Replacement Railroad Bridge at the Bonnet Carre’ Spillway, St. Charles Parish, Louisiana

NAME OF APPLICANT: Illinois Central Railroad Company, c/o HDR Engineering, Inc: Brooke Savant, 4828 Loop Central Drive Suite 800, Houston, TX 77081 LOCATION OF WORK: Project site is located at the Bonnet Carre’ Spillway in St. Charles Parish, Louisiana, as shown on the attached drawings. Hydrologic Unit Codes: 08090203– Eastern Louisiana Coastal Location: Latitude: 30.06432 Longitude: -90.38758. CHARACTER OF WORK: The applicant proposes to place timber matting for temporary construction access and to clear for access and work space associated with the construction of a new concrete railroad bridge. The existing wooden railroad bridge is proposed for removal with some structures remaining in their current state and maintained in place and other structures being cut at or below the mud line and maintained in place. Permanent impacts to 1.20 acres of jurisdictional wetlands from clearing activities associated with work space and access, and temporary impacts to 7.17 acres of jurisdictional wetlands associated with work space and access are proposed. The applicant has proposed the use of an approved mitigation bank to offset any unavoidable impacts to jurisdictional wetlands

JOINT PUBLIC NOTICE October 2, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch (OD-SE) 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2041 Benjamin.C.Sherman@usace.army.mil Project Manager Benjamin Sherman Permit Application Number MVN 2015-02351-2 ES

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC 170808-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). Replacement Railroad Bridge at the Bonnet Carre' Spillway, St. Charles Parish, Louisiana NAME OF APPLICANT: Illinois Central Railroad Company, c/o HDR Engineering, Inc: Brooke Savant, 4828 Loop Central Drive Suite 800, Houston, TX 77081 LOCATION OF WORK: Project site is located at the Bonnet Carre' Spillway in St. Charles Parish, Louisiana, as shown on the attached drawings. Hydrologic Unit Codes: 08090203­ Eastern Louisiana Coastal Location: Latitude: 30.06432 Longitude: -90.38758. CHARACTER OF WORK: The applicant proposes to place timber matting for temporary construction access and to clear for access and work space associated with the construction of a new concrete railroad bridge. The existing wooden railroad bridge is proposed for removal with some structures remaining in their current state and maintained in place and other structures being cut at or below the mud line and maintained in place. Permanent impacts to 1.20 acres of jurisdictional wetlands from clearing activities associated with work space and access, and temporary impacts to 7.17 acres of jurisdictional wetlands associated with work space and access are proposed. The applicant has proposed the use of an approved mitigation bank to offset any unavoidable impacts to jurisdictional wetlands

-2The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is aware the project crosses a navigable waterway of the United States and will require a bridge permit under Section 9 of the Rivers and Harbors Act. A bridge permit applies to any individual, partnership, corporation, or local, state, or federal legislative body, agency, or authority planning to construct or modify a bridge or causeway across a navigable waterway of the United States. Section 9 of Rivers and Harbors Act is administrated by the U.S. Coast Guard (USCG) and will require a separate review. The USCG is the lead Federal agency for the proposed action. In accordance with Section 106 of the National Historic Preservation Act (NHPA), the USACE is required to take into account the effects of any permitted action to historic properties, which includes both archaeological resources on the surface or below ground, as well as historic buildings and structures that are listed in or are eligible for listing in the National Register of Historic Places. To -3-

date, USACE has received a National Register of Historic Places evaluation of the "Bonnet Carre Spillway Bridge, for the Illinois Central Railroad line" and is reviewing it. For this proposed undertaking, the USCG, as the lead Federal agency, will comply with NHPA and other relevant laws and regulations per their own procedures. Endangered Species Act (ESA): The New Orleans District, Regulatory Branch, will coordinate with the USCG to insure compliance with the ESA through their evaluation. Essential Fish Habitat (EFH): The New Orleans District, Regulatory Branch, will coordinate with the USCG to insure compliance with the EFH through their evaluation. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Michael V. Farabee Chief, Eastern Evaluation Section Enclosure

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

P ROJECTLOCATI ON

§ ¦ ¨ 55

BA ST. P JO ST TIS HN .C TP T PA HA AR HE R I R L I SH SH E S

LAKE PONTCHARTRAIN

51

£ ¤

P ROJECTLOCATI ON

LEGEND

PR

ES

CO

TT

RO

AD

PROJECT LOCATION IC SU MCC RR BD O IV M B IS IO N

RIVER

LAKE PONTCHARTRAIN

KA SO N SA RA UT H S C ILW ER ITY AY N

I CRRBONNETCARRE BRI DGEREP LACEMENT

® q

61

3142

AIRPORTS

DATA SOURCES: LA DOTD, ESRI, US CENSUS BUREAU

£ ¤

¬ «

® q

MISSISSIPPI RIVER

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT

61

£ ¤

ROADWAY

SPILLWAY LEVEE

JEFFERSON PARISH

ST. CHARLES PARISH

EV C AN R O OU G E A D NT Y RO L I N 62 8 AD E

628

" ) M I SSI SS I P P I

RAILROAD

§ ¦ ¨

£ ¤ 628

COASTAL ZONE 10

61

¬ «

PARISH BOUNDARY

61

£ ¤

VICINITY MAP

¬ « 48

§ ¦ ¨

310

¬ «

3127

BAT IC RR O S UB N RO D I V UG E ISIO N

¬ « ¬ « 18

52

0

¬ « ¬ « 48

3060

U

PA NION

1 MILES

2

RO A D RAIL AY L I W RA SF

CIFIC BN

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ FI GURES_8. 5X11\ BONNETCARRE_BRI DGEREP LACEMENT_DELI NEATI ONS_FI G1_GENLOC_8. 5X11. MXD -USER:MCOWLI NG -DATE:8/ 30/ 2017

FIGURE 1

FORPERMI TTI N G ON LY ­ Thisd oc um entisnott o b e used forc onst r uc t ion,b id d ing,r ec or dat ion,c onveya nc e orsa les.

LAKE PONTCHARTRAIN

R DO I RR CO TY LI UTI

D

BB

WATERSOFTHEU. S. OPEN WATER

N OTWATERSOFTHEU. S. TIMBER MATS PRESCOTT ROAD (TO BE IMPROVED) CORRESPONDING CROSS SECTION IN FIGURE 3

43 2F T

D

AA

D

PERMAN EN TROCKFI LL ( MAI N TEN AN CEON LY ) UPTO 4500CY

I CRRBON N ETCARRE BRI DGEREPLACEMEN T CONSTRUCTION IMPACTS

Roc k willb e t he p r efer r ed m et hod used form a int ena nc e fr om t he ent r a nc e of Hwy 61a nd a long Pr esc ot tRd .up unt il t he p ip eline c or r id or( Ap p r oxim a t ely 8, 400FT) .

0

50 FEET

100

FIGURE 2-1 PATH:O: \ 260796_040_CN _TK3_BON N ET_CARRE_PERMI TTI N \ MAP_DOCS\ FI GURES\ DELI N EATI ON \ BRI DGE_REPLACEMEN T\ 404&408\ BON N ETCARRE_BRI DGEREPLACEMEN T_FI G2_I MPACTS_BW_8. 5X 11. MX D -USER:MCOWLI N G -DATE:9/ 1/ 2017

FORPERM I TTI NG ONLY­ Thisdo c um entisno tt o b e used fo rc o nst r uc t io n,b idding,r ec o r da t io n,c o nveya nc e o rsa les.

LAKE PONTCHARTRAIN

TEM PORARYFI LLPLACEM ENT ( ROCK)19'W I DEROADSECTI ON FORTRU CKSTAGI NG ( 350CY)

W ATERSOFTHEU . S. EMERGENT WETLAND OPEN WATER

NOT W ATERSOFTHEU . S. TIMBER MATS SHOULDER IMPROVEMENTS (IN UPLANDS) PRESCOTT ROAD (TO BE IMPROVED)

D 50 0F T

D

CORRESPONDING CROSS SECTION IN FIGURE 3

DD

PERM ANENT ROCKFI LL ( M AI NTENANCEONLY) U PTO 4500CY

I CRRBONNET CARRE BRI DGEREPLACEM ENT CONSTRUCTION IMPACTS Cur r entc o ndit io n o f Pr esc o t tRo a d no r t h o f pipeline cor r ido r( a ppr o xim a t ely 8, 600LF)willr equir e a ddit io na l r o c k a nd/ o rt im b erm a t st o a llo w deliver y o fb r idge c o nst r uc t io n m a t er ia lst o t em po r ar y a c c essr o ad ( see Fig 23t o 25) .

0

50 FEET

100

FIGURE 2-2 PATH:O: \ 260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I TTI N\ M AP_ DOCS\ FI GU RES\ DELI NEATI ON\ BRI DGE_ REPLACEM ENT\ 404&408\ BONNETCARRE_ BRI DGEREPLACEM ENT_ FI G2_ I M PACTS_ BW _ 8. 5X 11. M X D -U SER:M COW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

LAKEP ONTCHARTRAI N LAKE PONTCHARTRAIN

FT 40

GG

D

§ ¦ ¨ I 10

OF FI CE TR AI LE RS

TEMP ORARYACCESS GRAVELAP P ROACH 84. 8CY

W ATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

NOTW ATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) UPLAND TEMPORARY ACCESS TIMBER MATS PRESCOTT ROAD (TO BE IMPROVED) PERMANENT FILL EXISTING FIBER OPTIC LINE (ABANDONDED)

EE

D

CORRESPONDING CROSS SECTION IN FIGURE 3

65 FT

D FT 95

D

EXI STI NG UTI LI TY CORI DOR

FF

I CRRBONNETCARRE BRI DGEREP LACEMENT 1 NE I L CH T MA

CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-3 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORPERMI TTI N G ON LY ­This d oc um entis nott o b e us ed for c ons t ruc t ion,b id d ing,rec ord a t ion,c onveya nc e or s a les .

LAKEPON TCHARTRAI N 1 NE LI H TC A M

LAKE PONTCHARTRAIN

PERMAN EN TFI LL CLASS55LBSTON ERI PRAP 1000CY -UPLAN D

WATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

N OTWATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) UPLAND TEMPORARY ACCESS TIMBER MATS PERMANENT FILL EXISTING FIBER OPTIC LINE (ABANDONDED)

EMERGEN TWETLAN D 0. 95AC ACCESSROAD( TI MBERMATS) APPROX 32FTX 1200FT

I CRRBON N ETCARRE BRI DGEREPLACEMEN T CONSTRUCTION IMPACTS 2 NE I L CH T A M

0

50 FEET

100

FIGURE 2-4 PATH:O: \ 260796_040_CN _TK3_BON N ET_CARRE_PERMI TTI N \ MAP_DOCS\ FI GURES\ DELI N EATI ON \ BRI DGE_REPLACEMEN T\ 404&408\ BON N ETCARRE_BRI DGEREPLACEMEN T_FI G2_I MPACTS_BW_8. 5X 11. MX D -USER:MCOWLI N G -DATE:9/ 1/ 2017

FORPERMI TTI N G ON LY­Thisdoc um entisnott o b e used for c onst ruc t ion,b idding,rec orda t ion,c onveya nc e or sa les.

LAKEPON TCHARTRAI N 2 NE I L H C AT M

LAKE PONTCHARTRAIN

W ATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

N OT W ATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) UPLAND TEMPORARY ACCESS

HH

D CC

EQUIPMENT STAGING TIMBER MATS PROPOSED SHORING

D

PERMANENT FILL EXISTING FIBER OPTIC LINE (ABANDONDED)

TEMPORARYACCESSROAD FOREQUI PMEN T AN DMATERI ALS

FORESTEDW ETLAN D 0. 21AC TEMPORARYACCESS( TI MBERMATS)

MATC HLI N E3

D

CORRESPONDING CROSS SECTION IN FIGURE 3

I CRRBON N ET CARRE BRI DGEREPLACEMEN T CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-5 PATH:O: \ 260796_ 040_ CN _ TK3_ BON N ET_ CARRE_ PERMI TTI N \ MAP_ DOCS\ FI GURES\ DELI N EATI ON \ BRI DGE_ REPLACEMEN T\ 404&408\ BON N ETCARRE_ BRI DGEREPLACEMEN T_ FI G2_ I MPACTS_ BW _ 8. 5X 11. MX D -USER:MCOW LI N G -DATE:9/ 1/ 2017

FORPERM I TTI NG ONLY­ Thisdo cum entisno tt o b e used fo rco nst r uct io n,b idding,r eco r da t io n,co nveya nce o rsa les.

LAKEPONTCHARTRAI N PERM ANENT LI GHTW EI GHT FI LL 25FT NORTHOFBACKW ALL 100CY-UPLAND EXCAV ATI ON BEHI NDBACKW ALL-850CY

HH

D

LAKE PONTCHARTRAIN

SECTI ONALBARGE ( CONTI NGENCYACCESS) 40FT X40FT

! ! !

!

Y X

PERMANENT FILL

!

SECTIONAL BARGE

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

! !

FRESH WATER WELL (12 IN DIAMETER 100 FT DEEP)

!

!

\ !

\

!

\!

! \

!

Y X

! \ Y X

Y X

Y X

\!

Y X

Y X

Y X

\

Y X

Y X Y X Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

Y X

\

Y X

0

50 FEET

100

\!

Y X

! \

Y X

!

Y X

\

!

Y X

\

Y X

Y X

Y X

Y X Y X

Y X

Y X

Y X

\

!

Y X

Y X

M M

I CRRBONNET CARRE BRI DGEREPLACEM ENT CONSTRUCTION IMPACTS

\

4 NE I L H TC M A D

CORRESPONDING CROSS SECTION IN FIGURE 3

\

Y X

Y X

!

\

\!

Y X

Y X

Y X

!

!

Y X

Y X

!

PATH:O: \260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I TTI N\M AP_ DOCS\FI GURES\DELI NEATI ON\BRI DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI DGEREPLACEM ENT_ FI G2_ I M PACTS_ BW _ 8. 5X11. M XD -USER:M COW LI NG -DATE:9/ 1/ 2017

!

\

Y X

D

!

\

!

\!

!

\

!

\

\ !

\

Y X

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)

PROPOSED SHORING

!

\

Y X

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

TIMBER MATS

!

\

!

Y X

!

!

! \

!

\

Y X

EQUIPMENT STAGING

\

!

Y X

EXCAVATION LIMITS (450FT X 29FT)

TEMPORARY ACCESS

!

!

\!

Y X

SUPPORTING GANTRY CRANE PILES 36IN DIAMETER 100FT DEPTH

GANTRY CRANE FOOTPRINT

\

D

UPLAND

!

\

NN

PROPOSED RAIL BRIDGE CENTERLINE

!

\ KK

D

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

Y X

!

D

LL

OPEN WATER

NOT W ATERSOFTHEU. S.

Y X

I I

FORESTED WETLAND

FI LLI NUPLANDS 12I NSUBBALLAST -400CY 12I NBALLAST-600CY EM BANKM ENT -250CY

JJ \

D

EMERGENT WETLAND

Y X

D

D

W ATERSOFTHEU. S.

UU TEM PORARYAPPROACH ( TI M BERM ATS) APPROX40FT X90FT

\

M ATC HLI NE3

SHEETPI LE-I NUPLANDS 250FT X10FT 33. 92CYEXCAV ATI ON

FIGURE 2-6

FORP ERMI TTI NG ONLY­This d oc um entis nott o b e us ed for c ons t ruc t ion,b id d ing,rec ord a t ion,c onveya nc e or s a les .

Y X Y X

Y X Y X Y X Y X

Y X Y X

Y X

!

Y X

Y X

!

\

!

Y X

\

Y X

!

Y X

MM

\!

Y X

!

Y X

\

Y X

Y X

!

Y X

\!

Y X

Y X

Y X

Y X Y X Y X

Y X

!

Y X

Y X

!

Y X

\!

Y X Y X

Y X

!

\

Y X

!

Y X

Y X

Y X

\

Y X

!

Y X

Y X

Y X

\

!

Y X

\!

Y X Y X

Y X

OPEN WATER

!

!

Y X

Y X

WATERSOFTHEU. S.

!

\

!

\

Y X

\!

Y X

Y X

Y X

Y X

!

Y X Y X

Y X Y X

\!

Y X Y X

Y X Y X

Y X

PROPOSED RAIL BRIDGE CENTERLINE

!

\ \

!

! Y X

Y X

Y X Y X

Y X

! Y X

Y X Y X

Y X

!

Y X

Y X

Y X

Y X

!

Y X

Y X Y X

!

!

D

Y X

Y X

Y X

!

\

Y X

Y X

!

Y X

Y X

Y X

Y X

!

Y X

Y X Y X

Y X

!

Y X

Y X

CORRESPONDING CROSS SECTION IN FIGURE 3

\

Y X

\

!

Y X

\

Y X

Y X

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)

EXISTING FIBER OPTIC LINE (ABANDONDED)

Y X

Y X

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

TIMBER MATS

\

Y X

\ \

Y X

! !

!

Y X

\

Y X Y X

Y X

!

Y X Y X Y X Y X

MA TC HL I NE 5

Y X

!

Y X

EQUI P MENTSTAGI NG-NORTHLAYDOWNYARD 3. 3AC-UP LAND 20, 000CYTEMP ORARYROCKFI LL

EQUIPMENT STAGING

\

\

Y X

Y X

Y X Y X

EXCAVATION LIMITS (450FT X 29FT)

TEMPORARY ACCESS

\

Y X Y X Y X

SUPPORTING GANTRY CRANE PILES 36IN DIAMETER 100FT DEPTH

GANTRY CRANE FOOTPRINT

\

!

Y X

EXCAVATI ONLI MI TSFOR GANTRYCRANERUNWAY 2, 087CY

Y X

Y X

Y X

Y X

!

Y X

Y X

Y X

UPLAND

!

\!

Y X

Y X

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

!

Y X

Y X

NOTWATERSOFTHEU. S.

!

\

!

Y X

!

\

\

Y X

Y X

!

\

!

\!

Y X

GANTRYCRANE FOOTP RI NT 93FTX406FT

!

\

\

Y X

! \

Y X

\

!

Y X

!

\

Y X

!

Y X

!

\

Y X

Y X Y X

LAKE PONTCHARTRAIN

!

\

!

Y X

!

\

\!

D

\

\

! \

4 NE I L H TC MA D

\

\

Y X

!

\

!

Y X

!

\

!

NN

LAKEP ONTCHARTRAI N

!

\

\

\!

Y X

!

Y X

\ !

\

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-7 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORPERMI TTI N G ON LY ­This d oc um entis nott o b e us ed for c ons t ruc t ion,b id d ing,rec ord a t ion,c onveya nc e or s a les . !

\

! ! !

\

LAKE PONTCHARTRAIN

! ! ! ! ! ! !

! !

\

! ! ! !

WATERSOFTHEU. S.

!

OPEN WATER

\

! !

\

!

! !

!

! !

!

!

\

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

\

!

UPLAND

!

\

! ! !

\

!

TEMPORARY ACCESS

!

\

!

!

\

EQUIPMENT STAGING

\

!

!

\

!

!

\

!

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TIMBER MATS EXISTING FIBER OPTIC LINE (ABANDONDED)

\

D

\

!

\

!

CORRESPONDING CROSS SECTION IN FIGURE 3

\

!

\ !

\

!

\

! !

D OO

PROPOSED RAIL BRIDGE CENTERLINE

!

\

\

CRAN EACCESSROAD ( TI MBERMATS) APPROX 40FTX 900FT

N OTWATERSOFTHEU. S.

!

!

! !

!

!

\

\

I CRRBON N ETCARRE BRI DGEREPLACEMEN T

!

\ \

\

!

! !

!

\

\

!

\

\

\

\

\

\

!

\

! !

!

\

\

\

\

\

\

\

\

!

\

\

!

\

\

\

\

\

\

\

!

!

\

\

\

\

MA TC HL I N E 5

LAKEPON TCHARTRAI N

!

\

!

MA TC HL I NE 6

!

!

!

CONSTRUCTION IMPACTS

! !

0

50 FEET

100

FIGURE 2-8 PATH:O: \ 260796_040_CN _TK3_BON N ET_CARRE_PERMI TTI N \ MAP_DOCS\ FI GURES\ DELI N EATI ON \ BRI DGE_REPLACEMEN T\ 404&408\ BON N ETCARRE_BRI DGEREPLACEMEN T_FI G2_I MPACTS_BW_8. 5X 11. MX D -USER:MCOWLI N G -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

\ !

\

LAKEP ONTCHARTRAI N

!

!

LAKE PONTCHARTRAIN

! ! ! ! !

\

!

\

! !

\

!

\

! ! !

WATERSOFTHEU. S.

!

OPEN WATER

!

!

\

\

! !

!

\

\

NOTWATERSOFTHEU. S.

!

! !

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

PROPOSED RAIL BRIDGE CENTERLINE

!

UPLAND

!

!

\

\

TEMPORARY ACCESS

\

!

! !

\

\

!

!

!

\

\

!

! !

\

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

TIMBER MATS

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

! !

\

\

!

!

\

\

!

!

\

\

! !

\

\

!

\

\

!

\

! !

\

!

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

! !

\

!

MA TC H LI NE 7

!

\

CONSTRUCTION IMPACTS

!

! ! !

! !

\

\

!

! !

\

\

\

! !

\

! !

\

! !

\

\

\

! !

\ \

\

!

\

\

!

!

MA TC HL I NE 6

!

\

\

!

\

\

!

\

\

\

0

50 FEET

100

FIGURE 2-9 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

LAKEP ONTCHARTRAI N

! ! !

LAKE PONTCHARTRAIN

!

\

! ! ! ! !

\

!

\

! ! ! ! !

W ATERSOFTHEU. S.

!

EMERGENT WETLAND

!

! !

\

\

!

\

!

D

NOTW ATERSOFTHEU. S.

!

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

!

!

PROPOSED RAIL BRIDGE CENTERLINE

!

\

!

\

! ! !

D

UPLAND

\

! !

\

! !

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

\

!

\

!

!

D

!

\

!

\

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

!

QQ

!

\

PP

OPEN WATER

!

!

!

\

\

\

!

\

\

! !

\

\

!

\

!

\

! !

MA TC HL I NE 8

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

!

!

\

! !

CONSTRUCTION IMPACTS

! !

!

\

\

\

! !

\

\

\

!

\

\

\

! !

\

\

\

! !

!

!

\

\

\

! !

!

\

\

\

\

\

!

\

MA TC H LI NE 7

!

!

! !

\

\

\

!

\

\

\

!

\

\

\

\

\

!

0

50 FEET

100

FIGURE 2-10 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

\

!

LAKEP ONTCHARTRAI N

!

\

! ! !

LAKE PONTCHARTRAIN

! ! !

!

\

!

\

! ! ! ! !

\

! !

! !

! !

\

!

\

!

!

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED) PROPOSED RAIL BRIDGE CENTERLINE

!

!

\

\

!

\

!

! !

\

! ! !

\ !

\

!

\

!

D

!

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

\

! !

!

\

! !

\

!

\

!

!

\

!

\

\

! !

\

\

!

\

!

\

\

! !

\

M AT CH LI NE 9

!

TT

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

D D

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

SS

UPLAND

\

!

\

\

RR

NOTWATERSOFTHEU. S.

!

\

D

OPEN WATER

!

!

\

\

EMERGENT WETLAND

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

!

\

!

\

!

\

! !

\

\

WATERSOFTHEU. S.

FORESTEDUP LAND 0. 1AC TREECLEARI NG

!

!

! !

\

\

\

!

!

\

\

!

!

!

!

\

\

\

\

\

\

\

! !

\

MA TC HL I NE 8

!

\

!

\

\

\

!

\

\

!

\

\

!

\

\

\

\

\

! !

0

50 FEET

100

! ! !

FIGURE 2-11 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

! !

! ! ! ! !

!

!

\

\

!

!

\

\

!

!

\

\

! !

\

!

! ! !

\

\

!

! !

\

\

!

WATERSOFTHEU. S.

!

!

\

\

EMERGENT WETLAND

!

!

\

\

OPEN WATER

!

!

\

\

!

FORESTEDUP LAND 0. 11AC TREECLEARI NG

!

! !

\

\

!

!

\

\

!

!

\

\

NOTWATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) PROPOSED RAIL BRIDGE CENTERLINE UPLAND

\

! !

! !

\

\

! !

! !

\

\

!

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

D

!

! !

\

\

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

!

!

\

!

\

\

! !

\

\

!

\

\

!

\

\

! !

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

\

! !

\

!

LI NE 10

CONSTRUCTION IMPACTS

\

\ \

\

\

! !

M AT CH LI NE 9

LAKE PONTCHARTRAIN

!

\

!

!

\

\

\

!

\

\

!

\

D D

LAKEP ONTCHARTRAI N

!

\

\

\

\

!

!

! ! !

MA TC H

!

0

50 FEET

100

FIGURE 2-12 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. ! !

!

LAKE PONTCHARTRAIN

! ! ! ! ! !

! ! !

!

!

!

\

\

\

!

!

\

\

!

FORESTEDUP LAND 0. 09AC TREECLEARI NG

!

\

!

\

!

!

\

\

! !

!

\

\

!

! !

\

\

WATERSOFTHEU. S.

!

!

\

\

EMERGENT WETLAND

!

OPEN WATER

!

!

\

\

!

! !

\

\

NOTWATERSOFTHEU. S.

!

!

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

PROPOSED RAIL BRIDGE CENTERLINE

!

!

\

\

UPLAND

\

!

! !

\

\

!

!

!

\

\

!

\

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

! !

\

\

!

!

\

\

!

!

\

\

! !

\

\

!

\

\

!

\

! !

\

!

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

! !

\

! !

MA TC HL I NE 11

\

\

\

\

!

\

\

\

! !

LI NE 10

!

\

!

\ \

MA TC H

LAKEP ONTCHARTRAI N

!

\

!

\

\

\

\

!

!

CONSTRUCTION IMPACTS

! ! !

0

50 FEET

100

FIGURE 2-13 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

\

!

\

LAKEP ONTCHARTRAI N

! ! !

LAKE PONTCHARTRAIN

!

! ! !

\

! ! ! !

\

!

\

! ! ! !

!

EMERGENT WETLAND

!

\

\

!

\

!

OPEN WATER

!

\

!

\

!

!

\

NOTWATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

\

!

\

!

PROPOSED RAIL BRIDGE CENTERLINE

\

!

\

!

\

!

!

!

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

!

\

!

!

\

\

!

!

EMERGENTWETLAND 0. 11AC TEMP ORARYWORKSP ACE

WATERSOFTHEU. S.

!

!

! !

\

\

! !

\

!

!

\

\

\

\

!

\

\

\

! !

!

!

!

!

\

\

\

!

!

\

\

!

\

\

\

! !

\

\

\

!

\

MA TC HL I NE 11

!

\

!

\

\

\

\

\

\

!

\

\

!

\

! !

\

!

\

!

\

! !

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

\

!

\

!

! !

MA TC H

!

LI NE 12

!

CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-14 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

! ! !

LAKE PONTCHARTRAIN

! ! ! !

\

! ! !

\

!

\

! ! ! ! ! !

WATERSOFTHEU. S.

!

!

\

\

EMERGENT WETLAND

!

! !

\

\

OPEN WATER

!

!

\

\

!

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

! !

\

\

!

\

!

\

PROPOSED RAIL BRIDGE CENTERLINE

\

! !

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

! !

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

\

!

\

!

\

\

\

! !

\

!

\

!

\

! !

\

!

\

MAT CH LI NE 13

! !

EMERGENTWETLAND 0. 02AC TEMP ORARYWORKSP ACE

NOTWATERSOFTHEU. S.

!

\

!

!

\

\

!

! !

\

\

!

! !

\

\

!

! !

\

\

!

! !

\

! !

\

\

\

!

\

\

!

!

\

\ \

! !

\

\

!

!

\

\

\

!

\

MA TC H LI NE 12

LAKEP ONTCHARTRAI N

!

\

\

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-15 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! !

\

!

\

LAKE PONTCHARTRAIN

! ! ! !

! ! !

\

! ! ! !

\

! !

WATERSOFTHEU. S.

!

\

EMERGENT WETLAND

!

OPEN WATER

!

! !

\

\

!

NOTWATERSOFTHEU. S.

!

! !

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

\

\

!

! !

! !

\

\

!

! !

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

!

\

\

! !

! !

\

\

!

!

\

\

!

!

\

\

! !

! !

\

\

!

!

\

\

!

\

\

! !

\

\

!

\

\

!

\

LI NE 14

! !

\

\

\

!

!

\

\

\

! !

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

! !

\

!

\

!

MA TC H

!

!

\

CONSTRUCTION IMPACTS

!

\

!

\

\

! !

\

\

\

\

MAT CH LI NE 13

!

\

!

\

\

!

\

\

\

\

\

! ! !

0

50 FEET

100

! !

FIGURE 2-16 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

LAKEP ONTCHARTRAI N

!

\

! !

\

! LAKE PONTCHARTRAIN

! ! ! !

! !

\

! ! ! !

\

!

! ! !

\

\

!

WATERSOFTHEU. S.

!

!

\

\

EMERGENT WETLAND

!

!

\

\

OPEN WATER

!

! !

\

\

!

NOTWATERSOFTHEU. S.

!

!

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

! !

\

\

PROPOSED RAIL BRIDGE CENTERLINE

\

! !

! !

!

!

\

\

\

!

!

\

\

!

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

! !

\

\

! !

!

\

\

!

!

\

\

!

! !

\

\

! !

!

\

\

!

\

\

! !

\

\

!

\

\

!

\

MA TC H LI NE 15

!

\

MA TC H

!

\

\

! !

\

LI NE 14

!

\

\

\

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

\

\

!

\

\

!

\

\

\

\

! ! !

!

\

!

!

\

CONSTRUCTION IMPACTS

!

\

!

\

! !

!

0

50 FEET

100

! !

FIGURE 2-17 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! !

\

!

\

LAKE PONTCHARTRAIN

! ! ! !

!

! ! ! ! ! !

\

!

WATERSOFTHEU. S.

!

EMERGENT WETLAND

!

OPEN WATER

! !

NOTWATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

!

! !

! !

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

\

! !

\

! !

\

!

\

!

!

\

!

\

\

! !

\

! !

\

!

\

!

!

\

!

\

\

!

!

\

\

!

\

!

\

\

! !

\

\

!

\

! !

MA TC H

!

EMERGENTWETLAND 0. 1AC TEMP ORARYWORKSP ACE

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

!

\

\

LI NE 16

! !

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

!

!

!

\

\

\

!

!

\

\

!

!

!

\

\

!

!

\

\

\

!

!

\

\

\

!

\

\

\

LI NE 15

!

\

\

! !

\

MA TC H

!

\

\

\

\

!

\

\

!

\

\

\

\

\

! !

0

50 FEET

100

! !

FIGURE 2-18 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! ! !

! !

! ! ! !

\

! ! ! !

\

! !

WATERSOFTHEU. S.

!

!

\

\

EMERGENT WETLAND

!

! !

\

\

OPEN WATER

!

!

\

\

!

NOTWATERSOFTHEU. S.

!

!

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

! !

\

\

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

\

\

!

! !

!

\

\

!

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

! !

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

!

\

\

! !

!

\

\

!

! !

\

\

!

!

\

\

!

!

\

\

! !

\

\

!

\

\

!

\

! !

\

MA TC HL I NE 17

! !

!

!

!

\

\

\

!

!

\

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

! !

!

\ \

\

\

\

!

\

\

\

! !

\

LI NE 16

!

\

!

\ \

\

MA TC H

LAKE PONTCHARTRAIN

!

\

!

\

\

\

\

\

CONSTRUCTION IMPACTS

!

!

\

!

! ! ! !

0

50 FEET

100

FIGURE 2-19 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! !

\

!

\

LAKE PONTCHARTRAIN

!

\

! ! !

! ! ! ! ! ! ! ! !

WATERSOFTHEU. S.

!

\

EMERGENT WETLAND

!

OPEN WATER

! !

NOTWATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

!

!

! !

\

\

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

D

!

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

\

! !

\

!

\

!

\

!

!

\

! !

\

\

! !

\

!

\

!

\

!

!

\

\

\

! !

\

\

!

\

!

\

\

! ! !

EMERGENTWETLAND 0. 1AC TEMP ORARYWORKSP ACE

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

! !

\

\

MA TC H LI NE 18

!

!

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

\

!

!

\

\

!

!

!

\

\

!

!

!

!

\

\

\

! !

!

\

\

\

\

\

!

\

\

\

\

\

\

\

\

!

\

MA TC HL I NE 17

!

\

!

\

\

\

\

\

!

\

!

\

!

D

!

0

! !

100

!

WW2

50 FEET

FIGURE 2-20 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

\

!

\

LAKEP ONTCHARTRAI N

!

\

! !

\

!

\

! ! ! !

! !

\

!

!

! !

\

!

WATERSOFTHEU. S.

!

EMERGENT WETLAND

!

OPEN WATER

!

\

!

NOTWATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

! !

! !

\

\

!

\

!

!

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

! !

\

\

!

\

!

D

!

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

!

\

\

!

! !

\

\

!

\

!

! !

\

\

\

! !

\

\

!

\

!

\

\

\

! !

MA TC HL I NE 19

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

! !

!

!

!

!

CONSTRUCTION IMPACTS \

!

! !

EMERGENTWETLAND 0. 16AC TEMP ORARYWORKSP ACE

PROPOSED RAIL BRIDGE CENTERLINE

\

!

0 !

! !

\

\

!

! !

!

\

\

\

!

!

\

\

\

! !

\

\

\

!

\

\

\

!

WW2

!

\

\

!

!

\

\

!

!

\

\

! !

MA TC H

!

\

\

\

\

\

!

LI NE 18

\

\

\ \

\

D

LAKE PONTCHARTRAIN

!

\

50 FEET

100

FIGURE 2-21 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! !

\

!

\

LAKE PONTCHARTRAIN

! ! !

! ! ! ! !

\

! ! ! !

\

!

WATERSOFTHEU. S.

!

EMERGENT WETLAND

!

OPEN WATER

!

!

\

\

!

NOTWATERSOFTHEU. S.

!

! !

\

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

!

\

\

!

! !

\

! !

\

!

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

\

!

! !

\

!

\

!

\

!

!

\

!

\

\

!

! !

\

!

\

!

\

!

!

\

!

\

\

! !

\

\

!

\

!

\ \

\

! !

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

\

!

\

!

MA TC H

!

CONSTRUCTION IMPACTS

!

\

! !

EMERGENTWETLAND 0. 23AC TEMP ORARYWORKSP ACE

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

! !

\

\

LI NE 20

! !

\

\

0

!

!

!

\

\ \

!

!

\

\

!

\

! !

!

\

\

\

\

\

\

\

\

!

\

MA TC HL I NE 19

!

\

!

\

\

\

\

\

50 FEET

100

! !

FIGURE 2-22 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORPERM I TTI NG ONLY­Thisdoc um entisnott o b e used for c onst ruc t ion,b idding,rec orda t ion,c onveya nc e or sa les. !

\

LAKEPONTCHARTRAI N

!

\

! !

\

!

\

! ! !

\

! ! ! !

\

! ! !

\

! ! !

W ATERSOFTHEU. S.

!

EMERGENT WETLAND

!

FORESTED WETLAND

!

NOT W ATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

! !

!

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

!

\

\

D

!

CORRESPONDING CROSS SECTION IN FIGURE 3

!

! !

\

\

!

!

\

\

!

!

\

\

! !

! !

\

\

!

!

\

\ \ \ \

I CRRBONNET CARRE BRI DGEREPLACEM ENT

! !

!

\

M A TC H LI NE 21

!

\

CONSTRUCTION IMPACTS \

! !

\

\

\

!

\

\

W W 3

PROPOSED RAIL BRIDGE CENTERLINE

\

!

\

!

\

\

!

! !

\

\

D

EX I STI NG CHANNELAT 70FT TPG ( SPAN7) PPROX STATI ON257+00

OPEN WATER

!

\

!

\

\

!

!

\

\

!

! !

\

\

\

!

\

\

!

!

\

\

\

!

!

\

! !

\

\

\

\

! !

\

\

!

\

\

!

\

LI NE 20

\

\

\

\

M A TC H

LAKE PONTCHARTRAIN

!

\

!

!

!

!

!

\

!

! !

0

50 FEET

100

! !

FIGURE 2-23 PATH:O: \260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I TTI N\M AP_ DOCS\FI GURES\DELI NEATI ON\BRI DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI DGEREPLACEM ENT_ FI G2_ I M PACTS_ BW _ 8. 5X 11. M X D -USER:M COW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

!

! !

! !

\

! ! !

\

! ! ! !

\

! ! !

WATERSOFTHEU. S.

!

EMERGENT WETLAND

!

OPEN WATER

! !

NOTWATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

!

\

\

!

!

! !

\

\

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

\

! !

\

\

! !

\

!

\

!

\

!

!

\

\

\

! !

\

\

!

\

!

\

\

! !

\

!

LI NE 22

\

!

!

!

MA TC H

!

EMERGENTWETLAND 0. 02AC TEMP ORARYWORKSP ACE

PROPOSED RAIL BRIDGE CENTERLINE

\

!

!

! !

\

\

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

!

!

\

\

!

!

\

\

!

! !

\

\

\

!

!

\

\

!

!

!

\

\

\

!

!

\

\

\

!

\

\

\

!

!

\

\

\

!

\

\

\

! !

\

LI NE 21

!

\

!

\ \

MA TC H

LAKE PONTCHARTRAIN

!

\

!

\

\

\

\

\

! !

0

50 FEET

100

FIGURE 2-24 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

\

!

\

LAKEP ONTCHARTRAI N

!

\

! !

\

! LAKE PONTCHARTRAIN

! ! !

!

! ! ! !

FORESTEDUP LAND 0. 08AC TREECLEARI NG

! ! ! !

! !

\

\

VV

! !

\

\

D

!

\

!

EMERGENT WETLAND

! FORESTED WETLAND

!

\

OPEN WATER

!

NOTW ATERSOFTHEU. S.

!

\

\

! !

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

!

\

!

PROPOSED RAIL BRIDGE CENTERLINE

!

\

!

\

\

UPLAND

\

!

! !

\

! !

\

!

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

D

!

\

\

! !

\

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

!

\

!

!

\

!

\

\

! !

\

\

!

\

! !

EMERGENTW ETLAND 0. 4AC TEMP ORARYW ORKSP ACE

W ATERSOFTHEU. S.

!

!

\

\ \

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

MA TC HL I NE 23

\

!

!

\

CONSTRUCTION IMPACTS

\

\ \

!

! !

\

!

!

!

\

\

\

\

\

!

\

\

\

!

LI NE 22

!

\

\

!

\

\ \

! !

\

MA TC H

FORESTEDW ETLAND 0. 05AC TREECLEARI NG

!

\

!

\

\

!

\

\

\

\

\

!

!

!

! ! !

0

50 FEET

100

!

FIGURE 2-25 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! ! ! !

! ! !

FORESTEDUP LAND 0. 1AC VEGETATI ONCLEARI NG

!

! ! ! !

\

! ! !

W ATERSOFTHEU. S.

!

!

!

\

\

! !

!

\

\

! !

\

OPEN WATER

NOTW ATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

!

\

!

PROPOSED RAIL BRIDGE CENTERLINE

!

\

UPLAND

\

! !

\

\

! !

\

! !

\

!

\

!

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

\

\

! !

! !

\

!

\

\

!

\

!

!

\

!

\

\

! !

\

\

!

\

!

\

\

! !

EMERGENTW ETLAND 0. 39AC TEMP ORARYW ORKSP ACE

FORESTED WETLAND

!

! !

\

\

EMERGENT WETLAND

EMERGENTW ETLAND 0. 01AC TEMP ORARYACCESS

!

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

LI NE 24

\

!

!

!

\

!

! !

MA TC H

CONSTRUCTION IMPACTS

!

!

\

\

!

! !

\

\

\

! !

\

\

!

!

!

\

\

\

!

!

\

\

\

\

!

\

! !

!

\

\

\

\

\

\

\

MA TC HL I NE 23

!

\

LAKE PONTCHARTRAIN

FORESTEDW ETLAND 0. 05AC VEGETATI ONCLEARI NG

!

!

\

\

!

\

\

\

\

\

0

50 FEET

100

FIGURE 2-26 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

LAKEP ONTCHARTRAI N

! ! !

!

\

! !

\

!

FORESTEDUP LAND 0. 19AC VEGETATI ONCLEARI NG

!

\

! ! ! ! ! !

EMERGENTW ETLAND 0. 03AC TEMP ORARYACCESS

! ! !

! !

\

!

\

!

EMERGENT WETLAND

!

\

FORESTED WETLAND

!

\

\

! !

\

OPEN WATER

!

NOTW ATERSOFTHEU. S.

!

\

!

\

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

PROPOSED RAIL BRIDGE CENTERLINE

!

\

\

! !

\

UPLAND

\

! !

\

!

\

!

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

\

\

! !

\

! !

\

!

\

!

!

\

\

\

! !

\

\

!

\

! !

EMERGENTW ETLAND 0. 51AC TEMP ORARYW ORKSP ACE

W ATERSOFTHEU. S.

!

\

!

! !

\

\

\

!

\

!

\

!

MA TC HL I NE 25

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

!

!

\

!

!

CONSTRUCTION IMPACTS

! !

! !

\

\

\

\

\

!

\

\

!

!

!

\

\

\

!

!

\

\

\

!

\

\

\

! !

\

LI NE 24

LAKE PONTCHARTRAIN

\

\ \

MA TC H

FORESTEDW ETLAND 0. 07AC VEGETATI ONCLEARI NG

!

\

!

\

\

!

\

\

\

\

!

0

50 FEET

100

FIGURE 2-27 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

!

! ! LAKE PONTCHARTRAIN

! ! !

! ! ! !

EMERGENTW ETLAND 0. 24AC VEGETATI ONCLEARI NG

! ! ! !

\

!

\

EMERGENTW ETLAND 0. 18AC TEMP ORARYACCESS

! ! !

! !

!

\

\

EMERGENT WETLAND FORESTED WETLAND

!

!

\

\

!

OPEN WATER

!

NOTW ATERSOFTHEU. S.

!

\

\

! !

\

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

\

PROPOSED RAIL BRIDGE CENTERLINE

!

!

\

!

\

!

\

\

UPLAND

\

!

! !

\

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

!

\

!

\

EXISTING FIBER OPTIC LINE (ABANDONDED)

! !

\

\

! !

\

!

\

!

!

\

!

\

!

\

\

! !

\

\

!

\

!

\

\

\

! !

\

!

\

MA TC HL I NE 26

!

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

!

!

\

!

!

!

EMERGENTW ETLAND 0. 56AC TEMP ORARYW ORKSP ACE

W ATERSOFTHEU. S.

!

! !

!

\

\

CONSTRUCTION IMPACTS

!

!

\

\

!

!

\

\

\

!

!

\

\

!

!

\

\

\

!

\

\

\

! !

\

MA TC HL I NE 25

FORESTEDW ETLAND 0. 12AC VEGETATI ONCLEARI NG

!

\

\

\

\

!

\

\

!

\

\

\

\

\

0

50 FEET

100

!

FIGURE 2-28 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

\

LAKEP ONTCHARTRAI N

!

\

! !

\

! !

LAKE PONTCHARTRAIN

!

!

! ! ! !

\

!

FORESTEDW ETLAND 0. 07AC VEGETATI ONCLEARI NG

! ! !

\

! !

W ATERSOFTHEU. S.

!

EMERGENT WETLAND

!

! !

! !

\

!

\

\

!

!

\

\

! !

\

OPEN WATER

NOTW ATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) PROPOSED RAIL BRIDGE CENTERLINE

!

\

!

\

!

UPLAND

\

! !

\

! !

\

\

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

! !

\

!

\

\

! !

\

!

\

!

\

!

! !

\

\

\

! !

\

\

!

\

!

\

\

! !

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

!

\

! !

EMERGENTW ETLAND 0. 42AC TEMP ORARYW ORKSP ACE

FORESTED WETLAND

FORESTEDUP LAND 0. 17AC VEGETATI ONCLEARI NG

!

\

!

!

\

\

MA TC HL I NE 27

!

!

\

\

CONSTRUCTION IMPACTS \

! !

\

\

\

!

!

\

\

\

!

!

\

\

!

\

! !

!

\

\

\

\

\

\

\

MA TC HL I NE 26

!

\

!

\

\

!

\

\

\

\

\

!

!

!

!

! !

0

50 FEET

100

!

FIGURE 2-29 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

\

!

\

! !

\

!

LAKE PONTCHARTRAIN

! ! ! ! ! ! !

FORESTEDW ETLAND 0. 09AC VEGETAI ONCLEARI NG

!

\

! ! ! ! !

W ATERSOFTHEU. S.

!

EMERGENT WETLAND

!

FORESTED WETLAND

! OPEN WATER

!

NOTW ATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

! !

\

\

!

\

!

!

\

! !

\

! !

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

! !

\

!

\

\

!

! !

\

\

!

\

!

! !

\

\

\

! !

\

\

!

\

! !

\ \

!

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

! !

CONSTRUCTION IMPACTS

!

\

!

!

EMERGENTW ETLAND 0. 58AC TEMP ORARYW ORKSP ACE

UPLAND

\

!

\

EMERGENTW ETLAND 0. 08AC TEMP ORARYACCESS

PROPOSED RAIL BRIDGE CENTERLINE

!

!

!

\

\

MA TC HL I NE 28

!

\

\

!

! !

\

\

!

!

\

\

\

!

\

\

\

!

!

\

\

!

!

\

\

\

!

\

\

!

!

!

\

!

!

\

\

\

\

\

\

!

!

\

\

!

\

\

!

\

\

\

\ \

\

MA TC HL I NE 27

LAKEP ONTCHARTRAI N

!

\

0

50 FEET

100

!

!

FIGURE 2-30 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. !

\

!

\

! !

\

!

\

!

\

! !

\

! ! ! ! !

\

! ! ! ! ! !

D

EMERGENT WETLAND FORESTED WETLAND OPEN WATER

!

NOTW ATERSOFTHEU. S.

!

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

PROPOSED RAIL BRIDGE CENTERLINE

!

!

\

! ! !

!

!

\

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

\

!

D

!

\

\

! !

\

CORRESPONDING CROSS SECTION IN FIGURE 3

!

\

!

\

!

!

\

! !

\

\

! !

\

!

\

!

\

!

!

\

\

\

! !

\

\

!

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

! !

\

!

\

!

\

! ! !

!

CONSTRUCTION IMPACTS

!

!

EMERGENTW ETLAND 0. 37AC TEMP ORARYW ORKSP ACE

UPLAND

\

!

!

!

\

\

MA TCH LI NE 29

! !

\

\

0

!

! !

\

\

!

! !

\

\

W ATERSOFTHEU. S.

\

!

!

\ \

D

FORESTEDW ETLAND 0. 10AC V!EGETATI ONCLEARI NG

\

\ XX \

\

!

!

\

\

\

!

!

\ \

\

WW1

FORESTEDUP LAND 0. 38AC VEGETATI ONCLEARI NG

!

\

\

\

!

!

\

\

!

\

\

!

\

\

\

\

\

\

MA TC HL I NE 28

LAKE PONTCHARTRAIN

!

50 FEET

100

!

FIGURE 2-31 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

\

!

\

! !

\

!

!

! !

FORESTEDW ETLAND 0. 03AC VEGETATI ONCLEARI NG

! ! ! !

! ! ! ! ! !

W ATERSOFTHEU. S.

!

FORESTED WETLAND

!

OPEN WATER

!

NOTW ATERSOFTHEU. S.

! !

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

PROPOSED RAIL BRIDGE CENTERLINE

!

\

! !

! !

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

\

!

\

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

! !

\

!

\

!

!

\

!

\

\

!

\

!

! !

\

!

\

!

!

\

\

!

\

!

\

!

!

\

!

\

!

\

\

!

\

! !

\

!

\

I CRRBONNETCARRE BRI DGEREP LACEMENT

\

\

CONSTRUCTION IMPACTS

!

\

! !

EMERGENTW ETLAND 0. 46AC TEMP ORARYW ORKSP ACE

UPLAND

\

!

!

!

\

\

MA TC HL I NE 30

! !

\

\

0

!

!

\

\

!

!

\

\

!

! !

\

\

EMERGENTW ETLAND 0. 14AC TEMP ORARYACCESS

EMERGENT WETLAND

!

\

!

\

\

\

!

\

\

\

! !

\

\

!

!

\

\

!

!

\

\

\

!

!

\

\

!

\

\

\

\

\

!

\

\

\

LAKE PONTCHARTRAIN

!

\

\

MA TCH LI NE 29

F OR E A F ORE ES ST T ED DU UPP L L AN ND D 0 . 0 4 0 . 0 4A AC C V A I O E N VE EG GE ET T AT T I ON NC CL L EA AR RI I NG G

!

\

\

\

50 FEET

100

! ! !

FIGURE 2-32 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

!

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s. ! !

FORESTEDUP LAND 0. 08AC VEGETATI ONCLEARI NG

!

\

!

\

! !

LAKE PONTCHARTRAIN

! !

EMERGENTW ETLAND 0. 10AC VEGETATI ONCLEARI NG

! ! ! !

FORESTEDW ETLAND 0. 21AC VEGETATI ONCLEARI NG

! ! ! !

!

W ATERSOFTHEU. S.

! !

EMERGENT WETLAND

!

FORESTED WETLAND

!

OPEN WATER

NOTW ATERSOFTHEU. S.

! !

EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

!

PROPOSED RAIL BRIDGE CENTERLINE

!

! !

!

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE

!

EXISTING FIBER OPTIC LINE (ABANDONDED)

!

!

\

\

!

!

! !

\

!

\

!

!

\

!

\

!

\

!

\

!

\

! !

\

!

\

!

\

! !

!

\

! !

\

!

!

\

!

\

!

\ \ \

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

\

\

!

!

\

!

\

M AT CH LI NE 31

!

\

\

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

!

! !

\

\

!

EMERGENTW ETLAND 0. 66AC TEMP ORARYW ORKSP ACE

EQUIPMENT STAGING

\

!

!

!

\

\

!

EMERGENTW ETLAND 0. 15AC TEMP ORARYACCESS

UPLAND

!

\

!

\

\

!

! !

\

\

!

!

\

\

!

!

\

\

!

! !

\

\

\

!

\

\

!

!

!

\

\

!

! !

!

\

\

\

\

\

!

\

\

!

\

\

!

\

\

\

!

\

!

\

!

MA TC HL I NE 30

\

\

\

\

\

0

50 FEET

100

\

\

\ \

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW _8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

FIGURE 2-33

FORPERM I TTI NG ONLY ­ Thisdocum en tisn ott obe used forcon st r uct ion ,biddin g,r ecor da t ion ,con veya n ce orsa les.

\

!

!

\

!

\

LAKE PONTCHARTRAIN

\ !

\

ROADI M PROV EM ENT I NUPLAND ( 266. 5FT X32FT) EXCAV ATI ON-3FT ( 271CY ) SAND-12I N( 315CY) CONCRETEPI PE4I N( 360. 27CY) GEOTEXTI LEFABRI C

\

\ \

\

\

!

\ \ \

(

"(

\

\ \

\

\

\

\ \

\

D

\

\

YY

W ATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

NOT W ATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED)

\

W W 4

FI LLI NUPLAND CLASS55LBSTONERI PRAP 200CY

\

1 1

DD

\

ZZ

\

D

PROPOSED RAIL BRIDGE CENTERLINE

PERM ANENT LI GHTW EI GHT FI LL 25FT SOUTHOFBACKW ALL 100CY -UPLAND EXCAV ATI ON BEHI NDBACKW ALL-550CY

STAGI NG AREA ( 3AC)

UPLAND TEMPORARY ACCESS EQUIPMENT STAGING

\ ! !

!

(

\

( (

!

!

!

\

( "

BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE

!

! !

!

\

\

! !

AT CH

! !

LI NE 31

\

!

M

PROPOSEDBERM +/ -ELEV ATI ON. 68FT 76CY SOI LFI LLI NUPLAND

!

\

EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY) PERMANENT FILL

( " ( (

IMPROVED LIFT STATION BERM PARISH ROAD EXISTING FIBER OPTIC LINE (ABANDONDED)

FI LLI NUPLANDS 12I NSUBBALLAST -450CY 12I NBALLAST-550CY EM BANKM ENT -850CY

CORRESPONDING CROSS SECTION IN FIGURE 3

I CRRBONNET CARRE BRI DGEREPLACEM ENT M A TC HL I NE 32

LO W

ER

GU I DE LE VE E

EXI STI NG PAR I SHROA D

D

CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-34 PATH:O: \260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I TTI N\M AP_ DOCS\FI GURES\DELI NEATI ON\BRI DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI DGEREPLACEM ENT_ FI G2_ I M PACTS_ BW _ 8. 5X11. M XD -USER:M COW LI NG -DATE:9/ 1/ 2017

MA TC HL I NE 32

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

RELOCATEEXI STI NG SI GNALTOWER I NUP LANDS

LAKE PONTCHARTRAIN

WATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

NOTWATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) UPLAND TEMPORARY ACCESS PERMANENT FILL EXISTING FIBER OPTIC LINE (ABANDONDED)

MATCH LI NE34

TEMP ORARYACCESS-UP LAND

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-35 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

MATCH LI NE34

LAKE PONTCHARTRAIN

WATERSOFTHEU. S. EMERGENT WETLAND FORESTED WETLAND OPEN WATER

NOTWATERSOFTHEU. S. EXISTING RAILROAD CENTERLINE (TO BE REMOVED) UPLAND TEMPORARY ACCESS PERMANENT FILL EXISTING FIBER OPTIC LINE (ABANDONDED)

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-36 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

LAKE PONTCHARTRAIN

WATERSOFTHEU. S.

NOTWATERSOFTHEU. S.

I CRRBONNETCARRE BRI DGEREP LACEMENT CONSTRUCTION IMPACTS

0

50 FEET

100

FIGURE 2-37 P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G2_I MP ACTS_BW_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3AA

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3BB

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3CC

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3DD

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3EE

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3FF

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3GG

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3HH

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS

FI GURE3I I

FO RPERMI TTI NG O NLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

PREPARED BY: ESCA, INC. LA PE #: 30080

BO NNETCARRESPI LLW AYBRI DGEREPLACEMENT NO TTO SCALE

PATH:O : \ 260796_040_CN_TK3_BO NNET_CARRE_PERMI TTI N\ MAP_DO CS\ FI GURES\ DELI NEATI O N\ BRI DGE_REPLACEMENT\ 404&408\ BO NNETCARRE_BRI DGEREPLACEMENT_FI G3_CRO SS_SEC_8. 5X11. MXD -USER:MCO W LI NG -DATE:9/ 1/ 2017

CRO SSSECTI O NS

FI GURE3JJ

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3KK

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3LL

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3MM

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3NN

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3OO

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3PP

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLW AYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOW LI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3QQ

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3RR

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3SS

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3TT

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3UU

FO RPERMI TTI NG O NLY­This d oc um entis nott o b e us ed for c ons t ruc t ion,b id d ing,rec ord a t ion,c onveya nc e or s a les .

FO RESTEDWETLAND

FO RESTEDUPLAND

VEGETATI O NCLEAREDTO GRO UNDLI NE

AVERAGEDEPTH:0. 837FT MHHW:1. 096FT MLLW:0. 571 FT

42FO O TVEGETATI O NCLEARI NG

PREPARED BY HDR ENGINEERING, INC.

BO NNETCARRESPI LLWAYBRI DGEREPLACEMENT NO TTO SCALE

PATH:O : \ 260796_040_CN_TK3_BO NNET_CARRE_PERMI TTI N\ MAP_DO CS\ FI GURES\ DELI NEATI O N\ BRI DGE_REPLACEMENT\ 404&408\ BO NNETCARRE_BRI DGEREPLACEMENT_FI G3_CRO SS_SEC_8. 5X11. MXD -USER:MCO WLI NG -DATE:9/ 1/ 2017

CRO SSSECTI O NS FI GURE3VV

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

1

3

2

4

PREPARED BY: ESCA, INC. LA PE #: 30080

PREPARED BY HDR, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3WW

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3XX

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

PREPARED BY: ESCA, INC. LA PE #: 30080

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3YY

FORP ERMI TTI NG ONLY­This d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.

PREPARED BY: ESCA, INC. LA PE #: 30080

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS FI GURE3ZZ

FORP ERMI TTI NG ONLY­This d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.

PREPARED BY: CIVIL & ENVIRONMENTAL CONSULTING ENGINEERS DANNY J. HEBERT PE #: LLC 13919

BONNETCARRESP I LLWAYBRI DGEREP LACEMENT NOTTO SCALE

P ATH:O: \ 260796_040_CN_TK3_BONNET_CARRE_P ERMI TTI N\ MAP _DOCS\ FI GURES\ DELI NEATI ON\ BRI DGE_REP LACEMENT\ 404&408\ BONNETCARRE_BRI DGEREP LACEMENT_FI G3_CROSS_SEC_8. 5X11. MXD -USER:MCOWLI NG -DATE:9/ 1/ 2017

CROSSSECTI ONS

FI GURE311

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas