Daniel McGowan - The proposed project consist of sluicing accumulated sediment from the Pine Canyon Reservoir behind the McGowan Dam. A total of approximately 50,000 to 100,000 cubic yards per year will be discharged from sluicing events. The discharge will be controlled from the dam and is proposed to discharge at a rate to increase the Plum Creek elevation no more than two feet above base flow, approximately 500 feet below the dam, with no more than one foot of sediment accumulated in Plum Creek. Discharges from the dam would be kept below 500 cubic feet per second. Sluicing will be accomplished from approximately September 15 to April 15 and will consist of one or two sluicing events as needed to move the sediment above the dam down through Plum Creek. Sluicing will be timed to be after Brown Trout spawning and before native species spawning. Plum Creek is a tributary to the Niobrara National Scenic River.
Daniel McGowan - The proposed project consist of sluicing accumulated sediment from the Pine Canyon Reservoir behind the McGowan Dam. A total of approximately 50,000 to 100,000 cubic yards per year will be discharged from sluicing events. The discharge will be controlled from the dam and is proposed to discharge at a rate to increase the Plum Creek elevation no more than two feet above base flow, approximately 500 feet below the dam, with no more than one foot of sediment accumulated in Plum Creek. Discharges from the dam would be kept below 500 cubic feet per second. Sluicing will be accomplished from approximately September 15 to April 15 and will consist of one or two sluicing events as needed to move the sediment above the dam down through Plum Creek. Sluicing will be timed to be after Brown Trout spawning and before native species spawning. Plum Creek is a tributary to the Niobrara National Scenic River.
PUBLIC NOTICE
Application No: 2011-02835-WEH
Applicant: Dr. Daniel McGowan
Waterway: Plum Creek
Issue Date: September 25, 2017
Expiration Date: October 16, 2017
21 DAY NOTICE
Reply To:
NEBRASKA REGULATORY OFFICE
8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635
JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of
Engineers (Corps), Omaha District, and the Nebraska Department of Environmental Quality
(NDEQ). NDEQ will review the proposed project for state certification in accordance with the
provisions of Section 401 of the Clean Water Act. NDEQ hereby incorporates this public notice as
its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their
public notice will expire 30 days from the issue date shown above.
AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344).
APPLICANT: Dr. Daniel McGowan, 33 Rolling Hills Road, Kearney, Nebraska 68845
PROJECT LOCATION: The project is located in NE ΒΌ of Section 32, Township 3 North, Range
22 West, Brown County, Nebraska, at 42.707492o, -99.915967o.
PROJECT DESCRIPTION: The proposed project consist of sluicing accumulated sediment from
the Pine Canyon Reservoir behind the McGowan Dam. A total of approximately 50,000 to 100,000
cubic yards per year will be discharged from sluicing events. The discharge will be controlled from
the dam and is proposed to discharge at a rate to increase the Plum Creek elevation no more than two
feet above base flow, approximately 500 feet below the dam, with no more than one foot of sediment
accumulated in Plum Creek. Discharges from the dam would be kept below 500 cubic feet per
second. Sluicing will be accomplished from approximately September 15 to April 15 and will
consist of one or two sluicing events as needed to move the sediment above the dam down through
Plum Creek. Sluicing will be timed to be after Brown Trout spawning and before native species
spawning. Plum Creek is a tributary to the Niobrara National Scenic River.
1
PROJECT PURPOSE: The applicant's project purpose is to restore Pine Canyon Reservoir
capacity to as close as original as possible and improve aquatic habitat in Plum Creek.
The basic project purpose, as defined by the Corps, is to remove river sediments.
The overall project purpose, as defined by the Corps, is to remove accumulated river sediments from
the Pine Canyon Reservoir.
SPECIAL AQUATIC SITES: Each sluicing event will discharge between 50,000 and 100,000
cubic yards of accumulated river sediment into the Plum Creek. The sluicing events are not adding
any additional sediment to the Plum Creek system.
AVOIDANCE, MINIMIZATION, AND MITIGATION: This project is located in the Middle
Niobrara 8-digit HUC, 10150004. The applicant did provide avoidance and minimization measures
for impacts via different alternatives to remove the sediment from Pine Canyon Reservoir. Those
alternatives consist of mechanical dredging, hydraulic dredging, and a submerged dam. Information
was provided in the application for the Corps to review during a permit decision for compliance with
the 404(b)(1) guidelines. The applicant did not provide a compensatory mitigation plan for the
project. If compensatory mitigation is required, a plan will be submitted by the applicant and
reviewed by the USACE to meet the requirements of the 2008 mitigation rule prior to any permit
issuance.
CULTURAL RESOURCES: The Corps, Omaha District will comply with the National Historic
Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C.
We have checked the National Register of Historic Places, and any available site database
information, and there are no known National Register sites in the vicinity. We will evaluate input
by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and
we may conduct or require a survey of the permit area to check for unknown historic or prehistoric
properties, if warranted.
ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary
determination has been made that the described work will not affect the following species designated
as threatened or endangered or adversely affect critical habitat; American burying beetle, Blowout
penstemon, Interior least tern, Northern long-eared bat, Piping plover, and Western prairie fringed
orchid. A preliminary determination has been made that the described work may affect, not likely to
adversely affect the following species designated as threatened or endangered or adversely affect
critical habitat; Whooping crane. In order to complete our evaluation of this activity, comments are
solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals.
FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this notice, comments are requested from individuals
and agencies that believe the described work will adversely impact the floodplain.
2
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of fill material must be certified by the appropriate state agency as
complying with applicable effluent limitations and water quality standards. The discharge must be
certified before a Department of the Army permit can be issued. Certification, if issued, expresses
the State's opinion that the discharge will not violate applicable water quality standards. It is the
responsibility of the applicant to contact Nebraska Department of Environmental Quality as
soon as possible in the permitting process to discuss requirements for certification. Please
contact:
CWA Section 401 Coordinator
Water Quality Division, Planning Unit
Nebraska Department of Environmental Quality
1200 'N' Street, Suite 400
Lincoln, NE 68509-8922
Phone: 402.471.2875
Fax: 402.471.2909
E-mail: ndeq.401certification@nebraska.gov
PUBLIC INTEREST REVIEW: The decision whether to issue the Corps' permit will be based on
an evaluation of the probable impacts including cumulative impacts of the proposed/completed
activity on the public interest. That decision will reflect the national concern for both protection and
utilization of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against their reasonably foreseeable detriments. All factors which
may be relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety,
food and fiber production, mineral needs, considerations of property ownership and, in general, the
needs and welfare of the people. In addition, the evaluation of the impact of the work on the public
interest will include application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230).
COMMENTS: The Corps is soliciting comments from the public, Federal, State, and Local
agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the
impacts of this activity. Any comments received will be considered by the Corps to determine
whether to issue, modify, condition or deny a permit for this project. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the activity.
3
Anyone whose interests may be affected by the proposed/completed work is invited to submit
favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th
Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving
comments related to the proposal's probable impacts on the affected aquatic system's functional
values, cumulative and secondary effects and endangered species. All comments received will be
considered public information; copies of all comments, including names and addresses of
commentors, may be provided to the applicant unless confidentiality is requested. Comments must
be submitted on or before the expiration date (located at the top of the first page) of this notice to be
considered in the subsequent actions on this application.
PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that
a public hearing be held to consider this application. Requests shall specifically state the reason(s)
for holding a public hearing. If the District Engineer determines that the information received in
response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a
public hearing is warranted, interested parties will be notified of the time, date, and location.
ADDITIONAL INFORMATION: Additional information about this application may be obtained
by writing to Matt Wray at the address shown on page one or by calling him at (402) 896-0896.
You can also e-mail him at matt.t.wray@usace.army.mil.
REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until
the expiration date specified at the top of page one.