUMBRANCES ................................................................................................................. 15

4.2.4

ZONING AND PROPOSED DEVELOPMENT ........................................................................... 16

4.3

LONG-TERM SUSTAINABILITY OF THE SITE .................................................................... 16

4.4

ASSURANCE OF WATER RIGHTS ..................................................................................... 16

PROPOSED SERVICE AREA ............................................................................................. 16 5.1

6

7

CURRENT SITE RISKS ....................................................................................................... 15

RATIONALE FOR SERVICE AREA DETERMINATION ......................................................... 16

OPERATION OF THE MITIGATION BANK ........................................................................ 17 6.1

PROJECT REPRESENTATIVES ........................................................................................... 17

6.2

QUALIFICATIONS OF THE SPONSOR ............................................................................... 17

6.3

PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES ........... 17

6.4

SITE PROTECTION ........................................................................................................... 18

6.5

LONG-TERM STRATEGY .................................................................................................. 18

REFERENCES ................................................................................................................. 19

ii

List of Tables Table 1: Proposed Mitigation Bank Habitats....................................................................................... 2 Table 2: Existing Land Cover and Land Use of the Bank..................................................................... 4 Table 3: Representative Bottomland Hardwood Species Suitable for the Bank........................... 14 Table 4: Representative Baldcypress/Tupelo Swamp Species Suitable for the Bank................... 14

List of Figures Figure 1: Vicinity Map Figure 2: U.S.G.S. 24k Quad Topo Map Figure 3: Land Cover / Land Use with a 10-mile Radius Around Site Map Figure 4: Proposed Mitigation Habitat Type Map Figure 5: 1956 Aerial and Historical Land Cover Map Figure 6: 1963 Aerial Figure 7: 1973 Aerial Figure 8: 1998 Aerial Figure 9: 2004 Aerial Figure 10: 2008 Aerial Figure 11: 2010 Aerial Figure 12: 2015 Aerial Figure 13: Existing Land Cover / Land Use Map Figure 14: Existing Drainage Pump Locations Map Figure 15: Existing Hydrology within the Perimeter Levee Figure 16: Historical Drainage Area Map Figure 17: Existing Elevations Map Figure 18: Soils Map Figure 19: Preliminary Jurisdictional Determination Figure 20: LDEQ Subsegment and Site Map Figure 21: Plan View and Hydrological Improvements Map Figure 21A: Cross-section of Interior Levee Gapping Figure 21B: Cross-section of Field Drains to be Plugged Figure 21C: Cross-section of the Culverts to be Removed Figure 21D: Cross-section of Ditches to be Backfilled Figure 22: Post-Construction Hydrology Figure 23: Oil & Gas and Water Well Sites Map Figure 24: Service Area Map

iii

Chacahoula Bayou Mitigation Bank Final Prospectus

1 INTRODUCTION Fourth Louisiana Resource, LLC (hereinafter the Sponsor) has prepared this prospectus for submittal to the U.S. Army Corps of Engineers ­ New Orleans District (USACE) and Interagency Review Team (IRT) to provide an overview of the establishment and operation of the Chacahoula Bayou Mitigation Bank (the "Bank"). The details pertaining to the use of this site as a mitigation bank shall be specified in the subsequent Mitigation Banking Instrument (MBI).

1.1

PROJECT DESCRIPTION

The Bank is identified as having the potential to help meet the compensatory mitigation requirements for bottomland hardwood (BLH) and baldcypress-tupelo (CT) impacts in the LRAM Terrebonne Basin service area and more specifically within the Hydrologic Unit Code (HUC) 08090302, within the West Central Louisiana Coastal Basin, located in Terrebonne Parish, Louisiana. The predominate existing land covers are woody and herbaceous wetlands and the predominate land use is sugarcane according to the U.S. Department of Agriculture's (USDA) 2016 Cropland Data Layers (CDL). Historically, the Bank's land use was 46.5 percent flood plain, 8.8 percent backswamp and 44.7 percent natural levee according to the USDA landform classifications associated with soil types. Site conditions are such that make restoration of the site very practical using commonly employed restoration methods (i.e. tree planting, removal of hydrologic impediments and back filling of ditches). Given these activities coupled with the soils and size of the Bank, these restoration efforts shall require little long-term management or maintenance, which creates a self-sustainable aquatic resource. The cumulative preservation, re-establishment or enhancement of BLH and CT is 987.8 acres with 135.6 acres of non-mitigation features comprised of the Ringo Cocke Canal, maintenance and utility right-ofways (ROWs), this equates to a 1,123.4-acre Bank site. Specifically, the Bank shall provide 274.2 acres of a re-established and 51.6 acres of preserved BLH forest. Additionally, the Bank shall provide 48.3 acres of a re-established, 190.0 acres of enhanced and 423.6 acres of preserved CT. The ecological benefits to the watershed provided by the Bank will be extensive. The Bank proposes to protect the water quality downstream by enhancing various biogeochemical cycles and improving water quality, while providing habitat and refuge to wildlife. Furthermore, it shall establish a dynamically stable BLH and CT habitat resistant and resilient to disturbance events. The longevity and function of the system shall be ensured through long-term conservation measures. Furthermore, the Bank shall provide flexible and economically efficient mitigation opportunities to compensate for losses in the aquatic resource function resulting from unavoidable impacts within the watershed.

1.2

SITE LOCATION

The proposed bank is located on a tract in which the Sponsor owns just northwest of Houma in Terrebonne Parish, Louisiana (Figures 1 and 2). The 1,123.4-acre tract is located approximately 10.6 miles from Gibson, Louisiana. From LA-20 in Gibson, Louisiana head east for 5.0 miles, turn right onto Bull Run Road and travel 5.6 miles, the Bank will be on the south side. The Bank is centered on the point 29° 38' 08.45"' N, -90° 52' 17.75'' W. The Bank is within Section 108 within Township 16 South and Range

1

Chacahoula Bayou Mitigation Bank Final Prospectus

16 East, Sections 37, 38, 39 and 40 within Township 16 South and Range 15 East, Sections 27 and 28 within Township 17 South and Range 15 East, and Sections 32, 33, and 34 within Township 17 South and Range 16 East. The Bank is bound to the northwest, west and south by woody wetlands. The northeast and eastern side of the Bank are currently used as agricultural land. Expanding a 10-mile radius around the Bank reveals that the existing predominate land covers are woody and herbaceous wetlands (75 percent) with the predominate land uses being developed areas (10.4 percent) and sugarcane (5 percent) in culmination this account for 90.4 percent of the land cover and land use surrounding of the Bank (Figure 3).

2 PROJECT GOALS AND OBJECTIVES

The Bank proposes to preserve and re-establish BLH habitat, as well as enhance, re-establish and preserve CT within the West Central Louisiana Coastal basin. The Ringo Cocke Canal, cemetery and maintenance and utility ROW features shall be maintained as non-mitigation acreage within the Bank. The Bank shall provide additional BLH and CT functions and values not currently utilized under existing conditions and land use.

2.1

GOALS

The primary goal of the Bank is to enhance and rejuvenate the native vegetative community, enhance the topography and reconnect hydrology within the Bank. The secondary goal of the Bank is to enhance various biogeochemical cycles, improve sediment retention and reduce nonpoint source pollution. The tertiary goal of the Bank is to provide habitat and refuge to wildlife. With the holistic goal of establishing a self-sustaining BLH and CT habitat resistant and resilient to disturbance events that shall maintain, restore, preserve or enhance aquatic ecosystem function and water quality within the catchment. Based on the historical land use, soils data and current vegetation within the Bank. The Bank proposes to preserve and re-establish 325.8 acres of BLH habitat and re-establish, enhance and preserve 661.9 acres of CT habitat (Table 1 and Figure 4). Table 1: Proposed Mitigation Bank Habitats

Mitigation Type Preservation Re-establishment Total BLH

BLH

Acreage 51.6 274.2

Mitigation Type Re-establishment Enhancement Preservation 325.8 Total CT Non-mitigation Features: 135.6 acres Total Acres of Bank Site: 1,123.4 acres

CT

Acreage 48.3 190.0 423.6 661.9

2

Chacahoula Bayou Mitigation Bank Final Prospectus

2.2 OBJECTIVES The goals of the Bank shall be accomplished through the following objectives: · · · · · · ·

3

Re-establishment, enhancement or preservation of BLH or CT habitat across the Bank; Enhance and rejuvenate the vegetative community structure through vegetative plantings of native species and forest management strategies; Gapping interior perimeter levees to restore flow within the entire Bank and surrounding wetlands; The planting of trees shall result in overall water quality improvements due to increased filtration and enhanced biogeochemical cycling The cessation of various agricultural practices shall reduce nonpoint source pollution; Ensuring Bank stability and continuity by protecting the site in perpetuity with a conservation easement; and Ensure the long-term viability and sustainability of the Bank through monitoring and long-term maintenance and adaptive management activities, as needed.

ECOLOGICAL SUITABILITY OF THE BANK SITE

Details on the ecological suitability of the Bank to achieve the objectives of the proposed mitigation bank and how the Bank shall support the planned types of aquatic resources and functions is provided in the subsections below:

3.1 HISTORICAL ECOLOGICAL CHARCTERISTICS OF THE SITE The historical conditions of the Bank were derived from the USDA landform classifications associated with the soils. The historical state of the Bank was 46.5 percent floodplain, 44.7 percent natural levee and 8.8 percent backswamp (Figure 5). The sugarcane fields onsite, which are primarily along the natural levees have been in production for over 100 years and still actively farmed. Examination of historical aerial photographs indicate that portions of the Bank have been kept in a pastoral state since at least 1956 (Figures 5 to 12). The years of agricultural use have severely impacted the Bank beyond the removal of native vegetation.

3.2 CURRENT ECOLOGICAL CHARCTERISTICS OF THE SITE The historical land cover has been eradicated from approximately 32 percent of the Bank's landscape and replaced with some form agricultural use (Figure 13 and Table 2). BLH found within the Bank exist in four (4) locations with three (3) of those locations inside the perimeter levee system that separates the agricultural fields from the wetlands. One of these BLH areas is a 0.5-acre old cemetery, located in the northwestern portion of the sugarcane fields. Two other BLH inclusions within the levee system are ditched and appear to have been historically in sugarcane production, but at some point approximately 50 years ago, were abandoned, potentially for being too wet to farm, BLH were allowed to regenerate. The remaining BLH exist on a small ridge just outside of the leveed area, near the center of the southern boundary of the property. The small shrub/scrub wetland inclusion is located around a plugged and abandoned oil/gas well in the southwestern corner of the sugar cane fields. Cypress swamp exists in the southern and western reaches of the Bank. Outside of the interior levee system is all existing wetland.

3

Chacahoula Bayou Mitigation Bank Final Prospectus Table 2: Existing Land Use and Land Cover of the Bank:

Category

Herbaceous and Woody Wetland Agriculture Developed Shrubland

*Based on 2016 USDA CDL Data

Acres 760.0 354.0 6.2 0.2

Percent Cover* 68.0 31.5 0.4 0.1

3.2.1 HISTORICAL HYDROLOGY Personal communications, with the 30-year hunting lease holder, on April 26, 2017 during the IRT team's field site visit revealed that the historical hydrological regime consisted of the Bank's water flowing and exiting through the northwestern corner of the Bank site through Po Bayou. There was a dam constructed in this area that restricts flow from the Bank. The Bank operated under gravity flow until about 1982 or 1983, which is when the pumps were installed. Based on this personal communication the ridge that exists along the southwestern portion of the Bank inhibits the water from flowing south, due to the characteristics of the ridge. The ridge fans out towards the west and east and bends back towards the Bank directing the water within the Bank to exit via Po Bayou on the west. Water is transported from Po Bayou to Ringo Cocke Canal and into Black Bayou. 3.2.2 EXISTING HYDROLOGY As a result of efforts to facilitate drainage and enhance sugarcane production, the natural hydrology of the Bank was altered. Hydrology within the Bank has been intensely managed for agricultural activities through a combination of field drains, interior levees, culverts and drainage ditches controlled by a pump and discharged into the surrounding BLH habitat. Subbasins within the re-establishment portions (existing sugarcane fields) of the Bank are isolated by man-made levees. Water levels within the sugarcane fields along Bull Run Road are kept at lower levels than the external levees by drainage pumps. Drainage pump 1 is located along the perimeter levee to the west that separates the proposed BLH and CT habitats. Drainage pump 2, which shall remain, is operated by the Natural Resources Conservation Services (NRCS) Sugarcane Ardoyne Research Farm on Bull Run Road. This drainage pump is located outside the southeastern most corner of the Bank property. This pump currently, drains the easternmost subbasin of the Bank south of Bull Run Road (Figure 14). Existing hydrology within the perimeter levee: The BLH-1 parcel flows southeast into the drainage pump 2, operated by NRCS. The BLH-5 parcel is currently undeveloped wetland ringed by an interior levee to approximately three (3) feet with no apparent outfall. Forced drainage keeps interior wetlands water tables lower in BLH-5 than the levels outside the perimeter levee. BLH-6 is similarly isolated with a levee two (2) feet in elevation. A slight ridge separates BLH-3 and BLH-4, flows from these tracts and BLH-2 and CT-1 are routed to drainage pump 1 (Figure 15). Interior drainage channels approaching drainage pump 1, a diesel engine powered pump, are approximately 20 feet wide, with the top of the channel elevation at approximately one (1) foot with an estimated bottom elevation of -4 to -5 feet. The outfall channel for the drainage pump discharges

4

Chacahoula Bayou Mitigation Bank Final Prospectus

through existing wetland toward Ringo Cocke Canal. The outfall area is scoured approximately 30 feet wide and to an undetermined depth. The sources of water to the Bank are currently direct precipitation and surface flow from all adjacent land from the north to southwest. Currently, hydrology within the CT areas, which are outside of the interior perimeter levee system, have been altered due to Comeaux Canal. Personal communications with the current 30-year hunting lease holder, on April 26, 2017, revealed that after the construction of Comeaux Canal the CT habitats began showing signs of stress and die off due to the altered hydrology. 3.2.2 PARISH CLIMATE DATA Southwest Louisiana has a warm, humid, subtropical climate characterized by relatively high rainfall. The U.S. Climate Data for Houma, Louisiana states the average annual precipitation is 62.18 inches, of this 85 percent, usually fall in February through November, which is the growing season for most crops. 3.2.3 PHYSICAL SUITABILITY OF THE SITE The Bank's physical properties (topographic, geologic and hydrologic) are optimal to support enhancement, preservation, and re-establishment efforts, as historic anthropogenic manipulation has altered and degraded the ecological and hydrological functionality of the Bank. By restoring native vegetative communities and hydroperiods to the degraded floodplain, backswamp and natural levees the benefit to local flora and fauna shall be enhanced, along with water quality and biogeochemical cycling. Thus, benefiting HUC 08090302 and the regional watershed. The on-site surface hydrology within the fields flows from north to south through small field drains and directed into a drainage ditch that runs along the western and southern perimeter of the sugarcane fields. Water in this drainage ditch is controlled by a pump with an automatic float switch. When the water reaches a certain height the pump starts and transfers water from the drainage ditch on the north side of the levee into the swamp on the southern side of the levee. Hydrology within the swamp flows generally from north to south and from east to west. The existing drainage area of the Bank was estimated using topographic layers and the National Hydrography Dataset (NHD) in ArcGIS. Flow directional arrows were added to the NHD flowlines to identify which water features flowed into the Bank. Historically, the drainage area for the Bank was the Verret subbasin, which drains into the Penchant subbasin. However, drainage between these two (2) subbasins is naturally blocked by the Black Bayou Ridge, except for a natural outlet near Amelia. Due to hydrological modifications within the Verret Subbasin, the current drainage area of the Bank is estimated to be 39.5 square miles or 25,280 acres (Figure 16). Within the Bank itself, the major modifications that alter the drainage pattern are the interior levees, field drains, culverts and drainage ditches for the agricultural fields that exist throughout the Bank. Topography of the Bank shall allow for restoration of the Bank with minimal impact to the site. According to the USGS DRG24K data the land is fairly homogenous with elevations ranging from approximately two (2) to six (6) feet, gently sloping to the southwest of the Bank. This slopes towards wetlands that are located due south of the Bank (Figure 17). The higher elevation areas occur near Bull Run Road along the

5

Chacahoula Bayou Mitigation Bank Final Prospectus

northern perimeter of the Bank and along the interior perimeter levees. Of the total Bank acreage, 48.7 acres are above five (5) feet in elevation. 3.2.4 SOIL SURVEY The Bank is located in the southcentral region of Louisiana in Terrebonne Parish within the Mississippi Alluvial Plain ecoregion of the state. The NRCS soil survey for Terrebonne Parish identifies eight (8) soil map units within the Bank with all soils identified as having a hydric component (Figure 18). The presence of hydric soils indicate the Bank is either currently inundated or saturated in the upper soil profile for at least 14 consecutive days annually or was subject to these conditions prior to conversion of the Bank site to agriculture. The Bank is comprised primarily of clayey to silty alluvium soils, which, in this area, typically have a seasonal high water table between the surface and two (2) feet below the surface during the months of February through November. Bank site soils are as follows: Barbary Muck (BRA) covers 14 percent of the Bank site. · BRA series consist of flood plain land forms with a parent material of fluid clayey alluvium derived from sedimentary rock with very deep, poorly drained soils, which are frequently flooded. BRA is listed as 100 percent hydric. Cancienne Silt Loam (CbA) covers 18.2 percent of the Bank site. · CbA series consist of natural levee land forms with a parent material of silty alluvium with very deep and somewhat poorly drained soils. CbA series is listed as two (2) percent hydric. Cancienne Silty Clay Loam (Cda) covers 18.4 percent of the Bank site. · CdA series consist of natural levee land forms with a parent material of silty alluvium with very deep and somewhat poorly drained soils. CdA series is listed as 10 percent hydric. Fausse Clay (FAA) covers 16 percent of the Bank site. · FAA series consist of flood plain land forms with a parent material of clayey alluvium with very deep and very poorly drained soils, which as frequently flooded. FAA series is listed as 100 percent hydric. Gramercy-Cancienne (GcA) covers 6.7 percent of the Bank site. · GcA series consist of natural levee land forms with a parent material of clayey alluvium with very deep with somewhat to poorly drained soils. GcA series is listed as 45 percent hydric. Schriever Clay (ShA) covers 0.4 percent of the Bank site. · The ShA series consist of backswamp land forms with a parent material of clayey alluvium with very deep and poorly drained soils. ShA series is listed as 98 percent hydric. Schriever Clay (SIA) covers 17.8 percent of the Bank site. · The SIA series consist of flood plain land forms with a parent material of clayey alluvium with very deep, poorly drained soils, which are frequently flooded. SIA series is listed as 100 percent hydric. Shriever Clay (SrA) covers 8.3 percent of the Bank site. · SrA consist of flood plain land forms with a parent material of clayey alluvium with very deep and poorly drained soils, which are occasionally flooded. SrA series is listed as 100 percent hydric.

6

Chacahoula Bayou Mitigation Bank Final Prospectus

3.2.5 CHEMICAL SUITABILITY OF THE BANK The Bank shall be a suitable option for the restoration of the chemical processes within the watershed. Spatial and temporal hydrologic enhancements shall allow for an improvement in the natural chemical processes associated with wetlands, floodplains and naturally buffered stream systems. Long-term protection for the quality of the waters of the State shall be gained through improved chemical processes from re-established hydric soil conditions, nutrient retention, sequestration, and reduced aquatic and terrestrial impairments from surface water runoff through improvements to the floodplain and lower terrace areas of the Bank. The Bank shall provide treatment to existing waters through the restoration, enhancement or preservation of BLH and CT habitats. These shall be restored to their natural ecological condition of predominantly soft- and hard- wood vegetation, including a diversity of gap phase conditions consisting of early successional species in a seedling, scrub and sapling state. Site-specific restoration treatments to rehabilitate these hydrologic conditions and ecological planned communities shall be addressed in more detail in the Mitigation Plan of the draft MBI. Re-establishment, preservation or enhancement is planned for all BLH and CT on-site. 3.2.6 BIOLOGICAL SUITABILITY OF THE BANK The Bank is suitable to provide biological enhancements to habitat and utilization for the aquatic, herpetofauna and terrestrial communities. As discussed in the Physical Suitability of the Bank section, the regionality of the aforementioned areas shall increase the opportunities for native fauna to rest, nest, forage and breed. The biological soil properties are conducive to the enhancement, re-establishment or preservation of BLH or CT habit due to plant and vegetation cover, the vegetation history of the area and soil organic matter capabilities based on existing soil type. Despite a portion of the Bank being used for agricultural activities the reinstitution of wetland hydrology and vegetation shall increase plant microbe interactions, microbial diversity, soil organic matter, biogeochemical cycling and pore space. 3.2.7 VEGETATION SURVEY The Bank is comprised of several different habitat types, which include non-wetland sugarcane fields, BLH wetlands, small scrub/shrub wetlands and cypress swamps through the Bank. Vegetation growing within the non-wetland sugarcane fields and on elevated spoil bank within the Bank consists of a variety of herbaceous species. The dominant species in this habitat include sugarcane (Saccharum officinarum), bahia grass (Paspalum notatum), bermuda grass (Cynodon dactylon), southern dewberry (Rubus trivialis), spotted crane's-bill (Geranium maculatum), curly dock (Rumex crispus), purple-top vervain (Verbena bonariensis), spiny-leaf sow-thistle (Sonchus asper), Canadian goldenrod (Solidago canadensis), dog-fennel (Eupatorium capillifolium), annual marsh-elder (Iva annua), annual ragweed (Ambrosia artemisiifolia), and large barnyard grass (Echinochloa crus-gali). The BLH wetlands are dominated by species typically found in native BLH forests. The tree stratum consists of species such as sugarberry (Celtis laevigata), green ash (Fraxinus pennsylvanica), eastern cottonwood (Populus deltoides), water oak (Quercus nigra), Texas red oak (Quercus texana), cherry-bark 7

Chacahoula Bayou Mitigation Bank Final Prospectus

oak (Quercus pagoda), American elm (Ulmus americana), and Drummond red maple (Acer rubrum var. Drummondii). The sapling shrub layer in this habitat includes the aforementioned species as well as rough-leaf dogwood (Cornus drummondii), deciduous holly (Ilex decidua), and parsley hawthorn (Crataegus marshallii). The herbaceous layer in this habitat is primarily comprised of palmetto (Sabal minor), poison ivy (Toxicodendron radicans), southern dewberry (Rubus trivialis), sawbrier (Smilax glauca), and Virginia creeper (Parthenocissus quinquefolia). The small scrub/shrub wetland area located around a plugged and abandoned gas/oil well is dominated by species such as groundsel tree (Baccharis halimifolia), rough-leaf dogwood, sugarberry, box elder (Acer negundo), and green ash in the sapling/shrub stratum. The herbaceous layer in this habitat is dominated by bushy bluestem (Andropogon glomeratus), southern dewberry, trumpet creeper (Campsis radicans), and parrot's-feather (Myriophyllum aquaticum). The dominant vegetation within the tree stratum of the cypress swamp includes southern bald-cypress (Taxodium distichum), Drummond red maple, and black willow (Salix nigra). The sapling/shrub layer in this habitat is comprised of the aforementioned species as well as button-bush (Cephalanthus occidentalis). The herbaceous layer in the swamp is dominated by species such as lizard's-tail (Saururus cernuus), alligator-weed (Alternanthera philoxeroides), and southern cat-tail (Typha domingensis). 3.2.8 ENDANGERED AND THREATENED SPECIES AND HABITATS Plants and animals with a federal classification of endangered or threatened are protected under provisions of sections 7 and 9 of the Endangered Species Act of 1973, as amended. The U.S. Fish and Wildlife Service (USFWS) database listed two (2) species as threatened in Terrebonne Parish the piping plover (Charadriu melodu), which is listed as S2 1N 2 and G3 3, the peregrine falcon (Falco peregrinus), which is listed as S3N, The U.S. Fish and Wildlife Service (USFWS) database listed four (4) species as endangered in Terrebonne Parish the bald eagle (Haliaeetus leucocephalus), which as a listing of S3 4, the brown pelican (Pelecanus occidentalis), which has a listing of S3. The pallid sturgeon (Scaphirhynchus albus) and manatee (Trichechus manatus) is listed, but shall not be affected in any way within this Bank. The proposed project may offer some potential to improve or create suitable habitat for species of concern. Habitat may be improved or created for species that require wetland habitat by improving water quality, in- and near-stream forage, and providing stable conditions not subject to regular maintenance. The decision phase shall include USFWS coordination to confirm these findings.

1

S2 means imperiled in Louisiana because of rarity (6 to 20 known extant populations) or because of some factor(s) making it very vulnerable to extirpation. 2 N means nesting 3 G3 means either very rare and local throughout its range or found locally (even abundantly at some of its locations) in a restricted range (e.g., a single physiographic region) or because of other factors making it vulnerable to extinction throughout its range (21 to 100 known extant populations). 4

S3 means rare and local throughout the state or found locally (even abundantly at some of its locations) in a restricted region of the state, or because of other factors making it vulnerable to extirpation (21 to 100 known extant populations)

8

Chacahoula Bayou Mitigation Bank Final Prospectus

3.2.9 PRELIMINARY JURISDICTIONAL DETERMINATION The site was delineated in August 2016 by Resource Environmental Solutions, LLC and the Preliminary Jurisdictional Determination (PJD), MVN-2016-01058-SY, was issued February 10, 2017. The JD indicated that there were 763.7 acres of wetlands, 384.0 acres of uplands and 13.3 acres pf non-wetland area Figure 19.

3.3 GENERAL NEED FOR THE PROJECT IN THIS AREA Louisiana Department of Environment (LDEQ) has designated the waters of subsegment 120202 (Bayou Black) as impaired according to the 2016 Integrated Report (IR), which identifies the status of all State waterbodies as fully or not fully supporting their designated use (Figure 20). The subsegment, which contains the Bank site is impaired for nutrients (nitrogen and phosphorus) and dissolved oxygen year round and fecal coliform during the primary contact recreational months of May 1 ­ October 31, annually. Cessation of agricultural activities and hydrological restoration shall reduce nutrient and fecal coliform loadings and may increase dissolved oxygen concentrations to the local waters reducing nonpoint source pollution to the watershed. Within the HUC 08090302 within Terrebonne Parish there are seven (7) mitigation banks. Of those seven (7) banks only two (2) banks have BLH or CT credits available according to RIBITS, which was accessed on January 25, 2017. Terrebonne and Lafourche Parish have outpaced most parishes in population growth over the last 10 years according to the 2010 census. Terrebonne Parish's population increased seven (7) percent from 2000 to 2010. According to the Louisiana REA Project the Parish's population continues to grow (Louisiana REAP, 2016). Additionally, BLH habitat are important for a variety of fauna, maintenance of water quality and important in regulating flooding and stream recharge. BLH forest loss is estimated to be 50 to 75 percent of the original pre-settlement acreage (LNHP, 2009). CT habitat has been reduced by an alarming 95 to 99 percent of its original extent (LNHP, 2009). Therefore, the Bank shall protect both of these habitats by adding to its diminishing acreage, reintroducing the natural hydrologic regime, and native vegetation into perpetuity. Lastly, the Bank is needed to allow for mitigation to offset population growth, oil and gas exploration, pipeline and refinery structures. 3.3.1 WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE Louisiana's Nutrient Management Strategy (LNMS) the May 2014 Edition, was developed as a concerted effort between numerous state and federal agencies and through engagement with stakeholders within Louisiana, for the purpose of managing nutrients (nitrogen and phosphorus) to protect, improve and restore water quality in Louisiana's inland and coastal waters. The vision is to manage nutrient levels in Louisiana to ensure the support of healthy aquatic communities, clean water for public, agricultural and industrial use, to engage stakeholders at the local level and to actively support water quality protection, improvement and restoration. Additionally, it is said these protection, improvement and restoration strategies at the local level may have a cumulative and positive impact on the health of the receiving waterbodies both within the State and Gulf of Mexico. This Bank accomplishes all aspects of the vision for the LNMS by reducing agricultural impacts and enhancing, preserving, re-establishing or 9

Chacahoula Bayou Mitigation Bank Final Prospectus

rehabilitating BLH or CT habitat, which shall increase the efficiency of biogeochemical cycling within the Bank, reducing nutrients in the receiving watersheds and transition the anthropogenically impacted area back to its native state. Louisiana's Coastal Nonpoint Pollution Control Program (CNPCP) is being developed between Louisiana Department of Natural Resources (LDNR) and LDEQ in partnership with federal and local agencies. The CNPCP document outlines the management measures approved by U.S. Environmental Protection Agency and the National Oceanographic Atmospheric Administration that will control nonpoint pollution to coastal waters by using best management practices within the State designated CNPCP boundary. The Bank fits into the plan by reducing nonpoint source pollution and hydrological modification to the landscape by the cessation of agricultural activities within the Bank and restoring the Bank's hydrology to its natural state. The best management practices thorough the CNPCP aim to negate negative impacts by using natural processes to the maximum extent practical, which the Bank shall do for perpetuity. Louisiana's Nonpoint Source Management Plan (NPSMP) is prepared by LDEQ and numerous state and federal partners. The NPSMP has a plan for the Terrebonne River Basin, which encompasses the project area. The goal of NPSMP is to reduce nonpoint source pollutants entering waterbodies identified as not meeting water quality standards. The Bank shall return the anthropogenically impacted site back into its native state of BLH and CT, reducing nonpoint source pollution from agricultural practices within the Bank and receiving basins, thus improving water quality. Louisiana's 2016 IR is a list that identifies the State's waterbodies and their associated water quality status (i.e. fully or not fully supporting the State's water quality standard). The IR is developed by LDEQ every even numbered year. According to the IR, subsegment 120202, which contains the Bank is impaired for primary contact recreation and fish and wildlife propagation. Restoring the natural functioning of the land by returning it to its native state, topographically and hydrologically shall in in reducing nonpoint source pollution into the waters associated with the LDEQ subsegment. Barataria-Terrebonne National Estuary Program (BTNEP) Comprehensive Conservation Management Plan (CCMP) addresses the ecological management plans needed to tackle the difficulties facing the BTNEP area, which contains the Bank. The ecological management (EM) plans are divided into three (3) areas of focus, habitat management, water quality and living resources. The Bank aids in addressing the following ecological plans in the BTNEP CCMP: ·

·

EM-1 Hydrological Restoration, which has an objective of restoring the hydrology of the estuary to effectively use fresh water, sediments and nutrients to ameliorate the impacts of local hydrological modifications. The Bank, to the maximum extent practical, shall create flow regimes that effectively use freshwater, sediment and nutrients that reach the Bank. Furthermore, the Bank shall reduce the impacts of local hydrological modifications by reconnecting the Bank to the surrounding wetland habitat. EM-11 Reduction of Agricultural Pollutions, which has an objective of maintaining water quality standards that adequately protect estuarine resources from agricultural source pollutants. Agricultural pollutions can lead to loss of wetland vegetation due to the detrimental effects of nutrient loading, salts and herbicides, leading to erosion and loss of affected wetlands. The Bank 10

Chacahoula Bayou Mitigation Bank Final Prospectus

·

shall cease all agricultural activity immediately, improving water quality both within the Bank and the receiving basin. EM-15 Protection for Habitat for Migratory and Resident Birds, which has an objective of managing land in a way that maximizes its suitability as habitat for migratory and resident birds. Within the Bank, the natural levee area was cleared for agricultural development making the area uninhabitable for forest birds. Additionally, the fragmentation of the land may have also had a pernicious effect. For example, some species of interior foresting nesting birds can suffer serious declines in productivity as a result of the fragmentation, while some fragmented forest are heavily subjected to nest parasitism and predation and actually become population sinks. The Bank shall achieve the objective of the EM by maintaining 1,123.4 acres of unbroken forested wetland. EM-16 Reduction of Impacts from Exotic Vegetation, which has an objective of reducing negative impacts caused by proliferation of exotic plant species. The Bank shall have a noxious and invasive plant control plan and by managing exotic and invasive vegetation the Bank shall maintain a productive, diverse plant community that acts as conservation for habitat for game and non-game wildlife.

3.4 TECHNICAL FEASIBILITY The construction work required to develop the Bank is routine and based on currently-accepted restoration methods and is technically feasible. The mitigation activities are 1) site preparation, 2) vegetation planting and 3) monitoring. The presence of hydric soils and relatively low relief of the Bank indicate that minimal soil work shall be required for the successful restoration of BLH and CT habitat. The existence of BLH and CT adjacent to the Bank indicate a high potential for successful restoration. Drainage modifications shall provide for a natural and historic water regime creating a more selfsustaining Bank. Furthermore, the Bank's conservation objective shall be achieved through preservation of the Bank from future development activities through legal documentation (e.g. conservation easements).

3.5

CULTURAL RESOURCES

Agricultural activity has occurred within the Bank since at least 1956, since that time the land has been severely impacted by those agricultural practices. Agricultural practices would be considered more impactful to the Bank than the activities proposed. However, if any archeological objects are discovered during the course of this process, the Sponsor will cease work and disseminate any and all information to the State Historic Preservation Office for further review.

3.6 PROPERTY CONSTRAINTS The Bank includes a cumulative of 135.6 acres of non-mitigation features that are not included in the total mitigation acreage. Specifically, the non-mitigation features are composed of the Ringo Cocke Canal, and pipeline and utility ROWs, and the cemetery. The Bank is otherwise free of encumbrances.

11

Chacahoula Bayou Mitigation Bank Final Prospectus

3.7

ZONING AND ADJACENT PROPERTY DEVELOPMENT

The Bank and adjacent property is within unincorporated land and is absent of zoning regulations.

4 ESTABLISHMENT OF THE MITIGATION BANK The establishment of the mitigation bank is described below along with the technical feasibility of the proposed mitigation bank and the assurance of water rights to support the long-term sustainability of the mitigation bank. Additionally, a summary of the work necessary to accomplish restoration/enhancement, a description of how the proposed bank shall meet the goals and objectives, and any temporary or long-term structural management are described. The establishment of the Bank incorporates a tiered approach to provide the most effective and efficient methodologies to identify and evaluate the most-suitable bank sites, which shall provide the highest yields of ecological functional gain. Those tiers are listed below. Tier 1: A landscape-level geographic information system (GIS) evaluation and technical evaluations (soils, hydrology, fauna\flora community assessments, rare and endangered species, critical habitat, etc.) were performed to determine site selection and potential feasibility; Tier 2: After the potential site was identified, an in-depth analysis was performed to determine the Banks restoration, re-establishment, enhancement or preservation potential; Tier 3: Once the site is determined as a feasible option and the Prospectus approved, development of a Mitigation Plan and conceptual design shall occur and a draft MBI shall be submitted to the IRT for review and approval; and Tier 4: After the review process, the Final Mitigation Plan, completed design and the MBI shall be submitted to the USACE and IRT.

4.1

SITE RESTORATION PLAN

The site restoration plan section summarizes the work necessary to accomplish the proposed work needed to meet the goals and objectives of the Bank and the temporary or long-term management requirements need to assure hydrologic and vegetation restoration. Details for the site restoration plan measures are described in the subsections below. 4.1.1 RESTORATION OVERVIEW Site restoration shall be accomplished through hydrological restoration and afforestation of the native vegetative community. This includes abandoning farming operations, gapping the interior perimeter levee, plugging field drains, removing or plugging culverts, backfilling ditches, site preparation, elimination of invasive species, and replanting of BLH and CT species. The Bank work plan shall focus on a watershed approach to improve physical factors that slow the transport of water and increase nutrient retention. Improvements to factors that impede water transport are intended to increase aquatic functions and values on the Bank and surrounding area. The re-establishment of forested wetlands on the Bank shall create the physical structure to slow the transport of surface runoff across the Bank during heavy precipitation events. Slower water transport

12

Chacahoula Bayou Mitigation Bank Final Prospectus

leads to longer periods of water retention and contact with vegetation, which results in lower levels of suspended solids and dissolved solids and higher nutrient and sediment filtration rates. 4.1.2 HYDROLOGICAL RESTORATION During the process of converting the native habitat to agricultural land, certain hydrologic modifications were put in place to control site hydrology using anthropogenic methods. To hydrologically reconnect and meet the objectives of the Bank, those modifications shall be rendered ineffective. Impediments to be rendered ineffective are as follows: · · · ·

6 levee gaps each at least 100 feet wide are proposed in the interior levees (Figures 20 and 20A). 16 small field drains shall be plugged (Figures 20 and 20B). 73 culverts shall be removed or plugged (Figures 20 and 20C). 8,181 linear feet of ditches shall be backfilled (Figures 20 and 20D).

After hydrological restoration, the Bank's hydrology shall be primarily driven by precipitation, run off and high water tables. It is anticipated that once hydrological connectivity is restored, water will be transported off the land by Po Bayou for the areas to the west of the natural levee and the remainder of the Bank will transport water off the Bank through the existing wetlands located on the southern portion of the Bank site (Figure 22). Water will be allowed to freely flow from the interior levees through the levee gaps and into the surrounding wetland areas. Hydrologic restoration achieves many objectives by improving water quality, biogeochemical cycling and the hydrologic cycling, which shall inundate soils and restore them to their native historic hydric processes. Levee gaps are proposed due to the amount of earth work that would be required to fill the entirety of the existing man-made canals. Earth work would be a hindrance to the Bank; therefore, at least onehundred foot gaps in the levee are proposed. It would be hindrance such that if all the spoil material was returned to the canal it would inhibit the historical transport of water to Po Bayou. 4.1.3 SOIL PREPARATION Following hydrological restoration, soils in the fields within the Bank shall be mechanically prepared for vegetative plantings. Deep-ripping may be used to alleviate soil compaction and encourage air and water pore space for root growth. 4.1.4 VEGETATIVE PLANTINGS Following soil preparation, an appropriate combination of hard- and soft- mast producing bare-root stock shall be planted (Tables 3 and 4). The goal is match plant species to the maximum extent practical to the native species on the adjacent lands.

13

Chacahoula Bayou Mitigation Bank Final Prospectus

Table 3: Representative Bottomland Hardwood Species Suitable for the Bank

Common Name

Overcup oak Nuttall oak Willow oak Water oak Cherrybark oak Sweetpecan Water hickory Sweetgum Drummond red maple Baldcypress Mayhaw Sugarberry American elm Persimmon Green ash

Scientific Name

Quercus lyrata Quercus nuttallii Quercus phellos Quercus nigra Quercus pagodifolia Carya illinoinensis Carya aquatica Liquidambar styraciflua Acer rubrum var. drummondii Taxodium distichum Crataegus opaca Celtis laevigata Ulmus americana Diospyros virginiana Fraxinus pennsylvanica

Mast Hard Hard Hard Hard Hard Hard Hard Soft Soft Soft Soft Soft Soft Soft Soft

Table 4: Representative Baldcypress-Tupelo Swamp Species Suitable for the Bank

Common Name

Baldcypress Tupelo gum Swamp blackgum Drummond red maple Black willow Pumpkin ash Green Ash Water elm Water locust Virginia willow Buttonbush

Scientific Name

Taxodium distichum Nyssa aquatica Nyssa sylvatica var biflora Acer rubrum var. drummondii Salix nigra Fraxinus profunda Fraxinus pennsylvanica Planera aquatica Gleditsia aquatica Itea virginica Cephalanthus occidentalis

The Bank shall first be prepared by a combination of mowing, plowing, subsoiling, grading and/or application of herbicides. BLH and CT planting shall occur during the first planting season, approximately December to April. Planting success rates, escrow or bond sum release rates, and monitoring requirements shall be consistent with other recently implemented New Orleans District approved mitigation banks. Numerous Bank objectives shall be achieved through afforestation of native plant species. Planting shall positively affect the physical structure of the area and restore biogeochemical processes in the soil considerably through additional plant and invertebrate detritus. Additionally, it shall provide improved biotic condition and create habitat for mammals, insects, and migratory birds. Restored forested and vegetative habitats filter sediment depositions runoff into Bank and downstream receiving basins. Furthermore, it provides atmospheric maintenance and natural aesthetics to the area. 14

Chacahoula Bayou Mitigation Bank Final Prospectus

4.1.5 INVASIVE/NOXIOUS PLANT CONTROL Invasive and noxious plant species such as Chinese tallow (Triadica sebifera) shall be removed by mowing and/or herbicidal treatment during initial planting. The percent cover of invasive plants shall be monitored during short- and long- term success monitoring and appropriate action taken, if needed. 4.1.6 MONITORING At a minimum, monitoring reports shall be completed in the spring (when new growth makes identification practicable) of years 1, 3, 5, 8, and 10. Reports shall be submitted by December 15th of each monitoring year.

4.2 CURRENT SITE RISKS The Sponsor does not foresee any adverse impacts to the Bank site resulting from continued existence and operation of neighboring land uses. There are no existing hydrologic disturbances on or adjacent to the site at the present time. 4.2.1 THREATS WITHIN THE BANK Threats within the Bank site itself are continued agricultural practices that reduce the functionality of the land and alter its natural topography creating a non-self-sustaining habitat. Agricultural practices increase nonpoint source pollution to the watershed and degrade habitat for local fauna, as well as migratory birds. 4.2.2 RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS Resources the Bank intends to provide to offset the aforementioned threats within the Bank is the cessation of agricultural activities and protection of the Bank for perpetuity with a conservation easement. As a result, activities causing direct impacts or destruction of the habitats including the construction of roads, pipelines or utilities, and residential development, shall cease and the Bank seeks to restore the natural habitat types and maintain the natural species composition to the maximum extent practical. Habitat degradation or disturbance caused by the maintenance of existing roads, pipelines and utilities, physical damage from planting activities, hydrological alterations, contamination by chemicals (herbicides, fertilizers), and off-road vehicle use, shall cease, except where necessary as allocated by the conservation easement. 4.2.3 ENCUMBRANCES There are seven (7) oil and gas well sites within the Bank. Two have been plugged and abandoned, two (2) are temporarily inactive gas wells and three (3) are dry and plugged. Furthermore, there are three (3) water well registrations within the Bank. All three (3) water wells were for rig supply and have been plugged and abandoned (Figure 23). The two (2) remaining oil wells shall be removed by the owner according to the appropriate regulations governing closure and abandonment. The area where the wells are located shall be non-mitigation features within the Bank. Access to those well sites shall remain and be non-mitigation features within the Bank. In reference to all other wells, there are no remaining features associated with the wells aboveground.

15

Chacahoula Bayou Mitigation Bank Final Prospectus

4.2.4 ZONING AND PROPOSED DEVELOPMENT There are no zoning or existing ordinances in place that affect the Bank. There is no proposed development adjacent to the Bank. The MBI will contain a final survey plat of the proposed conservation servitude area, a metes, bounds description and title opinion.

4.3 LONG-TERM SUSTAINABILITY OF THE SITE The Bank Sponsor shall be the responsible agent for the long-term management of the Bank, unless a third-party entity is established and given authority to maintain the Bank in perpetuity through written approval by the IRT. The primary long-term strategy of the Bank is self-sustaining with relatively low maintenance. This management strategy is linked to the development stage of the mitigation banking process, particularly in the design and establishment of the Bank. Native vegetative planting and a natural hydroperiod shall provide these ecological benefits with minimal routine maintenance or attention after establishment. However, if the Bank is underperforming and not meeting the proposed performance standards, the Sponsor shall provide additional management designs to address the ecological benefit. The strategies shall be tailored to specific disturbances in order to achieve optimal results. Therefore, Adaptive Management Plans shall be derived at the time of the disturbance and based on the analysis of the data collected at the time. Work plans shall be submitted to the IRT for commentary, guidance, and approval before implementation. Prior to final release and in accordance with the timelines established in the final MBI, the Bank Sponsor shall establish a non-wasting endowment supporting the Bank's long-term maintenance plan. As previously stated, the Bank Sponsor shall be the long-term manager of the Bank property. Any expenditure must be related to the maintenance of the Bank and be approved by the USACE.

4.4 ASSURANCE OF WATER RIGHTS Louisiana Civil Code, Article 490, treats water resources under the theory of absolute ownership and rule of capture, provided capture does not result in harm to neighbors. The Bank shall depend primarily on precipitation, runoff from surround areas and high water tables. Therefore, long-term hydrology maintenance shall not be dependent upon the utilization of water captured from irrigation wells. As a result, sufficient water rights are ensured. The Sponsor does not foresee any adverse impacts on neighboring properties due to this project.

5 PROPOSED SERVICE AREA This section identifies the proposed watershed approach used for compensatory mitigation as stated in 33 CFR § 332.3(c) and 40 CFR Part 230.93(c) and the general need for the proposed mitigation bank in this area as stated in 33 CFR § 332.8(d)(2)(iv).

5.1 RATIONALE FOR SERVICE AREA DETERMINATION The Geographic Service Areas were determined utilizing the watershed approach combined with ecological, hydrological and finally, economic considerations for compensatory mitigation. The following is the rationale for determination of the service area for the Bank: 16

Chacahoula Bayou Mitigation Bank Final Prospectus

· ·

·

A watershed approach used to determine all service areas (Figure 24). o Primary service area is the LRAM Terrebonne Basin. Proposed service area is based on the needs within the watershed. o Provide mitigation for activities associated with continued population growth. o Provide mitigation for the area, which has a history of oil and gas exploration and production. o Improve water quality in a State designated impaired watershed. o Provide compensatory mitigation for the USACE New Orleans District approved projects within the Terrebonne Basin. Proposed service area is necessary for the economic viability of the Bank.

6 OPERATION OF THE MITIGATION BANK The Bank shall be stablished and operated by the Sponsor in accordance with all rules and regulations of 33 CFR § 332.8. Operation details of the Bank shall be further described in the Draft MBI per the rules outlined in 33 CFR § 332.8. The Bank shall be protected by a Conservational Servitude, which shall prohibit harmful activities that inhibit the long-term survival of the mitigation bank.

6.1

PROJECT REPRESENTATIVES

Sponsor/Landowner/Operations Manager/Agent Fourth Louisiana Resource, LLC Point of Contact: David Hill c/o Resource Environmental Solutions Email: David@res.us 412 N. Fourth Street, Suite 300 Phone Number: (225) 603-5334 Baton Rouge, Louisiana 70802

6.2 QUALIFICATIONS OF THE SPONSOR Fourth Louisiana Resource, LLC is managed by Resource Environmental Solutions, LLC (RES), which shall be the entity responsible for bank land management and administration. RES has restored, preserved, and/or enhanced over 40,400 acres of wetlands and over 180 miles of streams across nine (9) states and has 225 mitigation sites completed or in progress. RES has rehabilitated and/or preserved over 3,700 acres of endangered species habitats, as well as planted over 10,000,000 trees across all operating regions. RES works with 15 U.S. Army Corps of Engineer districts and more than 78 regulatory agencies across the country. A company profile may be viewed at www.res.us.

6.3

PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES

The Bank Sponsor shall establish a perpetual Conservation Easement, and shall monitor the sites for a minimum of 10 years or until 80 percent aerial coverage is achieved. The Mitigation Plan provides detailed information regarding bank operation, including long-term management and annual monitoring activities, for review and approval by the IRT. Upon approval of the sites by IRT, the site shall be transferred to a long-term land steward (to be determined by the Mitigation Plan). The long-term steward shall be responsible for periodic inspection of the site to ensure that restrictions required in the Conservation Easement of the deed restriction document(s) are upheld. Endowment funds required to uphold easement and deed restrictions shall be negotiated prior to site transfer to the responsible party.

17

Chacahoula Bayou Mitigation Bank Final Prospectus

The Bank Sponsor shall ensure the Conservation Easement allows for the implementation of an initial monitoring phase, which shall be developed during the design phase and conducted by the Bank Sponsor. The Conservation Easement shall allow for annual monitoring and, if necessary, maintenance of the Bank during the initial monitoring phase. These activities shall be conducted in accordance with the terms and conditions of the Chacahoula Bayou Mitigation Bank made and entered in to by Fourth Louisiana Resource, USACE and other IRT agencies. Long-Term Ownership and Management: Fourth Louisiana Resource, LLC Point of Contact: Richard Greig c/o Resource Environmental Solutions Email: rgreig@res.us 412 N. Fourth Street, Suite 300 Phone Number: (337) 443-6933 Baton Rouge, Louisiana 70802

6.4

SITE PROTECTION

The Bank shall be protected in perpetuity by Conservation Servitude, pursuant to Louisiana Revised Statute 9:1271 et seq. The Conservation Servitude shall be held by a conservation-oriented 501(c)(3) organization to be determined, and shall inure and run with the property title. The Conservation Servitude shall prohibit activities, such as clear cutting, fill discharges, cattle grazing, or other commercial surface development that would diminish the quality or quantity of restored wetlands. Additionally, the servitude shall specify permissive activities such as hunting, fishing and recreational use and mineral exploration given the activity does not negatively impact the functions and values of the rehabilitated, re-established, enhanced or preserved BLH and CT.

6.5

LONG-TERM STRATEGY

A long-term maintenance and protection escrow account shall provide funding for long-term maintenance and site protection, in accordance with 33 CFR § 332.7 into perpetuity. Long-term maintenance and site protection activities shall be conducted by the Sponsor. The Sponsor shall ensure long-term success and sustainability of the Bank through mechanisms including vegetative and hydrologic maintenance as necessary, site monitoring, invasive species management, establishment of financial assurances and protection in perpetuity by conservation servitude. The conservation servitude shall protect the Bank from any activities that would diminish the quality of the restored Bank lands. No structures are proposed or would be necessary to assure hydrologic or vegetation restoration. A longterm management plan shall be included in the MBI.

18

Chacahoula Bayou Mitigation Bank Final Prospectus

7 REFERENCES Code of Federal Regulations, Title 33, Parts 325 and 332 and Title 40, Part 230, as published on pages 19594-19704 in the Federal Register dated 10 April 2008. Louisiana Nutrient Management Strategy Interagency Team. 2014. Louisiana Nutrient Management Strategy: Protection, Improvement, and Restoration of Water Quality in Louisiana's Water Bodies. Coastal Protection and Restoration Authority of Louisiana, Louisiana Department of Agriculture and Forestry, Louisiana Department of Environmental Quality, and Louisiana Department of Natural Resources. May 2014. Baton Rouge, LA. Louisiana Department of Environmental Quality.2012. Louisiana's Nonpoint Source Management Plan. November 2012. Baton Rouge, Louisiana. Louisiana REAP. 2016. Terrebonne Parish versus Louisiana Comparative Trends Report: Population, 1969-2015. Retrieved January 25, 2017. https://louisiana.reaproject.org/analysis/comparative-trendsanalysis/population/reports/220109/220000/#page_3. Louisiana Wildlife and Fisheries Louisiana Natural Heritage Program. Updated 2009. The Natural Communities of Louisiana. Accessed October 31, 2016. http://www.wlf.louisiana.gov/sites/default/files/pdf/page_wildlife/6776Rare%20Natural%20Communities/LA_NAT_COM.pdf Moore, David M. and Rivers, Robert D. 1996. The Ecological Management Action Plans. BaratariaTerrebonne National Estuary Program, Thibodaux, Louisiana. Accessed November 14, 2016. http://www.btnep.org/BTNEP/about/theplan.aspx. United States Department of Agriculture ­ Natural Resources Conservation Service, Web Soil Survey, Allen Parish, Louisiana, Retrieved August 2015. http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx United States Department of Agriculture ­ Natural Resources Conservation Service, PLANTS Database ­ USDA PLANTS, Retrieved August 2015. http://plants.usda.gov/ United States Army Corps of Engineers-New Orleans District. List of Approved Mitigation Banks within the New Orleans District, Retrieved August 2015. US Department of Agriculture, Soil Conservation Service, Allen Parish, 1980, (SCS 1980)

19

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure1_ChacahoulaBayou_VicinityMap.mxd

Legend Site (1,123.4 ac +/-)

Base map taken from LADOTD Louisiana state map. Horizontal Datum is NAD83 UTM Zone 15N.

FIGURE 1

0

5 Miles

10

CHACAHOULA BAYOU MITIGATION BANK VICINITY MAP TERREBONNE PARISH, LOUISIANA

Date: 1/25/2017 Drawn by: BL Checked by: RG

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure2_ChacahoulaBayou_USGS24kQuadMap.mxd

Site (1,123.4 Ac.) Sec. 108, T16S, R16E, Sec's. 37, 38, 39, & 40, T16S, R15E, Sec's. 27, & 28, T17S, R15E, & Sec's. 34, 33, & 32, T17S, R16E Lat: 29° 38' 08.45" N, Long: 90° 52' 17.75" W

Legend Site (1,123.4 ac +/-)

Topographic imagery from US Geological Survey. Horizontal Datum is NAD83 UTM Zone 15N.

FIGURE 2

0

1,500 Feet

3,000

CHACAHOULA BAYOU MITIGATION BANK U.S.G.S. 24K QUAD MAP TERREBONNE PARISH, LOUISIANA

Date: 1/25/2017 Drawn by: BL Checked by: RG

Legend Site (1,123.4 ac +/-) 10 Mile Radius

Class Name, Percent Cover Aquaculture, 0.0% Barren, 0.0% Corn, 0.0% Cotton, 0.0% Deciduous Forest, 0.0% Developed/High Intensity, 0.8% Developed/Low Intensity, 6.3% Developed/Med Intensity, 1.5% Developed/Open Space, 1.8% Evergreen Forest, 0.0% Fallow/Idle Cropland, 1.9% Grassland/Pasture, 4.1% Herbaceous Wetlands, 31.4% Mixed Forest, 0.0% Open Water, 3.1% Oranges, 0.0%

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure3_ChacahoulaBayou_10MileRadiusLandCover.mxd

Other Hay/Non Alfalfa, 0.0% Rice, 0.0% Shrubland, 0.3% Sod/Grass Seed, 0.0% Soybeans, 0.2% Sugarcane, 5.0% Winter Wheat, 0.0% USDA, National Agricultural Statistics Service, 2016 Louisiana Cropland Data Layer Horizontal Datum is NAD83 UTM Zone 15N.

Woody Wetlands, 43.6%

FIGURE 3

0

2 Miles

4

CHACAHOULA BAYOU MITIGATION BANK 2016 CDL LAND COVER/LAND USE WITH A 10 MILE RADIUS AROUND SITE MAP TERREBONNE PARISH, LOUISIANA

Date: 1/26/2017 Drawn by: BL Checked by: RG

o Bay Po u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure4_ChacahoulaBayou_ProposedMitigationHabitatTypeMap.mxd

Comeaux Canal

Legend Site (1,123.4 ac +/-)

Cypress-Tupelo Enhancement (190.0 ac)

BLH Preservation (51.6 ac)

Cypress-Tupelo Preservation (423.6 ac)

BLH Re-establishment (274.2 ac)

Non-mitigation (135.6 ac)

Cypress-Tupelo Re-establishment (48.3 ac) Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 4

1,500

CHACAHOULA BAYOU MITIGATION BANK PROPOSED MITIGATION HABITAT TYPE MAP TERREBONNE PARISH, LOUISIANA

Date: 5/24/2017 Drawn by: BL Checked by: TW

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure5_ChacahoulaBayou_1956Aerial&HistoricalLandCover.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Bank Historical Conditions Backswamp (98.7 ac) Floodplain (527.0 ac) Natural Levee (497.7 ac)

1956 aerial provided by USGS. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 5

1,500

CHACAHOULA BAYOU MITIGATION BANK 1956 AERIAL & HISTORICAL LAND COVER MAP TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure6_ChacahoulaBayou_1963Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from USGS EarthExplorer. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 6

1,500

CHACAHOULA BAYOU MITIGATION BANK 1963 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure7_ChacahoulaBayou_1973Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from USGS EarthExplorer. Horizontal Datum is NAD83 UTM Zone 15N.

0

© 750

Feet

FIGURE 7

1,500

CHACAHOULA BAYOU MITIGATION BANK 1973 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure8_ChacahoulaBayou_1998Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from 1998 DOQQ. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 8

1,500

CHACAHOULA BAYOU MITIGATION BANK 1998 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/23/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure9_ChacahoulaBayou_2004Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from 2004 DOQQ. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 9

1,500

CHACAHOULA BAYOU MITIGATION BANK 2004 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/23/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure10_ChacahoulaBayou_2008Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from 2008 coastal imagery DOQQ. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 10

1,500

CHACAHOULA BAYOU MITIGATION BANK 2008 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/23/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure11_ChacahoulaBayou_2010Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from Atlas GOHSEP. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 11

1,500

CHACAHOULA BAYOU MITIGATION BANK 2010 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/23/2017 Drawn by: BL Checked by: RG

B Po ayo u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure12_ChacahoulaBayou_2015Aerial.mxd

Comeaux Canal

Legend Site (1,123.4 ac)

Imagery from 2015 NAIP. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 12

1,500

CHACAHOULA BAYOU MITIGATION BANK 2015 AERIAL TERREBONNE PARISH, LOUISIANA

Date: 5/23/2017 Drawn by: BL Checked by: RG

o Bay Po u

Ru

nR

d.

Ri ng oC oc ke

Ca na l

Bu ll

Comeaux Canal

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure13_ChacahoulaBayou_ExistingLandCover_CDL.mxd

Legend Site (1,123.4 ac)

Grassland/Pasture, 0.0%

Class Name, Percent Coverage

USDA, National Agricultural Statistics Service, 2016 Louisiana Cropland Data Layer Imagery taken from 2015 NAIP. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

FIGURE 13

1,500

CHACAHOULA BAYOU MITIGATION BANK EXISTING LAND COVER/LAND USE MAP TERREBONNE PARISH, LOUISIANA

Herbaceous Wetlands, 6.5%

Developed/High Intensity, 0.1%

Shrubland, 0.0%

Developed/Low Intensity, 0.5%

Soybeans, 0.2%

Developed/Open Space, 0.0%

Sugarcane, 25.4%

Fallow/Idle Cropland, 5.9%

Woody Wetlands, 61.3% Date: 5/22/2017 Drawn by: BL Checked by: RG

Legend Site (1,123.4 ac)

! C

Drainage Pump Location

E

Natural Ridge

Flow Direction

B Po

Forced Drainage Area Thru Interior Levees To Pump #1

ayo u

Forced Drainage Area To Pump #2

y

Pump #1 Discharge Area

Ru

nR

d.

! C Pump #1 Comeaux Canal

E

Ri ng oC oc ke

Ca na l

Bu ll

Pump #2

E Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure_ChacahoulaBayou_PreRestorationHydrology.mxd

! C E

E

Imagery taken from 2015 NAIP. Horizontal Datum is NAD83 UTM Zone 15N.

FIGURE 14

© 0

750 Feet

CHACAHOULA BAYOU MITIGATION BANK 1,500

PRE-RESTORATION HYDROLOGY TERREBONNE PARISH, LOUISIANA

Date: 5/24/2017 Drawn by: BL Checked by: TW

B Po ayo u

BLH-4

Ri ng oC oc ke

Ca na l

Bu ll

BLH-3

Pump #1

! C

Ru

nR

d.

BLH-2 BLH-5

BLH-6

Comeaux Canal

BLH-1

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure15_ChacahoulaBayou_ExistingDrainageAreaLocationMap.mxd

CT-1

Pump #2

! C

Legend Site (1,123.4 ac)

! C Soil data provided by NRCS. Drainage areas provided by HDR. Horizontal Datum is NAD83 UTM Zone 15N.

© 0

750 Feet

Existing Hydrology within Interior Perimeter Levee FIGURE 15

1,500

Drainage Pump Location

CHACAHOULA MITIGATION BANK EXISTING HYDROLOGY WITHIN PERIMETER LEVEE TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure16_ChacahoulaBayou_HistoricalDrainageAreaMap.mxd

Legend Site (1,123.4 ac +/-) Flowline Topographic imagery from US Geological Survey. Stream data provided by USGS NHD. Horizontal Datum is NAD83 UTM Zone 15N.

0

© 4,000 Feet

Drainage Area (39.5 sq/mi)

FIGURE 16

8,000

CHACAHOULA BAYOU MITIGATION BANK HISTORICAL/EXISTING DRAINAGE AREA MAP TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

2 2

3

4

6

6

7 8

7

6

7

7

5

3

5

2

4

2

2

3

5

6

3 2

2

Legend 2

2

2 Site (1,123.4 2 2 ac)

2

2

2

2

5

3

2

One FT Elevation Contour

2

2

2

2

2

3 Elevation Contour Half FT 2

2

2

2

2

Elevation Above2 5 Ft (48.7 ac) 2

FIGURE 17

Date: 6/1/2017

CHACAHOULA BAYOU MITIGATION BANK EXISTING ELEVATIONS MAP

Drawn by: BL

TERREBONNE PARISH, LOUISIANA

24

2

2

3

2

3

3

3 4 3

4 6

4 3 3

3

3

2

3 5

4

5

2

2

2

2

5

3 4 2 2 2 3

5

4

3

2

3

4

2

3

5

3

4

3

3

3

2

2

3

4 3

2

5

2

3

2 2 2

2

3

3

2

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure17_ChacahoulaBayou_ExistingElevationsMap.mxd

3

4

8

6

2

2

2

3

5

5

7

2

2

2

2

2

3

4

6 7

5

2

2

2

2

4

3

2

2

2

3

7

4

4

2

3

2

3

2

3

2

2

4

2

4

4

2

2

2

4

3

3

4

3

2

2

3

2

4

4

3

3

4

3 3 5

2

2

3

2

3

4

2

3

2

3 2

2

2

4

2

3

3

4

2 Feet

2,000

3

3

2

2

4

3

2

2

2 1,000

3

2

4

3

4

3

Elevation data provided by LOSCO 5M LIDAR DEM. Horizontal Datum is NAD83 UTM Zone 15N.

0

2

4

3

3

3

3

6

2

2

5

2

3

3

2

2

2

2

3

2

2

3

3

4

2

2

©

3

6

2 4

2

2

2

4

3

4

3

2

2

2

3 4

5

3

2

2

2

3

3

4

2

2

3

6

2

3 3

2

3

3 4

3

4 5

4

2

3

3

5

3

2

4

2

2

2

4

3

3

2

2

2

2

3

4

2

3

2

6

2

5

2

4

3

3 4 34 2

3

2 4

2

1 2 2

3

2

2 2 1

4

1

2

2

2

1

2

3

2

2

2

3 2

2 2

Checked by: RG

2

2

BRA

Legend

ShA

ShA

W

FAA

ShA

Site (1,123.4 ac)

CbA; Cancienne silt loam, 0 to 1 percent slopes

SIA; Schriever clay, 0 to 1% slopes, frequently flooded

National Hydric List Soils

CdA; Cancienne silty clay loam, 0 to 1 percent slopes

CdAslopes, frequently flooded FAA; Fausse clay, 0 to 1 percent

ShA; Schriever clay, 0 to 1 percent slopes

GcA; Gramercy-Cancienne silty clay loams, 0 to 1 percent slopes

W; Water

MUSYM, MUName BRA; Barbary muck, 0 to 1% slope, frequently flooded

SIA

ayo

B Po

SIA

SrA; Schriever clay, 0 to 1% slopes, occasionally flooded

u

CdA Bu ll

Ca na l

CdA

Ri ng oC oc ke

SrA

ShA

CdA

BRA

Ru

ShA nR

d.

GcA

CbA

GcA Comeaux Canal

FAA SIA

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure18_ChacahoulaBayou_SoilsMap.mxd

GcA

SrA

FAA USDA/NRCS Gridded Soil Survey Geographic Horizontal Datum is NAD83 UTM Zone 15N.

0

©

FAA

1,000 Feet

FAA FIGURE 18

2,000

CHACAHOULA BAYOU MITIGATION BANK SOILS MAP TERREBONNE PARISH, LOUISIANA

Date: 5/22/2017 Drawn by: BL Checked by: RG

ShA

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118 REPLY TO ATTENTION OF

February 10, 2017

Operations Division Surveillance and Enforcement Section

Mr. Brighton Heard Resource Environmental Solutions, LLC 412 N. 4th St. Baton Rouge, Louisiana 70802 Dear Mr. Heard: Reference is made to your request, on behalf of the Sweetland Project, for a U.S. Army Corps of Engineers' (Corps) jurisdictional determination on property located in Sections 32, 33, 37, 38, 39, and 40, Township 16 South, Range 16 East, Terrebonne Parish, Louisiana (enclosed map). Specifically, this property is identified as 1,161 acre "Sweetland Project" west of Bullrun Road. Based on review of recent maps, aerial photography, soils data, and the information provided with your request, we have determined that part of the property is wetland and may be subject to Corps' jurisdiction. The approximate limits of the wetland are designated in red on the map. A Department of the Army (DA) permit under Section 404 of the Clean Water Act will be required prior to the deposition or redistribution of dredged or fill material into wetlands that are waters of the United States. Additionally, a DA permit will be required if you propose to deposit dredged or fill material into other waters subject to Corps' jurisdiction. Other waters that may be subject to Corps' jurisdiction are indicated in blue on the map. You and your client are advised that this preliminary jurisdictional determination is valid for a period of 5 years from the date of this letter unless new information warrants revision prior to the expiration date or the District Commander has identified, after public notice and comment, that specific geographic areas with rapidly changing environmental conditions merit re-verification on a more frequent basis. Should there be any questions concerning these matters, please contact Mr. Brian Oberlies at (504) 862-2275 and reference our Account No. MVN-2016-01058-SY. If you have specific questions regarding the permit process or permit applications, please contact our Central Evaluation Section at (504) 862-1581. Sincerely,

Martin S. Mayer Chief, Regulatory Branch Enclosures

US ARMY CORPS OF ENGINEERS

PRELIMINARY JURISDICTIONAL DETERMINATION

USACE IN HOUSE, 8 FEB 2017 BRIAN OBERLIES FOR B. HEARD ACCOUNT # MVN-2016-01058-SY UPLAND WETLAND NONWETLAND WATERS

February 10, 2017

Feb 10, 2017

Bayou Trepagnier Bayou Labranche Mississippi River

Mississippi River

Grand Bayou and Little Grand Bayou

Lac des Allemands

Bayou Verret, Bayou Chevreuil, Bayou Citamon, and Grand Bayou Intracoastal Waterway

Lake Cataouatche Bayou des Allemands

Lake Verret and Grassy Lake Bayou Boeuf, Halpin Canal and Theriot Canals

Bayou Gauche

Lake Boeuf Lower Atchafalaya Basin Floodway

Lower Grand River and Belle River

Bayou Lafourche Bayou des Allemands

Thibodaux Swamp (Pointe Au Chien Swamp) Lake Palourde

Bayou Teche Bayou Teche

Bayou Folse

Bayou Bayou Ramos Swamp Boeuf

Bayou Black Bayou Terrebonne

Lake Salvador

Intracoastal Waterway Bayou L'Eau Bleu

Wax Lake Outlet

Bayou Terrebonne

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure19_ChacahoulaBayou_LDEQ_Subsegments.mxd

Intracoastal Waterway

Company Canal Houma Navigation Canal

Atchafalaya River Bayou Chene

Atchafalaya Bay, Delta, LDEQ subsegments Gulf waters provided by Environmental Data Center (LEDC) Base map taken from LADOTD Louisiana state map. The National Hydrography Dataset (NHD) provided by USGS. Horizontal Datum Datum is is NAD83 NAD83 UTM UTM Zone Zone 15N. 15N. Horizontal

0

© 2.5

Miles

Bayou Penchant

Lake Hatch and Lake Theriot

Houma Navigation Canal Bayou du Large

Bayou Grand Caillou

Bayou du Large

Bayou Bayou Grand Caillou

Petit Site (1,123.4 ac) Caillou

Lake Boudreaux

CHACAHOULA BAYOU MITIGATION BANK ASSOCIATED LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY (LDEQ) SUBSEGMENTS MAP TERREBONNE PARISH, LOUISIANA

Bayou Blue

Bayou Terrebonne

Legend

FIGURE 20

5

Bayou Blue

Bayou Pointe au Chien

Bayou Chauvin

Lake Penchant

Lake de Cade

Intracoastal Waterway

Bayou Petit Caillou

Bayou Blue

Bayou LDEQ Subsegment (Bayou Black) Terrebonne

Date: 5/22/2017 Drawn by: BL Checked by: RG

Legend S ite ( 1, 123. 4a c) Culve rt To Be Re m ove d/ Plug g e d( 73)

! ? !

_ ^

!!

!

!

!

! !

!

!

!!

. !

!

! !!

Ma jor Dra ina g e Fe a ture

! !!

!!

!

!

!!

!!!

"

? !

! ?

! ?

! ?

! ?

! ?

! !!

!

!

!

!

" "

!

D

!!!

!

!

!

!

!

! !

! . . ! . ! . ! . ! . ! !

!!

! ! !

!!

!

! ?

!

. !

!

!!

!

! ! ! !

!

!

! ?

! ?

! ?

! ?

! ? ! ?

_ ^

Comeaux Canal

! !!

!!!

! !!

!!!

! !!

!!!

! !!

! ? ! ? ! ?

! ?! ? !!!

_ ^ ! !!

? ! ? !

!!!

!! !

! ?

! ?

! ? !

! ?

!

!

A'

!!

!

!

!!

! !!

!!

!

!!!

! ?

!

!

!!

! !!

! ?

! ?

!

!

! ?

! ?

!!!

! ?

! ?

!

! ? ! ? ! ? ! ? ! ? ! ? ! ? ! ? ! ? ? ! ? ! ! ? ? .! !

Ridg e

! ? ! ?

A

_ ^

! ?

D'

!

!

! ?

!!

!

! ?

"

C'

!!! !

. !

C

!

!!

!

!

!

!

N Ri atu ng r a oC lD oc rai ke na Ca g e na l

u

!

!!

!

!

!

. !

!!

!

ayo

!

!

!

_ ^

Fie ldDra in To Be Plug g e d( 16) Ditch To Be Ba ckf ille d( 8, 181L. F. )

? !! ?

" "

!

!! !

! ? !! !

!

!

B Po

!

!

! ?

Propose d100'Wide Le ve e Ga p ( 6)

! ?

! ?

!

! ! !

. !

!

!

!

_ ^

. !

Docum e nt Pa th :C: \ Use rs \ Wa rne r\ Dropb ox( RES ) \ @RES GI S \ Proje c ts\ LA\ Ch a c a h oula Ba you\ Prospe c tus \ MXD\ Fig ure 20_Ch a c a h oula Ba y ou_Hydrolog icI m prove m e ntMa p. m xd

" "

B

B'

! ? !!

_ ^

!

! ?

!!

!

! ?

!!

!

0

750

Fe e t

1, 500

TERREBONNE PARISH, LOUISIANA

!!

!

! ?

!

! ? ! ? !!

I m a g e ryta ke n f rom 2015NAI P. Horiz onta lDa tum isNAD83UTM Zone 15N.

CHACAHOULA BAYOU MITIGATION BANK PLAN VIEW & HYDROLOGIC IMPROVEMENTS MAP

! ?

!!

! ?

FIGURE 21

! ? ! ?

! ?

. !

. !

©

. !

! ?

Da te :6/ 7/ 2017 Dra wn b y:BL Ch e cke db y :RG

!

. !

10.0

PFO WETLAND

OTHER WATERS

PFO WETLAND

SPOIL

5.0

5.0

0.0

0.0

-5.0

Elevation, FT

Elevation, FT

10.0

-5.0 0

50

100

150

200

250

300

Distance, FT.

TYPICAL CROSS-SECTION EXISTING LEVEE

10.0

10.0 OTHER WATERS

PFO WETLAND

SPOIL REMOVED

5.0

5.0

0.0

0.0

-5.0

Elevation, FT

Elevation, FT

PFO WETLAND

-5.0 0

50

100

150

200

250

300

Distance, FT.

TYPICAL CROSS-SECTION LEVEE GAPPED

CBMB_XSectionA-A_GAP.dwg

*Spoil material will be redeposited within agricultural fields at or near grade or will be deposited in nonwetland areas. FIGURE 21A TYPICAL CROSS-SECTION A-A' CHACAHOULA BAYOU MITIGATION BANK TERREBONNE PARISH, LOUISIANA

0'

50'

Horizontal Scale Vertical Scale Is As Shown

0

2

1

3

4

5

6

1.50

1.50

EXISTING AGRICULTURE 1.00

Existing Grade

0.00

0.00

-1.00

-1.00

-1.50

Depth, FT

Depth, FT

1.00

-1.50 0

2

6

4

10

8

12

Distance, FT.

TYPICAL CROSS-SECTION FIELD DRAIN

0

2

1

3

4

5

6

1.50

1.50

BLH RE-ESTABLISHED

1.00

Cut

Cut

0.00

0.00

Existing Grade

Fill

Depth, FT

Depth, FT

1.00

*Use Existing Material For Backfill -1.00

-1.00

* Field drain to be filled to the extent that adjacent spoil will allow. CBMB_XSectionB-B_FieldDrain.dwg

-1.50

-1.50 0

2

4

6

8

10

12

Distance, FT.

FIGURE 21B TYPICAL CROSS-SECTION B-B' CHACAHOULA BAYOU MITIGATION BANK TERREBONNE PARISH, LOUISIANA

TYPICAL CROSS-SECTION PROPOSED FIELD DRAIN BACKFILLED 0'

2'

4'

Horizontal Scale Vertical Scale Is As Shown

0

1

2

4

3

5

6

1.50

1.50

EXSITING AGRICULTURE

1.00

Existing Culvert To Be Removed 0.00

0.00

8'' TO 24''

Existing Material (To Remain)

-1.00

Elevation, FT

Elevation, FT

1.00

-1.00

-1.50

-1.50 0

2

4

6

10

8

12

Distance, FT.

TYPICAL CROSS-SECTION CULVERT

0

1

2

4

3

5

6

1.50

1.50

RE-ESTABLISHED WETLANDS 1.00

Culvert Removed 0.00

0.00

* Existing Material -1.00

-1.00

RESTORED SWALE TO NATURAL GRADE

-1.50

-1.50

CBMB_XSectionC-C_Culvert.dwg

0

2

4

CHACAHOULA BAYOU MITIGATION BANK TERREBONNE PARISH, LOUISIANA

6

8

10

12

Distance, FT.

FIGURE 21C TYPICAL CROSS-SECTION C-C'

Elevation, FT

Elevation, FT

1.00

TYPICAL CROSS-SECTION PROPOSED CULVERT REMOVAL 0'

2'

4'

Horizontal Scale Vertical Scale Is As Shown

*Removed culvert to be filled to the extent that adjacent spoil will allow, no outside fill material utilized.

2.0

2.0

SPOIL

OTHER WATERS

AGRICULTURE

1.0

1.0

0.0

0.0

-1.0

-1.0

Elevation, FT

Elevation, FT

AGRICULTURE

-2.0

-2.0

0

10

30

20

40

50

60

Distance, FT.

TYPICAL CROSS-SECTION EXISTING DITCH

2.0

2.0

BLH RE-ESTABLISHED

1.0

CUT

0.0

0.0

*FILL -1.0

Elevation, FT

Elevation, FT

1.0

-1.0

*Ditch to be filled to the extent that adjacent spoil will allow. CBMB_XSectionD-D_Ditch.dwg

-2.0

FIGURE 21D TYPICAL CROSS-SECTION D-D' CHACAHOULA BAYOU MITIGATION BANK TERREBONNE PARISH, LOUISIANA

-2.0

0

10

20

30

40

50

Distance, FT.

TYPICAL CROSS-SECTION PROPOSED DITCH BACKFILL 0'

15'

Horizontal Scale Vertical Scale Is As Shown

60

! !!

!! !

E

! !!

! !!

! !! ! !!

!!!

!!!

Ca na l

!!!

!! !

E

Ru

nR

d.

!! !

Ri ng oC oc ke

Bu ll

E

E

!! !

_ ^

E

! !!

E

E

!! !

!! !

!! !

E

u

!! ! !! !

E

o Bay Po

!! !

!! !

E

!! !

!! !

E

!! !

_ ^

!! !

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure_ChacahoulaBayou_ProposedPostRestorationHydrology.mxd

E

E

_ ^

Comeaux Canal

E E

E

E

E

E

E

E

!! !

_ ^

E

!! ! !! !

E

_ ^

E

E E

_ ^ Legend

E

Site (1,123.4 ac)

_ ^

Proposed Levee Gap (6)

E

E

Flow Direction

!!!

!!!

Major Drainage Feature Natural Ridge

Imagery taken from 2015 NAIP. Horizontal Datum is NAD83 UTM Zone 15N.

0

© 750

Feet

FIGURE - 22

1,500

CHACAHOULA BAYOU MITIGATION BANK PROPOSED POST-RESTORATION HYDROLOGY TERREBONNE PARISH, LOUISIANA

Date: 6/1/2017 Drawn by: BL Checked by: TW

Well #212516 Plugged and Abandoned Gas 01/21/1994 Water Well #109-5241Z Plugged and Abandoned RigSupply

Well #30699 Dry and Plugged 10/20/1945 Well #218943 Dry and Plugged 06/01/1996

Water Well #109-5419Z Plugged and Abandoned RigSupply

Well #73599 Dry and Plugged 02/26/1959

Well #232472 PS-35 Temporary Inactive Well Gas 03/14/2006

Well #231560 PS-35 Temporary Inactive Well Gas 08/06/2005

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure21_ChacahoulaBayou_Oil_Gas_WaterWellMap.mxd

Well #68471 Plugged and Abandoned Gas 03/27/1968

Water Well #109-5634Z Plugged and Abandoned RigSupply

Legend Site (1,123.4 ac +/-) Pipeline Centerline (24,190 L.F.) Oil & Gas Wells (7)

Imagery taken from 2015 NAIP. Well data provided by SONRIS. Horizontal Datum is NAD83 UTM Zone 15N.

Water Wells (3) FIGURE 23

0

750 Feet

1,500

CHACAHOULA BAYOU MITIGATION BANK OIL & GAS AND WATER WELL MAP TERREBONNE PARISH, LOUISIANA

Date: 1/26/2017 Drawn by: BL Checked by: RG

Vicksburg District

Mobile District

Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure22_ChacahoulaBayou_ServiceAreaMap.mxd

New Orleans District

Legend Site (1,123.4 ac +/-) LRAM Service Area - Terrebonne Basin USACE Districts Base map taken from LADOTD Louisiana state map. Horizontal Datum is NAD83 UTM Zone 15N.

FIGURE 24

0

10 Miles

20

CHACAHOULA BAYOU MITIGATION BANK SERVICE AREA MAP TERREBONNE PARISH, LOUISIANA

Date: 1/25/2017 Drawn by: BL Checked by: RG

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas