Replacement Railroad Bridge at the Bonnet Carre’ Spillway, St. Charles Parish, Louisiana
NAME OF APPLICANT: Illinois Central Railroad Company, c/o HDR Engineering, Inc: Brooke
Savant, 4828 Loop Central Drive Suite 800, Houston, TX 77081
LOCATION OF WORK: Project site is located at the Bonnet Carre’ Spillway in St. Charles Parish,
Louisiana, as shown on the attached drawings.
Hydrologic Unit Codes: 08090203– Eastern Louisiana Coastal Location: Latitude: 30.06432
Longitude: -90.38758.
CHARACTER OF WORK: The applicant proposes to place timber matting for temporary construction
access and to clear for access and work space associated with the construction of a new concrete
railroad bridge. The existing wooden railroad bridge is proposed for removal with some structures
remaining in their current state and maintained in place and other structures being cut at or below the
mud line and maintained in place. Permanent impacts to 1.20 acres of jurisdictional wetlands from
clearing activities associated with work space and access, and temporary impacts to 7.17 acres of
jurisdictional wetlands associated with work space and access are proposed. The applicant has
proposed the use of an approved mitigation bank to offset any unavoidable impacts to jurisdictional
wetlands
JOINT PUBLIC NOTICE
October 2, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch (OD-SE)
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2041
Benjamin.C.Sherman@usace.army.mil
Project Manager
Benjamin Sherman
Permit Application Number
MVN 2015-02351-2 ES
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170808-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Replacement Railroad Bridge at the Bonnet Carre' Spillway, St. Charles Parish, Louisiana
NAME OF APPLICANT: Illinois Central Railroad Company, c/o HDR Engineering, Inc: Brooke
Savant, 4828 Loop Central Drive Suite 800, Houston, TX 77081
LOCATION OF WORK: Project site is located at the Bonnet Carre' Spillway in St. Charles Parish,
Louisiana, as shown on the attached drawings.
Hydrologic Unit Codes: 08090203 Eastern Louisiana Coastal Location: Latitude: 30.06432
Longitude: -90.38758.
CHARACTER OF WORK: The applicant proposes to place timber matting for temporary construction
access and to clear for access and work space associated with the construction of a new concrete
railroad bridge. The existing wooden railroad bridge is proposed for removal with some structures
remaining in their current state and maintained in place and other structures being cut at or below the
mud line and maintained in place. Permanent impacts to 1.20 acres of jurisdictional wetlands from
clearing activities associated with work space and access, and temporary impacts to 7.17 acres of
jurisdictional wetlands associated with work space and access are proposed. The applicant has
proposed the use of an approved mitigation bank to offset any unavoidable impacts to jurisdictional
wetlands
-2The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project
Manager listed above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The Section Chief
will review the request and the requestor will be promptly notified of the decision to grant or deny the
request. If granted, the time extension will be continuous to the initial comment period and, inclusive
of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is aware the project crosses a navigable waterway of the United States
and will require a bridge permit under Section 9 of the Rivers and Harbors Act. A bridge permit
applies to any individual, partnership, corporation, or local, state, or federal legislative body, agency,
or authority planning to construct or modify a bridge or causeway across a navigable waterway of the
United States. Section 9 of Rivers and Harbors Act is administrated by the U.S. Coast Guard (USCG)
and will require a separate review. The USCG is the lead Federal agency for the proposed action.
In accordance with Section 106 of the National Historic Preservation Act (NHPA), the USACE is
required to take into account the effects of any permitted action to historic properties, which includes
both archaeological resources on the surface or below ground, as well as historic buildings and
structures that are listed in or are eligible for listing in the National Register of Historic Places. To
-3-
date, USACE has received a National Register of Historic Places evaluation of the "Bonnet Carre
Spillway Bridge, for the Illinois Central Railroad line" and is reviewing it. For this proposed
undertaking, the USCG, as the lead Federal agency, will comply with NHPA and other relevant laws
and regulations per their own procedures.
Endangered Species Act (ESA): The New Orleans District, Regulatory Branch, will coordinate
with the USCG to insure compliance with the ESA through their evaluation.
Essential Fish Habitat (EFH): The New Orleans District, Regulatory Branch, will coordinate with
the USCG to insure compliance with the EFH through their evaluation.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
P ROJECTLOCATI
ON
§
¦
¨
55
BA ST.
P JO
ST TIS HN
.C TP T
PA HA AR HE
R I R L I SH
SH E
S
LAKE
PONTCHARTRAIN
51
£
¤
P ROJECTLOCATI
ON
LEGEND
PR
ES
CO
TT
RO
AD
PROJECT LOCATION
IC
SU MCC RR
BD O IV M B
IS
IO
N
RIVER
LAKE
PONTCHARTRAIN
KA
SO N SA
RA UT H S C
ILW ER ITY
AY N
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
®
q
61
3142
AIRPORTS
DATA SOURCES: LA DOTD, ESRI, US CENSUS BUREAU
£
¤
¬
«
®
q
MISSISSIPPI RIVER
LOUIS ARMSTRONG
NEW ORLEANS
INTERNATIONAL AIRPORT
61
£
¤
ROADWAY
SPILLWAY LEVEE
JEFFERSON PARISH
ST. CHARLES PARISH
EV
C
AN
R O OU
G
E
A D NT
Y
RO L I N
62
8
AD E
628
"
)
M I SSI SS I P P I
RAILROAD
§
¦
¨
£
¤
628
COASTAL ZONE
10
61
¬
«
PARISH BOUNDARY
61
£
¤
VICINITY MAP
¬
«
48
§
¦
¨
310
¬
«
3127
BAT IC RR
O
S UB N RO
D I V UG E
ISIO
N
¬
«
¬
«
18
52
0
¬
«
¬
«
48
3060
U
PA
NION
1
MILES
2
RO A D
RAIL
AY
L
I W
RA
SF
CIFIC
BN
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
FI
GURES_8.
5X11\
BONNETCARRE_BRI
DGEREP LACEMENT_DELI
NEATI
ONS_FI
G1_GENLOC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:8/
30/
2017
FIGURE 1
FORPERMI
TTI
N G ON LY Thisd oc um entisnott
o b e used forc onst
r
uc t
ion,b id d ing,r
ec or
dat
ion,c onveya nc e orsa les.
LAKE
PONTCHARTRAIN
R
DO
I
RR
CO
TY
LI
UTI
D
BB
WATERSOFTHEU.
S.
OPEN WATER
N OTWATERSOFTHEU.
S.
TIMBER MATS
PRESCOTT ROAD (TO BE IMPROVED)
CORRESPONDING CROSS SECTION IN FIGURE 3
43
2F
T
D
AA
D
PERMAN EN TROCKFI
LL
(
MAI
N TEN AN CEON LY )
UPTO 4500CY
I
CRRBON N ETCARRE
BRI
DGEREPLACEMEN T
CONSTRUCTION IMPACTS
Roc k willb e t
he p r
efer
r
ed m et
hod used form a int
ena nc e fr
om t
he
ent
r
a nc e of Hwy 61a nd a long Pr
esc ot
tRd .up unt
il
t
he p ip eline c or
r
id or(
Ap p r
oxim a t
ely 8,
400FT)
.
0
50
FEET
100
FIGURE 2-1
PATH:O:
\
260796_040_CN _TK3_BON N ET_CARRE_PERMI
TTI
N \
MAP_DOCS\
FI
GURES\
DELI
N EATI
ON \
BRI
DGE_REPLACEMEN T\
404&408\
BON N ETCARRE_BRI
DGEREPLACEMEN T_FI
G2_I
MPACTS_BW_8.
5X 11.
MX D -USER:MCOWLI
N G -DATE:9/
1/
2017
FORPERM I
TTI
NG ONLY Thisdo c um entisno tt
o b e used fo rc o nst
r
uc t
io n,b idding,r
ec o r
da t
io n,c o nveya nc e o rsa les.
LAKE
PONTCHARTRAIN
TEM PORARYFI
LLPLACEM ENT
(
ROCK)19'W I
DEROADSECTI
ON
FORTRU CKSTAGI
NG (
350CY)
W ATERSOFTHEU .
S.
EMERGENT WETLAND
OPEN WATER
NOT W ATERSOFTHEU .
S.
TIMBER MATS
SHOULDER IMPROVEMENTS (IN UPLANDS)
PRESCOTT ROAD (TO BE IMPROVED)
D
50
0F
T
D
CORRESPONDING CROSS SECTION IN FIGURE 3
DD
PERM ANENT ROCKFI
LL
(
M AI
NTENANCEONLY)
U PTO 4500CY
I
CRRBONNET CARRE
BRI
DGEREPLACEM ENT
CONSTRUCTION IMPACTS
Cur
r
entc o ndit
io n o f Pr
esc o t
tRo a d no r
t
h o f pipeline
cor
r
ido r(
a ppr
o xim a t
ely 8,
600LF)willr
equir
e a ddit
io na l
r
o c k a nd/
o rt
im b erm a t
st
o a llo w deliver
y o fb r
idge
c o nst
r
uc t
io n m a t
er
ia lst
o t
em po r
ar
y a c c essr
o ad
(
see Fig 23t
o 25)
.
0
50
FEET
100
FIGURE 2-2
PATH:O:
\
260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I
TTI
N\
M AP_ DOCS\
FI
GU RES\
DELI
NEATI
ON\
BRI
DGE_ REPLACEM ENT\
404&408\
BONNETCARRE_ BRI
DGEREPLACEM ENT_ FI
G2_ I
M PACTS_ BW _ 8.
5X 11.
M X D -U SER:M COW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
LAKEP ONTCHARTRAI
N
LAKE
PONTCHARTRAIN
FT
40
GG
D
§
¦
¨
I
10
OF
FI
CE
TR
AI
LE
RS
TEMP ORARYACCESS
GRAVELAP P ROACH
84.
8CY
W ATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
NOTW ATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
UPLAND
TEMPORARY ACCESS
TIMBER MATS
PRESCOTT ROAD (TO BE IMPROVED)
PERMANENT FILL
EXISTING FIBER OPTIC LINE (ABANDONDED)
EE
D
CORRESPONDING CROSS SECTION IN FIGURE 3
65
FT
D
FT
95
D
EXI
STI
NG UTI
LI
TY
CORI
DOR
FF
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
1
NE
I
L
CH
T
MA
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-3
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORPERMI
TTI
N G ON LY This d oc um entis nott
o b e us ed for c ons t
ruc t
ion,b id d ing,rec ord a t
ion,c onveya nc e or s a les .
LAKEPON TCHARTRAI
N
1
NE
LI
H
TC
A
M
LAKE
PONTCHARTRAIN
PERMAN EN TFI
LL
CLASS55LBSTON ERI
PRAP
1000CY -UPLAN D
WATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
N OTWATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
UPLAND
TEMPORARY ACCESS
TIMBER MATS
PERMANENT FILL
EXISTING FIBER OPTIC LINE (ABANDONDED)
EMERGEN TWETLAN D
0.
95AC
ACCESSROAD(
TI
MBERMATS)
APPROX 32FTX 1200FT
I
CRRBON N ETCARRE
BRI
DGEREPLACEMEN T
CONSTRUCTION IMPACTS
2
NE
I
L
CH
T
A
M
0
50
FEET
100
FIGURE 2-4
PATH:O:
\
260796_040_CN _TK3_BON N ET_CARRE_PERMI
TTI
N \
MAP_DOCS\
FI
GURES\
DELI
N EATI
ON \
BRI
DGE_REPLACEMEN T\
404&408\
BON N ETCARRE_BRI
DGEREPLACEMEN T_FI
G2_I
MPACTS_BW_8.
5X 11.
MX D -USER:MCOWLI
N G -DATE:9/
1/
2017
FORPERMI
TTI
N G ON LYThisdoc um entisnott
o b e used for c onst
ruc t
ion,b idding,rec orda t
ion,c onveya nc e or sa les.
LAKEPON TCHARTRAI
N
2
NE
I
L
H
C
AT
M
LAKE
PONTCHARTRAIN
W ATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
N OT W ATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
UPLAND
TEMPORARY ACCESS
HH
D
CC
EQUIPMENT STAGING
TIMBER MATS
PROPOSED SHORING
D
PERMANENT FILL
EXISTING FIBER OPTIC LINE (ABANDONDED)
TEMPORARYACCESSROAD
FOREQUI
PMEN T AN DMATERI
ALS
FORESTEDW ETLAN D
0.
21AC
TEMPORARYACCESS(
TI
MBERMATS)
MATC
HLI
N E3
D
CORRESPONDING CROSS SECTION IN FIGURE 3
I
CRRBON N ET CARRE
BRI
DGEREPLACEMEN T
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-5
PATH:O:
\
260796_ 040_ CN _ TK3_ BON N ET_ CARRE_ PERMI
TTI
N \
MAP_ DOCS\
FI
GURES\
DELI
N EATI
ON \
BRI
DGE_ REPLACEMEN T\
404&408\
BON N ETCARRE_ BRI
DGEREPLACEMEN T_ FI
G2_ I
MPACTS_ BW _ 8.
5X 11.
MX D -USER:MCOW LI
N G -DATE:9/
1/
2017
FORPERM I
TTI
NG ONLY Thisdo cum entisno tt
o b e used fo rco nst
r
uct
io n,b idding,r
eco r
da t
io n,co nveya nce o rsa les.
LAKEPONTCHARTRAI
N
PERM ANENT LI
GHTW EI
GHT FI
LL
25FT NORTHOFBACKW ALL
100CY-UPLAND
EXCAV ATI
ON
BEHI
NDBACKW ALL-850CY
HH
D
LAKE
PONTCHARTRAIN
SECTI
ONALBARGE
(
CONTI
NGENCYACCESS)
40FT X40FT
!
!
!
!
Y
X
PERMANENT FILL
!
SECTIONAL BARGE
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
!
FRESH WATER WELL (12 IN DIAMETER 100 FT DEEP)
!
!
\
!
\
!
\!
!
\
!
Y
X
!
\
Y
X
Y
X
Y
X
\!
Y
X
Y
X
Y
X
\
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
\
Y
X
0
50
FEET
100
\!
Y
X
!
\
Y
X
!
Y
X
\
!
Y
X
\
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
\
!
Y
X
Y
X
M M
I
CRRBONNET CARRE
BRI
DGEREPLACEM ENT
CONSTRUCTION IMPACTS
\
4
NE
I
L
H
TC
M A
D
CORRESPONDING CROSS SECTION IN FIGURE 3
\
Y
X
Y
X
!
\
\!
Y
X
Y
X
Y
X
!
!
Y
X
Y
X
!
PATH:O:
\260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I
TTI
N\M AP_ DOCS\FI
GURES\DELI
NEATI
ON\BRI
DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI
DGEREPLACEM ENT_ FI
G2_ I
M PACTS_ BW _ 8.
5X11.
M XD -USER:M COW LI
NG -DATE:9/
1/
2017
!
\
Y
X
D
!
\
!
\!
!
\
!
\
\
!
\
Y
X
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
PROPOSED SHORING
!
\
Y
X
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
TIMBER MATS
!
\
!
Y
X
!
!
!
\
!
\
Y
X
EQUIPMENT STAGING
\
!
Y
X
EXCAVATION LIMITS (450FT X 29FT)
TEMPORARY ACCESS
!
!
\!
Y
X
SUPPORTING GANTRY CRANE PILES
36IN DIAMETER 100FT DEPTH
GANTRY CRANE FOOTPRINT
\
D
UPLAND
!
\
NN
PROPOSED RAIL BRIDGE CENTERLINE
!
\
KK
D
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
Y
X
!
D
LL
OPEN WATER
NOT W ATERSOFTHEU.
S.
Y
X
I
I
FORESTED WETLAND
FI
LLI
NUPLANDS
12I
NSUBBALLAST -400CY
12I
NBALLAST-600CY
EM BANKM ENT -250CY
JJ
\
D
EMERGENT WETLAND
Y
X
D
D
W ATERSOFTHEU.
S.
UU TEM PORARYAPPROACH
(
TI
M BERM ATS)
APPROX40FT X90FT
\
M ATC
HLI
NE3
SHEETPI
LE-I
NUPLANDS
250FT X10FT
33.
92CYEXCAV ATI
ON
FIGURE 2-6
FORP ERMI
TTI
NG ONLYThis d oc um entis nott
o b e us ed for c ons t
ruc t
ion,b id d ing,rec ord a t
ion,c onveya nc e or s a les .
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
!
\
!
Y
X
\
Y
X
!
Y
X
MM
\!
Y
X
!
Y
X
\
Y
X
Y
X
!
Y
X
\!
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
!
Y
X
\!
Y
X
Y
X
Y
X
!
\
Y
X
!
Y
X
Y
X
Y
X
\
Y
X
!
Y
X
Y
X
Y
X
\
!
Y
X
\!
Y
X
Y
X
Y
X
OPEN WATER
!
!
Y
X
Y
X
WATERSOFTHEU.
S.
!
\
!
\
Y
X
\!
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
\!
Y
X
Y
X
Y
X
Y
X
Y
X
PROPOSED RAIL BRIDGE CENTERLINE
!
\
\
!
!
Y
X
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
!
!
D
Y
X
Y
X
Y
X
!
\
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
CORRESPONDING CROSS SECTION IN FIGURE 3
\
Y
X
\
!
Y
X
\
Y
X
Y
X
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
EXISTING FIBER OPTIC LINE (ABANDONDED)
Y
X
Y
X
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
TIMBER MATS
\
Y
X
\
\
Y
X
!
!
!
Y
X
\
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
Y
X
MA
TC
HL
I
NE
5
Y
X
!
Y
X
EQUI
P MENTSTAGI
NG-NORTHLAYDOWNYARD
3.
3AC-UP LAND
20,
000CYTEMP ORARYROCKFI
LL
EQUIPMENT STAGING
\
\
Y
X
Y
X
Y
X
Y
X
EXCAVATION LIMITS (450FT X 29FT)
TEMPORARY ACCESS
\
Y
X
Y
X
Y
X
SUPPORTING GANTRY CRANE PILES
36IN DIAMETER 100FT DEPTH
GANTRY CRANE FOOTPRINT
\
!
Y
X
EXCAVATI
ONLI
MI
TSFOR
GANTRYCRANERUNWAY
2,
087CY
Y
X
Y
X
Y
X
Y
X
!
Y
X
Y
X
Y
X
UPLAND
!
\!
Y
X
Y
X
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
!
Y
X
Y
X
NOTWATERSOFTHEU.
S.
!
\
!
Y
X
!
\
\
Y
X
Y
X
!
\
!
\!
Y
X
GANTRYCRANE
FOOTP RI
NT
93FTX406FT
!
\
\
Y
X
!
\
Y
X
\
!
Y
X
!
\
Y
X
!
Y
X
!
\
Y
X
Y
X
Y
X
LAKE
PONTCHARTRAIN
!
\
!
Y
X
!
\
\!
D
\
\
!
\
4
NE
I
L
H
TC
MA
D
\
\
Y
X
!
\
!
Y
X
!
\
!
NN
LAKEP ONTCHARTRAI
N
!
\
\
\!
Y
X
!
Y
X
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-7
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORPERMI
TTI
N G ON LY This d oc um entis nott
o b e us ed for c ons t
ruc t
ion,b id d ing,rec ord a t
ion,c onveya nc e or s a les .
!
\
!
!
!
\
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
!
!
\
!
!
!
!
WATERSOFTHEU.
S.
!
OPEN WATER
\
!
!
\
!
!
!
!
!
!
!
!
\
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
\
!
UPLAND
!
\
!
!
!
\
!
TEMPORARY ACCESS
!
\
!
!
\
EQUIPMENT STAGING
\
!
!
\
!
!
\
!
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TIMBER MATS
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
D
\
!
\
!
CORRESPONDING CROSS SECTION IN FIGURE 3
\
!
\
!
\
!
\
!
!
D
OO
PROPOSED RAIL BRIDGE CENTERLINE
!
\
\
CRAN EACCESSROAD
(
TI
MBERMATS)
APPROX 40FTX 900FT
N OTWATERSOFTHEU.
S.
!
!
!
!
!
!
\
\
I
CRRBON N ETCARRE
BRI
DGEREPLACEMEN T
!
\
\
\
!
!
!
!
\
\
!
\
\
\
\
\
\
!
\
!
!
!
\
\
\
\
\
\
\
\
!
\
\
!
\
\
\
\
\
\
\
!
!
\
\
\
\
MA
TC
HL
I
N E
5
LAKEPON TCHARTRAI
N
!
\
!
MA
TC
HL
I
NE
6
!
!
!
CONSTRUCTION IMPACTS
!
!
0
50
FEET
100
FIGURE 2-8
PATH:O:
\
260796_040_CN _TK3_BON N ET_CARRE_PERMI
TTI
N \
MAP_DOCS\
FI
GURES\
DELI
N EATI
ON \
BRI
DGE_REPLACEMEN T\
404&408\
BON N ETCARRE_BRI
DGEREPLACEMEN T_FI
G2_I
MPACTS_BW_8.
5X 11.
MX D -USER:MCOWLI
N G -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
\
!
\
LAKEP ONTCHARTRAI
N
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
\
!
\
!
!
\
!
\
!
!
!
WATERSOFTHEU.
S.
!
OPEN WATER
!
!
\
\
!
!
!
\
\
NOTWATERSOFTHEU.
S.
!
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
PROPOSED RAIL BRIDGE CENTERLINE
!
UPLAND
!
!
\
\
TEMPORARY ACCESS
\
!
!
!
\
\
!
!
!
\
\
!
!
!
\
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
TIMBER MATS
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
!
!
\
\
!
!
\
\
!
!
\
\
!
\
\
!
\
!
!
\
!
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
\
!
MA
TC
H
LI
NE
7
!
\
CONSTRUCTION IMPACTS
!
!
!
!
!
!
\
\
!
!
!
\
\
\
!
!
\
!
!
\
!
!
\
\
\
!
!
\
\
\
!
\
\
!
!
MA
TC
HL
I
NE
6
!
\
\
!
\
\
!
\
\
\
0
50
FEET
100
FIGURE 2-9
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
LAKEP ONTCHARTRAI
N
!
!
!
LAKE
PONTCHARTRAIN
!
\
!
!
!
!
!
\
!
\
!
!
!
!
!
W ATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
!
!
\
\
!
\
!
D
NOTW ATERSOFTHEU.
S.
!
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
!
!
PROPOSED RAIL BRIDGE CENTERLINE
!
\
!
\
!
!
!
D
UPLAND
\
!
!
\
!
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
!
\
!
!
D
!
\
!
\
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
!
QQ
!
\
PP
OPEN WATER
!
!
!
\
\
\
!
\
\
!
!
\
\
!
\
!
\
!
!
MA
TC
HL
I
NE
8
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
!
\
!
!
CONSTRUCTION IMPACTS
!
!
!
\
\
\
!
!
\
\
\
!
\
\
\
!
!
\
\
\
!
!
!
!
\
\
\
!
!
!
\
\
\
\
\
!
\
MA
TC
H
LI
NE
7
!
!
!
!
\
\
\
!
\
\
\
!
\
\
\
\
\
!
0
50
FEET
100
FIGURE 2-10
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
\
!
LAKEP ONTCHARTRAI
N
!
\
!
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
\
!
\
!
!
!
!
!
\
!
!
!
!
!
!
\
!
\
!
!
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
PROPOSED RAIL BRIDGE CENTERLINE
!
!
\
\
!
\
!
!
!
\
!
!
!
\
!
\
!
\
!
D
!
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
\
!
!
!
\
!
!
\
!
\
!
!
\
!
\
\
!
!
\
\
!
\
!
\
\
!
!
\
M
AT
CH
LI
NE
9
!
TT
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
D
D
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
SS
UPLAND
\
!
\
\
RR
NOTWATERSOFTHEU.
S.
!
\
D
OPEN WATER
!
!
\
\
EMERGENT WETLAND
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
!
\
!
\
!
\
!
!
\
\
WATERSOFTHEU.
S.
FORESTEDUP LAND
0.
1AC
TREECLEARI
NG
!
!
!
!
\
\
\
!
!
\
\
!
!
!
!
\
\
\
\
\
\
\
!
!
\
MA
TC
HL
I
NE
8
!
\
!
\
\
\
!
\
\
!
\
\
!
\
\
\
\
\
!
!
0
50
FEET
100
!
!
!
FIGURE 2-11
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
!
!
!
!
!
!
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
\
!
!
!
!
\
\
!
!
!
\
\
!
WATERSOFTHEU.
S.
!
!
\
\
EMERGENT WETLAND
!
!
\
\
OPEN WATER
!
!
\
\
!
FORESTEDUP LAND
0.
11AC
TREECLEARI
NG
!
!
!
\
\
!
!
\
\
!
!
\
\
NOTWATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
PROPOSED RAIL BRIDGE CENTERLINE
UPLAND
\
!
!
!
!
\
\
!
!
!
!
\
\
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
D
!
!
!
\
\
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
!
!
\
!
\
\
!
!
\
\
!
\
\
!
\
\
!
!
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
\
!
!
\
!
LI
NE
10
CONSTRUCTION IMPACTS
\
\
\
\
\
!
!
M
AT
CH
LI
NE
9
LAKE
PONTCHARTRAIN
!
\
!
!
\
\
\
!
\
\
!
\
D
D
LAKEP ONTCHARTRAI
N
!
\
\
\
\
!
!
!
!
!
MA
TC
H
!
0
50
FEET
100
FIGURE 2-12
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
!
!
!
!
!
\
\
\
!
!
\
\
!
FORESTEDUP LAND
0.
09AC
TREECLEARI
NG
!
\
!
\
!
!
\
\
!
!
!
\
\
!
!
!
\
\
WATERSOFTHEU.
S.
!
!
\
\
EMERGENT WETLAND
!
OPEN WATER
!
!
\
\
!
!
!
\
\
NOTWATERSOFTHEU.
S.
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
PROPOSED RAIL BRIDGE CENTERLINE
!
!
\
\
UPLAND
\
!
!
!
\
\
!
!
!
\
\
!
\
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
\
\
!
\
\
!
\
!
!
\
!
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
\
!
!
MA
TC
HL
I
NE
11
\
\
\
\
!
\
\
\
!
!
LI
NE
10
!
\
!
\
\
MA
TC
H
LAKEP ONTCHARTRAI
N
!
\
!
\
\
\
\
!
!
CONSTRUCTION IMPACTS
!
!
!
0
50
FEET
100
FIGURE 2-13
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
\
!
\
LAKEP ONTCHARTRAI
N
!
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
\
!
!
!
!
\
!
\
!
!
!
!
!
EMERGENT WETLAND
!
\
\
!
\
!
OPEN WATER
!
\
!
\
!
!
\
NOTWATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
\
!
\
!
PROPOSED RAIL BRIDGE CENTERLINE
\
!
\
!
\
!
!
!
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
!
\
!
!
\
\
!
!
EMERGENTWETLAND
0.
11AC
TEMP ORARYWORKSP ACE
WATERSOFTHEU.
S.
!
!
!
!
\
\
!
!
\
!
!
\
\
\
\
!
\
\
\
!
!
!
!
!
!
\
\
\
!
!
\
\
!
\
\
\
!
!
\
\
\
!
\
MA
TC
HL
I
NE
11
!
\
!
\
\
\
\
\
\
!
\
\
!
\
!
!
\
!
\
!
\
!
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
\
!
\
!
!
!
MA
TC
H
!
LI
NE
12
!
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-14
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
!
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
\
!
!
!
\
!
\
!
!
!
!
!
!
WATERSOFTHEU.
S.
!
!
\
\
EMERGENT WETLAND
!
!
!
\
\
OPEN WATER
!
!
\
\
!
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
!
!
\
\
!
\
!
\
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
!
\
!
\
\
\
!
!
\
!
\
!
\
!
!
\
!
\
MAT
CH
LI
NE
13
!
!
EMERGENTWETLAND
0.
02AC
TEMP ORARYWORKSP ACE
NOTWATERSOFTHEU.
S.
!
\
!
!
\
\
!
!
!
\
\
!
!
!
\
\
!
!
!
\
\
!
!
!
\
!
!
\
\
\
!
\
\
!
!
\
\
\
!
!
\
\
!
!
\
\
\
!
\
MA
TC
H
LI
NE
12
LAKEP ONTCHARTRAI
N
!
\
\
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-15
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
\
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
\
!
!
!
!
\
!
!
WATERSOFTHEU.
S.
!
\
EMERGENT WETLAND
!
OPEN WATER
!
!
!
\
\
!
NOTWATERSOFTHEU.
S.
!
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
\
\
!
!
!
!
!
\
\
!
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
!
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
!
!
\
\
!
!
\
\
!
\
\
!
!
\
\
!
\
\
!
\
LI
NE
14
!
!
\
\
\
!
!
\
\
\
!
!
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
\
!
\
!
MA
TC
H
!
!
\
CONSTRUCTION IMPACTS
!
\
!
\
\
!
!
\
\
\
\
MAT
CH
LI
NE
13
!
\
!
\
\
!
\
\
\
\
\
!
!
!
0
50
FEET
100
!
!
FIGURE 2-16
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
\
!
!
!
!
\
!
!
!
!
\
\
!
WATERSOFTHEU.
S.
!
!
\
\
EMERGENT WETLAND
!
!
\
\
OPEN WATER
!
!
!
\
\
!
NOTWATERSOFTHEU.
S.
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
!
!
\
\
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
!
!
!
\
\
\
!
!
\
\
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
!
\
\
!
!
!
\
\
!
!
\
\
!
!
!
\
\
!
!
!
\
\
!
\
\
!
!
\
\
!
\
\
!
\
MA
TC
H
LI
NE
15
!
\
MA
TC
H
!
\
\
!
!
\
LI
NE
14
!
\
\
\
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
\
\
!
\
\
!
\
\
\
\
!
!
!
!
\
!
!
\
CONSTRUCTION IMPACTS
!
\
!
\
!
!
!
0
50
FEET
100
!
!
FIGURE 2-17
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
\
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
!
!
!
!
\
!
WATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
OPEN WATER
!
!
NOTWATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
!
!
!
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
\
!
!
\
!
!
\
!
\
!
!
\
!
\
\
!
!
\
!
!
\
!
\
!
!
\
!
\
\
!
!
\
\
!
\
!
\
\
!
!
\
\
!
\
!
!
MA
TC
H
!
EMERGENTWETLAND
0.
1AC
TEMP ORARYWORKSP ACE
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
\
\
LI
NE
16
!
!
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
!
!
!
\
\
\
!
!
\
\
!
!
!
\
\
!
!
\
\
\
!
!
\
\
\
!
\
\
\
LI
NE
15
!
\
\
!
!
\
MA
TC
H
!
\
\
\
\
!
\
\
!
\
\
\
\
\
!
!
0
50
FEET
100
!
!
FIGURE 2-18
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
!
!
!
!
!
!
!
\
!
!
!
!
\
!
!
WATERSOFTHEU.
S.
!
!
\
\
EMERGENT WETLAND
!
!
!
\
\
OPEN WATER
!
!
\
\
!
NOTWATERSOFTHEU.
S.
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
!
\
\
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
\
\
!
!
!
!
\
\
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
!
!
!
\
\
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
\
\
!
\
\
!
\
!
!
\
MA
TC
HL
I
NE
17
!
!
!
!
!
\
\
\
!
!
\
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
!
\
\
\
\
\
!
\
\
\
!
!
\
LI
NE
16
!
\
!
\
\
\
MA
TC
H
LAKE
PONTCHARTRAIN
!
\
!
\
\
\
\
\
CONSTRUCTION IMPACTS
!
!
\
!
!
!
!
!
0
50
FEET
100
FIGURE 2-19
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
\
LAKE
PONTCHARTRAIN
!
\
!
!
!
!
!
!
!
!
!
!
!
!
WATERSOFTHEU.
S.
!
\
EMERGENT WETLAND
!
OPEN WATER
!
!
NOTWATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
!
!
!
!
\
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
D
!
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
\
!
!
\
!
\
!
\
!
!
\
!
!
\
\
!
!
\
!
\
!
\
!
!
\
\
\
!
!
\
\
!
\
!
\
\
!
!
!
EMERGENTWETLAND
0.
1AC
TEMP ORARYWORKSP ACE
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
!
\
\
MA
TC
H
LI
NE
18
!
!
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
\
!
!
\
\
!
!
!
\
\
!
!
!
!
\
\
\
!
!
!
\
\
\
\
\
!
\
\
\
\
\
\
\
\
!
\
MA
TC
HL
I
NE
17
!
\
!
\
\
\
\
\
!
\
!
\
!
D
!
0
!
!
100
!
WW2
50
FEET
FIGURE 2-20
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
\
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
\
!
!
!
!
!
!
\
!
!
!
!
\
!
WATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
OPEN WATER
!
\
!
NOTWATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
!
!
!
!
\
\
!
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
!
\
\
!
\
!
D
!
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
!
\
\
!
!
!
\
\
!
\
!
!
!
\
\
\
!
!
\
\
!
\
!
\
\
\
!
!
MA
TC
HL
I
NE
19
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
!
!
!
!
!
!
CONSTRUCTION IMPACTS
\
!
!
!
EMERGENTWETLAND
0.
16AC
TEMP ORARYWORKSP ACE
PROPOSED RAIL BRIDGE CENTERLINE
\
!
0
!
!
!
\
\
!
!
!
!
\
\
\
!
!
\
\
\
!
!
\
\
\
!
\
\
\
!
WW2
!
\
\
!
!
\
\
!
!
\
\
!
!
MA
TC
H
!
\
\
\
\
\
!
LI
NE
18
\
\
\
\
\
D
LAKE
PONTCHARTRAIN
!
\
50
FEET
100
FIGURE 2-21
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
\
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
!
\
!
!
!
!
\
!
WATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
OPEN WATER
!
!
\
\
!
NOTWATERSOFTHEU.
S.
!
!
!
\
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
!
\
\
!
!
!
\
!
!
\
!
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
\
!
!
!
\
!
\
!
\
!
!
\
!
\
\
!
!
!
\
!
\
!
\
!
!
\
!
\
\
!
!
\
\
!
\
!
\
\
\
!
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
\
!
\
!
MA
TC
H
!
CONSTRUCTION IMPACTS
!
\
!
!
EMERGENTWETLAND
0.
23AC
TEMP ORARYWORKSP ACE
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
!
\
\
LI
NE
20
!
!
\
\
0
!
!
!
\
\
\
!
!
\
\
!
\
!
!
!
\
\
\
\
\
\
\
\
!
\
MA
TC
HL
I
NE
19
!
\
!
\
\
\
\
\
50
FEET
100
!
!
FIGURE 2-22
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORPERM I
TTI
NG ONLYThisdoc um entisnott
o b e used for c onst
ruc t
ion,b idding,rec orda t
ion,c onveya nc e or sa les.
!
\
LAKEPONTCHARTRAI
N
!
\
!
!
\
!
\
!
!
!
\
!
!
!
!
\
!
!
!
\
!
!
!
W ATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
FORESTED WETLAND
!
NOT W ATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
!
!
!
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
D
!
CORRESPONDING CROSS SECTION IN FIGURE 3
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
!
!
\
\
!
!
\
\
\
\
\
I
CRRBONNET CARRE
BRI
DGEREPLACEM ENT
!
!
!
\
M A
TC
H
LI
NE
21
!
\
CONSTRUCTION IMPACTS
\
!
!
\
\
\
!
\
\
W W 3
PROPOSED RAIL BRIDGE CENTERLINE
\
!
\
!
\
\
!
!
!
\
\
D
EX I
STI
NG CHANNELAT
70FT TPG (
SPAN7)
PPROX STATI
ON257+00
OPEN WATER
!
\
!
\
\
!
!
\
\
!
!
!
\
\
\
!
\
\
!
!
\
\
\
!
!
\
!
!
\
\
\
\
!
!
\
\
!
\
\
!
\
LI
NE
20
\
\
\
\
M A
TC
H
LAKE
PONTCHARTRAIN
!
\
!
!
!
!
!
\
!
!
!
0
50
FEET
100
!
!
FIGURE 2-23
PATH:O:
\260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I
TTI
N\M AP_ DOCS\FI
GURES\DELI
NEATI
ON\BRI
DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI
DGEREPLACEM ENT_ FI
G2_ I
M PACTS_ BW _ 8.
5X 11.
M X D -USER:M COW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
!
!
!
\
!
!
!
\
!
!
!
!
\
!
!
!
WATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
OPEN WATER
!
!
NOTWATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
\
\
!
!
!
!
\
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
\
!
!
\
\
!
!
\
!
\
!
\
!
!
\
\
\
!
!
\
\
!
\
!
\
\
!
!
\
!
LI
NE
22
\
!
!
!
MA
TC
H
!
EMERGENTWETLAND
0.
02AC
TEMP ORARYWORKSP ACE
PROPOSED RAIL BRIDGE CENTERLINE
\
!
!
!
!
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
!
!
\
\
!
!
\
\
!
!
!
\
\
\
!
!
\
\
!
!
!
\
\
\
!
!
\
\
\
!
\
\
\
!
!
\
\
\
!
\
\
\
!
!
\
LI
NE
21
!
\
!
\
\
MA
TC
H
LAKE
PONTCHARTRAIN
!
\
!
\
\
\
\
\
!
!
0
50
FEET
100
FIGURE 2-24
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
\
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
!
FORESTEDUP LAND
0.
08AC
TREECLEARI
NG
!
!
!
!
!
!
\
\
VV
!
!
\
\
D
!
\
!
EMERGENT WETLAND
!
FORESTED WETLAND
!
\
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
\
\
!
!
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
!
\
!
PROPOSED RAIL BRIDGE CENTERLINE
!
\
!
\
\
UPLAND
\
!
!
!
\
!
!
\
!
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
D
!
\
\
!
!
\
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
!
\
!
!
\
!
\
\
!
!
\
\
!
\
!
!
EMERGENTW ETLAND
0.
4AC
TEMP ORARYW ORKSP ACE
W ATERSOFTHEU.
S.
!
!
\
\
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
MA
TC
HL
I
NE
23
\
!
!
\
CONSTRUCTION IMPACTS
\
\
\
!
!
!
\
!
!
!
\
\
\
\
\
!
\
\
\
!
LI
NE
22
!
\
\
!
\
\
\
!
!
\
MA
TC
H
FORESTEDW ETLAND
0.
05AC
TREECLEARI
NG
!
\
!
\
\
!
\
\
\
\
\
!
!
!
!
!
!
0
50
FEET
100
!
FIGURE 2-25
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
!
!
!
!
!
FORESTEDUP LAND
0.
1AC
VEGETATI
ONCLEARI
NG
!
!
!
!
!
\
!
!
!
W ATERSOFTHEU.
S.
!
!
!
\
\
!
!
!
\
\
!
!
\
OPEN WATER
NOTW ATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
!
\
!
PROPOSED RAIL BRIDGE CENTERLINE
!
\
UPLAND
\
!
!
\
\
!
!
\
!
!
\
!
\
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
\
!
!
!
!
\
!
\
\
!
\
!
!
\
!
\
\
!
!
\
\
!
\
!
\
\
!
!
EMERGENTW ETLAND
0.
39AC
TEMP ORARYW ORKSP ACE
FORESTED WETLAND
!
!
!
\
\
EMERGENT WETLAND
EMERGENTW ETLAND
0.
01AC
TEMP ORARYACCESS
!
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
LI
NE
24
\
!
!
!
\
!
!
!
MA
TC
H
CONSTRUCTION IMPACTS
!
!
\
\
!
!
!
\
\
\
!
!
\
\
!
!
!
\
\
\
!
!
\
\
\
\
!
\
!
!
!
\
\
\
\
\
\
\
MA
TC
HL
I
NE
23
!
\
LAKE
PONTCHARTRAIN
FORESTEDW ETLAND
0.
05AC
VEGETATI
ONCLEARI
NG
!
!
\
\
!
\
\
\
\
\
0
50
FEET
100
FIGURE 2-26
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
LAKEP ONTCHARTRAI
N
!
!
!
!
\
!
!
\
!
FORESTEDUP LAND
0.
19AC
VEGETATI
ONCLEARI
NG
!
\
!
!
!
!
!
!
EMERGENTW ETLAND
0.
03AC
TEMP ORARYACCESS
!
!
!
!
!
\
!
\
!
EMERGENT WETLAND
!
\
FORESTED WETLAND
!
\
\
!
!
\
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
\
!
\
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
PROPOSED RAIL BRIDGE CENTERLINE
!
\
\
!
!
\
UPLAND
\
!
!
\
!
\
!
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
\
!
!
\
!
!
\
!
\
!
!
\
\
\
!
!
\
\
!
\
!
!
EMERGENTW ETLAND
0.
51AC
TEMP ORARYW ORKSP ACE
W ATERSOFTHEU.
S.
!
\
!
!
!
\
\
\
!
\
!
\
!
MA
TC
HL
I
NE
25
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
!
!
\
!
!
CONSTRUCTION IMPACTS
!
!
!
!
\
\
\
\
\
!
\
\
!
!
!
\
\
\
!
!
\
\
\
!
\
\
\
!
!
\
LI
NE
24
LAKE
PONTCHARTRAIN
\
\
\
MA
TC
H
FORESTEDW ETLAND
0.
07AC
VEGETATI
ONCLEARI
NG
!
\
!
\
\
!
\
\
\
\
!
0
50
FEET
100
FIGURE 2-27
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
EMERGENTW ETLAND
0.
24AC
VEGETATI
ONCLEARI
NG
!
!
!
!
\
!
\
EMERGENTW ETLAND
0.
18AC
TEMP ORARYACCESS
!
!
!
!
!
!
\
\
EMERGENT WETLAND
FORESTED WETLAND
!
!
\
\
!
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
\
\
!
!
\
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
\
PROPOSED RAIL BRIDGE CENTERLINE
!
!
\
!
\
!
\
\
UPLAND
\
!
!
!
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
!
\
!
\
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
!
!
\
!
\
!
!
\
!
\
!
\
\
!
!
\
\
!
\
!
\
\
\
!
!
\
!
\
MA
TC
HL
I
NE
26
!
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
!
!
\
!
!
!
EMERGENTW ETLAND
0.
56AC
TEMP ORARYW ORKSP ACE
W ATERSOFTHEU.
S.
!
!
!
!
\
\
CONSTRUCTION IMPACTS
!
!
\
\
!
!
\
\
\
!
!
\
\
!
!
\
\
\
!
\
\
\
!
!
\
MA
TC
HL
I
NE
25
FORESTEDW ETLAND
0.
12AC
VEGETATI
ONCLEARI
NG
!
\
\
\
\
!
\
\
!
\
\
\
\
\
0
50
FEET
100
!
FIGURE 2-28
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
\
LAKEP ONTCHARTRAI
N
!
\
!
!
\
!
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
\
!
FORESTEDW ETLAND
0.
07AC
VEGETATI
ONCLEARI
NG
!
!
!
\
!
!
W ATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
!
!
!
!
\
!
\
\
!
!
\
\
!
!
\
OPEN WATER
NOTW ATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
PROPOSED RAIL BRIDGE CENTERLINE
!
\
!
\
!
UPLAND
\
!
!
\
!
!
\
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
!
\
\
!
!
\
!
\
!
\
!
!
!
\
\
\
!
!
\
\
!
\
!
\
\
!
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
!
\
!
!
EMERGENTW ETLAND
0.
42AC
TEMP ORARYW ORKSP ACE
FORESTED WETLAND
FORESTEDUP LAND
0.
17AC
VEGETATI
ONCLEARI
NG
!
\
!
!
\
\
MA
TC
HL
I
NE
27
!
!
\
\
CONSTRUCTION IMPACTS
\
!
!
\
\
\
!
!
\
\
\
!
!
\
\
!
\
!
!
!
\
\
\
\
\
\
\
MA
TC
HL
I
NE
26
!
\
!
\
\
!
\
\
\
\
\
!
!
!
!
!
!
0
50
FEET
100
!
FIGURE 2-29
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
\
!
\
!
!
\
!
LAKE
PONTCHARTRAIN
!
!
!
!
!
!
!
FORESTEDW ETLAND
0.
09AC
VEGETAI
ONCLEARI
NG
!
\
!
!
!
!
!
W ATERSOFTHEU.
S.
!
EMERGENT WETLAND
!
FORESTED WETLAND
!
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
!
!
\
\
!
\
!
!
\
!
!
\
!
!
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
!
\
\
!
!
!
\
\
!
\
!
!
!
\
\
\
!
!
\
\
!
\
!
!
\
\
!
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
!
!
CONSTRUCTION IMPACTS
!
\
!
!
EMERGENTW ETLAND
0.
58AC
TEMP ORARYW ORKSP ACE
UPLAND
\
!
\
EMERGENTW ETLAND
0.
08AC
TEMP ORARYACCESS
PROPOSED RAIL BRIDGE CENTERLINE
!
!
!
\
\
MA
TC
HL
I
NE
28
!
\
\
!
!
!
\
\
!
!
\
\
\
!
\
\
\
!
!
\
\
!
!
\
\
\
!
\
\
!
!
!
\
!
!
\
\
\
\
\
\
!
!
\
\
!
\
\
!
\
\
\
\
\
\
MA
TC
HL
I
NE
27
LAKEP ONTCHARTRAI
N
!
\
0
50
FEET
100
!
!
FIGURE 2-30
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
\
!
\
!
!
\
!
\
!
\
!
!
\
!
!
!
!
!
\
!
!
!
!
!
!
D
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
PROPOSED RAIL BRIDGE CENTERLINE
!
!
\
!
!
!
!
!
\
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
\
!
D
!
\
\
!
!
\
CORRESPONDING CROSS SECTION IN FIGURE 3
!
\
!
\
!
!
\
!
!
\
\
!
!
\
!
\
!
\
!
!
\
\
\
!
!
\
\
!
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
!
!
\
!
\
!
\
!
!
!
!
CONSTRUCTION IMPACTS
!
!
EMERGENTW ETLAND
0.
37AC
TEMP ORARYW ORKSP ACE
UPLAND
\
!
!
!
\
\
MA
TCH
LI
NE
29
!
!
\
\
0
!
!
!
\
\
!
!
!
\
\
W ATERSOFTHEU.
S.
\
!
!
\
\
D
FORESTEDW ETLAND
0.
10AC
V!EGETATI
ONCLEARI
NG
\
\ XX
\
\
!
!
\
\
\
!
!
\
\
\
WW1
FORESTEDUP LAND
0.
38AC
VEGETATI
ONCLEARI
NG
!
\
\
\
!
!
\
\
!
\
\
!
\
\
\
\
\
\
MA
TC
HL
I
NE
28
LAKE
PONTCHARTRAIN
!
50
FEET
100
!
FIGURE 2-31
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
\
!
\
!
!
\
!
!
!
!
FORESTEDW ETLAND
0.
03AC
VEGETATI
ONCLEARI
NG
!
!
!
!
!
!
!
!
!
!
W ATERSOFTHEU.
S.
!
FORESTED WETLAND
!
OPEN WATER
!
NOTW ATERSOFTHEU.
S.
!
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
PROPOSED RAIL BRIDGE CENTERLINE
!
\
!
!
!
!
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
\
!
\
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
!
\
!
!
\
!
\
\
!
\
!
!
!
\
!
\
!
!
\
\
!
\
!
\
!
!
\
!
\
!
\
\
!
\
!
!
\
!
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
\
\
CONSTRUCTION IMPACTS
!
\
!
!
EMERGENTW ETLAND
0.
46AC
TEMP ORARYW ORKSP ACE
UPLAND
\
!
!
!
\
\
MA
TC
HL
I
NE
30
!
!
\
\
0
!
!
\
\
!
!
\
\
!
!
!
\
\
EMERGENTW ETLAND
0.
14AC
TEMP ORARYACCESS
EMERGENT WETLAND
!
\
!
\
\
\
!
\
\
\
!
!
\
\
!
!
\
\
!
!
\
\
\
!
!
\
\
!
\
\
\
\
\
!
\
\
\
LAKE
PONTCHARTRAIN
!
\
\
MA
TCH
LI
NE
29
F
OR
E
A
F
ORE
ES
ST
T
ED
DU
UPP L
L
AN
ND
D
0
.
0
4
0
.
0
4A
AC
C
V
A
I
O
E
N
VE
EG
GE
ET
T
AT
T
I
ON
NC
CL
L
EA
AR
RI
I
NG
G
!
\
\
\
50
FEET
100
!
!
!
FIGURE 2-32
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
!
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
!
!
FORESTEDUP LAND
0.
08AC
VEGETATI
ONCLEARI
NG
!
\
!
\
!
!
LAKE
PONTCHARTRAIN
!
!
EMERGENTW ETLAND
0.
10AC
VEGETATI
ONCLEARI
NG
!
!
!
!
FORESTEDW ETLAND
0.
21AC
VEGETATI
ONCLEARI
NG
!
!
!
!
!
W ATERSOFTHEU.
S.
!
!
EMERGENT WETLAND
!
FORESTED WETLAND
!
OPEN WATER
NOTW ATERSOFTHEU.
S.
!
!
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
!
PROPOSED RAIL BRIDGE CENTERLINE
!
!
!
!
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
TEMPORARY WORKSPACE FOR DEMOLITION - 70 FT WIDE
!
EXISTING FIBER OPTIC LINE (ABANDONDED)
!
!
\
\
!
!
!
!
\
!
\
!
!
\
!
\
!
\
!
\
!
\
!
!
\
!
\
!
\
!
!
!
\
!
!
\
!
!
\
!
\
!
\
\
\
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
\
\
!
!
\
!
\
M
AT
CH
LI
NE
31
!
\
\
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
!
!
!
\
\
!
EMERGENTW ETLAND
0.
66AC
TEMP ORARYW ORKSP ACE
EQUIPMENT STAGING
\
!
!
!
\
\
!
EMERGENTW ETLAND
0.
15AC
TEMP ORARYACCESS
UPLAND
!
\
!
\
\
!
!
!
\
\
!
!
\
\
!
!
\
\
!
!
!
\
\
\
!
\
\
!
!
!
\
\
!
!
!
!
\
\
\
\
\
!
\
\
!
\
\
!
\
\
\
!
\
!
\
!
MA
TC
HL
I
NE
30
\
\
\
\
\
0
50
FEET
100
\
\
\
\
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW _8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
FIGURE 2-33
FORPERM I
TTI
NG ONLY Thisdocum en tisn ott
obe used forcon st
r
uct
ion ,biddin g,r
ecor
da t
ion ,con veya n ce orsa les.
\
!
!
\
!
\
LAKE
PONTCHARTRAIN
\
!
\
ROADI
M PROV EM ENT I
NUPLAND
(
266.
5FT X32FT)
EXCAV ATI
ON-3FT (
271CY )
SAND-12I
N(
315CY)
CONCRETEPI
PE4I
N(
360.
27CY)
GEOTEXTI
LEFABRI
C
\
\
\
\
\
!
\
\
\
(
"(
\
\
\
\
\
\
\
\
\
D
\
\
YY
W ATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
NOT W ATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
\
W W 4
FI
LLI
NUPLAND
CLASS55LBSTONERI
PRAP
200CY
\
1
1
DD
\
ZZ
\
D
PROPOSED RAIL BRIDGE CENTERLINE
PERM ANENT LI
GHTW EI
GHT FI
LL
25FT SOUTHOFBACKW ALL
100CY -UPLAND
EXCAV ATI
ON
BEHI
NDBACKW ALL-550CY
STAGI
NG
AREA (
3AC)
UPLAND
TEMPORARY ACCESS
EQUIPMENT STAGING
\
!
!
!
(
\
( (
!
!
!
\
(
"
BRIDGE BUILDER WORKSPACE VEGETATION CLEARING FOOTPRINT 42 FT WIDE
!
!
!
!
\
\
!
!
AT
CH
!
!
LI
NE
31
\
!
M
PROPOSEDBERM
+/
-ELEV ATI
ON.
68FT
76CY SOI
LFI
LLI
NUPLAND
!
\
EQUIPMENT WORKSPACE - 95 FT WIDE (BRANCH TRIMMING ONLY)
PERMANENT FILL
(
"
( (
IMPROVED LIFT STATION
BERM
PARISH ROAD
EXISTING FIBER OPTIC LINE (ABANDONDED)
FI
LLI
NUPLANDS
12I
NSUBBALLAST -450CY
12I
NBALLAST-550CY
EM BANKM ENT -850CY
CORRESPONDING CROSS SECTION IN FIGURE 3
I
CRRBONNET CARRE
BRI
DGEREPLACEM ENT
M A
TC
HL
I
NE
32
LO
W
ER
GU
I
DE
LE
VE
E
EXI
STI
NG PAR
I
SHROA
D
D
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-34
PATH:O:
\260796_ 040_ CN_ TK3_ BONNET_ CARRE_ PERM I
TTI
N\M AP_ DOCS\FI
GURES\DELI
NEATI
ON\BRI
DGE_ REPLACEM ENT\404&408\BONNETCARRE_ BRI
DGEREPLACEM ENT_ FI
G2_ I
M PACTS_ BW _ 8.
5X11.
M XD -USER:M COW LI
NG -DATE:9/
1/
2017
MA
TC
HL
I
NE
32
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
RELOCATEEXI
STI
NG
SI
GNALTOWER
I
NUP LANDS
LAKE
PONTCHARTRAIN
WATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
NOTWATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
UPLAND
TEMPORARY ACCESS
PERMANENT FILL
EXISTING FIBER OPTIC LINE (ABANDONDED)
MATCH
LI
NE34
TEMP ORARYACCESS-UP LAND
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-35
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
MATCH
LI
NE34
LAKE
PONTCHARTRAIN
WATERSOFTHEU.
S.
EMERGENT WETLAND
FORESTED WETLAND
OPEN WATER
NOTWATERSOFTHEU.
S.
EXISTING RAILROAD CENTERLINE (TO BE REMOVED)
UPLAND
TEMPORARY ACCESS
PERMANENT FILL
EXISTING FIBER OPTIC LINE (ABANDONDED)
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-36
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
LAKE
PONTCHARTRAIN
WATERSOFTHEU.
S.
NOTWATERSOFTHEU.
S.
I
CRRBONNETCARRE
BRI
DGEREP LACEMENT
CONSTRUCTION IMPACTS
0
50
FEET
100
FIGURE 2-37
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G2_I
MP ACTS_BW_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3AA
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3BB
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3CC
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3DD
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3EE
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3FF
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3GG
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3HH
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3I
I
FO RPERMI
TTI
NG O NLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
PREPARED BY: ESCA, INC.
LA PE #: 30080
BO NNETCARRESPI
LLW AYBRI
DGEREPLACEMENT
NO TTO SCALE
PATH:O :
\
260796_040_CN_TK3_BO NNET_CARRE_PERMI
TTI
N\
MAP_DO CS\
FI
GURES\
DELI
NEATI
O N\
BRI
DGE_REPLACEMENT\
404&408\
BO NNETCARRE_BRI
DGEREPLACEMENT_FI
G3_CRO SS_SEC_8.
5X11.
MXD -USER:MCO W LI
NG -DATE:9/
1/
2017
CRO SSSECTI
O NS
FI
GURE3JJ
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3KK
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3LL
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3MM
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3NN
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3OO
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3PP
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLW AYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOW LI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3QQ
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3RR
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3SS
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3TT
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3UU
FO RPERMI
TTI
NG O NLYThis d oc um entis nott
o b e us ed for c ons t
ruc t
ion,b id d ing,rec ord a t
ion,c onveya nc e or s a les .
FO RESTEDWETLAND
FO RESTEDUPLAND
VEGETATI
O NCLEAREDTO GRO UNDLI
NE
AVERAGEDEPTH:0.
837FT
MHHW:1.
096FT
MLLW:0.
571 FT
42FO O TVEGETATI
O NCLEARI
NG
PREPARED BY HDR ENGINEERING, INC.
BO NNETCARRESPI
LLWAYBRI
DGEREPLACEMENT
NO TTO SCALE
PATH:O :
\
260796_040_CN_TK3_BO NNET_CARRE_PERMI
TTI
N\
MAP_DO CS\
FI
GURES\
DELI
NEATI
O N\
BRI
DGE_REPLACEMENT\
404&408\
BO NNETCARRE_BRI
DGEREPLACEMENT_FI
G3_CRO SS_SEC_8.
5X11.
MXD -USER:MCO WLI
NG -DATE:9/
1/
2017
CRO SSSECTI
O NS
FI
GURE3VV
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
1
3
2
4
PREPARED BY: ESCA, INC.
LA PE #: 30080
PREPARED BY HDR, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3WW
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
EXHIBITS DEPICT PRELIMINARY PLANS FOR TEMPORARY FEATURES FOR CONSTRUCTION PROVIDED BY OCCI, INC.
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3XX
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
PREPARED BY: ESCA, INC.
LA PE #: 30080
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3YY
FORP ERMI
TTI
NG ONLYThis d oc um e nt is not to b e use d for c onstruc tion,b id d ing,re c ord ation,c onve yanc e or sale s.
PREPARED BY: ESCA, INC.
LA PE #: 30080
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE3ZZ
FORP ERMI
TTI
NG ONLYThis d oc u m e nt is not to be u se d for c onstru c tion,bid d ing,re c ord ation,c onve yanc e or sale s.
PREPARED BY: CIVIL & ENVIRONMENTAL CONSULTING ENGINEERS
DANNY J. HEBERT PE #: LLC 13919
BONNETCARRESP I
LLWAYBRI
DGEREP LACEMENT
NOTTO SCALE
P ATH:O:
\
260796_040_CN_TK3_BONNET_CARRE_P ERMI
TTI
N\
MAP _DOCS\
FI
GURES\
DELI
NEATI
ON\
BRI
DGE_REP LACEMENT\
404&408\
BONNETCARRE_BRI
DGEREP LACEMENT_FI
G3_CROSS_SEC_8.
5X11.
MXD -USER:MCOWLI
NG -DATE:9/
1/
2017
CROSSSECTI
ONS
FI
GURE311