Programmatic General Permit SAJ-91. BULKHEADS AND BACKFILL, AERIAL TRANSMISSION LINES, SUBAQUEOUS UTILITY AND TRANSMISSION LINES, PRIVATE SINGLE-FAMILY DOCKS AND APPURTENANCES, MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS, AND STORMWATER OUTFALLS LOCATED WITHIN THE CITY OF CAPE CORAL, LEE COUNTY, FLORIDA.

BACKGROUND: In order to simplify and speed processing of Department of the Army permits, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued the above programmatic general permit on February 28, 2013 for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located within the City of Cape Coral, Lee County, Florida. During the time period of February 28, 2008 through the date of this public notice, the City of Cape Coral has reviewed the SAJ-91 approximately 1,033 times.

PROPOSAL: The above-listed general permit is under review for the purposes of updating and reissuance. The permit has been revised to include the Project Design Criteria (PDCs) as contained in the draft Jacksonville Biological Opinion (Opinion), as well as provide the species names for mangroves that are prohibited from removal. A draft of the general permit as proposed for reissuance follows:

DEPARTMENT OF THE ARMY

PROGRAMMATIC GENERAL PERMIT SAJ-91

Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act, general authority is hereby given to the City of Cape Coral to administer this permit for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located in waters of the United States within the City of Cape Coral, Lee County, Florida (Attachment 1). This permit does not authorize any work or structure within the Caloosahatchee River, Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth sawfish limited exclusion zones (Attachment 2).

This programmatic general permit is subject to the following conditions:

A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL CANALS

1. The work herein authorized includes the construction, repair or maintenance of seawalls (bulkheads) and associated backfill in residential canals.

2. The seawall shall not exceed 500 feet in length and not extend any farther waterward than 18” from the existing seawall or Mean High Water Line (MHWL) and shall connect with adjacent seawalls to the maximum extent practicable.

3. The backfill must be from upland sources and consist of suitable clean fill material free from toxic pollutants in other than trace quantities. The amount of backfill shall not exceed one (1) cubic yard per running foot below the plane of the MHWL.

4. This permit does not authorize any filling, except for backfill behind the seawall. New riprap may be placed at the toe of the existing or replacement seawall when the toe of the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement riprap can only be added within the same footprint of existing riprap (i.e. no waterward expansion or lateral expansion of riprap beyond the previous footprint) in depths less than or equal to -3 feet MLLW.

5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)].

6. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

B. CONDITIONS FOR AERIAL TRANSMISSION LINES:

1. The work herein authorized includes the installation of aerial transmission lines and associated structures.

2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does not apply in the case of a lift bridge. Minimum clearance for lift bridges will be determined on a case-by-case basis.

a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as established by the U.S. Coast Guard (USCG). In the event the USCG has not established a bridge clearance, minimum vertical clearances for power and aerials lines will not be less than required by Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2.

b. The minimum clearance* for an aerial line, transmitting electrical power, is based on the low point of the line under conditions that produce the greatest sag, taking consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line crossing navigable waters of the U.S. shall be governed by the system voltage, as indicated below:

Nominal System Minimum Clearance

Voltage, kilovoltAbove Bridge Clearance (as established by the USCG)

115 and below20 feet

138 22 161 24

230 26

350 30

500 35

700 42

750-765 45

*NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to underside of the bridge, and the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge.

c. On navigable waters of the U.S., including all federal navigation project, whether there is no bridge for reference for minimum clearance, the proposed project will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the minimum clearance between the line and MHW necessary to protect navigational interests.

3. The construction of aerial transmission lines does not involve the dredging or filling of navigable waters or waters of the United States.

4. Where the proposed aerial transmission line is to be installed in navigable waters of the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office writing that the work is commencing, and again upon completion of the work. The permittee shall notify the District Engineer at the letterhead address, attention Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov. This notification will include “As-Built plans” signed by a registered surveyor/engineer licensed in the State of Florida, that certify the project is constructed as authorized and must include an accurate (within plus or minus 1 foot) depiction of the location and configuration of the completed activity in relation to the MHW of the navigable water.

5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in areas where the essential features are present.

6. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit.

7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES:

1. The work herein authorized includes the installation and maintenance of subaqueous utility and transmission lines placed on, under or embedded in the bottom of navigable waters of the United States within the City of Cape Coral. The installation of utility and transmission lines by directional bore is authorized if the drilling originates and terminates on the uplands (i.e. no in-water work). The permittee must provide the City of Cape Coral with a frac-out contingency plan prior to verification of this General Permit (Attachment 3)

2. Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the water (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled on non-wetland areas.

3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet below the bottom contour of any water of the U.S. The 6-foot criterion applies to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing.

4. Subaqueous utility and transmission lines may be installed (including as part of a repair/replacement project) by trenching. When excavating the trench, the bottom sediments may be temporarily sidecast into areas devoid of submerged aquatic vegetation and mangroves. Immediately upon completing the excavation and placing the transmission or utility line into the trench, the trench must be filled and the bottom contours must be restored to pre-construction conditions.

5. New subaqueous transmission and utility lines cannot be placed on the canal substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines may be repaired or replaced above the substrate by pinning or anchoring the new section of line in place to ensure that it does not move and damage surrounding seagrasses and mangrove habitat.

6. When repairing existing transmission or utility lines, riprap and articulated mats may be placed on subaqueous lines that are buried in trenches or on lines that are attached to the substrate (in accordance with special condition #3 above) to stabilize the line. Riprap and articulated mats may also be used to stabilize new subaqueous lines placed in high erosion areas. These stabilization materials are limited to the minimum amount necessary to stabilize and protect the lines existing lines (which may have been exposed by scouring) and cannot be placed on seagrasses or mangrove habitat.

7. The permittee will install signs at the shoreline to notify navigational interests of the location of subaqueous utility and transmission lines.

8. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit.

9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES:

1. Structures authorized under this general permit are private single-family piers not to exceed 4 slips. This would include normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways, mooring piles, dolphins, and maintenance of these appurtenances. Upland-cut boat slips are not authorized by this general permit.

2. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited.

3. No living, fueling, or storage facilities over navigable waters of the United States are authorized under this general permit.

4. The structure shall be consistent with other structures in the area.

5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should be avoided.

6. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.

7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)].

8. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee’s expense on authorized facilities in navigable waters of the United States.

9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS:

1. The work herein authorized will be for minor structures to include:

a. Single mooring piles;

b. Small mooring dolphins (limited to one cluster of 4 or fewer pilings);

c. Non-commercial information signage;

d. Boat lifts, hoists, davits; and,

e. Other minor structures that would have less environmental impact than a small dock.

2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should be avoided.

3. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited.

4. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.

5. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

F. CONDITIONS FOR STORM WATER OUTFALLS:

1. Structures authorized under this general permit are storm water outfalls and appurtenances.

2. Authorization is contingent upon issuance of lawfully required National Pollutant Discharge Elimination System permits (Section 402 of the Clean Water Act) from the U.S. Environmental Protection Agency, Florida Department of Environmental Protection, State Water Management District, or their legally authorized delegate.

3. This general permit authorizes dredging at storm water outfalls. Maintenance dredging is authorized as long as it within the previously authorized dredge foot print and to the previously USACE authorized depth. No additional dredging is authorized under this general permit other than that which would be necessary to restore the discharge structure to its original permitted excavated depth. In addition, if only shallow euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of all red mangrove prop roots. Muck dredging (dredging or removal of accumulated organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW).

4. Excavated spoil material shall be deposited at self-contained upland areas that will prevent spoil material and/or return water from reentering any water of the United States (including wetlands) or interfering with natural drainage.

5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches, but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be placed on the accessible end(s) to restrict manatee access. The installation of grates applies to submerged or partially submerged pipes and culverts reasonably accessible to manatees.

6. All outfall discharge shall be designed and implemented to prevent erosion and scour.

7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

G. SPECIAL CONDITIONS FOR ALL WORK:

1. No activities (Activities A-F above) are authorized within the smalltooth sawfish limited exclusion zones (Attachment 2).

2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4).

3. All project involving the installation of piles or sheet piles shall follow the PDCs for In-Water Noise from Pile and Sheet Pile Installation (Attachment 5).

4. All activities must be completed during daylight hours.

5. No work shall be performed until the permittee submits satisfactory plans, and surveys, if necessary, for the proposed activity and receives written authorization from the City of Cape Coral. (For example: Vegetation surveys which clearly depict what type of vegetation is present on the site, including mangrove species, location of the Mean High Water Line, and the location of wetlands and uplands.)

6. The work authorized herein is limited to existing canals within the City of Cape Coral and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve, smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways.

7. No activity shall be authorized under this general permit that may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or submerged aquatic vegetation.

9. No work shall be performed until after the permittee provides notification to the owner(s) or operator(s) of any marked utilities in the work area.

10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant’s/Permittee’s behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.cr.nps.gov/nr/research/.

If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7.

In the unlikely event that human remains are identified, they will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, the State Archaeologist (850-245-6444), and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps.

11. Conformance with descriptions and quantities contained herein does not necessarily guarantee authorization under this general permit and the District Engineer reserves the right to evaluate any proposed work in waters of the United States as a Standard Permit.

12. Any structure or work authorized under this general permit must not interfere with general navigation.

13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key entitled “The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida – March 2011”, will be used to determine potential manatee impacts. Projects judged as a “may affect” to the manatee are not authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife Service by the Corps in accordance with the Endangered Species Act. Projects judged as a “may affect not likely to adversely affect” must follow all additional, specific conditions related to the pertinent activities as outlined in the Key and its associated maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.

14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the “Standard Manatee Conditions for In-Water Work, 2011” (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/Manatee/2011_StandardConditionsForIn-waterWork.pdf)

15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the “Sea Turtle and Smalltooth Sawfish Construction Conditions” (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/sea_turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate for the proposed activity. Note: These conditions may be subject to revision at any time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application.

16. Turbidity control measures will be used to control water quality and the work must be in accordance with State Water Quality Standards as outlined in Florida Statute 62.302. Turbidity control measures may include but are not limited to, turbidity control curtains, the exclusive use of suction dredging, the exclusive use of closed “clam shell” dredging, or any other technique necessary to reduce turbidity to no more than background turbidity. The Florida Department of Environmental Protection (FDEP) may require the applicant to submit a daily turbidity report which may be verified by state or local government inspectors.

17. No activity shall be authorized under this general permit which is likely to adversely affect a Federally-listed threatened or endangered species or a species proposed for such designation, or destroy or adversely modify its designated critical habitat.

19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the installation of metal or sheet piles installed by impact hammer. They also require the use of noise abatement measures if 5 or more concrete piles are installed by impact hammer in a confined space as defined in Appendix C. No project shall be authorized that results in noise in excess of the established thresholds for physical injury (single strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic, Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic surveys, low frequency sonar, explosions, and seismic air guns typically towed underwater by vessels to locate oil and gas deposits.

20. This PGP does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species.

21. Activities qualifying for this programmatic general permit (PGP) must be authorized by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any authorization required to use or occupy state-owned submerged lands (SSL) under Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the Department of Environmental Protection, a water management district under s. 373.069, F.S., or a local government with delegated authority under s. 373.441, F.S., will provide the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone Consistency Concurrence (CZCC). WQC is waived for activities authorized under this PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as

applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under shall not be precluded from acting on a request to use this PGP before the applicable SSL authorization is granted.

22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable state lands authorizations under Chapter 253 of the Florida Statutes must be obtained from the State of Florida, the South Florida Water Management District (SFWMD), FDEP, or their authorized representatives, as appropriate.

23. For projects authorized under this permit in navigable waters of the U.S., the permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

24. This programmatic general permit will be valid for a period of 5 years from the date specified above unless suspended or revoked by the District Engineer prior to that date. If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization of activities that have commenced or are under contract to commence in reliance on SAJ-91 will remain in effect provided the activity is completed with 12 months of the date SAJ-91 expired or was revoked.

25. The General conditions attached hereto are made a part of this permit and must be attached to all authorizations processed under this permit.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341.

COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with the Coastal Zone Management Act, 16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart C.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being coordinated via separate letters with the U.S. Fish and Wildlife Service as required under Section 7 of the Endangered Species Act, and with the National Marine Fisheries Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery Conservation and Management Act. Additionally, the proposed reissuance of this permit is being coordinated with the Environmental Protection Agency under Section 404 of the Clean Water Act.

RESPONSE: Comments regarding the proposed reissuance of this Programmatic General Permit SAJ-91 should be submitted in writing to the District Engineer at the above address within 45 days from the date of this notice. The permit will be reissued without further notice if no adverse comments are received. If you have any questions concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead address or by electronic mail at Brianne.E.McGuffie@usace.army.mil.

GENERAL CONDITIONS

1. The time limit for completing the work authorized ends on ______________

2. You must maintain the activity authorized by this permit in good condition and in

conformance with the terms and conditions of this permit. You are not relieved of this

requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while

accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of this authorization.

6. You must allow a representative from the Corps or its delegated authority to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Further Information:

1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:

(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).

(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).

( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).

2. Limits of this authorization.

a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.

b. This permit does not grant any property rights or exclusive privileges.

c. This permit does not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federal projects.

3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:

a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.

b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation of this permit.

4. Reliance on Applicant's Data: The determination of this office that issuance of this permit verification is not contrary to the public interest was made in reliance on the information you provided.

5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision on this permit verification at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:

a. You fail to comply with the terms and conditions of this permit.

b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).

c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified .in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1520 ROYAL PALM SQUARE BOULEVARD, SUITE 310 FORT MYERS, FLORIDA 33919 REPLY TO ATTENTION OF

September 25, 2017

Regulatory Division Fort Myers Permits Section

PUBLIC NOTICE Programmatic General Permit SAJ-91 SAJ-2005-08775 (BEM) BULKHEADS AND BACKFILL, AERIAL TRANSMISSION LINES, SUBAQUEOUS UTILITY AND TRANSMISSION LINES, PRIVATE SINGLE-FAMILY DOCKS AND APPURTENANCES, MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS, AND STORMWATER OUTFALLS LOCATED WITHIN THE CITY OF CAPE CORAL, LEE COUNTY, FLORIDA. BACKGROUND: In order to simplify and speed processing of Department of the Army permits, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued the above programmatic general permit on February 28, 2013 for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located within the City of Cape Coral, Lee County, Florida. During the time period of February 28, 2008 through the date of this public notice, the City of Cape Coral has reviewed the SAJ-91 approximately 1,033 times. PROPOSAL: The above-listed general permit is under review for the purposes of updating and reissuance. The permit has been revised to include the Project Design Criteria (PDCs) as contained in the draft Jacksonville Biological Opinion (Opinion), as well as provide the species names for mangroves that are prohibited from removal. A draft of the general permit as proposed for reissuance follows: DEPARTMENT OF THE ARMY PROGRAMMATIC GENERAL PERMIT SAJ-91 Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act, general authority is hereby given to the City of Cape Coral to administer this permit for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located in waters of the United States within the City of Cape Coral, Lee County, Florida (Attachment 1). This

permit does not authorize any work or structure within the Caloosahatchee River, Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth sawfish limited exclusion zones (Attachment 2). This programmatic general permit is subject to the following conditions: A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL CANALS 1. The work herein authorized includes the construction, repair or maintenance of seawalls (bulkheads) and associated backfill in residential canals. 2. The seawall shall not exceed 500 feet in length and not extend any farther waterward than 18" from the existing seawall or Mean High Water Line (MHWL) and shall connect with adjacent seawalls to the maximum extent practicable. 3. The backfill must be from upland sources and consist of suitable clean fill material free from toxic pollutants in other than trace quantities. The amount of backfill shall not exceed one (1) cubic yard per running foot below the plane of the MHWL. 4. This permit does not authorize any filling, except for backfill behind the seawall. New riprap may be placed at the toe of the existing or replacement seawall when the toe of the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement riprap can only be added within the same footprint of existing riprap (i.e. no waterward expansion or lateral expansion of riprap beyond the previous footprint) in depths less than or equal to -3 feet MLLW. 5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)]. 6. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. B. CONDITIONS FOR AERIAL TRANSMISSION LINES: 1. The work herein authorized includes the installation of aerial transmission lines and associated structures. 2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does not apply in the case of a lift bridge. Minimum clearance for lift bridges will be determined on a case-by-case basis.

2

a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as established by the U.S. Coast Guard (USCG). In the event the USCG has not established a bridge clearance, minimum vertical clearances for power and aerials lines will not be less than required by Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2. b. The minimum clearance* for an aerial line, transmitting electrical power, is based on the low point of the line under conditions that produce the greatest sag, taking consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line crossing navigable waters of the U.S. shall be governed by the system voltage, as indicated below: Nominal System Voltage, kilovolt

Minimum Clearance Above Bridge Clearance (as established by the USCG)

115 and below 138 161 230 350 500 700 750-765

20 feet 22 24 26 30 35 42 45

*NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to underside of the bridge, and the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge. c. On navigable waters of the U.S., including all federal navigation project, whether there is no bridge for reference for minimum clearance, the proposed project will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the minimum clearance between the line and MHW necessary to protect navigational interests. 3. The construction of aerial transmission lines does not involve the dredging or filling of navigable waters or waters of the United States. 4. Where the proposed aerial transmission line is to be installed in navigable waters of the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office writing that the work is commencing, and again upon completion of the work. The permittee shall notify the District Engineer at the letterhead address, attention Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov.

3

This notification will include "As-Built plans" signed by a registered surveyor/engineer licensed in the State of Florida, that certify the project is constructed as authorized and must include an accurate (within plus or minus 1 foot) depiction of the location and configuration of the completed activity in relation to the MHW of the navigable water. 5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in areas where the essential features are present. 6. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit. 7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES: 1. The work herein authorized includes the installation and maintenance of subaqueous utility and transmission lines placed on, under or embedded in the bottom of navigable waters of the United States within the City of Cape Coral. The installation of utility and transmission lines by directional bore is authorized if the drilling originates and terminates on the uplands (i.e. no in-water work). The permittee must provide the City of Cape Coral with a frac-out contingency plan prior to verification of this General Permit (Attachment 3) 2. Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the water (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled on non-wetland areas. 3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet below the bottom contour of any water of the U.S. The 6-foot criterion applies to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing. 4. Subaqueous utility and transmission lines may be installed (including as part of a repair/replacement project) by trenching. When excavating the trench, the bottom sediments may be temporarily sidecast into areas devoid of submerged aquatic vegetation and mangroves. Immediately upon completing the excavation and placing the transmission or utility line into the trench, the trench must be filled and the bottom contours must be restored to pre-construction conditions.

4

5. New subaqueous transmission and utility lines cannot be placed on the canal substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines may be repaired or replaced above the substrate by pinning or anchoring the new section of line in place to ensure that it does not move and damage surrounding seagrasses and mangrove habitat. 6. When repairing existing transmission or utility lines, riprap and articulated mats may be placed on subaqueous lines that are buried in trenches or on lines that are attached to the substrate (in accordance with special condition #3 above) to stabilize the line. Riprap and articulated mats may also be used to stabilize new subaqueous lines placed in high erosion areas. These stabilization materials are limited to the minimum amount necessary to stabilize and protect the lines existing lines (which may have been exposed by scouring) and cannot be placed on seagrasses or mangrove habitat. 7. The permittee will install signs at the shoreline to notify navigational interests of the location of subaqueous utility and transmission lines. 8. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit. 9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES: 1. Structures authorized under this general permit are private single-family piers not to exceed 4 slips. This would include normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways, mooring piles, dolphins, and maintenance of these appurtenances. Upland-cut boat slips are not authorized by this general permit. 2. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited. 3. No living, fueling, or storage facilities over navigable waters of the United States are authorized under this general permit. 4. The structure shall be consistent with other structures in the area. 5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should be avoided.

5

6. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit. 7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)]. 8. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. 9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS: 1. The work herein authorized will be for minor structures to include: a. Single mooring piles; b. Small mooring dolphins (limited to one cluster of 4 or fewer pilings); c. Non-commercial information signage; d. Boat lifts, hoists, davits; and, e. Other minor structures that would have less environmental impact than a small dock. 2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should be avoided. 3. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited. 4. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.

6

5. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. F. CONDITIONS FOR STORM WATER OUTFALLS: 1. Structures authorized under this general permit are storm water outfalls and appurtenances. 2. Authorization is contingent upon issuance of lawfully required National Pollutant Discharge Elimination System permits (Section 402 of the Clean Water Act) from the U.S. Environmental Protection Agency, Florida Department of Environmental Protection, State Water Management District, or their legally authorized delegate. 3. This general permit authorizes dredging at storm water outfalls. Maintenance dredging is authorized as long as it within the previously authorized dredge foot print and to the previously USACE authorized depth. No additional dredging is authorized under this general permit other than that which would be necessary to restore the discharge structure to its original permitted excavated depth. In addition, if only shallow euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of all red mangrove prop roots. Muck dredging (dredging or removal of accumulated organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW). 4. Excavated spoil material shall be deposited at self-contained upland areas that will prevent spoil material and/or return water from reentering any water of the United States (including wetlands) or interfering with natural drainage. 5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches, but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be placed on the accessible end(s) to restrict manatee access. The installation of grates applies to submerged or partially submerged pipes and culverts reasonably accessible to manatees. 6. All outfall discharge shall be designed and implemented to prevent erosion and scour. 7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

7

G. SPECIAL CONDITIONS FOR ALL WORK: 1. No activities (Activities A-F above) are authorized within the smalltooth sawfish limited exclusion zones (Attachment 2). 2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4). 3. All project involving the installation of piles or sheet piles shall follow the PDCs for In-Water Noise from Pile and Sheet Pile Installation (Attachment 5). 4. All activities must be completed during daylight hours. 5. No work shall be performed until the permittee submits satisfactory plans, and surveys, if necessary, for the proposed activity and receives written authorization from the City of Cape Coral. (For example: Vegetation surveys which clearly depict what type of vegetation is present on the site, including mangrove species, location of the Mean High Water Line, and the location of wetlands and uplands.) 6. The work authorized herein is limited to existing canals within the City of Cape Coral and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve, smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways. 7. No activity shall be authorized under this general permit that may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or submerged aquatic vegetation. 9. No work shall be performed until after the permittee provides notification to the owner(s) or operator(s) of any marked utilities in the work area. 10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant's/Permittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, contacting the Florida Master Site File at 850245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.cr.nps.gov/nr/research/. If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with

8

Native American cultures or early colonial or American settlement), the permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. In the unlikely event that human remains are identified, they will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, the State Archaeologist (850-245-6444), and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 11. Conformance with descriptions and quantities contained herein does not necessarily guarantee authorization under this general permit and the District Engineer reserves the right to evaluate any proposed work in waters of the United States as a Standard Permit. 12. Any structure or work authorized under this general permit must not interfere with general navigation. 13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key entitled "The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida ­ March 2011", will be used to determine potential manatee impacts. Projects judged as a "may affect" to the manatee are not authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife Service by the Corps in accordance with the Endangered Species Act. Projects judged as a "may affect not likely to adversely affect" must follow all additional, specific conditions related to the pertinent activities as outlined in the Key and its associated maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.

14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the "Standard Manatee Conditions for In-Water Work, 2011" (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec ies/Manatee/2011 StandardConditionsForIn-waterWork.pdf) 15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the "Sea Turtle and Smalltooth Sawfish Construction Conditions" (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec ies/sea turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate for the proposed activity. Note: These conditions may be subject to revision at any 9

time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application. 16. Turbidity control measures will be used to control water quality and the work must be in accordance with State Water Quality Standards as outlined in Florida Statute 62.302. Turbidity control measures may include but are not limited to, turbidity control curtains, the exclusive use of suction dredging, the exclusive use of closed "clam shell" dredging, or any other technique necessary to reduce turbidity to no more than background turbidity. The Florida Department of Environmental Protection (FDEP) may require the applicant to submit a daily turbidity report which may be verified by state or local government inspectors. 17. No activity shall be authorized under this general permit which is likely to adversely affect a Federally-listed threatened or endangered species or a species proposed for such designation, or destroy or adversely modify its designated critical habitat. 19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the installation of metal or sheet piles installed by impact hammer. They also require the use of noise abatement measures if 5 or more concrete piles are installed by impact hammer in a confined space as defined in Appendix C. No project shall be authorized that results in noise in excess of the established thresholds for physical injury (single strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic, Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic surveys, low frequency sonar, explosions, and seismic air guns typically towed underwater by vessels to locate oil and gas deposits. 20. This PGP does not include conditions that would prevent the `take' of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species. 21. Activities qualifying for this programmatic general permit (PGP) must be authorized by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any authorization required to use or occupy state-owned submerged lands (SSL) under Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the Department of Environmental Protection, a water management district under s. 373.069, F.S., or a local government with delegated authority under s. 373.441, F.S., will provide the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone Consistency Concurrence (CZCC). WQC is waived for activities authorized under this

10

PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under shall not be precluded from acting on a request to use this PGP before the applicable SSL authorization is granted. 22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable state lands authorizations under Chapter 253 of the Florida Statutes must be obtained from the State of Florida, the South Florida Water Management District (SFWMD), FDEP, or their authorized representatives, as appropriate. 23. For projects authorized under this permit in navigable waters of the U.S., the permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 24. This programmatic general permit will be valid for a period of 5 years from the date specified above unless suspended or revoked by the District Engineer prior to that date. If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization of activities that have commenced or are under contract to commence in reliance on SAJ-91 will remain in effect provided the activity is completed with 12 months of the date SAJ-91 expired or was revoked. 25. The General conditions attached hereto are made a part of this permit and must be attached to all authorizations processed under this permit. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization

11

of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341. COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with the Coastal Zone Management Act, 16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart C. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing. OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being coordinated via separate letters with the U.S. Fish and Wildlife Service as required under Section 7 of the Endangered Species Act, and with the National Marine Fisheries Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery Conservation and Management Act. Additionally, the proposed reissuance of this permit

12

is being coordinated with the Environmental Protection Agency under Section 404 of the Clean Water Act. RESPONSE: Comments regarding the proposed reissuance of this Programmatic General Permit SAJ-91 should be submitted in writing to the District Engineer at the above address within 45 days from the date of this notice. The permit will be reissued without further notice if no adverse comments are received. If you have any questions concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead address or by electronic mail at Brianne.E.McGuffie@usace.army.mil. GENERAL CONDITIONS 1. The time limit for completing the work authorized ends on ______________ 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of this authorization. 6. You must allow a representative from the Corps or its delegated authority to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: (X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). (X) Section 404 of the Clean Water Act (33 U.S.C. 1344). ( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).

13

2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit verification is not contrary to the public interest was made in reliance on the information you provided. 5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision on this permit verification at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

14

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified .in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

15

permit does not authorize any work or structure within the Caloosahatchee River, Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth sawfish limited exclusion zones (Attachment 2). This programmatic general permit is subject to the following conditions: A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL CANALS 1. The work herein authorized includes the construction, repair or maintenance of seawalls (bulkheads) and associated backfill in residential canals. 2. The seawall shall not exceed 500 feet in length and not extend any farther waterward than 18" from the existing seawall or Mean High Water Line (MHWL) and shall connect with adjacent seawalls to the maximum extent practicable. 3. The backfill must be from upland sources and consist of suitable clean fill material free from toxic pollutants in other than trace quantities. The amount of backfill shall not exceed one (1) cubic yard per running foot below the plane of the MHWL. 4. This permit does not authorize any filling, except for backfill behind the seawall. New riprap may be placed at the toe of the existing or replacement seawall when the toe of the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement riprap can only be added within the same footprint of existing riprap (i.e. no waterward expansion or lateral expansion of riprap beyond the previous footprint) in depths less than or equal to -3 feet MLLW. 5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)]. 6. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. B. CONDITIONS FOR AERIAL TRANSMISSION LINES: 1. The work herein authorized includes the installation of aerial transmission lines and associated structures. 2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does not apply in the case of a lift bridge. Minimum clearance for lift bridges will be determined on a case-by-case basis.

2

a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as established by the U.S. Coast Guard (USCG). In the event the USCG has not established a bridge clearance, minimum vertical clearances for power and aerials lines will not be less than required by Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2. b. The minimum clearance* for an aerial line, transmitting electrical power, is based on the low point of the line under conditions that produce the greatest sag, taking consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line crossing navigable waters of the U.S. shall be governed by the system voltage, as indicated below: Nominal System Voltage, kilovolt

Minimum Clearance Above Bridge Clearance (as established by the USCG)

115 and below 138 161 230 350 500 700 750-765

20 feet 22 24 26 30 35 42 45

*NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to underside of the bridge, and the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge. c. On navigable waters of the U.S., including all federal navigation project, whether there is no bridge for reference for minimum clearance, the proposed project will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the minimum clearance between the line and MHW necessary to protect navigational interests. 3. The construction of aerial transmission lines does not involve the dredging or filling of navigable waters or waters of the United States. 4. Where the proposed aerial transmission line is to be installed in navigable waters of the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office writing that the work is commencing, and again upon completion of the work. The permittee shall notify the District Engineer at the letterhead address, attention Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov.

3

This notification will include "As-Built plans" signed by a registered surveyor/engineer licensed in the State of Florida, that certify the project is constructed as authorized and must include an accurate (within plus or minus 1 foot) depiction of the location and configuration of the completed activity in relation to the MHW of the navigable water. 5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in areas where the essential features are present. 6. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit. 7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES: 1. The work herein authorized includes the installation and maintenance of subaqueous utility and transmission lines placed on, under or embedded in the bottom of navigable waters of the United States within the City of Cape Coral. The installation of utility and transmission lines by directional bore is authorized if the drilling originates and terminates on the uplands (i.e. no in-water work). The permittee must provide the City of Cape Coral with a frac-out contingency plan prior to verification of this General Permit (Attachment 3) 2. Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the water (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled on non-wetland areas. 3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet below the bottom contour of any water of the U.S. The 6-foot criterion applies to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing. 4. Subaqueous utility and transmission lines may be installed (including as part of a repair/replacement project) by trenching. When excavating the trench, the bottom sediments may be temporarily sidecast into areas devoid of submerged aquatic vegetation and mangroves. Immediately upon completing the excavation and placing the transmission or utility line into the trench, the trench must be filled and the bottom contours must be restored to pre-construction conditions.

4

5. New subaqueous transmission and utility lines cannot be placed on the canal substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines may be repaired or replaced above the substrate by pinning or anchoring the new section of line in place to ensure that it does not move and damage surrounding seagrasses and mangrove habitat. 6. When repairing existing transmission or utility lines, riprap and articulated mats may be placed on subaqueous lines that are buried in trenches or on lines that are attached to the substrate (in accordance with special condition #3 above) to stabilize the line. Riprap and articulated mats may also be used to stabilize new subaqueous lines placed in high erosion areas. These stabilization materials are limited to the minimum amount necessary to stabilize and protect the lines existing lines (which may have been exposed by scouring) and cannot be placed on seagrasses or mangrove habitat. 7. The permittee will install signs at the shoreline to notify navigational interests of the location of subaqueous utility and transmission lines. 8. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit. 9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES: 1. Structures authorized under this general permit are private single-family piers not to exceed 4 slips. This would include normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways, mooring piles, dolphins, and maintenance of these appurtenances. Upland-cut boat slips are not authorized by this general permit. 2. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited. 3. No living, fueling, or storage facilities over navigable waters of the United States are authorized under this general permit. 4. The structure shall be consistent with other structures in the area. 5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should be avoided.

5

6. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit. 7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)]. 8. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. 9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS: 1. The work herein authorized will be for minor structures to include: a. Single mooring piles; b. Small mooring dolphins (limited to one cluster of 4 or fewer pilings); c. Non-commercial information signage; d. Boat lifts, hoists, davits; and, e. Other minor structures that would have less environmental impact than a small dock. 2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should be avoided. 3. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited. 4. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.

6

5. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit. F. CONDITIONS FOR STORM WATER OUTFALLS: 1. Structures authorized under this general permit are storm water outfalls and appurtenances. 2. Authorization is contingent upon issuance of lawfully required National Pollutant Discharge Elimination System permits (Section 402 of the Clean Water Act) from the U.S. Environmental Protection Agency, Florida Department of Environmental Protection, State Water Management District, or their legally authorized delegate. 3. This general permit authorizes dredging at storm water outfalls. Maintenance dredging is authorized as long as it within the previously authorized dredge foot print and to the previously USACE authorized depth. No additional dredging is authorized under this general permit other than that which would be necessary to restore the discharge structure to its original permitted excavated depth. In addition, if only shallow euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of all red mangrove prop roots. Muck dredging (dredging or removal of accumulated organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW). 4. Excavated spoil material shall be deposited at self-contained upland areas that will prevent spoil material and/or return water from reentering any water of the United States (including wetlands) or interfering with natural drainage. 5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches, but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be placed on the accessible end(s) to restrict manatee access. The installation of grates applies to submerged or partially submerged pipes and culverts reasonably accessible to manatees. 6. All outfall discharge shall be designed and implemented to prevent erosion and scour. 7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G ("Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.

7

G. SPECIAL CONDITIONS FOR ALL WORK: 1. No activities (Activities A-F above) are authorized within the smalltooth sawfish limited exclusion zones (Attachment 2). 2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4). 3. All project involving the installation of piles or sheet piles shall follow the PDCs for In-Water Noise from Pile and Sheet Pile Installation (Attachment 5). 4. All activities must be completed during daylight hours. 5. No work shall be performed until the permittee submits satisfactory plans, and surveys, if necessary, for the proposed activity and receives written authorization from the City of Cape Coral. (For example: Vegetation surveys which clearly depict what type of vegetation is present on the site, including mangrove species, location of the Mean High Water Line, and the location of wetlands and uplands.) 6. The work authorized herein is limited to existing canals within the City of Cape Coral and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve, smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways. 7. No activity shall be authorized under this general permit that may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or submerged aquatic vegetation. 9. No work shall be performed until after the permittee provides notification to the owner(s) or operator(s) of any marked utilities in the work area. 10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant's/Permittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, contacting the Florida Master Site File at 850245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.cr.nps.gov/nr/research/. If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with

8

Native American cultures or early colonial or American settlement), the permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. In the unlikely event that human remains are identified, they will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, the State Archaeologist (850-245-6444), and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 11. Conformance with descriptions and quantities contained herein does not necessarily guarantee authorization under this general permit and the District Engineer reserves the right to evaluate any proposed work in waters of the United States as a Standard Permit. 12. Any structure or work authorized under this general permit must not interfere with general navigation. 13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key entitled "The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida ­ March 2011", will be used to determine potential manatee impacts. Projects judged as a "may affect" to the manatee are not authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife Service by the Corps in accordance with the Endangered Species Act. Projects judged as a "may affect not likely to adversely affect" must follow all additional, specific conditions related to the pertinent activities as outlined in the Key and its associated maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.

14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the "Standard Manatee Conditions for In-Water Work, 2011" (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec ies/Manatee/2011 StandardConditionsForIn-waterWork.pdf) 15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the "Sea Turtle and Smalltooth Sawfish Construction Conditions" (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec ies/sea turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate for the proposed activity. Note: These conditions may be subject to revision at any 9

time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application. 16. Turbidity control measures will be used to control water quality and the work must be in accordance with State Water Quality Standards as outlined in Florida Statute 62.302. Turbidity control measures may include but are not limited to, turbidity control curtains, the exclusive use of suction dredging, the exclusive use of closed "clam shell" dredging, or any other technique necessary to reduce turbidity to no more than background turbidity. The Florida Department of Environmental Protection (FDEP) may require the applicant to submit a daily turbidity report which may be verified by state or local government inspectors. 17. No activity shall be authorized under this general permit which is likely to adversely affect a Federally-listed threatened or endangered species or a species proposed for such designation, or destroy or adversely modify its designated critical habitat. 19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the installation of metal or sheet piles installed by impact hammer. They also require the use of noise abatement measures if 5 or more concrete piles are installed by impact hammer in a confined space as defined in Appendix C. No project shall be authorized that results in noise in excess of the established thresholds for physical injury (single strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic, Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic surveys, low frequency sonar, explosions, and seismic air guns typically towed underwater by vessels to locate oil and gas deposits. 20. This PGP does not include conditions that would prevent the `take' of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species. 21. Activities qualifying for this programmatic general permit (PGP) must be authorized by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any authorization required to use or occupy state-owned submerged lands (SSL) under Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the Department of Environmental Protection, a water management district under s. 373.069, F.S., or a local government with delegated authority under s. 373.441, F.S., will provide the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone Consistency Concurrence (CZCC). WQC is waived for activities authorized under this

10

PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under shall not be precluded from acting on a request to use this PGP before the applicable SSL authorization is granted. 22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable state lands authorizations under Chapter 253 of the Florida Statutes must be obtained from the State of Florida, the South Florida Water Management District (SFWMD), FDEP, or their authorized representatives, as appropriate. 23. For projects authorized under this permit in navigable waters of the U.S., the permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 24. This programmatic general permit will be valid for a period of 5 years from the date specified above unless suspended or revoked by the District Engineer prior to that date. If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization of activities that have commenced or are under contract to commence in reliance on SAJ-91 will remain in effect provided the activity is completed with 12 months of the date SAJ-91 expired or was revoked. 25. The General conditions attached hereto are made a part of this permit and must be attached to all authorizations processed under this permit. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization

11

of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341. COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with the Coastal Zone Management Act, 16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart C. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing. OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being coordinated via separate letters with the U.S. Fish and Wildlife Service as required under Section 7 of the Endangered Species Act, and with the National Marine Fisheries Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery Conservation and Management Act. Additionally, the proposed reissuance of this permit

12

is being coordinated with the Environmental Protection Agency under Section 404 of the Clean Water Act. RESPONSE: Comments regarding the proposed reissuance of this Programmatic General Permit SAJ-91 should be submitted in writing to the District Engineer at the above address within 45 days from the date of this notice. The permit will be reissued without further notice if no adverse comments are received. If you have any questions concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead address or by electronic mail at Brianne.E.McGuffie@usace.army.mil. GENERAL CONDITIONS 1. The time limit for completing the work authorized ends on ______________ 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of this authorization. 6. You must allow a representative from the Corps or its delegated authority to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: (X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). (X) Section 404 of the Clean Water Act (33 U.S.C. 1344). ( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).

13

2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit verification is not contrary to the public interest was made in reliance on the information you provided. 5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision on this permit verification at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

14

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified .in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

15

-

~

-

- . _ . ,u l o - - - ~

~

-

·

-~

w w u

-

~

-

~

!-----; I -

w w

~

--ir----i

UL.I

..a.l

-

--·

I.A)

W

-----..,~ ~

l.V

l.).j

_

I.I.)

i.:, _ _ ._ _ _

IJO

1..v

:;;.,-~---e ~ ·- -- ~- ,.,- ---

W

I.JU

W

l.IU

tM.J

---==,· ~,, r-- , ~

uu

..U

00

--4 ,_,.,__. __ ~

95

127

l.AJ

96

LE IGH AC ~S

128

112

192

Limited Exclusion Zones in Smalltooth Sawfish Critical Habitat Longitude Name Latitude U.S. 41 Bridges (the area between the following coordinates) U.S. 41 NW 26.660413°N 81.885243°W 81.872966°W U.S. 41 NE 26.666827°N U.S. 41 SW 26.642991 °N 81.873880°W U.S. 41 SE 81 .861605°W 26.649405°N Iona Cove (the area between the following coordinates) ICNW 26.521437°N 81.991586°W IC NE 26.521212°N 81.976191 °W ICSW 26 .511762°N 81 .991762°W ICSE 26.511537°N 81.976368°W Glover Bight (the area between the following coordinates) GBNW 26.542971 °N 81.997791 °W GB NE 26.542678°N 81.977745°W GBSW 26.529478°N 81.998035°W GB SE 26.529185°N 81.977992°W Cape Coral (the area between the following coordinates) cc 1 26.551662°N 81.947412°W 26.551561 °N CC2 81 .940683 °W CC3 26.539075°N 81 .940916°W CC4 26.539205°N 81.951049°W 81.951047°W CC5 26.542181 °N CC6 26.542133°N 81.947776°W

Figure 2. Smalltooth sawfish limited exclusion zones The locations of very small juveniles shown as red dots (©2012 Google; red dots based on the National Sawfish Encounter Database, May 2011)

ATTACHMENT 27 TO SPGP V PAGE 1OF 3

15 A ppendix B: frnc-Out Pfan Example Pmpos.ed Methods for Protectio11 of Water QuaUty for Directional Bored Water Crossings (BMPs and Frac-out Plan) BMPs

[TI1e APl)LICANT) and (the C@tractor] will implement the followiug Best Manageme.ut Practices (BMPs) to minimize the potential for a.dverse e11viro111nep1=<'ll itnpact.~ during horizontal directinnal driJling activities:

D BMPs for erosion col1trol w1thm the stag.il1g area shall be implemented and maintained at all times during the drilling illld back-reaming oper;itions to prevent siltatiou and turbid discharges in excess ofState Water Quality StMdards pursuant to Rule 62-302, F.AC. lv.lethods shaJ.1 il1.dude, but ar~ not limited to the jmmediate. placement ofturbidity containment devices such as turbidity seree11, silt co11tairu11ent fonce, J1ay bales, and earthen berms, e1c. to contait1 the drilling rnud. Earthen betrns shall not be utilized as lo impact wetfonds ~r otluir surface waters_ F rac-out Plan To provide an additional level of resource prntection, the followmg rueasun::s shall be t·aken to

.monitor any potential releases of drilling fll\id:

D Measures used to prevent .fra&out during the

the bottom of the waterway wilt be _.I#]_ foet as shown on the cross sect ion. This is suspe<-ied h) be $Ltfficie1\t to prevent frac-ont when drilling 1mder the waterway.

0

Nontoxic fluoresce.ot dyes wlll be added lo the, drilling lubricant

D The voltune of bentonJe in the clral string will be monitored .at all times duriug the directional drilling opernlion. Should a.dr-0v in volume ofbenwuite occur, immediately ~ondt~.::t a vi~ual inspection ofboth te1Testrial anq subaqueous portions of the. horizontal directional drilling conidor.

D Should the detection of dye or a dro p in voltune of bmtonite occu~~ the Contractor will follnw the Release Procedures ou:tbiled below.

D The Contractor will tdentify pnQr. to con1111e11cement of consttl1ct.i.011an en nl'onme.ntal ,scientist/ biologist wilh expe.rienc.:> in-water quatdy monitoEing aud l1abi1at protection to be

nsed in t.he event -0f ;i frac-out. The bio l11gist wiH supervise t:he in1pte1nema1io11 (lftb.e Frac-Out Plan, Re lease Procedure, and Contaiume11t Plan outlined below. Divers shall. be present dudng drilling operations in order to respond to a potential !he-out release.

ATTACHMENT 27 TO SPGP V PAGE 2 OF 3

ATIACHMENT 27 TO SPGP V PAGE 3 OF 3

0

01ice the split is ccntamed. Lheescap.:cl drill lug lubriciml shit I I be properly disposed of iu an approved llplai1d di~p0$3 r si~e

0

Clean-up w~h a vacuu m system shall conunence within 24 hours.

0 Alter oontain.mi:mtirecover)· of the drilling materia llresou(ces, a detailed written rt'i})Ort shallbe submitted to the USA.CE, wjthiu 10 busi.ness da ys, iodi.::atingthe lo0ation ofthedl:ac-ont. amoui1t ofdrilling llll}krial d isch arged mid the <1monnt of drilling mud recovered, the process in which. the drillit1g mud was recovered. and the. area that was :tf.th~ted by the drilling d is ch arge.

254

FIGURE 3

PDCs for In-Water Activities

For an activity to be covered under this Opinion, the USACE authorization must include the following conditions. Failure to comply with these conditions could result in enforcement action by the USACE and/or NMFS. AP.1. Education and Observation: The permittee must ensure that all personnel associated with the project are instructed about the potential presence of species protected under the ESA and the Marine Mammal Protection Act (MMPA). All on-site project personnel are responsible for observing water-related activities for the presence of protected species. All personnel shall be advised that there are civil and criminal penalties for harming, harassing, or killing ESA-listed species or marine mammals. To determine which species may be found in the project area, please review the relevant Protected Species List at: http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangere d/index.html AP.2. Reporting of interactions with protected species: a) Any collision(s) with and/or injury to any sea turtle, sawfish, whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (1-727-824-5312) or by email to takereport.nmfsser@noaa.gov and CESAJ-ComplyDocs@usace.army.mil. b) Smalltooth sawfish: Report sightings to 1-844-SAWFISH or email Sawfish@MyFWC.com c) Sturgeon: Report dead sturgeon to 1-844-STURG 911 (1-844-788-7491) or email nmfs.ser.sturgeonnetwork@noaa.gov d) Sea turtles and marine mammals: Report stranded, injured, or dead animals to 1 877-WHALE HELP (1-877-942-5343). e) North Atlantic right whale: Report injured, dead, or entangled right whales to the USCG via VHF Channel 16. AP.3. Vessel Traffic and Construction Equipment: All vessel operators must watch for and avoid collision with species protected under the ESA and MMPA. Vessel operators must avoid potential interactions with protected species and operate in accordance with the following protective measures: a) Construction Equipment: i) All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while operating in water depths where the draft of the vessel provides less than a 4-foot (ft) clearance from the bottom, and after a protected species has been observed in and has departed the area.

ii) All vessels will follow marked channels and/or routes using the maximum water depth whenever possible. iii) Operation of any mechanical construction equipment, including vessels, shall cease immediately if a listed species is observed within a 50-ft radius of construction equipment and cannot resume until the species has departed the area of its own volition. iv) If the detection of species is not possible during certain weather conditions (e.g., fog, rain, wind), then in-water operations will cease until weather conditions improve and detection is again feasible. b) All Vessels: i) Sea turtles: Maintain a minimum distance of 150 ft. ii) North Atlantic right whale: Maintain a minimum 1,500-ft distance (500 yards). iii) Vessels 65 ft in length or longer must comply with the Right Whale Ship Strike Reduction Rule (50 CFR 224.105) which includes reducing speeds to 10 knots or less in Seasonal Management Areas (http://www.fisheries.noaa.gov/pr/shipstrike/). iv) Mariners shall check various communication media for general information regarding avoiding ship strikes and specific information regarding right whale sightings in the area. These include National Oceanic and Atmospheric Administration (NOAA) weather radio, USCG NAVTEX broadcasts, and Notices to Mariners. v) Marine mammals (i.e., dolphins, whales [other than North Atlantic right whales], and porpoises): Maintain a minimum distance of 300 ft. vi) When these animals are sighted while the vessel is underway (e.g., bowriding), attempt to remain parallel to the animal's course. Avoid excessive speed or abrupt changes in direction until they have left the area. vii) Reduce speed to 10 knots or less when mother/calf pairs or groups of marine mammals are observed, when safety permits. AP.4. Turbidity Control Measures during Construction: Turbidity must be monitored and controlled. Prior to initiating any of the work covered under this Opinion, the Permittee shall install turbidity curtains as described below. In some instances, the use of turbidity curtains may be waived by the USACE project manager if the project is deemed too minimal to generate turbidity (e.g., certain ATON installation, scientific survey device placement, marine debris removal) or if the current is too strong for the curtains to stay in place. Turbidity curtains specifications: a) Install floating turbidity barriers with weighted skirts that extend to within 1 ft of the bottom around all work areas that are in, or adjacent to, surface waters. b) Use these turbidity barriers throughout construction to control erosion and siltation and ensure that turbidity levels within the project area do not exceed background conditions (i.e., the normal water quality levels from natural turbidity). c) Position turbidity barriers in a way that does not block species' entry to or exit from designated critical habitat.

d) Monitor and maintain turbidity barriers in place until the authorized work has been completed and the water quality in the project area has returned to background conditions. e) In the range of corals (St. Lucie Inlet, Martin County south to the Dry Tortugas and the U.S. Caribbean) and Johnson's seagrass (Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida): · Projects that include upland earth moving (e.g., grading to install a building or parking lot associated with a dock and seawall project), must install sediment control barriers to prevent any upland sediments from reaching estuarine or marine waters. · The turbidity curtain requirement cannot be waived for any project that moves or removes sediment (e.g., dredging, auger to create a pile, trenching to install a cable line). If turbidity curtains are not feasible in an area based on site conditions such as water current, high wave action, or stormy conditions, the project must undergo individual Section 7 consultation and is not covered under this Programmatic Opinion. AP.5. Entanglement: All turbidity curtains and other in-water equipment must be properly secured with materials that reduce the risk of entanglement of marine species (described below). Turbidity curtains likewise must be made of materials that reduce the risk of entanglement of marine species. a) In-water lines (rope, chain, and cable, including the lines to secure turbidity curtains) must be stiff, taut, and non-looping. Examples of such lines are heavy metal chains or heavy cables that do not readily loop and tangle. Flexible inwater lines, such as nylon rope or any lines that could loop or tangle, must be enclosed in a plastic or rubber sleeve/tube to add rigidity and prevent the line from looping and tangling. In all instances, no excess line is allowed in the water. b) Turbidity curtains and other in-water equipment must be placed in a manner that does not entrap species within the construction area or block access for them to navigate around the construction area.

16 Appendix C: SWPBO Noise Effects Matrix and BMPs This Appendix summarizes the potential noise effects to sea turtles, smalltooth sawfish, and sturgeon from activities analyzed under the SWPBO. The analysis of noise for activities analyzed under the SWPBO, noise effects matrix, and BMPs is based on the noise analysis conducted in support of the USACE's General Permit SAJ-82 Programmatic Opinion (NMFS 2014b). The tables that follow are formatted as described below: 1. Species: We first consider which species may be affected (sea turtles and smalltooth sawfish). 2. Noise Metric: In order to understand how noise affects species, it is important to know how noise is measured and what noise levels affect species. Noise is measured in 3 different ways and each is expressed in its own units of measurement. a. Single-Strike Injury- This measurement is used to determine if injury would occur from impact hammer installation. This is measured in units of sSEL or peak pressure. If either peak pressure or sSEL are exceeded, then injury occurs. b. One-Second Injury Exposure- This measurement is used to determine if injury would occur from one second of exposure to non-impact hammer source like vibratory or auger installation. This is measured in units of peak pressure. c. Daily Cumulative Noise Exposure- This measurement (cSEL) determines if the noise produced over the course of the day of construction can cause injury. Note that the source level and calculations for cumulative noise exposure are adjusted with each pile strike or with time for vibratory installation to account for accumulated exposure, as described in Appendix B of SAJ-82. d. Behavioral Response- This measurement (RMS) determines if the noise will result in a behavioral response such as a change in feeding or sheltering. 3. Source Levels: For each construction activity, we provide the noise levels provided in literature of the noise produced during the installation of the pile, back-calculated to the actual source using the 15 logR spreading model, if the literature values are reported at some greater distance from the source, as explained in Appendix B of SAJ-82. 4. Threshold: For each noise metric, we provide the noise level from the literature at which the onset of impacts to species occurs.

5. Impact Radius: The distance from the source at which species are effected by noise above the corresponding threshold level. Because the daily cumulative noise exposure source levels change with every strike/over time, the impact radius also changes. The table shows the change as more piles are installed (e.g., the impact radius for 1 pile versus 10 piles), as described in more detail in Appendix B of SAJ-82. 255

6. Possible Species Responses: If species can be affected within a given impact radius, we then consider all of the possible species responses (both injurious and behavioral) that may occur within that radius from the pile. 7. Required BMPs: This column directs you to the BMP Plan required under SAJ-82 based on the type of pile and installation method used. The BMP Plans are provided immediately following the tables. 8. Effects Determination: This is the determination that NMFS made on what effect we believe the noise generated from the pile installation will have on sea turtle and smalltooth sawfish from activities analyzed under SAJ-82. The effects determinations include: a. NE: No Effect means that we do not believe the pile type and installation method will result in an effect to the species. b. NLAA: Not likely to Adversely Affect means that we believe the effect will be discountable or insignificant, as described in more detail in Section 3.1.4. c. LAA: Likely to Adversely Affect means that we believe the pile type and installation method is likely to have detrimental effects to the species. Activities that are LAA were not analyzed under SAJ-82.

256

e

2:

I~

-i::·

~c]

-

Sea Turtles

. s t aII th epile. -pressure wa t er 1s usedto creatth e o e an d some times t o sunu ItaneousIy m e epilhl Route of Effect

Thl'eshold (Iii oise level

that causes a response)

Impact Radius

P ossible Species R esponse

Required BMPs underSAJ 82

Effects Determination

One-second Injury Exposw-e

206 (peak pressure)

0

NIA

Daily Cumulative Noise Exposure

Tiueshold levels for noise sources ~ 167 dB SELwere not calculated

0

NIA

160 dB (RMS)

0

NfA

NE

206 (peak pressure)

0

NfA

NE

Tiueshold levels for noise SOlU'Ces ~ 167 dB SEL were not calculated

0

NIA

150 dB (RMS)

0

NIA

Behavioral Response One-second hljury Exposure Smalltooth Saw.fish and Sturgeon

Som·ce Level (Noise generated by activity)

Daily Cumulative Noise Exposm-e Behavioral Response

Jetting smu·c.e levels ru:e unknown but result in much lower noise levels than either impact or vibratory pile driving alone while minimizing the amotmt of hammering necessary. Noise measurements taken with water jetting ttuned on or off during pile driving resulted in no additional noise recorded a hove that of the pile-driving noise (CALTRANS 2007).

257

NE

BMPPlanA

BMPPlan A

NE

NE

NE

Drop punch: Drop punching is a method that uses a 12- to 24-inch-diameter steel punch that is repeatedly gravityd:ropped from a barge-mounted crane to create the hole to install a pile.

..

Jr · ;..;'~ · l!lr..

..

Ji#,..

I

! ·-

Ro ute of Effect

---- -

-

SotU"ce Lt>"eJ (Noise generated hr ncthity)

Single-Strike

Injury

Sea Ttutles

Daily Cnmu.Jative Noise Exposure Beba\ioral Response Single-Strike

Injury

Small tooth Sawfish

and Srurgeon

Daily C' wuulative Noise Exposure

Behavioral Response

The best available information on a drop ptmch is a bucket dredge strikiug the sea bottom. The noise produced from the heavy bucket dropped onto the channel bottom was measured to be 124 dB re l ftPa (RMS) at 150 m from the work site (Dickerson et al 1001 ). Back-calculating the noise attenuation 150 m results iu a potential source le,·el of 156 dB re l fl.Pa (RMS).

Th resbold {I'oise leiel rhar csuse~ "

Impacl RAdins

re~lJOllSe)

'.W6 dB (peak pressure) or I 87 dB (sSEL) Threshold levels for uoise sources s 167 dB SEL were not calculated

Possibt.

Spedes Respons.

lhqalnd BMPs muler

Ell'«n Detennia11doa

SAJ-82

0

NIA

0

NIA

160 dB (RMS)

0

NIA

NE

206 dB (peal; pressure) OJ' 187 dB (sSEL)

0

N IA

NE

"Threshold levels for nois e sources 5 167 dB SEL were not calculated

0

NIA

258

BMPPlan A

NE

NE HtvfPPlan A

Disrupted feeding,

150 dB (RMS)

NE

2.Sm (8 ft)

sheltering. pupping. or potential increase in risk to predation

NE. impact radii1s 1s so small that ad\·erse effects are implausible

. t a II a p iie. Au2er: A n aue;er ts usedto creat e th e h oIe t 0 IDS 1.-....... _...

It

~:

~

Route of Effect

Soune Level (Noise generated by activity)

Possible Species Response

Impact Radius

206 dB (peak pressure)

0

NIA

1breshold levels for noise sources :::; 167 dB SEL were not calculated

0

N IA

160 dB (RMS)

0

N IA

NE

206 dB (peak pressure)

0

N IA

NE

1breshold levels for noise sources :::; 16( dB SEL were not calculated

0

N IA

NE

150 dB (RMS)

0

N IA

NE

I

One-second Injmy Exposm·e Sea Tllltles

Daily Cumulative Noise Exposure Behavioral Response One-second Injury Exposure

Smalltooth Sawfish and Sturgeon

Daily Cwnulative Noise Exposure Behavioral Response

Noise levels from small-scale drilling operations that are representative of dock construction methods such as auguring have been measured to be no more than 107 dB 1·e 1 µPa (0-peak) at 7.5 m from the sow·ce (Willis et al. 2010). Olll· backcalculation resulted in an approximate source level no greater than 120 dB re 1 ~tPa (0-peak).

Required BMPs under SAJ-

T hreshold (Noise level that causes a response)

E fferts Determination

82

NE

BMPPlan A

NE

BMPPlan A

259

Vibratory Hammer for Installation of Vinyl Sheet Pile 01· Wood, Concrete, or Metal Piles 13 inches in Diameter or Fewer

1·;;:- -. It

·: ~'

,.r·1. ,

I

~--"'··

Requir ed BMPs UDder SA.J-

Sow-ce Level (Noise generated by acthity)

T b1·eshold (?' oise level that causes a response)

Impact Radius (m)

P ossible Species Response

186 dB (peak pressw-e), 170 dB (SEL)

206 dB (peak pressure)

0

NIA

The source level is adjusted over time to reflect accumulated exposure.

234 dB (cSEL)

0

NIA

Behavioral Response

170 dB (RMS)

160 dB (RMS)

5m (16 ft)

Di<>rupted feeding, sheltering

NLAA

One-second Injury Exposure

186 dB (peak pressure), 170 dB (SEL)

0

NIA

NE

Daily Ctuuulative Noise Expos1ue

The source level is adjusted over time to reflect accumulated exposure.

0

N/A

NE

R oute of Effect

Effects Determination

82

"'

Sea Ttniles

Small tooth Sawfish and Stmgeon

One-second Injw·y Exposure Daily Cumulative Noise Exposure

Behavioral Response

170 dB (RMS)

206 dB (peak

pressure)

234 dB (cSEL)

NE

BMPPlanA

NE

BMPPlanA

150 dB (RMS)

22m (72 ft)

260

Disrupted feeding, sheltering, pupping, or potential increase in risk to predation

NLAA

Vibratory Hammer for Installation of 2 Metal Boatlift I-beams

- ~ --=·,... ,... -

II11';~ -

,.,

[ii

Route of Effect

Source Level (Noise generated by acthity)

Threshold (Noise level that causes a response)

Impact Radius

Possible Species R esponse

One-second Injury Exposme

165 dB (peak pressme), 150 dB (SEL)

206 dB (peak pressme)

0

NIA

Daily Cunmlative Noise Exposure

TI1e source level is adjusted over time to reflect accumulated exposure.

234 dB (cSEL)

0

NIA

Behavioral Response

150 dB (RMS)

160 dB (RMS)

0

NIA

NE

One-second Injury Exposme

165 dB (peak pressure), 150 dB (SEL)

206 dB (peak pressure)

0

NIA

NE

Daily Cumulative Noise Exposure

The source level is adjusted over time to reflect accumulated exposure.

234 dB (cSEL)

0

NIA

Behavioral Response

150 dB (RMS)

150 dB (RMS)

0

NIA

R equired BMPsunder SAJ-82

Effects Determination

- 11?

Sea Turtles

Smalltooth Sawfisli and Sturgeon

261

NE

BMPPlanA

BMPPlan A

NE

NE

NE

Vibratory H ammer for Installation of 24-inch-wide Metal Slteet Pile 1;

Sow·ce Level (Noise generated by activity)

Threshold (Noise leYel t hat causes a response)

Impact Radius

One-second Injmy Exposure

192 dB (peak pressure). 178 dB (SEL)

206 dB (peak pressure)

0

N IA

Daily Cumulative Noise Exposure

The source level is adjusted over time to reflect accumulated exposure.

234 dB (cSEL)

0

N IA

Behavioral Response

178 dB (RMS)

160 dB (RMS)

16 m (52 ft)

Disrupted feeding, sheltering

NLAA

One-second Injtuy Exposure

192 dB (peak pressure), 178 dB (SEL)

206 dB (peak pressure)

0

NIA

NE

Daily Cumulative Noise Exposure

The source level is adjusted over time to reflect a ccumulated exposure.

234 dB (cSEL)

0

N IA

150 dB (RMS)

74 m (243 ft)

Disrupted feeding, Sheltering, pupping, or potential increase in risk to predation

---

11.~~~d -..- . ~

'4

Route of Effect

~

Sea Twtles

Small tooth Sawfi.sh and Sturgeon

Behavioral Response

178 dB (RMS)

P ossible Species Response

R equired BMPs under

Effects Determination

S.AJ-82

262

NE

BMPPlan A

BMPPlan A

NE

NE

NLAA

. h - d"tame ter W 00d Pile I mpac tH ammer I nstllti a a on orv·m y I SheetPile or up t oa 14-me 11'

""'·"

1 ~·

Route of Effect

Source Level (Noise generated by activity)

Threshold (Noise level that causes a response)

Impact Radius

Possible Species Response

SingleStrike Injury

195 dB (peak pressure). 175 dB (sSEL)

206 dB (peak pressure) or 187 dB (sSEL)

0

N IA

Daily Cumulative Noise Exposure

The source level is adjusted for total pile strikes to reflect accumulated exposw·e.

187 dB (cSEL)

1pile=2 m (7 ft). 10 piles= 9 m (30 ft)

Onset of auditory injury

Behavioral Response

185 dB (RMS)

160 dB (RMS)

46m (150 ft)

Disrupted feeding, sheltering

NLAA

SingleStrike Injmy

195 dB (peak pressure) . 175 dB (sSEL)

206 dB (peak pressure) or 187 dB (sSEL)

0

NI A

NE

Daily Cwnulative Noise Exposure

TI1e source level is adjusted for total pile strikes to reflect accumulated exposure.

206 dB (peak pressure) OJ' 187 dB (cSEL)

1 pile= 2 111 (7 ft) . lOpiles = 9 Ill (30 ft)

Onset of auditory illjllly

150 dB (RMS)

215m (705 ft)

Disrupted feeding, sheltering, pupping. or potential increase in risk to predation

rt_

Sea Turtles

Smalltooth Sawfish and Sturgeon

Behavioral Response

185 dB (RMS)

263

Required BMPs under SAJ-82

Effects Determination

NE

BMPPlan A

BMPPlan A

NL.AA

NLAA

NL.AA

. 0 f up to a 2 4-Inc . hd - iarneter c oocrete Pile H a mm er In sta 0!ltiOD

Im

~

.-.:

Route ur Erreel

Smgle-Stri.ke Injury

Doily Cumul ntive Noise Exposlll'e

Source Lenl (Soise generiued by actMty)

200 dB (peak pressure) . 175 dB (sSEL)

The source 1eYel is adjusted for total pile strikes to reflect accumulated eiq)osure.

Thres hold C'\oise leul that causes

11

lmp11cl RadJlll

Possibl· Sptdes RHpoaw

0

NIA

106 dB (peak pressure) or 187 dB (sSEL)

0.tft"miaattoa

B MP Plan A ..L B

I pile =- 5 w ( 15 ft ) 206 dB (peak pressure) or 187 dB (cSEL)

5 piles"" 1-1 m (50 ft)

illjtU)'

-16 w ( 150 ft )

264

NE

NLAA

If the project is located in a confined space, up to S concrete piles may be installed per day.

LO piles= 22 111 (71 ft)

160 dB (RMS)

including:

If the project 1s located in open water. up to 10 concrete piles may be installed Onset of auditory per day.

Sea

I85 dB (Ri"IS)

Dl'Kl'l

DDderS.U'-82

respouse)

Turtles

Beba\1oral Response

JWquiftd BMPs

D isrupted feedmg. sb eItering.

If more than 5 piles IDil be installed in a day. noise abatement measw-es are required for all of the concrete piles mstalled that day with a maximum of 10 piles installed per day.

NLAA

to a 14-incb-diameter Concrete Pile Source Lern

Threshold

~OiSf'

C\oiw- If\ el

generated by 11rthi ty)

that cause" a response)

SingleStnke lnJlU")'

:!00 dB (peak pressure) . l -5 dB (sSEL)

206 dB {peak

Daily Cu111uhlti ve Noise Exposw·e

The source le\'el is adjusted for total pile s trikes to 1·eflect accumulated exposure.

Route or f.'.trecc

Smalhoo1h Saw6sh

pr~e) or

is- dB (sSEL)

I mpart Radiu'

r.sa.a. Sp«iH RMpoew

NA

0

5 piles= 14 Ill (50 ft)

injury

I 0 piles -= 22 m (71 ft)

Stw!leou

185 dB ~fS)

ISO dB (RMSl

115 Ul

c-os

ft)

265

B~fP Plan A including:

+

Eaten

o.c...lllht·tlo·

B

O nset of auditory

.tnd

BewmoraJ Rbpon e

mut.rs.u.a2

NE

If the project is located in open water. up to 10 concrete ptles may be ins talled per day.

1 pile = 5 Ill ( 15 ft)

206 dB (peak pressure) or 187 dB (cSEL)

·quindBMPt

Disrupted feedin,g.. <;hehering. puppUl!!- or potential increase m risk lo p1 edation

If the project is located in a confined space. up to 5 concrete piles may be iru.talled per day. Ifmore than 5 piles v.nl be installed m a day. noise abaterueo1 measures are required for all of the concrete piles installed that d.1y v.ith a maximt Wl of IO piles installed per clay

NLAA

I mpac tHa mmer I nst a IIat"IOll 0 f 2 lVI ea t I B oatr1ft I -b ea ms

u

-

.r::l

......

--¥=

0

Sea Turtles

Small tooth Sawfish and Sturgeon

Requir~d

Route of Effect

Source Level (Noise generated by activity)

Threshold (Noise level that causes a resoonse)

Impact Radius

Possible Species Response

SingleStrike Injury

205 dB (peak pressure). 175 dB (sSEL)

206 dB (peak pressure) or 187 dB (sSEL)

0

NIA

Daily Cumulative Noise Exposure

TI1e somce level is adjusted for total pile strikes to reflect accumulated exposure.*

187 dB (cSEL)

1pile=13 m (43 ft) 2 piles= 20 m (66 ft)*

Onset of auditory injwy

Behavioral Response

190 dB (RMS)*

160 dB (RMS)

lOOm (328 ft)

Disrupted feeding, sheltering

NLAA

SingleStrike Injury

205 dB (peak pressure), 1 75 dB (sSEL)*

206 dB (peak pressure) or 187 dB (sSEL)

0

NIA

NE

Daily Cumulative Noise Exposme

TI1e source level is adjusted for total pile strikes to reflect accumulated exposure.*

206 dB (peak presslU'e) or 187 dB (cSEL)

1pile=13 m (43 ft) 2 piles= 20 Ill (66 ft) *

Onset of auditory injury

150 dB (RMS)

465m (1,525 ft)*

Disrupted feeding. sheltering, pupping, or potential increase in risk to predation

~---

Behavioral Response

190 dB (RMS)*

BMPs unde1· SAJ--82

Effects Determination

NE

BMP Plan

A

BMPPlan

NLAA

NLAA

A

NLAA

*Noise levels not believed to be accurate based on the installation method used. Boatlift I-beams only penetrate loose sediment tmti1 they reach the top of or first few inches of. hard substrate to stabilize the structure on the hard substrate versus penetrating it.

266

act Hammer In taUation of 24-inch-l\ide !\tetnl beet Pile ( '\"'01 unnl\"lt>d under SWPBO) Routt- of Erfttt

Sinttfe- Stnke lnJW")

Dnily Sea Tunic

C1u11111ntive Noise Expo!>ure

Source U>~l (Soise generated by

Thno~hold

:iicthitY

(Soise le\PI 1Juu ciu1se'i A ttS oose

:no dB (peak pressure). 19-t dB (sSEL}

206 dB (peak pressure) or 187 dB {sSEL)

The source level is adjusted for total p ile strikes to reflect

206 dB (penk press1u·e) or 187 dB (cSEL)

Rnpoaw

B.\IP.i

_.r

S.\J-12

9m (30 ft)

Physical or auditory lllJUfY

LAA

(73 1 fl) On,c;et of auditory injury

10 pile~ = 8.58 Ol (2.81.5 ft)

e~i><>sure.

20-t dB (RMS)

, . . . . . SpKits

I pile = 223 Ill

8CC\W1Ulated

Belia\!toral Response

Reqldnd

Impart RAdJu'

160dB (RMS)

18.5 m (601 ft)

267

Disrupted feeding or shehering. poteruial increase m risk to predauon. potential ehered reproduction (mating and acce5£ to 11e:.tmg beachel>). po1enuaJ for noiserelated mjury if species remaw in impact radius

Not analyzed onder SAJ82

LAA

NL.AA or LAA dependm~ on the localton and tin1e of year

act Hammer Io-,tnUatioo of 24-inch-wide Metal beet Pile (~01 uonhpurl under S\YPBO) Soune U'f°el Roufe of

~Oise

E(ff(f

generated by acrhitY

Sw1deSmke lnJury

Daily C1111111l11tive Smolllooth

Noi~e

Sawlish aud

Exposure

Srurgeon

~:10

dB (peak pressure). 194 dB (sSEL)

The source level is adjusted for total pile strikes to reflect accumulated

ex

Beh:l\1oral Rel.pouse

Thre\hold le\el

~oise

tJuU CllllWS

n

E&d(1)to

IUdiu~

Rf.spoase

btdhidaal

Phyr;.1cal or mulitory mjury

Temporary a.-oidance of area and potennal noise-related injuries

0 11set of audito

Temporary avoidance of area and potential noise-related injuries

9 m (J0 ft)

1 pt.le = 206 dB (peok

223 m (731 fi )

pressure) or 187 dB (cSEL)

10 piles= 858 Ill (2.S 1.5 ft)

ure.

'.!0-l dB (RMS)

~. . . Sptrift

res oose 1.06 dB (peal pressure) 01 187 dB (sSEL)

150dB lRMSl

......

~

lmp11rf

858 sn {2.8 15 ft)

·A.J-ll ·r

Not

Elf"h O.tttada.adoll

LAA

annlyzed under SAJ-

81 Disrupted feeding or :J1ehenn~. pupping_. potcnnal wc::rease in n k Lo predation. potential for noiserelated mjury if species ttmalll 'i ID impact radms

268

BMh

Temporary a\·01da:ncc of area and

potential noise-related injunes

NlAAorLAA depend in 2 OU the local!OO and tune of year

16.1 Noise Best Management Practices (BMPs) for SWPBO The following best management practices key is for reducing the exposure to sea turtles, smalltooth sawfish, and sturgeon to potential harmful daily noise exposure levels associated with pile driving during dock and seawall construction activities. 16.1.1 Noise BMP Plan A: Sea Turtle, Smalltooth Sawfish, and Sturgeon Construction Conditions The permittee shall comply with the following protected species construction conditions: a. All construction personnel are responsible for observing water-related activities to detect the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing species protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which protected species cannot become entangled, be properly secured, and be regularly monitored to avoid protected species' entrapment. Barriers may not block protected species entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg, Florida. d. If a protected species is seen within 100 yd of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 ft of a protected species. Operation of any mechanical construction equipment shall cease immediately if a protected species is seen within a 50 ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. e. Any injury to a protected species shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. f. All work must occur during daylight hours. 16.1.2 Noise BMP Plan B: Impact Pile-Driving Construction Conditions for the Installation of 6 or More Concrete Piles per Day 1. The permittee shall follow all conditions defined in the Noise BMP Plan A above plus the conditions provided below:

269

2. It must be determined if the project occurs in open water or a confined space. This differentiation is important because if a project occurs in a confined space, an animal may not move through or past a noise source to escape it. A confined space is defined as any area that has a solid object (e.g., shoreline, seawall, jetty) or structure within 150 feet (ft) of the pile installation site that would effectively serve as a barrier or otherwise prevent animals from moving past it to exit the area. This does not include objects such as docks or other pile-supported structures that would not stop animal movement or significantly reflect noise. 3. If the project is located in open water, up to 10 concrete piles measuring up to 24-in diameter may be installed per day. 4. If the project is located in a confined space, up to 5 concrete piles measuring up to 24-in diameter may be installed per day. If more than 5 piles will be installed in a day, noise abatement measures are required for all of the concrete piles installed that day with a maximum of 10 piles installed per day. Noise Abatement Measures: Approved noise abatement measures include noise attenuation piles (TNAP) and/or bubble curtains. The TNAP design must be constructed of a double-walled tubular casing (a casing within a larger casing), with at least a 5-in wide hollow space completely filled with closed-cell foam or other noise dampening material between the walls. The TNAP must be long enough to be seated firmly on the sea bottom, fit over the pile being driven, and extend at least 3 ft above the surface of the water. The bubble curtain design must adhere to the guidelines for unconfined and confined bubble curtains defined below, and be followed as detailed in the USACE permit application. The use of any other alternative noise control method must receive prior approval by NMFS and the USACE. If the required noise abatement measure discussed above cannot be used, then the pile must be installed by a different method using the appropriate noise BMPs defined in this Opinion (e.g., concrete piles may be installed by vibratory hammer instead, following BMP Plan A). 16.1.3 Bubble Curtain Specifications for Pile Driving When using an impact hammer to drive or proof concrete piles, use one of the following sound attenuation methods: 1) If water velocity is equal to or less than 1.6 ft per second (1.1 miles per hour) for the entire installation period, surround the pile being driven by a confined or unconfined bubble curtain that will distribute small air bubbles around 100% of the pile perimeter for the full depth of the water column. a) General - An unconfined bubble curtain is composed of an air compressor(s), supply lines to deliver the air, distribution manifolds or headers, perforated 270

aeration pipe, and a frame. The frame facilitates transport and placement of the system, keeps the aeration pipes stable, and provides ballast to counteract the buoyancy of the aeration pipes in operation. b) The aeration pipe system shall consist of multiple layers of perforated pipe rings, stacked vertically in accordance with the following: Water Depth (m) 0 to less than 5 5 to less than 10 10 to less than 15 15 to less than 20 20 to less than 25

No. of Layers 2 4 7 10 13

c) The pipes in all layers shall be arranged in a geometric pattern which shall allow for the pile being driven to be completely enclosed by bubbles for the full depth of the water column and with a radial dimension such that the rings are no more than 0.5 m from the outside surface of the pile. i.

The lowest layer of perforated aeration pipe shall be designed to ensure contact with the substrate without burial and shall accommodate sloped conditions.

ii.

Air holes shall be 1.6 millimeter (mm) (1/16-in) in diameter and shall be spaced approximately 20 mm (3/4 in) apart. Air holes with this size and spacing shall be placed in 4 adjacent rows along the pipe to provide uniform bubble flux.

iii.

The system shall provide a bubble flux 3.0 m³ per minute per linear meter of pipe in each layer (32.91 ft³ per minute per lin ft of pipe in each layer). The total volume of air per layer is the product of the bubble flux and the circumference of the ring: V = 3.0 m³/min/m * Circumference of the aeration ring in m t

or V = 32.91 ft³/min/ft * Circumference of the aeration ring in ft t

iv.

Meters shall be provided as follows: x

Pressure meters shall be installed at all inlets to aeration pipelines and at points of lowest pressure in each branch of the aeration pipeline.

271

x

Flow meters shall be installed in the main line at each compressor and at each branch of the aeration pipelines at each inlet. In applications where the feed line from the compressor is continuous from the compressor to the aeration pipe inlet, the flow meter at the compressor can be eliminated. Flow meters shall be installed according to the manufacturer's recommendation based on either laminar flow or non-laminar flow.

2) If water velocity is greater than 1.6 ft per second (1.1 miles per hour) at any point during installation or if constructing a seawall, surround the pile or area being driven by a confined bubble curtain (e.g., a bubble ring surrounded by a fabric or non-metallic sleeve). The confined bubble curtain will distribute air bubbles around 100% of the pile perimeter for the full depth of the water column, according to specifications below. a) General - A confined bubble curtain is composed of an air compressor(s), supply lines to deliver the air, distribution manifolds or headers, perforated aeration pipe(s), and a means of confining the bubbles. b) The confinement shall extend from the substrate to a sufficient elevation above the maximum water level expected during pile installation such that when the air delivery system is adjusted properly, the bubble curtain does not act as a water pump (i.e., little or no water should be pumped out of the top of the confinement system). c) The confinement shall contain resilient pile guides that prevent the pile and the confinement from coming into contact with each other and do not transmit vibrations to the confinement sleeve and into the water column (e.g., rubber spacers, air-filled cushions). d) In-water less than 15 m deep, the system shall have a single aeration ring at the substrate level. In-waters greater than 15 m deep, the system shall have at least 2 rings: 1 at the substrate level and the other at mid-depth. e) The lowest layer of perforated aeration pipe shall be designed to ensure contact with the substrate without sinking into the substrate and shall accommodate for sloped conditions. f) Air holes shall be 1.6 mm (1/16-in) in diameter and shall be spaced approximately 20 mm (3/4 in) apart. Air holes with this size and spacing shall be placed in 4 adjacent rows along the pipe to provide uniform bubble flux. 272

g) The system shall provide a bubble flux of 2.0 m³ per minute per linear meter of pipe in each layer (21.53 ft³ per minute per lin ft of pipe in each layer). The total volume of air per layer is the product of the bubble flux and the circumference of the ring: Vt = 2.0 m3/min/m * Circumference of the aeration ring in m or Vt = 21.53 ft3/min/ft * Circumference of the aeration ring in ft

(h) Flow meters shall be provided as follows: i.

Pressure meters shall be installed at all inlets to aeration pipelines and at points of lowest pressure in each branch of the aeration pipeline.

ii.

Flow meters shall be installed in the main line at each compressor and at each branch of the aeration pipelines at each inlet. In applications where the feed line from the compressor is continuous from the compressor to the aeration pipe inlet, the flow meter at the compressor can be eliminated.

iii.

Flow meters shall be installed according to the manufacturer's recommendation based on either laminar flow or non-laminar flow.

273

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas