PROPOSED CHACAHOULA BAYOU MITIGATION BANK IN TERREBONNE PARISH
NAME OF APPLICANT: Fourth Louisiana Resource, LLC c/o Resource Environmental Solutions, LLC Attention: Mr. Richard Greig, 412 North Fourth Street, Suite 300, Baton Rouge, LA 70802
LOCATION OF WORK: The proposed site is located in Section 108, Township 16 South, Range 16 East, Sections 37, 38, 39 and 40, Township 16 South, Range 15 East, Sections 27 and 28, Township 17 South, Range 15 East, and Sections 32, 33, and 34, Township 17 South, Range 16 East. The 1,123.4-acre site is located approximately 10.6 miles from Gibson, Louisiana. From LA 20 in Gibson, Louisiana head east for 5.0 miles, turn right onto Bull Run Road and travel 5.6 miles, the site is on the south side of Bull Run Road. The site is centered on the point 29° 38’ 08.45” N, -90° 52’ 17.75’’ W, located in Hydrologic Unit Code 08090302, as shown in the attached prospectus.
CHARACTER OF WORK: Site restoration shall be accomplished through hydrological restoration and afforestation of the native vegetative community. This includes abandoning farming operations, gapping the interior perimeter levee, plugging field drains, removing or plugging culverts, backfilling ditches, site preparation, elimination of invasive species, and replanting of appropriate species in order to generate bottomland hardwood and cypress-tupelo swamp credits that could be used as compensation for unavoidable impacts to wetlands associated with Department of the Army (DA) permits authorized under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
REPLY TO
ATTENTION OF
09/25/2017
Operations Division
Regulatory Branch
Project Manager: Stephen Pfeffer
stephen.d.pfeffer@usace.army.mil
(504) 862-2099
SUBJECT: MVN-2016-01058-MS
PUBLIC NOTICE
Public Notice Purpose: Pursuant to Section 10 of the Rivers and Harbors Act of
March 3, 1899 (30 Stat. 1151; 33 USC 403) and Section 404 of the Clean Water Act (86
Stat. 816; 33 USC 1344), the U.S. Army Corps of Engineers, New Orleans District,
Regulatory Branch is soliciting comments from all interested parties on the
development, utilization and long-term management of a proposed mitigation bank. The
purpose of this mitigation bank is to provide compensatory mitigation for unavoidable
impacts to wetland resources, including other waters of the United States, that result
from projects authorized through the Department of the Army permit program.
PROPOSED CHACAHOULA BAYOU MITIGATION BANK
IN TERREBONNE PARISH
NAME OF APPLICANT: Fourth Louisiana Resource, LLC c/o Resource Environmental
Solutions, LLC Attention: Mr. Richard Greig, 412 North Fourth Street, Suite 300, Baton
Rouge, LA 70802
LOCATION OF WORK: The proposed site is located in Section 108, Township 16
South, Range 16 East, Sections 37, 38, 39 and 40, Township 16 South, Range 15 East,
Sections 27 and 28, Township 17 South, Range 15 East, and Sections 32, 33, and 34,
Township 17 South, Range 16 East. The 1,123.4-acre site is located approximately
10.6 miles from Gibson, Louisiana. From LA 20 in Gibson, Louisiana head east for 5.0
miles, turn right onto Bull Run Road and travel 5.6 miles, the site is on the south side of
Bull Run Road. The site is centered on the point 29° 38' 08.45" N, -90° 52' 17.75'' W,
located in Hydrologic Unit Code 08090302, as shown in the attached prospectus.
CHARACTER OF WORK: Site restoration shall be accomplished through hydrological
restoration and afforestation of the native vegetative community. This includes
abandoning farming operations, gapping the interior perimeter levee, plugging field
drains, removing or plugging culverts, backfilling ditches, site preparation, elimination of
invasive species, and replanting of appropriate species in order to generate bottomland
hardwood and cypress-tupelo swamp credits that could be used as compensation for
-2unavoidable impacts to wetlands associated with Department of the Army (DA) permits
authorized under Section 404 of the Clean Water Act and Section 10 of the Rivers and
Harbors Act.
The Corps of Engineers is soliciting written comments from the public; federal, state,
and local agencies and officials; Indian Tribes; and other interested parties. The
comment period will close 30 days from the date of this public notice advertisement.
Written comments, including suggestions for modifications or objections to the proposed
work, stating reasons thereof, are being solicited from anyone having interest in this
prospectus. Letters must reference the applicant's name and the subject number, be
addressed and mailed to the above address,
ATTENTION: REGULATORY BRANCH.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosure
Final Prospectus
Chacahoula Bayou Mitigation Bank
Terrebonne Parish, Louisiana
PREPARED FOR
U.S. Army Corps of Engineers, New Orleans District
PREPARED AND SUBMITTED BY
Fourth Louisiana Resource, LLC
c/o Resource Environmental Solutions, LLC
412 N. Fourth Street, Suite 300
Baton Rouge, Louisiana 70802
DATE:
June 8, 2017
Table of Contents
1
2
3
INTRODUCTION .............................................................................................................. 1
1.1
PROJECT DESCRIPTION ..................................................................................................... 1
1.2
SITE LOCATION ................................................................................................................. 1
PROJECT GOALS AND OBJECTIVES ................................................................................... 2
2.1
GOALS ............................................................................................................................... 2
2.2
OBJECTIVES ....................................................................................................................... 3
ECOLOGICAL SUITABILITY OF THE BANK SITE ................................................................... 3
3.1
HISTORICAL ECOLOGICAL CHARCTERISTICS OF THE SITE................................................. 3
3.2
CURRENT ECOLOGICAL CHARCTERISTICS OF THE SITE .................................................... 3
3.2.1
HISTORICAL HYDROLOGY ...................................................................................................... 4
3.2.2
EXISTING HYDROLOGY .......................................................................................................... 4
3.2.2
PARISH CLIMATE DATA ......................................................................................................... 5
3.2.3
PHYSICAL SUITABILITY OF THE SITE....................................................................................... 5
3.2.4
SOIL SURVEY .......................................................................................................................... 6
3.2.5
CHEMICAL SUITABILITY OF THE BANK................................................................................... 7
3.2.6
BIOLOGICAL SUITABILITY OF THE BANK ................................................................................ 7
3.2.7
VEGETATION SURVEY ............................................................................................................ 7
3.2.8
ENDANGERED AND THREATENED SPECIES AND HABITATS .................................................. 8
3.2.9
PRELIMINARY JURISDICTIONAL DETERMINATION ................................................................ 9
3.3
GENERAL NEED FOR THE PROJECT IN THIS AREA ............................................................ 9
3.3.1
4
WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE .............................. 9
3.4
TECHNICAL FEASIBILITY .................................................................................................. 11
3.5
CULTURAL RESOURCES ................................................................................................... 11
3.6
PROPERTY CONSTRAINTS ............................................................................................... 11
3.7
ZONING AND ADJACENT PROPERTY DEVELOPMENT ..................................................... 12
ESTABLISHMENT OF THE MITIGATION BANK ................................................................. 12
4.1
SITE RESTORATION PLAN ............................................................................................... 12
4.1.1
RESTORATION OVERVIEW ................................................................................................... 12
4.1.2
HYDROLOGICAL RESTORATION ........................................................................................... 13
4.1.3
SOIL PREPARATION ............................................................................................................. 13
4.1.4
VEGETATIVE PLANTINGS ..................................................................................................... 13
4.1.5
INVASIVE/NOXIOUS PLANT CONTROL ................................................................................ 15
4.1.6
MONITORING ...................................................................................................................... 15
4.2
5
4.2.1
THREATS WITHIN THE BANK ............................................................................................... 15
4.2.2
RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS.............................................. 15
4.2.3
ENCUMBRANCES ................................................................................................................. 15
4.2.4
ZONING AND PROPOSED DEVELOPMENT ........................................................................... 16
4.3
LONG-TERM SUSTAINABILITY OF THE SITE .................................................................... 16
4.4
ASSURANCE OF WATER RIGHTS ..................................................................................... 16
PROPOSED SERVICE AREA ............................................................................................. 16
5.1
6
7
CURRENT SITE RISKS ....................................................................................................... 15
RATIONALE FOR SERVICE AREA DETERMINATION ......................................................... 16
OPERATION OF THE MITIGATION BANK ........................................................................ 17
6.1
PROJECT REPRESENTATIVES ........................................................................................... 17
6.2
QUALIFICATIONS OF THE SPONSOR ............................................................................... 17
6.3
PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES ........... 17
6.4
SITE PROTECTION ........................................................................................................... 18
6.5
LONG-TERM STRATEGY .................................................................................................. 18
REFERENCES ................................................................................................................. 19
ii
List of Tables
Table 1: Proposed Mitigation Bank Habitats....................................................................................... 2
Table 2: Existing Land Cover and Land Use of the Bank..................................................................... 4
Table 3: Representative Bottomland Hardwood Species Suitable for the Bank........................... 14
Table 4: Representative Baldcypress/Tupelo Swamp Species Suitable for the Bank................... 14
List of Figures
Figure 1: Vicinity Map
Figure 2: U.S.G.S. 24k Quad Topo Map
Figure 3: Land Cover / Land Use with a 10-mile Radius Around Site Map
Figure 4: Proposed Mitigation Habitat Type Map
Figure 5: 1956 Aerial and Historical Land Cover Map
Figure 6: 1963 Aerial
Figure 7: 1973 Aerial
Figure 8: 1998 Aerial
Figure 9: 2004 Aerial
Figure 10: 2008 Aerial
Figure 11: 2010 Aerial
Figure 12: 2015 Aerial
Figure 13: Existing Land Cover / Land Use Map
Figure 14: Existing Drainage Pump Locations Map
Figure 15: Existing Hydrology within the Perimeter Levee
Figure 16: Historical Drainage Area Map
Figure 17: Existing Elevations Map
Figure 18: Soils Map
Figure 19: Preliminary Jurisdictional Determination
Figure 20: LDEQ Subsegment and Site Map
Figure 21: Plan View and Hydrological Improvements Map
Figure 21A: Cross-section of Interior Levee Gapping
Figure 21B: Cross-section of Field Drains to be Plugged
Figure 21C: Cross-section of the Culverts to be Removed
Figure 21D: Cross-section of Ditches to be Backfilled
Figure 22: Post-Construction Hydrology
Figure 23: Oil & Gas and Water Well Sites Map
Figure 24: Service Area Map
iii
Chacahoula Bayou Mitigation Bank Final Prospectus
1 INTRODUCTION
Fourth Louisiana Resource, LLC (hereinafter the Sponsor) has prepared this prospectus for submittal to
the U.S. Army Corps of Engineers New Orleans District (USACE) and Interagency Review Team (IRT) to
provide an overview of the establishment and operation of the Chacahoula Bayou Mitigation Bank (the
"Bank"). The details pertaining to the use of this site as a mitigation bank shall be specified in the
subsequent Mitigation Banking Instrument (MBI).
1.1
PROJECT DESCRIPTION
The Bank is identified as having the potential to help meet the compensatory mitigation requirements
for bottomland hardwood (BLH) and baldcypress-tupelo (CT) impacts in the LRAM Terrebonne Basin
service area and more specifically within the Hydrologic Unit Code (HUC) 08090302, within the West
Central Louisiana Coastal Basin, located in Terrebonne Parish, Louisiana.
The predominate existing land covers are woody and herbaceous wetlands and the predominate land
use is sugarcane according to the U.S. Department of Agriculture's (USDA) 2016 Cropland Data Layers
(CDL). Historically, the Bank's land use was 46.5 percent flood plain, 8.8 percent backswamp and 44.7
percent natural levee according to the USDA landform classifications associated with soil types. Site
conditions are such that make restoration of the site very practical using commonly employed
restoration methods (i.e. tree planting, removal of hydrologic impediments and back filling of ditches).
Given these activities coupled with the soils and size of the Bank, these restoration efforts shall require
little long-term management or maintenance, which creates a self-sustainable aquatic resource.
The cumulative preservation, re-establishment or enhancement of BLH and CT is 987.8 acres with 135.6
acres of non-mitigation features comprised of the Ringo Cocke Canal, maintenance and utility right-ofways (ROWs), this equates to a 1,123.4-acre Bank site. Specifically, the Bank shall provide 274.2 acres of
a re-established and 51.6 acres of preserved BLH forest. Additionally, the Bank shall provide 48.3 acres
of a re-established, 190.0 acres of enhanced and 423.6 acres of preserved CT.
The ecological benefits to the watershed provided by the Bank will be extensive. The Bank proposes to
protect the water quality downstream by enhancing various biogeochemical cycles and improving water
quality, while providing habitat and refuge to wildlife. Furthermore, it shall establish a dynamically stable
BLH and CT habitat resistant and resilient to disturbance events. The longevity and function of the system
shall be ensured through long-term conservation measures. Furthermore, the Bank shall provide flexible
and economically efficient mitigation opportunities to compensate for losses in the aquatic resource
function resulting from unavoidable impacts within the watershed.
1.2
SITE LOCATION
The proposed bank is located on a tract in which the Sponsor owns just northwest of Houma in
Terrebonne Parish, Louisiana (Figures 1 and 2). The 1,123.4-acre tract is located approximately 10.6
miles from Gibson, Louisiana. From LA-20 in Gibson, Louisiana head east for 5.0 miles, turn right onto
Bull Run Road and travel 5.6 miles, the Bank will be on the south side. The Bank is centered on the point
29° 38' 08.45"' N, -90° 52' 17.75'' W. The Bank is within Section 108 within Township 16 South and Range
1
Chacahoula Bayou Mitigation Bank Final Prospectus
16 East, Sections 37, 38, 39 and 40 within Township 16 South and Range 15 East, Sections 27 and 28
within Township 17 South and Range 15 East, and Sections 32, 33, and 34 within Township 17 South and
Range 16 East.
The Bank is bound to the northwest, west and south by woody wetlands. The northeast and eastern side
of the Bank are currently used as agricultural land. Expanding a 10-mile radius around the Bank reveals
that the existing predominate land covers are woody and herbaceous wetlands (75 percent) with the
predominate land uses being developed areas (10.4 percent) and sugarcane (5 percent) in culmination
this account for 90.4 percent of the land cover and land use surrounding of the Bank (Figure 3).
2 PROJECT GOALS AND OBJECTIVES
The Bank proposes to preserve and re-establish BLH habitat, as well as enhance, re-establish and
preserve CT within the West Central Louisiana Coastal basin. The Ringo Cocke Canal, cemetery and
maintenance and utility ROW features shall be maintained as non-mitigation acreage within the Bank.
The Bank shall provide additional BLH and CT functions and values not currently utilized under existing
conditions and land use.
2.1
GOALS
The primary goal of the Bank is to enhance and rejuvenate the native vegetative community, enhance
the topography and reconnect hydrology within the Bank. The secondary goal of the Bank is to enhance
various biogeochemical cycles, improve sediment retention and reduce nonpoint source pollution. The
tertiary goal of the Bank is to provide habitat and refuge to wildlife. With the holistic goal of establishing
a self-sustaining BLH and CT habitat resistant and resilient to disturbance events that shall maintain,
restore, preserve or enhance aquatic ecosystem function and water quality within the catchment.
Based on the historical land use, soils data and current vegetation within the Bank. The Bank proposes
to preserve and re-establish 325.8 acres of BLH habitat and re-establish, enhance and preserve 661.9
acres of CT habitat (Table 1 and Figure 4).
Table 1: Proposed Mitigation Bank Habitats
Mitigation Type
Preservation
Re-establishment
Total BLH
BLH
Acreage
51.6
274.2
Mitigation Type
Re-establishment
Enhancement
Preservation
325.8
Total CT
Non-mitigation Features: 135.6 acres
Total Acres of Bank Site: 1,123.4 acres
CT
Acreage
48.3
190.0
423.6
661.9
2
Chacahoula Bayou Mitigation Bank Final Prospectus
2.2 OBJECTIVES
The goals of the Bank shall be accomplished through the following objectives:
·
·
·
·
·
·
·
3
Re-establishment, enhancement or preservation of BLH or CT habitat across the Bank;
Enhance and rejuvenate the vegetative community structure through vegetative plantings of
native species and forest management strategies;
Gapping interior perimeter levees to restore flow within the entire Bank and surrounding
wetlands;
The planting of trees shall result in overall water quality improvements due to increased filtration
and enhanced biogeochemical cycling
The cessation of various agricultural practices shall reduce nonpoint source pollution;
Ensuring Bank stability and continuity by protecting the site in perpetuity with a conservation
easement; and
Ensure the long-term viability and sustainability of the Bank through monitoring and long-term
maintenance and adaptive management activities, as needed.
ECOLOGICAL SUITABILITY OF THE BANK SITE
Details on the ecological suitability of the Bank to achieve the objectives of the proposed mitigation bank
and how the Bank shall support the planned types of aquatic resources and functions is provided in the
subsections below:
3.1 HISTORICAL ECOLOGICAL CHARCTERISTICS OF THE SITE
The historical conditions of the Bank were derived from the USDA landform classifications associated
with the soils. The historical state of the Bank was 46.5 percent floodplain, 44.7 percent natural levee
and 8.8 percent backswamp (Figure 5). The sugarcane fields onsite, which are primarily along the natural
levees have been in production for over 100 years and still actively farmed. Examination of historical
aerial photographs indicate that portions of the Bank have been kept in a pastoral state since at least
1956 (Figures 5 to 12). The years of agricultural use have severely impacted the Bank beyond the removal
of native vegetation.
3.2 CURRENT ECOLOGICAL CHARCTERISTICS OF THE SITE
The historical land cover has been eradicated from approximately 32 percent of the Bank's landscape
and replaced with some form agricultural use (Figure 13 and Table 2). BLH found within the Bank exist
in four (4) locations with three (3) of those locations inside the perimeter levee system that separates
the agricultural fields from the wetlands. One of these BLH areas is a 0.5-acre old cemetery, located in
the northwestern portion of the sugarcane fields. Two other BLH inclusions within the levee system are
ditched and appear to have been historically in sugarcane production, but at some point approximately
50 years ago, were abandoned, potentially for being too wet to farm, BLH were allowed to regenerate.
The remaining BLH exist on a small ridge just outside of the leveed area, near the center of the southern
boundary of the property. The small shrub/scrub wetland inclusion is located around a plugged and
abandoned oil/gas well in the southwestern corner of the sugar cane fields. Cypress swamp exists in the
southern and western reaches of the Bank. Outside of the interior levee system is all existing wetland.
3
Chacahoula Bayou Mitigation Bank Final Prospectus
Table 2: Existing Land Use and Land Cover of the Bank:
Category
Herbaceous and Woody Wetland
Agriculture
Developed
Shrubland
*Based on 2016 USDA CDL Data
Acres
760.0
354.0
6.2
0.2
Percent Cover*
68.0
31.5
0.4
0.1
3.2.1 HISTORICAL HYDROLOGY
Personal communications, with the 30-year hunting lease holder, on April 26, 2017 during the IRT team's
field site visit revealed that the historical hydrological regime consisted of the Bank's water flowing and
exiting through the northwestern corner of the Bank site through Po Bayou. There was a dam
constructed in this area that restricts flow from the Bank. The Bank operated under gravity flow until
about 1982 or 1983, which is when the pumps were installed. Based on this personal communication
the ridge that exists along the southwestern portion of the Bank inhibits the water from flowing south,
due to the characteristics of the ridge. The ridge fans out towards the west and east and bends back
towards the Bank directing the water within the Bank to exit via Po Bayou on the west. Water is
transported from Po Bayou to Ringo Cocke Canal and into Black Bayou.
3.2.2 EXISTING HYDROLOGY
As a result of efforts to facilitate drainage and enhance sugarcane production, the natural hydrology of
the Bank was altered. Hydrology within the Bank has been intensely managed for agricultural activities
through a combination of field drains, interior levees, culverts and drainage ditches controlled by a pump
and discharged into the surrounding BLH habitat. Subbasins within the re-establishment portions
(existing sugarcane fields) of the Bank are isolated by man-made levees. Water levels within the
sugarcane fields along Bull Run Road are kept at lower levels than the external levees by drainage pumps.
Drainage pump 1 is located along the perimeter levee to the west that separates the proposed BLH and
CT habitats. Drainage pump 2, which shall remain, is operated by the Natural Resources Conservation
Services (NRCS) Sugarcane Ardoyne Research Farm on Bull Run Road. This drainage pump is located
outside the southeastern most corner of the Bank property. This pump currently, drains the easternmost
subbasin of the Bank south of Bull Run Road (Figure 14).
Existing hydrology within the perimeter levee: The BLH-1 parcel flows southeast into the drainage pump
2, operated by NRCS. The BLH-5 parcel is currently undeveloped wetland ringed by an interior levee to
approximately three (3) feet with no apparent outfall. Forced drainage keeps interior wetlands water
tables lower in BLH-5 than the levels outside the perimeter levee. BLH-6 is similarly isolated with a levee
two (2) feet in elevation. A slight ridge separates BLH-3 and BLH-4, flows from these tracts and BLH-2
and CT-1 are routed to drainage pump 1 (Figure 15).
Interior drainage channels approaching drainage pump 1, a diesel engine powered pump, are
approximately 20 feet wide, with the top of the channel elevation at approximately one (1) foot with an
estimated bottom elevation of -4 to -5 feet. The outfall channel for the drainage pump discharges
4
Chacahoula Bayou Mitigation Bank Final Prospectus
through existing wetland toward Ringo Cocke Canal. The outfall area is scoured approximately 30 feet
wide and to an undetermined depth.
The sources of water to the Bank are currently direct precipitation and surface flow from all adjacent
land from the north to southwest. Currently, hydrology within the CT areas, which are outside of the
interior perimeter levee system, have been altered due to Comeaux Canal. Personal communications
with the current 30-year hunting lease holder, on April 26, 2017, revealed that after the construction of
Comeaux Canal the CT habitats began showing signs of stress and die off due to the altered hydrology.
3.2.2 PARISH CLIMATE DATA
Southwest Louisiana has a warm, humid, subtropical climate characterized by relatively high rainfall. The
U.S. Climate Data for Houma, Louisiana states the average annual precipitation is 62.18 inches, of this
85 percent, usually fall in February through November, which is the growing season for most crops.
3.2.3 PHYSICAL SUITABILITY OF THE SITE
The Bank's physical properties (topographic, geologic and hydrologic) are optimal to support
enhancement, preservation, and re-establishment efforts, as historic anthropogenic manipulation has
altered and degraded the ecological and hydrological functionality of the Bank. By restoring native
vegetative communities and hydroperiods to the degraded floodplain, backswamp and natural levees
the benefit to local flora and fauna shall be enhanced, along with water quality and biogeochemical
cycling. Thus, benefiting HUC 08090302 and the regional watershed.
The on-site surface hydrology within the fields flows from north to south through small field drains and
directed into a drainage ditch that runs along the western and southern perimeter of the sugarcane
fields. Water in this drainage ditch is controlled by a pump with an automatic float switch. When the
water reaches a certain height the pump starts and transfers water from the drainage ditch on the north
side of the levee into the swamp on the southern side of the levee. Hydrology within the swamp flows
generally from north to south and from east to west.
The existing drainage area of the Bank was estimated using topographic layers and the National
Hydrography Dataset (NHD) in ArcGIS. Flow directional arrows were added to the NHD flowlines to
identify which water features flowed into the Bank. Historically, the drainage area for the Bank was the
Verret subbasin, which drains into the Penchant subbasin. However, drainage between these two (2)
subbasins is naturally blocked by the Black Bayou Ridge, except for a natural outlet near Amelia. Due to
hydrological modifications within the Verret Subbasin, the current drainage area of the Bank is estimated
to be 39.5 square miles or 25,280 acres (Figure 16). Within the Bank itself, the major modifications that
alter the drainage pattern are the interior levees, field drains, culverts and drainage ditches for the
agricultural fields that exist throughout the Bank.
Topography of the Bank shall allow for restoration of the Bank with minimal impact to the site. According
to the USGS DRG24K data the land is fairly homogenous with elevations ranging from approximately two
(2) to six (6) feet, gently sloping to the southwest of the Bank. This slopes towards wetlands that are
located due south of the Bank (Figure 17). The higher elevation areas occur near Bull Run Road along the
5
Chacahoula Bayou Mitigation Bank Final Prospectus
northern perimeter of the Bank and along the interior perimeter levees. Of the total Bank acreage, 48.7
acres are above five (5) feet in elevation.
3.2.4 SOIL SURVEY
The Bank is located in the southcentral region of Louisiana in Terrebonne Parish within the Mississippi
Alluvial Plain ecoregion of the state. The NRCS soil survey for Terrebonne Parish identifies eight (8) soil
map units within the Bank with all soils identified as having a hydric component (Figure 18). The presence
of hydric soils indicate the Bank is either currently inundated or saturated in the upper soil profile for at
least 14 consecutive days annually or was subject to these conditions prior to conversion of the Bank
site to agriculture. The Bank is comprised primarily of clayey to silty alluvium soils, which, in this area,
typically have a seasonal high water table between the surface and two (2) feet below the surface during
the months of February through November. Bank site soils are as follows:
Barbary Muck (BRA) covers 14 percent of the Bank site.
· BRA series consist of flood plain land forms with a parent material of fluid clayey alluvium derived
from sedimentary rock with very deep, poorly drained soils, which are frequently flooded. BRA is
listed as 100 percent hydric.
Cancienne Silt Loam (CbA) covers 18.2 percent of the Bank site.
· CbA series consist of natural levee land forms with a parent material of silty alluvium with very
deep and somewhat poorly drained soils. CbA series is listed as two (2) percent hydric.
Cancienne Silty Clay Loam (Cda) covers 18.4 percent of the Bank site.
· CdA series consist of natural levee land forms with a parent material of silty alluvium with very
deep and somewhat poorly drained soils. CdA series is listed as 10 percent hydric.
Fausse Clay (FAA) covers 16 percent of the Bank site.
· FAA series consist of flood plain land forms with a parent material of clayey alluvium with very
deep and very poorly drained soils, which as frequently flooded. FAA series is listed as 100
percent hydric.
Gramercy-Cancienne (GcA) covers 6.7 percent of the Bank site.
· GcA series consist of natural levee land forms with a parent material of clayey alluvium with very
deep with somewhat to poorly drained soils. GcA series is listed as 45 percent hydric.
Schriever Clay (ShA) covers 0.4 percent of the Bank site.
· The ShA series consist of backswamp land forms with a parent material of clayey alluvium with
very deep and poorly drained soils. ShA series is listed as 98 percent hydric.
Schriever Clay (SIA) covers 17.8 percent of the Bank site.
· The SIA series consist of flood plain land forms with a parent material of clayey alluvium with very
deep, poorly drained soils, which are frequently flooded. SIA series is listed as 100 percent hydric.
Shriever Clay (SrA) covers 8.3 percent of the Bank site.
· SrA consist of flood plain land forms with a parent material of clayey alluvium with very deep and
poorly drained soils, which are occasionally flooded. SrA series is listed as 100 percent hydric.
6
Chacahoula Bayou Mitigation Bank Final Prospectus
3.2.5 CHEMICAL SUITABILITY OF THE BANK
The Bank shall be a suitable option for the restoration of the chemical processes within the watershed.
Spatial and temporal hydrologic enhancements shall allow for an improvement in the natural chemical
processes associated with wetlands, floodplains and naturally buffered stream systems. Long-term
protection for the quality of the waters of the State shall be gained through improved chemical processes
from re-established hydric soil conditions, nutrient retention, sequestration, and reduced aquatic and
terrestrial impairments from surface water runoff through improvements to the floodplain and lower
terrace areas of the Bank.
The Bank shall provide treatment to existing waters through the restoration, enhancement or
preservation of BLH and CT habitats. These shall be restored to their natural ecological condition of
predominantly soft- and hard- wood vegetation, including a diversity of gap phase conditions consisting
of early successional species in a seedling, scrub and sapling state. Site-specific restoration treatments
to rehabilitate these hydrologic conditions and ecological planned communities shall be addressed in
more detail in the Mitigation Plan of the draft MBI. Re-establishment, preservation or enhancement is
planned for all BLH and CT on-site.
3.2.6 BIOLOGICAL SUITABILITY OF THE BANK
The Bank is suitable to provide biological enhancements to habitat and utilization for the aquatic,
herpetofauna and terrestrial communities. As discussed in the Physical Suitability of the Bank section,
the regionality of the aforementioned areas shall increase the opportunities for native fauna to rest,
nest, forage and breed.
The biological soil properties are conducive to the enhancement, re-establishment or preservation of
BLH or CT habit due to plant and vegetation cover, the vegetation history of the area and soil organic
matter capabilities based on existing soil type. Despite a portion of the Bank being used for agricultural
activities the reinstitution of wetland hydrology and vegetation shall increase plant microbe interactions,
microbial diversity, soil organic matter, biogeochemical cycling and pore space.
3.2.7 VEGETATION SURVEY
The Bank is comprised of several different habitat types, which include non-wetland sugarcane fields,
BLH wetlands, small scrub/shrub wetlands and cypress swamps through the Bank.
Vegetation growing within the non-wetland sugarcane fields and on elevated spoil bank within the Bank
consists of a variety of herbaceous species. The dominant species in this habitat include sugarcane
(Saccharum officinarum), bahia grass (Paspalum notatum), bermuda grass (Cynodon dactylon), southern
dewberry (Rubus trivialis), spotted crane's-bill (Geranium maculatum), curly dock (Rumex crispus),
purple-top vervain (Verbena bonariensis), spiny-leaf sow-thistle (Sonchus asper), Canadian goldenrod
(Solidago canadensis), dog-fennel (Eupatorium capillifolium), annual marsh-elder (Iva annua), annual
ragweed (Ambrosia artemisiifolia), and large barnyard grass (Echinochloa crus-gali).
The BLH wetlands are dominated by species typically found in native BLH forests. The tree stratum
consists of species such as sugarberry (Celtis laevigata), green ash (Fraxinus pennsylvanica), eastern
cottonwood (Populus deltoides), water oak (Quercus nigra), Texas red oak (Quercus texana), cherry-bark
7
Chacahoula Bayou Mitigation Bank Final Prospectus
oak (Quercus pagoda), American elm (Ulmus americana), and Drummond red maple (Acer rubrum var.
Drummondii). The sapling shrub layer in this habitat includes the aforementioned species as well as
rough-leaf dogwood (Cornus drummondii), deciduous holly (Ilex decidua), and parsley hawthorn
(Crataegus marshallii). The herbaceous layer in this habitat is primarily comprised of palmetto (Sabal
minor), poison ivy (Toxicodendron radicans), southern dewberry (Rubus trivialis), sawbrier (Smilax
glauca), and Virginia creeper (Parthenocissus quinquefolia).
The small scrub/shrub wetland area located around a plugged and abandoned gas/oil well is dominated
by species such as groundsel tree (Baccharis halimifolia), rough-leaf dogwood, sugarberry, box elder
(Acer negundo), and green ash in the sapling/shrub stratum. The herbaceous layer in this habitat is
dominated by bushy bluestem (Andropogon glomeratus), southern dewberry, trumpet creeper (Campsis
radicans), and parrot's-feather (Myriophyllum aquaticum).
The dominant vegetation within the tree stratum of the cypress swamp includes southern bald-cypress
(Taxodium distichum), Drummond red maple, and black willow (Salix nigra). The sapling/shrub layer in
this habitat is comprised of the aforementioned species as well as button-bush (Cephalanthus
occidentalis). The herbaceous layer in the swamp is dominated by species such as lizard's-tail (Saururus
cernuus), alligator-weed (Alternanthera philoxeroides), and southern cat-tail (Typha domingensis).
3.2.8 ENDANGERED AND THREATENED SPECIES AND HABITATS
Plants and animals with a federal classification of endangered or threatened are protected under
provisions of sections 7 and 9 of the Endangered Species Act of 1973, as amended. The U.S. Fish and
Wildlife Service (USFWS) database listed two (2) species as threatened in Terrebonne Parish the piping
plover (Charadriu melodu), which is listed as S2 1N 2 and G3 3, the peregrine falcon (Falco peregrinus),
which is listed as S3N,
The U.S. Fish and Wildlife Service (USFWS) database listed four (4) species as endangered in Terrebonne
Parish the bald eagle (Haliaeetus leucocephalus), which as a listing of S3 4, the brown pelican (Pelecanus
occidentalis), which has a listing of S3. The pallid sturgeon (Scaphirhynchus albus) and manatee
(Trichechus manatus) is listed, but shall not be affected in any way within this Bank.
The proposed project may offer some potential to improve or create suitable habitat for species of
concern. Habitat may be improved or created for species that require wetland habitat by improving
water quality, in- and near-stream forage, and providing stable conditions not subject to regular
maintenance. The decision phase shall include USFWS coordination to confirm these findings.
1
S2 means imperiled in Louisiana because of rarity (6 to 20 known extant populations) or because of some factor(s) making it very vulnerable to
extirpation.
2 N means nesting
3 G3 means either very rare and local throughout its range or found locally (even abundantly at some of its locations) in a restricted range (e.g., a single
physiographic region) or because of other factors making it vulnerable to extinction throughout its range (21 to 100 known extant populations).
4
S3 means rare and local throughout the state or found locally (even abundantly at some of its locations) in a restricted region of the state, or because of
other factors making it vulnerable to extirpation (21 to 100 known extant populations)
8
Chacahoula Bayou Mitigation Bank Final Prospectus
3.2.9 PRELIMINARY JURISDICTIONAL DETERMINATION
The site was delineated in August 2016 by Resource Environmental Solutions, LLC and the Preliminary
Jurisdictional Determination (PJD), MVN-2016-01058-SY, was issued February 10, 2017. The JD indicated
that there were 763.7 acres of wetlands, 384.0 acres of uplands and 13.3 acres pf non-wetland area
Figure 19.
3.3 GENERAL NEED FOR THE PROJECT IN THIS AREA
Louisiana Department of Environment (LDEQ) has designated the waters of subsegment 120202 (Bayou
Black) as impaired according to the 2016 Integrated Report (IR), which identifies the status of all State
waterbodies as fully or not fully supporting their designated use (Figure 20). The subsegment, which
contains the Bank site is impaired for nutrients (nitrogen and phosphorus) and dissolved oxygen year
round and fecal coliform during the primary contact recreational months of May 1 October 31,
annually. Cessation of agricultural activities and hydrological restoration shall reduce nutrient and fecal
coliform loadings and may increase dissolved oxygen concentrations to the local waters reducing
nonpoint source pollution to the watershed.
Within the HUC 08090302 within Terrebonne Parish there are seven (7) mitigation banks. Of those seven
(7) banks only two (2) banks have BLH or CT credits available according to RIBITS, which was accessed on
January 25, 2017. Terrebonne and Lafourche Parish have outpaced most parishes in population growth
over the last 10 years according to the 2010 census. Terrebonne Parish's population increased seven (7)
percent from 2000 to 2010. According to the Louisiana REA Project the Parish's population continues to
grow (Louisiana REAP, 2016).
Additionally, BLH habitat are important for a variety of fauna, maintenance of water quality and
important in regulating flooding and stream recharge. BLH forest loss is estimated to be 50 to 75 percent
of the original pre-settlement acreage (LNHP, 2009). CT habitat has been reduced by an alarming 95 to
99 percent of its original extent (LNHP, 2009). Therefore, the Bank shall protect both of these habitats
by adding to its diminishing acreage, reintroducing the natural hydrologic regime, and native vegetation
into perpetuity. Lastly, the Bank is needed to allow for mitigation to offset population growth, oil and
gas exploration, pipeline and refinery structures.
3.3.1 WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE
Louisiana's Nutrient Management Strategy (LNMS) the May 2014 Edition, was developed as a concerted
effort between numerous state and federal agencies and through engagement with stakeholders within
Louisiana, for the purpose of managing nutrients (nitrogen and phosphorus) to protect, improve and
restore water quality in Louisiana's inland and coastal waters. The vision is to manage nutrient levels in
Louisiana to ensure the support of healthy aquatic communities, clean water for public, agricultural and
industrial use, to engage stakeholders at the local level and to actively support water quality protection,
improvement and restoration. Additionally, it is said these protection, improvement and restoration
strategies at the local level may have a cumulative and positive impact on the health of the receiving
waterbodies both within the State and Gulf of Mexico. This Bank accomplishes all aspects of the vision
for the LNMS by reducing agricultural impacts and enhancing, preserving, re-establishing or
9
Chacahoula Bayou Mitigation Bank Final Prospectus
rehabilitating BLH or CT habitat, which shall increase the efficiency of biogeochemical cycling within the
Bank, reducing nutrients in the receiving watersheds and transition the anthropogenically impacted area
back to its native state.
Louisiana's Coastal Nonpoint Pollution Control Program (CNPCP) is being developed between Louisiana
Department of Natural Resources (LDNR) and LDEQ in partnership with federal and local agencies. The
CNPCP document outlines the management measures approved by U.S. Environmental Protection
Agency and the National Oceanographic Atmospheric Administration that will control nonpoint pollution
to coastal waters by using best management practices within the State designated CNPCP boundary. The
Bank fits into the plan by reducing nonpoint source pollution and hydrological modification to the
landscape by the cessation of agricultural activities within the Bank and restoring the Bank's hydrology
to its natural state. The best management practices thorough the CNPCP aim to negate negative impacts
by using natural processes to the maximum extent practical, which the Bank shall do for perpetuity.
Louisiana's Nonpoint Source Management Plan (NPSMP) is prepared by LDEQ and numerous state and
federal partners. The NPSMP has a plan for the Terrebonne River Basin, which encompasses the project
area. The goal of NPSMP is to reduce nonpoint source pollutants entering waterbodies identified as not
meeting water quality standards. The Bank shall return the anthropogenically impacted site back into its
native state of BLH and CT, reducing nonpoint source pollution from agricultural practices within the
Bank and receiving basins, thus improving water quality.
Louisiana's 2016 IR is a list that identifies the State's waterbodies and their associated water quality
status (i.e. fully or not fully supporting the State's water quality standard). The IR is developed by LDEQ
every even numbered year. According to the IR, subsegment 120202, which contains the Bank is
impaired for primary contact recreation and fish and wildlife propagation. Restoring the natural
functioning of the land by returning it to its native state, topographically and hydrologically shall in in
reducing nonpoint source pollution into the waters associated with the LDEQ subsegment.
Barataria-Terrebonne National Estuary Program (BTNEP) Comprehensive Conservation Management
Plan (CCMP) addresses the ecological management plans needed to tackle the difficulties facing the
BTNEP area, which contains the Bank. The ecological management (EM) plans are divided into three (3)
areas of focus, habitat management, water quality and living resources. The Bank aids in addressing the
following ecological plans in the BTNEP CCMP:
·
·
EM-1 Hydrological Restoration, which has an objective of restoring the hydrology of the estuary
to effectively use fresh water, sediments and nutrients to ameliorate the impacts of local
hydrological modifications. The Bank, to the maximum extent practical, shall create flow regimes
that effectively use freshwater, sediment and nutrients that reach the Bank. Furthermore, the
Bank shall reduce the impacts of local hydrological modifications by reconnecting the Bank to the
surrounding wetland habitat.
EM-11 Reduction of Agricultural Pollutions, which has an objective of maintaining water quality
standards that adequately protect estuarine resources from agricultural source pollutants.
Agricultural pollutions can lead to loss of wetland vegetation due to the detrimental effects of
nutrient loading, salts and herbicides, leading to erosion and loss of affected wetlands. The Bank
10
Chacahoula Bayou Mitigation Bank Final Prospectus
·
shall cease all agricultural activity immediately, improving water quality both within the Bank and
the receiving basin.
EM-15 Protection for Habitat for Migratory and Resident Birds, which has an objective of
managing land in a way that maximizes its suitability as habitat for migratory and resident birds.
Within the Bank, the natural levee area was cleared for agricultural development making the area
uninhabitable for forest birds. Additionally, the fragmentation of the land may have also had a
pernicious effect. For example, some species of interior foresting nesting birds can suffer serious
declines in productivity as a result of the fragmentation, while some fragmented forest are
heavily subjected to nest parasitism and predation and actually become population sinks. The
Bank shall achieve the objective of the EM by maintaining 1,123.4 acres of unbroken forested
wetland.
EM-16 Reduction of Impacts from Exotic Vegetation, which has an objective of reducing
negative impacts caused by proliferation of exotic plant species. The Bank shall have a noxious
and invasive plant control plan and by managing exotic and invasive vegetation the Bank shall
maintain a productive, diverse plant community that acts as conservation for habitat for game
and non-game wildlife.
3.4 TECHNICAL FEASIBILITY
The construction work required to develop the Bank is routine and based on currently-accepted
restoration methods and is technically feasible. The mitigation activities are 1) site preparation, 2)
vegetation planting and 3) monitoring. The presence of hydric soils and relatively low relief of the Bank
indicate that minimal soil work shall be required for the successful restoration of BLH and CT habitat.
The existence of BLH and CT adjacent to the Bank indicate a high potential for successful restoration.
Drainage modifications shall provide for a natural and historic water regime creating a more selfsustaining Bank. Furthermore, the Bank's conservation objective shall be achieved through preservation
of the Bank from future development activities through legal documentation (e.g. conservation
easements).
3.5
CULTURAL RESOURCES
Agricultural activity has occurred within the Bank since at least 1956, since that time the land has been
severely impacted by those agricultural practices. Agricultural practices would be considered more
impactful to the Bank than the activities proposed. However, if any archeological objects are discovered
during the course of this process, the Sponsor will cease work and disseminate any and all information
to the State Historic Preservation Office for further review.
3.6 PROPERTY CONSTRAINTS
The Bank includes a cumulative of 135.6 acres of non-mitigation features that are not included in the
total mitigation acreage. Specifically, the non-mitigation features are composed of the Ringo Cocke
Canal, and pipeline and utility ROWs, and the cemetery. The Bank is otherwise free of encumbrances.
11
Chacahoula Bayou Mitigation Bank Final Prospectus
3.7
ZONING AND ADJACENT PROPERTY DEVELOPMENT
The Bank and adjacent property is within unincorporated land and is absent of zoning regulations.
4 ESTABLISHMENT OF THE MITIGATION BANK
The establishment of the mitigation bank is described below along with the technical feasibility of the
proposed mitigation bank and the assurance of water rights to support the long-term sustainability of
the mitigation bank. Additionally, a summary of the work necessary to accomplish
restoration/enhancement, a description of how the proposed bank shall meet the goals and objectives,
and any temporary or long-term structural management are described.
The establishment of the Bank incorporates a tiered approach to provide the most effective and efficient
methodologies to identify and evaluate the most-suitable bank sites, which shall provide the highest
yields of ecological functional gain. Those tiers are listed below.
Tier 1: A landscape-level geographic information system (GIS) evaluation and technical evaluations (soils,
hydrology, fauna\flora community assessments, rare and endangered species, critical habitat,
etc.) were performed to determine site selection and potential feasibility;
Tier 2: After the potential site was identified, an in-depth analysis was performed to determine the Banks
restoration, re-establishment, enhancement or preservation potential;
Tier 3: Once the site is determined as a feasible option and the Prospectus approved, development of a
Mitigation Plan and conceptual design shall occur and a draft MBI shall be submitted to the IRT
for review and approval; and
Tier 4: After the review process, the Final Mitigation Plan, completed design and the MBI shall be
submitted to the USACE and IRT.
4.1
SITE RESTORATION PLAN
The site restoration plan section summarizes the work necessary to accomplish the proposed work
needed to meet the goals and objectives of the Bank and the temporary or long-term management
requirements need to assure hydrologic and vegetation restoration. Details for the site restoration plan
measures are described in the subsections below.
4.1.1 RESTORATION OVERVIEW
Site restoration shall be accomplished through hydrological restoration and afforestation of the native
vegetative community. This includes abandoning farming operations, gapping the interior perimeter
levee, plugging field drains, removing or plugging culverts, backfilling ditches, site preparation,
elimination of invasive species, and replanting of BLH and CT species.
The Bank work plan shall focus on a watershed approach to improve physical factors that slow the
transport of water and increase nutrient retention. Improvements to factors that impede water
transport are intended to increase aquatic functions and values on the Bank and surrounding area. The
re-establishment of forested wetlands on the Bank shall create the physical structure to slow the
transport of surface runoff across the Bank during heavy precipitation events. Slower water transport
12
Chacahoula Bayou Mitigation Bank Final Prospectus
leads to longer periods of water retention and contact with vegetation, which results in lower levels of
suspended solids and dissolved solids and higher nutrient and sediment filtration rates.
4.1.2 HYDROLOGICAL RESTORATION
During the process of converting the native habitat to agricultural land, certain hydrologic modifications
were put in place to control site hydrology using anthropogenic methods. To hydrologically reconnect
and meet the objectives of the Bank, those modifications shall be rendered ineffective. Impediments to
be rendered ineffective are as follows:
·
·
·
·
6 levee gaps each at least 100 feet wide are proposed in the interior levees (Figures 20 and 20A).
16 small field drains shall be plugged (Figures 20 and 20B).
73 culverts shall be removed or plugged (Figures 20 and 20C).
8,181 linear feet of ditches shall be backfilled (Figures 20 and 20D).
After hydrological restoration, the Bank's hydrology shall be primarily driven by precipitation, run off
and high water tables. It is anticipated that once hydrological connectivity is restored, water will be
transported off the land by Po Bayou for the areas to the west of the natural levee and the remainder of
the Bank will transport water off the Bank through the existing wetlands located on the southern portion
of the Bank site (Figure 22). Water will be allowed to freely flow from the interior levees through the
levee gaps and into the surrounding wetland areas.
Hydrologic restoration achieves many objectives by improving water quality, biogeochemical cycling
and the hydrologic cycling, which shall inundate soils and restore them to their native historic hydric
processes.
Levee gaps are proposed due to the amount of earth work that would be required to fill the entirety of
the existing man-made canals. Earth work would be a hindrance to the Bank; therefore, at least onehundred foot gaps in the levee are proposed. It would be hindrance such that if all the spoil material was
returned to the canal it would inhibit the historical transport of water to Po Bayou.
4.1.3 SOIL PREPARATION
Following hydrological restoration, soils in the fields within the Bank shall be mechanically prepared for
vegetative plantings. Deep-ripping may be used to alleviate soil compaction and encourage air and water
pore space for root growth.
4.1.4 VEGETATIVE PLANTINGS
Following soil preparation, an appropriate combination of hard- and soft- mast producing bare-root
stock shall be planted (Tables 3 and 4). The goal is match plant species to the maximum extent practical
to the native species on the adjacent lands.
13
Chacahoula Bayou Mitigation Bank Final Prospectus
Table 3: Representative Bottomland Hardwood Species Suitable for the Bank
Common Name
Overcup oak
Nuttall oak
Willow oak
Water oak
Cherrybark oak
Sweetpecan
Water hickory
Sweetgum
Drummond red maple
Baldcypress
Mayhaw
Sugarberry
American elm
Persimmon
Green ash
Scientific Name
Quercus lyrata
Quercus nuttallii
Quercus phellos
Quercus nigra
Quercus pagodifolia
Carya illinoinensis
Carya aquatica
Liquidambar styraciflua
Acer rubrum var. drummondii
Taxodium distichum
Crataegus opaca
Celtis laevigata
Ulmus americana
Diospyros virginiana
Fraxinus pennsylvanica
Mast
Hard
Hard
Hard
Hard
Hard
Hard
Hard
Soft
Soft
Soft
Soft
Soft
Soft
Soft
Soft
Table 4: Representative Baldcypress-Tupelo Swamp Species Suitable for the Bank
Common Name
Baldcypress
Tupelo gum
Swamp blackgum
Drummond red maple
Black willow
Pumpkin ash
Green Ash
Water elm
Water locust
Virginia willow
Buttonbush
Scientific Name
Taxodium distichum
Nyssa aquatica
Nyssa sylvatica var biflora
Acer rubrum var. drummondii
Salix nigra
Fraxinus profunda
Fraxinus pennsylvanica
Planera aquatica
Gleditsia aquatica
Itea virginica
Cephalanthus occidentalis
The Bank shall first be prepared by a combination of mowing, plowing, subsoiling, grading and/or
application of herbicides. BLH and CT planting shall occur during the first planting season, approximately
December to April. Planting success rates, escrow or bond sum release rates, and monitoring
requirements shall be consistent with other recently implemented New Orleans District approved
mitigation banks.
Numerous Bank objectives shall be achieved through afforestation of native plant species. Planting shall
positively affect the physical structure of the area and restore biogeochemical processes in the soil
considerably through additional plant and invertebrate detritus. Additionally, it shall provide improved
biotic condition and create habitat for mammals, insects, and migratory birds. Restored forested and
vegetative habitats filter sediment depositions runoff into Bank and downstream receiving basins.
Furthermore, it provides atmospheric maintenance and natural aesthetics to the area.
14
Chacahoula Bayou Mitigation Bank Final Prospectus
4.1.5 INVASIVE/NOXIOUS PLANT CONTROL
Invasive and noxious plant species such as Chinese tallow (Triadica sebifera) shall be removed by mowing
and/or herbicidal treatment during initial planting. The percent cover of invasive plants shall be
monitored during short- and long- term success monitoring and appropriate action taken, if needed.
4.1.6 MONITORING
At a minimum, monitoring reports shall be completed in the spring (when new growth makes
identification practicable) of years 1, 3, 5, 8, and 10. Reports shall be submitted by December 15th of
each monitoring year.
4.2 CURRENT SITE RISKS
The Sponsor does not foresee any adverse impacts to the Bank site resulting from continued existence
and operation of neighboring land uses.
There are no existing hydrologic disturbances on or adjacent to the site at the present time.
4.2.1 THREATS WITHIN THE BANK
Threats within the Bank site itself are continued agricultural practices that reduce the functionality of
the land and alter its natural topography creating a non-self-sustaining habitat. Agricultural practices
increase nonpoint source pollution to the watershed and degrade habitat for local fauna, as well as
migratory birds.
4.2.2 RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS
Resources the Bank intends to provide to offset the aforementioned threats within the Bank is the
cessation of agricultural activities and protection of the Bank for perpetuity with a conservation
easement. As a result, activities causing direct impacts or destruction of the habitats including the
construction of roads, pipelines or utilities, and residential development, shall cease and the Bank seeks
to restore the natural habitat types and maintain the natural species composition to the maximum
extent practical. Habitat degradation or disturbance caused by the maintenance of existing roads,
pipelines and utilities, physical damage from planting activities, hydrological alterations, contamination
by chemicals (herbicides, fertilizers), and off-road vehicle use, shall cease, except where necessary as
allocated by the conservation easement.
4.2.3 ENCUMBRANCES
There are seven (7) oil and gas well sites within the Bank. Two have been plugged and abandoned, two
(2) are temporarily inactive gas wells and three (3) are dry and plugged. Furthermore, there are three
(3) water well registrations within the Bank. All three (3) water wells were for rig supply and have been
plugged and abandoned (Figure 23). The two (2) remaining oil wells shall be removed by the owner
according to the appropriate regulations governing closure and abandonment. The area where the wells
are located shall be non-mitigation features within the Bank. Access to those well sites shall remain and
be non-mitigation features within the Bank. In reference to all other wells, there are no remaining
features associated with the wells aboveground.
15
Chacahoula Bayou Mitigation Bank Final Prospectus
4.2.4 ZONING AND PROPOSED DEVELOPMENT
There are no zoning or existing ordinances in place that affect the Bank. There is no proposed
development adjacent to the Bank. The MBI will contain a final survey plat of the proposed conservation
servitude area, a metes, bounds description and title opinion.
4.3 LONG-TERM SUSTAINABILITY OF THE SITE
The Bank Sponsor shall be the responsible agent for the long-term management of the Bank, unless a
third-party entity is established and given authority to maintain the Bank in perpetuity through written
approval by the IRT.
The primary long-term strategy of the Bank is self-sustaining with relatively low maintenance. This
management strategy is linked to the development stage of the mitigation banking process, particularly
in the design and establishment of the Bank. Native vegetative planting and a natural hydroperiod shall
provide these ecological benefits with minimal routine maintenance or attention after establishment.
However, if the Bank is underperforming and not meeting the proposed performance standards, the
Sponsor shall provide additional management designs to address the ecological benefit. The strategies
shall be tailored to specific disturbances in order to achieve optimal results. Therefore, Adaptive
Management Plans shall be derived at the time of the disturbance and based on the analysis of the data
collected at the time. Work plans shall be submitted to the IRT for commentary, guidance, and approval
before implementation.
Prior to final release and in accordance with the timelines established in the final MBI, the Bank Sponsor
shall establish a non-wasting endowment supporting the Bank's long-term maintenance plan. As
previously stated, the Bank Sponsor shall be the long-term manager of the Bank property. Any
expenditure must be related to the maintenance of the Bank and be approved by the USACE.
4.4 ASSURANCE OF WATER RIGHTS
Louisiana Civil Code, Article 490, treats water resources under the theory of absolute ownership and rule
of capture, provided capture does not result in harm to neighbors. The Bank shall depend primarily on
precipitation, runoff from surround areas and high water tables. Therefore, long-term hydrology
maintenance shall not be dependent upon the utilization of water captured from irrigation wells. As a
result, sufficient water rights are ensured. The Sponsor does not foresee any adverse impacts on
neighboring properties due to this project.
5 PROPOSED SERVICE AREA
This section identifies the proposed watershed approach used for compensatory mitigation as stated in
33 CFR § 332.3(c) and 40 CFR Part 230.93(c) and the general need for the proposed mitigation bank in
this area as stated in 33 CFR § 332.8(d)(2)(iv).
5.1 RATIONALE FOR SERVICE AREA DETERMINATION
The Geographic Service Areas were determined utilizing the watershed approach combined with
ecological, hydrological and finally, economic considerations for compensatory mitigation. The following
is the rationale for determination of the service area for the Bank:
16
Chacahoula Bayou Mitigation Bank Final Prospectus
·
·
·
A watershed approach used to determine all service areas (Figure 24).
o Primary service area is the LRAM Terrebonne Basin.
Proposed service area is based on the needs within the watershed.
o Provide mitigation for activities associated with continued population growth.
o Provide mitigation for the area, which has a history of oil and gas exploration and
production.
o Improve water quality in a State designated impaired watershed.
o Provide compensatory mitigation for the USACE New Orleans District approved projects
within the Terrebonne Basin.
Proposed service area is necessary for the economic viability of the Bank.
6 OPERATION OF THE MITIGATION BANK
The Bank shall be stablished and operated by the Sponsor in accordance with all rules and regulations of
33 CFR § 332.8. Operation details of the Bank shall be further described in the Draft MBI per the rules
outlined in 33 CFR § 332.8. The Bank shall be protected by a Conservational Servitude, which shall
prohibit harmful activities that inhibit the long-term survival of the mitigation bank.
6.1
PROJECT REPRESENTATIVES
Sponsor/Landowner/Operations Manager/Agent
Fourth Louisiana Resource, LLC
Point of Contact: David Hill
c/o Resource Environmental Solutions
Email: David@res.us
412 N. Fourth Street, Suite 300
Phone Number: (225) 603-5334
Baton Rouge, Louisiana 70802
6.2 QUALIFICATIONS OF THE SPONSOR
Fourth Louisiana Resource, LLC is managed by Resource Environmental Solutions, LLC (RES), which shall
be the entity responsible for bank land management and administration. RES has restored, preserved,
and/or enhanced over 40,400 acres of wetlands and over 180 miles of streams across nine (9) states and
has 225 mitigation sites completed or in progress. RES has rehabilitated and/or preserved over 3,700
acres of endangered species habitats, as well as planted over 10,000,000 trees across all operating
regions. RES works with 15 U.S. Army Corps of Engineer districts and more than 78 regulatory agencies
across the country. A company profile may be viewed at www.res.us.
6.3
PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES
The Bank Sponsor shall establish a perpetual Conservation Easement, and shall monitor the sites for a
minimum of 10 years or until 80 percent aerial coverage is achieved. The Mitigation Plan provides
detailed information regarding bank operation, including long-term management and annual monitoring
activities, for review and approval by the IRT. Upon approval of the sites by IRT, the site shall be
transferred to a long-term land steward (to be determined by the Mitigation Plan). The long-term
steward shall be responsible for periodic inspection of the site to ensure that restrictions required in the
Conservation Easement of the deed restriction document(s) are upheld. Endowment funds required to
uphold easement and deed restrictions shall be negotiated prior to site transfer to the responsible party.
17
Chacahoula Bayou Mitigation Bank Final Prospectus
The Bank Sponsor shall ensure the Conservation Easement allows for the implementation of an initial
monitoring phase, which shall be developed during the design phase and conducted by the Bank
Sponsor. The Conservation Easement shall allow for annual monitoring and, if necessary, maintenance
of the Bank during the initial monitoring phase. These activities shall be conducted in accordance with
the terms and conditions of the Chacahoula Bayou Mitigation Bank made and entered in to by Fourth
Louisiana Resource, USACE and other IRT agencies.
Long-Term Ownership and Management:
Fourth Louisiana Resource, LLC
Point of Contact: Richard Greig
c/o Resource Environmental Solutions
Email: rgreig@res.us
412 N. Fourth Street, Suite 300
Phone Number: (337) 443-6933
Baton Rouge, Louisiana 70802
6.4
SITE PROTECTION
The Bank shall be protected in perpetuity by Conservation Servitude, pursuant to Louisiana Revised
Statute 9:1271 et seq. The Conservation Servitude shall be held by a conservation-oriented 501(c)(3)
organization to be determined, and shall inure and run with the property title.
The Conservation Servitude shall prohibit activities, such as clear cutting, fill discharges, cattle grazing,
or other commercial surface development that would diminish the quality or quantity of restored
wetlands. Additionally, the servitude shall specify permissive activities such as hunting, fishing and
recreational use and mineral exploration given the activity does not negatively impact the functions and
values of the rehabilitated, re-established, enhanced or preserved BLH and CT.
6.5
LONG-TERM STRATEGY
A long-term maintenance and protection escrow account shall provide funding for long-term
maintenance and site protection, in accordance with 33 CFR § 332.7 into perpetuity. Long-term
maintenance and site protection activities shall be conducted by the Sponsor. The Sponsor shall ensure
long-term success and sustainability of the Bank through mechanisms including vegetative and
hydrologic maintenance as necessary, site monitoring, invasive species management, establishment of
financial assurances and protection in perpetuity by conservation servitude. The conservation servitude
shall protect the Bank from any activities that would diminish the quality of the restored Bank lands. No
structures are proposed or would be necessary to assure hydrologic or vegetation restoration. A longterm management plan shall be included in the MBI.
18
Chacahoula Bayou Mitigation Bank Final Prospectus
7 REFERENCES
Code of Federal Regulations, Title 33, Parts 325 and 332 and Title 40, Part 230, as published on pages
19594-19704 in the Federal Register dated 10 April 2008.
Louisiana Nutrient Management Strategy Interagency Team. 2014. Louisiana Nutrient Management
Strategy: Protection, Improvement, and Restoration of Water Quality in Louisiana's Water Bodies.
Coastal Protection and Restoration Authority of Louisiana, Louisiana Department of Agriculture
and Forestry, Louisiana Department of Environmental Quality, and Louisiana Department of
Natural Resources. May 2014. Baton Rouge, LA.
Louisiana Department of Environmental Quality.2012. Louisiana's Nonpoint Source Management Plan.
November 2012. Baton Rouge, Louisiana.
Louisiana REAP. 2016. Terrebonne Parish versus Louisiana Comparative Trends Report: Population,
1969-2015. Retrieved January 25, 2017.
https://louisiana.reaproject.org/analysis/comparative-trendsanalysis/population/reports/220109/220000/#page_3.
Louisiana Wildlife and Fisheries Louisiana Natural Heritage Program. Updated 2009. The Natural
Communities
of
Louisiana.
Accessed
October
31,
2016.
http://www.wlf.louisiana.gov/sites/default/files/pdf/page_wildlife/6776Rare%20Natural%20Communities/LA_NAT_COM.pdf
Moore, David M. and Rivers, Robert D. 1996. The Ecological Management Action Plans. BaratariaTerrebonne National Estuary Program, Thibodaux, Louisiana. Accessed November 14, 2016.
http://www.btnep.org/BTNEP/about/theplan.aspx.
United States Department of Agriculture Natural Resources Conservation Service, Web Soil Survey,
Allen
Parish,
Louisiana,
Retrieved
August
2015.
http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx
United States Department of Agriculture Natural Resources Conservation Service, PLANTS Database
USDA PLANTS, Retrieved August 2015. http://plants.usda.gov/
United States Army Corps of Engineers-New Orleans District. List of Approved Mitigation Banks within
the New Orleans District, Retrieved August 2015.
US Department of Agriculture, Soil Conservation Service, Allen Parish, 1980, (SCS 1980)
19
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure1_ChacahoulaBayou_VicinityMap.mxd
Legend
Site (1,123.4 ac +/-)
Base map taken from LADOTD Louisiana state map.
Horizontal Datum is NAD83 UTM Zone 15N.
FIGURE 1
0
5
Miles
10
CHACAHOULA BAYOU MITIGATION BANK
VICINITY MAP
TERREBONNE PARISH, LOUISIANA
Date: 1/25/2017
Drawn by: BL
Checked by: RG
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure2_ChacahoulaBayou_USGS24kQuadMap.mxd
Site (1,123.4 Ac.)
Sec. 108, T16S, R16E, Sec's. 37, 38, 39, & 40, T16S, R15E,
Sec's. 27, & 28, T17S, R15E, & Sec's. 34, 33, & 32, T17S, R16E
Lat: 29° 38' 08.45" N, Long: 90° 52' 17.75" W
Legend
Site (1,123.4 ac +/-)
Topographic imagery from US Geological Survey.
Horizontal Datum is NAD83 UTM Zone 15N.
FIGURE 2
0
1,500
Feet
3,000
CHACAHOULA BAYOU MITIGATION BANK
U.S.G.S. 24K QUAD MAP
TERREBONNE PARISH, LOUISIANA
Date: 1/25/2017
Drawn by: BL
Checked by: RG
Legend
Site (1,123.4 ac +/-)
10 Mile Radius
Class Name, Percent Cover
Aquaculture, 0.0%
Barren, 0.0%
Corn, 0.0%
Cotton, 0.0%
Deciduous Forest, 0.0%
Developed/High Intensity, 0.8%
Developed/Low Intensity, 6.3%
Developed/Med Intensity, 1.5%
Developed/Open Space, 1.8%
Evergreen Forest, 0.0%
Fallow/Idle Cropland, 1.9%
Grassland/Pasture, 4.1%
Herbaceous Wetlands, 31.4%
Mixed Forest, 0.0%
Open Water, 3.1%
Oranges, 0.0%
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure3_ChacahoulaBayou_10MileRadiusLandCover.mxd
Other Hay/Non Alfalfa, 0.0%
Rice, 0.0%
Shrubland, 0.3%
Sod/Grass Seed, 0.0%
Soybeans, 0.2%
Sugarcane, 5.0%
Winter Wheat, 0.0%
USDA, National Agricultural Statistics Service,
2016 Louisiana Cropland Data Layer
Horizontal Datum is NAD83 UTM Zone 15N.
Woody Wetlands, 43.6%
FIGURE 3
0
2
Miles
4
CHACAHOULA BAYOU MITIGATION BANK
2016 CDL LAND COVER/LAND USE WITH A 10 MILE RADIUS AROUND SITE MAP
TERREBONNE PARISH, LOUISIANA
Date: 1/26/2017
Drawn by: BL
Checked by: RG
o
Bay
Po
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure4_ChacahoulaBayou_ProposedMitigationHabitatTypeMap.mxd
Comeaux Canal
Legend
Site (1,123.4 ac +/-)
Cypress-Tupelo Enhancement (190.0 ac)
BLH Preservation (51.6 ac)
Cypress-Tupelo Preservation (423.6 ac)
BLH Re-establishment (274.2 ac)
Non-mitigation (135.6 ac)
Cypress-Tupelo Re-establishment (48.3 ac)
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 4
1,500
CHACAHOULA BAYOU MITIGATION BANK
PROPOSED MITIGATION HABITAT TYPE MAP
TERREBONNE PARISH, LOUISIANA
Date: 5/24/2017
Drawn by: BL
Checked by: TW
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure5_ChacahoulaBayou_1956Aerial&HistoricalLandCover.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Bank Historical Conditions
Backswamp (98.7 ac)
Floodplain (527.0 ac)
Natural Levee (497.7 ac)
1956 aerial provided by USGS.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 5
1,500
CHACAHOULA BAYOU MITIGATION BANK
1956 AERIAL & HISTORICAL LAND COVER MAP
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure6_ChacahoulaBayou_1963Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from USGS EarthExplorer.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 6
1,500
CHACAHOULA BAYOU MITIGATION BANK
1963 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure7_ChacahoulaBayou_1973Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from USGS EarthExplorer.
Horizontal Datum is NAD83 UTM Zone 15N.
0
©
750
Feet
FIGURE 7
1,500
CHACAHOULA BAYOU MITIGATION BANK
1973 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure8_ChacahoulaBayou_1998Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from 1998 DOQQ.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 8
1,500
CHACAHOULA BAYOU MITIGATION BANK
1998 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/23/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure9_ChacahoulaBayou_2004Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from 2004 DOQQ.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 9
1,500
CHACAHOULA BAYOU MITIGATION BANK
2004 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/23/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure10_ChacahoulaBayou_2008Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from 2008 coastal imagery DOQQ.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 10
1,500
CHACAHOULA BAYOU MITIGATION BANK
2008 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/23/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure11_ChacahoulaBayou_2010Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from Atlas GOHSEP.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 11
1,500
CHACAHOULA BAYOU MITIGATION BANK
2010 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/23/2017
Drawn by: BL
Checked by: RG
B
Po
ayo
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure12_ChacahoulaBayou_2015Aerial.mxd
Comeaux Canal
Legend
Site (1,123.4 ac)
Imagery from 2015 NAIP.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 12
1,500
CHACAHOULA BAYOU MITIGATION BANK
2015 AERIAL
TERREBONNE PARISH, LOUISIANA
Date: 5/23/2017
Drawn by: BL
Checked by: RG
o
Bay
Po
u
Ru
nR
d.
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Comeaux Canal
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure13_ChacahoulaBayou_ExistingLandCover_CDL.mxd
Legend
Site (1,123.4 ac)
Grassland/Pasture, 0.0%
Class Name, Percent Coverage
USDA, National Agricultural Statistics Service,
2016 Louisiana Cropland Data Layer
Imagery taken from 2015 NAIP.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
FIGURE 13
1,500
CHACAHOULA BAYOU MITIGATION BANK
EXISTING LAND COVER/LAND USE MAP
TERREBONNE PARISH, LOUISIANA
Herbaceous Wetlands, 6.5%
Developed/High Intensity, 0.1%
Shrubland, 0.0%
Developed/Low Intensity, 0.5%
Soybeans, 0.2%
Developed/Open Space, 0.0%
Sugarcane, 25.4%
Fallow/Idle Cropland, 5.9%
Woody Wetlands, 61.3%
Date: 5/22/2017
Drawn by: BL
Checked by: RG
Legend
Site (1,123.4 ac)
!
C
Drainage Pump Location
E
Natural Ridge
Flow Direction
B
Po
Forced Drainage Area Thru Interior Levees To Pump #1
ayo
u
Forced Drainage Area To Pump #2
y
Pump #1
Discharge
Area
Ru
nR
d.
!
C Pump #1
Comeaux Canal
E
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
Pump #2
E
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure_ChacahoulaBayou_PreRestorationHydrology.mxd
!
C
E
E
Imagery taken from 2015 NAIP.
Horizontal Datum is NAD83 UTM Zone 15N.
FIGURE 14
©
0
750
Feet
CHACAHOULA BAYOU MITIGATION BANK
1,500
PRE-RESTORATION HYDROLOGY
TERREBONNE PARISH, LOUISIANA
Date: 5/24/2017
Drawn by: BL
Checked by: TW
B
Po
ayo
u
BLH-4
Ri
ng
oC
oc
ke
Ca
na
l
Bu
ll
BLH-3
Pump #1
!
C
Ru
nR
d.
BLH-2
BLH-5
BLH-6
Comeaux Canal
BLH-1
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure15_ChacahoulaBayou_ExistingDrainageAreaLocationMap.mxd
CT-1
Pump #2
!
C
Legend
Site (1,123.4 ac)
!
C
Soil data provided by NRCS.
Drainage areas provided by HDR.
Horizontal Datum is NAD83 UTM Zone 15N.
©
0
750
Feet
Existing Hydrology within Interior Perimeter Levee
FIGURE 15
1,500
Drainage Pump Location
CHACAHOULA MITIGATION BANK
EXISTING HYDROLOGY WITHIN PERIMETER LEVEE
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure16_ChacahoulaBayou_HistoricalDrainageAreaMap.mxd
Legend
Site (1,123.4 ac +/-)
Flowline
Topographic imagery from US Geological Survey.
Stream data provided by USGS NHD.
Horizontal Datum is NAD83 UTM Zone 15N.
0
©
4,000
Feet
Drainage Area (39.5 sq/mi)
FIGURE 16
8,000
CHACAHOULA BAYOU MITIGATION BANK
HISTORICAL/EXISTING DRAINAGE AREA MAP
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
2
2
3
4
6
6
7 8
7
6
7
7
5
3
5
2
4
2
2
3
5
6
3
2
2
Legend
2
2
2
Site
(1,123.4
2 2 ac)
2
2
2
2
5
3
2
One FT Elevation Contour
2
2
2
2
2
3 Elevation Contour
Half FT
2
2
2
2
2
Elevation Above2 5 Ft (48.7 ac)
2
FIGURE 17
Date: 6/1/2017
CHACAHOULA BAYOU MITIGATION BANK
EXISTING ELEVATIONS MAP
Drawn by: BL
TERREBONNE PARISH, LOUISIANA
24
2
2
3
2
3
3
3
4
3
4
6
4
3 3
3
3
2
3
5
4
5
2
2
2
2
5
3
4
2
2
2 3
5
4
3
2
3
4
2
3
5
3
4
3
3
3
2
2
3
4 3
2
5
2
3
2
2 2
2
3
3
2
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure17_ChacahoulaBayou_ExistingElevationsMap.mxd
3
4
8
6
2
2
2
3
5
5
7
2
2
2
2
2
3
4
6
7
5
2
2
2
2
4
3
2
2
2
3
7
4
4
2
3
2
3
2
3
2
2
4
2
4
4
2
2
2
4
3
3
4
3
2
2
3
2
4
4
3
3
4
3
3 5
2
2
3
2
3
4
2
3
2
3
2
2
2
4
2
3
3
4
2
Feet
2,000
3
3
2
2
4
3
2
2
2
1,000
3
2
4
3
4
3
Elevation data provided by LOSCO 5M LIDAR DEM.
Horizontal Datum is NAD83 UTM Zone 15N.
0
2
4
3
3
3
3
6
2
2
5
2
3
3
2
2
2
2
3
2
2
3
3
4
2
2
©
3
6
2 4
2
2
2
4
3
4
3
2
2
2
3 4
5
3
2
2
2
3
3
4
2
2
3
6
2
3
3
2
3
3
4
3
4
5
4
2
3
3
5
3
2
4
2
2
2
4
3
3
2
2
2
2
3
4
2
3
2
6
2
5
2
4
3
3 4 34
2
3
2
4
2
1 2
2
3
2
2 2
1
4
1
2
2
2
1
2
3
2
2
2
3
2
2
2
Checked by: RG
2
2
BRA
Legend
ShA
ShA
W
FAA
ShA
Site (1,123.4 ac)
CbA; Cancienne silt loam, 0 to 1 percent slopes
SIA; Schriever clay, 0 to 1% slopes, frequently flooded
National Hydric List Soils
CdA; Cancienne silty clay loam, 0 to 1 percent slopes
CdAslopes, frequently flooded
FAA; Fausse clay, 0 to 1 percent
ShA; Schriever clay, 0 to 1 percent slopes
GcA; Gramercy-Cancienne silty clay loams, 0 to 1 percent slopes
W; Water
MUSYM, MUName
BRA; Barbary muck, 0 to 1% slope, frequently flooded
SIA
ayo
B
Po
SIA
SrA; Schriever clay, 0 to 1% slopes, occasionally flooded
u
CdA
Bu
ll
Ca
na
l
CdA
Ri
ng
oC
oc
ke
SrA
ShA
CdA
BRA
Ru
ShA
nR
d.
GcA
CbA
GcA
Comeaux Canal
FAA
SIA
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure18_ChacahoulaBayou_SoilsMap.mxd
GcA
SrA
FAA
USDA/NRCS Gridded Soil Survey Geographic
Horizontal Datum is NAD83 UTM Zone 15N.
0
©
FAA
1,000
Feet
FAA
FIGURE 18
2,000
CHACAHOULA BAYOU MITIGATION BANK
SOILS MAP
TERREBONNE PARISH, LOUISIANA
Date: 5/22/2017
Drawn by: BL
Checked by: RG
ShA
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
REPLY TO
ATTENTION OF
February 10, 2017
Operations Division
Surveillance and Enforcement Section
Mr. Brighton Heard
Resource Environmental Solutions, LLC
412 N. 4th St.
Baton Rouge, Louisiana 70802
Dear Mr. Heard:
Reference is made to your request, on behalf of the Sweetland Project, for a U.S.
Army Corps of Engineers' (Corps) jurisdictional determination on property located in
Sections 32, 33, 37, 38, 39, and 40, Township 16 South, Range 16 East, Terrebonne
Parish, Louisiana (enclosed map). Specifically, this property is identified as 1,161 acre
"Sweetland Project" west of Bullrun Road.
Based on review of recent maps, aerial photography, soils data, and the information
provided with your request, we have determined that part of the property is wetland and
may be subject to Corps' jurisdiction. The approximate limits of the wetland are
designated in red on the map. A Department of the Army (DA) permit under Section
404 of the Clean Water Act will be required prior to the deposition or redistribution of
dredged or fill material into wetlands that are waters of the United States. Additionally,
a DA permit will be required if you propose to deposit dredged or fill material into other
waters subject to Corps' jurisdiction. Other waters that may be subject to Corps'
jurisdiction are indicated in blue on the map.
You and your client are advised that this preliminary jurisdictional determination is
valid for a period of 5 years from the date of this letter unless new information warrants
revision prior to the expiration date or the District Commander has identified, after public
notice and comment, that specific geographic areas with rapidly changing
environmental conditions merit re-verification on a more frequent basis.
Should there be any questions concerning these matters, please contact Mr. Brian
Oberlies at (504) 862-2275 and reference our Account No. MVN-2016-01058-SY. If you
have specific questions regarding the permit process or permit applications, please
contact our Central Evaluation Section at (504) 862-1581.
Sincerely,
Martin S. Mayer
Chief, Regulatory Branch
Enclosures
US ARMY CORPS OF ENGINEERS
PRELIMINARY
JURISDICTIONAL DETERMINATION
USACE
IN HOUSE, 8 FEB 2017
BRIAN OBERLIES
FOR B. HEARD
ACCOUNT # MVN-2016-01058-SY
UPLAND
WETLAND
NONWETLAND WATERS
February 10, 2017
Feb 10, 2017
Bayou Trepagnier
Bayou Labranche
Mississippi
River
Mississippi River
Grand Bayou
and Little
Grand Bayou
Lac des
Allemands
Bayou Verret,
Bayou Chevreuil,
Bayou Citamon,
and Grand Bayou
Intracoastal
Waterway
Lake
Cataouatche
Bayou des
Allemands
Lake Verret and
Grassy Lake
Bayou Boeuf,
Halpin Canal and
Theriot Canals
Bayou Gauche
Lake Boeuf
Lower
Atchafalaya
Basin Floodway
Lower Grand
River and
Belle River
Bayou
Lafourche
Bayou des
Allemands
Thibodaux Swamp
(Pointe Au
Chien Swamp)
Lake Palourde
Bayou
Teche
Bayou Teche
Bayou Folse
Bayou
Bayou
Ramos
Swamp Boeuf
Bayou Black
Bayou
Terrebonne
Lake Salvador
Intracoastal
Waterway
Bayou
L'Eau
Bleu
Wax Lake
Outlet
Bayou
Terrebonne
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure19_ChacahoulaBayou_LDEQ_Subsegments.mxd
Intracoastal
Waterway
Company Canal
Houma
Navigation
Canal
Atchafalaya
River
Bayou Chene
Atchafalaya
Bay, Delta,
LDEQ subsegments
Gulf waters provided by Environmental Data Center (LEDC)
Base
map
taken
from LADOTD
Louisiana
state map.
The National
Hydrography
Dataset
(NHD) provided
by USGS.
Horizontal Datum
Datum is
is NAD83
NAD83 UTM
UTM Zone
Zone 15N.
15N.
Horizontal
0
©
2.5
Miles
Bayou
Penchant
Lake Hatch
and Lake
Theriot
Houma
Navigation
Canal
Bayou
du Large
Bayou
Grand
Caillou
Bayou
du Large
Bayou
Bayou
Grand
Caillou
Petit
Site
(1,123.4 ac)
Caillou
Lake
Boudreaux
CHACAHOULA BAYOU MITIGATION BANK
ASSOCIATED LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY (LDEQ) SUBSEGMENTS MAP
TERREBONNE PARISH, LOUISIANA
Bayou
Blue
Bayou
Terrebonne
Legend
FIGURE 20
5
Bayou Blue
Bayou
Pointe au
Chien
Bayou Chauvin
Lake Penchant
Lake de Cade
Intracoastal Waterway
Bayou Petit
Caillou
Bayou Blue
Bayou
LDEQ Subsegment
(Bayou Black)
Terrebonne
Date: 5/22/2017
Drawn by: BL
Checked by: RG
Legend
S ite (
1,
123.
4a c)
Culve rt To Be Re m ove d/
Plug g e d(
73)
!
?
!
_
^
!!
!
!
!
!
!
!
!
!!
.
!
!
!
!!
Ma jor Dra ina g e Fe a ture
! !!
!!
!
!
!!
!!!
"
?
!
!
?
!
?
!
?
!
?
!
?
! !!
!
!
!
!
"
"
!
D
!!!
!
!
!
!
!
!
!
!
.
.
!
.
!
.
!
.
!
.
!
!
!!
!
!
!
!!
!
!
?
!
.
!
!
!!
!
!
!
!
!
!
!
!
?
!
?
!
?
!
?
!
?
!
?
_
^
Comeaux Canal
! !!
!!!
! !!
!!!
! !!
!!!
! !!
!
?
!
?
!
?
!
?!
?
!!!
_
^
! !!
?
!
? !
!!!
!! !
!
?
!
?
!
?
!
!
?
!
!
A'
!!
!
!
!!
!
!!
!!
!
!!!
!
?
!
!
!!
! !!
!
?
!
?
!
!
!
?
!
?
!!!
!
?
!
?
!
!
?
!
?
!
?
!
?
!
?
!
?
!
?
!
?
!
?
?
!
? !
!
?
?
.!
!
Ridg e
!
?
!
?
A
_
^
!
?
D'
!
!
!
?
!!
!
!
?
"
C'
!!!
!
.
!
C
!
!!
!
!
!
!
N
Ri atu
ng r a
oC lD
oc rai
ke na
Ca g e
na
l
u
!
!!
!
!
!
.
!
!!
!
ayo
!
!
!
_
^
Fie ldDra in To Be Plug g e d(
16)
Ditch To Be Ba ckf
ille d(
8,
181L.
F.
)
?
!!
?
"
"
!
!! !
!
?
!! !
!
!
B
Po
!
!
!
?
Propose d100'Wide Le ve e Ga p (
6)
!
?
!
?
!
!
!
!
.
!
!
!
!
_
^
.
!
Docum e nt Pa th :C:
\
Use rs
\
Wa rne r\
Dropb ox(
RES )
\
@RES GI
S \
Proje c
ts\
LA\
Ch a c
a h oula Ba you\
Prospe c
tus
\
MXD\
Fig ure 20_Ch a c
a h oula Ba y
ou_Hydrolog icI
m prove m e ntMa p.
m xd
"
"
B
B'
!
?
!!
_
^
!
!
?
!!
!
!
?
!!
!
0
750
Fe e t
1,
500
TERREBONNE PARISH, LOUISIANA
!!
!
!
?
!
!
? !
?
!!
I
m a g e ryta ke n f
rom 2015NAI
P.
Horiz
onta lDa tum isNAD83UTM Zone 15N.
CHACAHOULA BAYOU MITIGATION BANK
PLAN VIEW & HYDROLOGIC IMPROVEMENTS MAP
!
?
!!
!
?
FIGURE 21
!
?
!
?
!
?
.
!
.
!
©
.
!
!
?
Da te :6/
7/
2017
Dra wn b y:BL
Ch e cke db y
:RG
!
.
!
10.0
PFO WETLAND
OTHER
WATERS
PFO WETLAND
SPOIL
5.0
5.0
0.0
0.0
-5.0
Elevation, FT
Elevation, FT
10.0
-5.0
0
50
100
150
200
250
300
Distance, FT.
TYPICAL CROSS-SECTION EXISTING LEVEE
10.0
10.0
OTHER
WATERS
PFO WETLAND
SPOIL REMOVED
5.0
5.0
0.0
0.0
-5.0
Elevation, FT
Elevation, FT
PFO WETLAND
-5.0
0
50
100
150
200
250
300
Distance, FT.
TYPICAL CROSS-SECTION LEVEE GAPPED
CBMB_XSectionA-A_GAP.dwg
*Spoil material will be redeposited
within agricultural fields at or near
grade or will be deposited in
nonwetland areas.
FIGURE 21A
TYPICAL CROSS-SECTION A-A'
CHACAHOULA BAYOU MITIGATION BANK
TERREBONNE PARISH, LOUISIANA
0'
50'
Horizontal Scale
Vertical Scale Is As Shown
0
2
1
3
4
5
6
1.50
1.50
EXISTING AGRICULTURE
1.00
Existing Grade
0.00
0.00
-1.00
-1.00
-1.50
Depth, FT
Depth, FT
1.00
-1.50
0
2
6
4
10
8
12
Distance, FT.
TYPICAL CROSS-SECTION FIELD DRAIN
0
2
1
3
4
5
6
1.50
1.50
BLH RE-ESTABLISHED
1.00
Cut
Cut
0.00
0.00
Existing Grade
Fill
Depth, FT
Depth, FT
1.00
*Use Existing Material For Backfill
-1.00
-1.00
* Field drain to be filled to the
extent that adjacent spoil will allow.
CBMB_XSectionB-B_FieldDrain.dwg
-1.50
-1.50
0
2
4
6
8
10
12
Distance, FT.
FIGURE 21B
TYPICAL CROSS-SECTION B-B'
CHACAHOULA BAYOU MITIGATION BANK
TERREBONNE PARISH, LOUISIANA
TYPICAL CROSS-SECTION PROPOSED FIELD DRAIN BACKFILLED
0'
2'
4'
Horizontal Scale
Vertical Scale Is As Shown
0
1
2
4
3
5
6
1.50
1.50
EXSITING AGRICULTURE
1.00
Existing Culvert To Be Removed
0.00
0.00
8'' TO 24''
Existing Material
(To Remain)
-1.00
Elevation, FT
Elevation, FT
1.00
-1.00
-1.50
-1.50
0
2
4
6
10
8
12
Distance, FT.
TYPICAL CROSS-SECTION CULVERT
0
1
2
4
3
5
6
1.50
1.50
RE-ESTABLISHED WETLANDS
1.00
Culvert Removed
0.00
0.00
* Existing Material
-1.00
-1.00
RESTORED SWALE TO NATURAL GRADE
-1.50
-1.50
CBMB_XSectionC-C_Culvert.dwg
0
2
4
CHACAHOULA BAYOU MITIGATION BANK
TERREBONNE PARISH, LOUISIANA
6
8
10
12
Distance, FT.
FIGURE 21C
TYPICAL CROSS-SECTION C-C'
Elevation, FT
Elevation, FT
1.00
TYPICAL CROSS-SECTION PROPOSED CULVERT REMOVAL
0'
2'
4'
Horizontal Scale
Vertical Scale Is As Shown
*Removed culvert to be filled to the
extent that adjacent spoil will allow, no
outside fill material utilized.
2.0
2.0
SPOIL
OTHER
WATERS
AGRICULTURE
1.0
1.0
0.0
0.0
-1.0
-1.0
Elevation, FT
Elevation, FT
AGRICULTURE
-2.0
-2.0
0
10
30
20
40
50
60
Distance, FT.
TYPICAL CROSS-SECTION EXISTING DITCH
2.0
2.0
BLH RE-ESTABLISHED
1.0
CUT
0.0
0.0
*FILL
-1.0
Elevation, FT
Elevation, FT
1.0
-1.0
*Ditch to be filled to the extent that
adjacent spoil will allow.
CBMB_XSectionD-D_Ditch.dwg
-2.0
FIGURE 21D
TYPICAL CROSS-SECTION D-D'
CHACAHOULA BAYOU MITIGATION BANK
TERREBONNE PARISH, LOUISIANA
-2.0
0
10
20
30
40
50
Distance, FT.
TYPICAL CROSS-SECTION PROPOSED DITCH BACKFILL
0'
15'
Horizontal Scale
Vertical Scale Is As Shown
60
!
!!
!!
!
E
!
!!
!
!!
!
!!
!
!!
!!!
!!!
Ca
na
l
!!!
!!
!
E
Ru
nR
d.
!!
!
Ri
ng
oC
oc
ke
Bu
ll
E
E
!!
!
_
^
E
!
!!
E
E
!!
!
!!
!
!!
!
E
u
!!
!
!!
!
E
o
Bay
Po
!!
!
!!
!
E
!!
!
!!
!
E
!!
!
_
^
!!
!
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure_ChacahoulaBayou_ProposedPostRestorationHydrology.mxd
E
E
_
^
Comeaux Canal
E
E
E
E
E
E
E
E
!!
!
_
^
E
!!
!
!!
!
E
_
^
E
E
E
_
^
Legend
E
Site (1,123.4 ac)
_
^
Proposed Levee Gap (6)
E
E
Flow Direction
!!!
!!!
Major Drainage Feature
Natural Ridge
Imagery taken from 2015 NAIP.
Horizontal Datum is NAD83 UTM Zone 15N.
0
©
750
Feet
FIGURE - 22
1,500
CHACAHOULA BAYOU MITIGATION BANK
PROPOSED POST-RESTORATION HYDROLOGY
TERREBONNE PARISH, LOUISIANA
Date: 6/1/2017
Drawn by: BL
Checked by: TW
Well #212516
Plugged and Abandoned Gas 01/21/1994
Water Well #109-5241Z
Plugged and Abandoned RigSupply
Well #30699
Dry and Plugged 10/20/1945
Well #218943
Dry and Plugged 06/01/1996
Water Well #109-5419Z
Plugged and Abandoned RigSupply
Well #73599
Dry and Plugged 02/26/1959
Well #232472
PS-35 Temporary Inactive Well Gas 03/14/2006
Well #231560
PS-35 Temporary Inactive
Well Gas 08/06/2005
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure21_ChacahoulaBayou_Oil_Gas_WaterWellMap.mxd
Well #68471
Plugged and Abandoned Gas 03/27/1968
Water Well #109-5634Z
Plugged and Abandoned RigSupply
Legend
Site (1,123.4 ac +/-)
Pipeline Centerline (24,190 L.F.)
Oil & Gas Wells (7)
Imagery taken from 2015 NAIP.
Well data provided by SONRIS.
Horizontal Datum is NAD83 UTM Zone 15N.
Water Wells (3)
FIGURE 23
0
750
Feet
1,500
CHACAHOULA BAYOU MITIGATION BANK
OIL & GAS AND WATER WELL MAP
TERREBONNE PARISH, LOUISIANA
Date: 1/26/2017
Drawn by: BL
Checked by: RG
Vicksburg
District
Mobile
District
Document Path: E:\Dropbox (RES)\@RES GIS\Projects\LA\ChacahoulaBayou\Prospectus\MXD\Figure22_ChacahoulaBayou_ServiceAreaMap.mxd
New Orleans
District
Legend
Site (1,123.4 ac +/-)
LRAM Service Area - Terrebonne Basin
USACE Districts
Base map taken from LADOTD Louisiana state map.
Horizontal Datum is NAD83 UTM Zone 15N.
FIGURE 24
0
10
Miles
20
CHACAHOULA BAYOU MITIGATION BANK
SERVICE AREA MAP
TERREBONNE PARISH, LOUISIANA
Date: 1/25/2017
Drawn by: BL
Checked by: RG