Programmatic General Permit SAJ-91.
BULKHEADS AND BACKFILL, AERIAL TRANSMISSION LINES, SUBAQUEOUS UTILITY AND TRANSMISSION LINES, PRIVATE SINGLE-FAMILY DOCKS AND APPURTENANCES, MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS, AND STORMWATER OUTFALLS LOCATED WITHIN THE CITY OF CAPE CORAL, LEE COUNTY, FLORIDA.
BACKGROUND: In order to simplify and speed processing of Department of the Army permits, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued the above programmatic general permit on February 28, 2013 for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located within the City of Cape Coral, Lee County, Florida. During the time period of February 28, 2008 through the date of this public notice, the City of Cape Coral has reviewed the SAJ-91 approximately 1,033 times.
PROPOSAL: The above-listed general permit is under review for the purposes of updating and reissuance. The permit has been revised to include the Project Design Criteria (PDCs) as contained in the draft Jacksonville Biological Opinion (Opinion), as well as provide the species names for mangroves that are prohibited from removal. A draft of the general permit as proposed for reissuance follows:
DEPARTMENT OF THE ARMY
PROGRAMMATIC GENERAL PERMIT SAJ-91
Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act, general authority is hereby given to the City of Cape Coral to administer this permit for bulkheads, backfill and riprap revetments, aerial transmission lines, subaqueous utility and transmission lines, private single-family docks and appurtenances, private single-family docks and appurtenances, other minor structures, and storm water outfalls located in waters of the United States within the City of Cape Coral, Lee County, Florida (Attachment 1). This permit does not authorize any work or structure within the Caloosahatchee River, Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth sawfish limited exclusion zones (Attachment 2).
This programmatic general permit is subject to the following conditions:
A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL CANALS
1. The work herein authorized includes the construction, repair or maintenance of seawalls (bulkheads) and associated backfill in residential canals.
2. The seawall shall not exceed 500 feet in length and not extend any farther waterward than 18” from the existing seawall or Mean High Water Line (MHWL) and shall connect with adjacent seawalls to the maximum extent practicable.
3. The backfill must be from upland sources and consist of suitable clean fill material free from toxic pollutants in other than trace quantities. The amount of backfill shall not exceed one (1) cubic yard per running foot below the plane of the MHWL.
4. This permit does not authorize any filling, except for backfill behind the seawall. New riprap may be placed at the toe of the existing or replacement seawall when the toe of the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement riprap can only be added within the same footprint of existing riprap (i.e. no waterward expansion or lateral expansion of riprap beyond the previous footprint) in depths less than or equal to -3 feet MLLW.
5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)].
6. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
B. CONDITIONS FOR AERIAL TRANSMISSION LINES:
1. The work herein authorized includes the installation of aerial transmission lines and associated structures.
2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does not apply in the case of a lift bridge. Minimum clearance for lift bridges will be determined on a case-by-case basis.
a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as established by the U.S. Coast Guard (USCG). In the event the USCG has not established a bridge clearance, minimum vertical clearances for power and aerials lines will not be less than required by Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2.
b. The minimum clearance* for an aerial line, transmitting electrical power, is based on the low point of the line under conditions that produce the greatest sag, taking consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line crossing navigable waters of the U.S. shall be governed by the system voltage, as indicated below:
Nominal System Minimum Clearance
Voltage, kilovoltAbove Bridge Clearance (as established by the USCG)
115 and below20 feet
138 22
161 24
230 26
350 30
500 35
700 42
750-765 45
*NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to underside of the bridge, and the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge.
c. On navigable waters of the U.S., including all federal navigation project, whether there is no bridge for reference for minimum clearance, the proposed project will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the minimum clearance between the line and MHW necessary to protect navigational interests.
3. The construction of aerial transmission lines does not involve the dredging or filling of navigable waters or waters of the United States.
4. Where the proposed aerial transmission line is to be installed in navigable waters of the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office writing that the work is commencing, and again upon completion of the work. The permittee shall notify the District Engineer at the letterhead address, attention Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov. This notification will include “As-Built plans” signed by a registered surveyor/engineer licensed in the State of Florida, that certify the project is constructed as authorized and must include an accurate (within plus or minus 1 foot) depiction of the location and configuration of the completed activity in relation to the MHW of the navigable water.
5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in areas where the essential features are present.
6. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit.
7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES:
1. The work herein authorized includes the installation and maintenance of subaqueous utility and transmission lines placed on, under or embedded in the bottom of navigable waters of the United States within the City of Cape Coral. The installation of utility and transmission lines by directional bore is authorized if the drilling originates and terminates on the uplands (i.e. no in-water work). The permittee must provide the City of Cape Coral with a frac-out contingency plan prior to verification of this General Permit (Attachment 3)
2. Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the water (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled on non-wetland areas.
3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet below the bottom contour of any water of the U.S. The 6-foot criterion applies to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing.
4. Subaqueous utility and transmission lines may be installed (including as part of a repair/replacement project) by trenching. When excavating the trench, the bottom sediments may be temporarily sidecast into areas devoid of submerged aquatic vegetation and mangroves. Immediately upon completing the excavation and placing the transmission or utility line into the trench, the trench must be filled and the bottom contours must be restored to pre-construction conditions.
5. New subaqueous transmission and utility lines cannot be placed on the canal substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines may be repaired or replaced above the substrate by pinning or anchoring the new section of line in place to ensure that it does not move and damage surrounding seagrasses and mangrove habitat.
6. When repairing existing transmission or utility lines, riprap and articulated mats may be placed on subaqueous lines that are buried in trenches or on lines that are attached to the substrate (in accordance with special condition #3 above) to stabilize the line. Riprap and articulated mats may also be used to stabilize new subaqueous lines placed in high erosion areas. These stabilization materials are limited to the minimum amount necessary to stabilize and protect the lines existing lines (which may have been exposed by scouring) and cannot be placed on seagrasses or mangrove habitat.
7. The permittee will install signs at the shoreline to notify navigational interests of the location of subaqueous utility and transmission lines.
8. The permittee shall defend and hold the U.S. Government harmless from any and all claims by reason of the placement and installation of the transmission lines authorized by this permit.
9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES:
1. Structures authorized under this general permit are private single-family piers not to exceed 4 slips. This would include normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways, mooring piles, dolphins, and maintenance of these appurtenances. Upland-cut boat slips are not authorized by this general permit.
2. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited.
3. No living, fueling, or storage facilities over navigable waters of the United States are authorized under this general permit.
4. The structure shall be consistent with other structures in the area.
5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should be avoided.
6. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.
7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia racemosa)].
8. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee’s expense on authorized facilities in navigable waters of the United States.
9. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY DOCKS:
1. The work herein authorized will be for minor structures to include:
a. Single mooring piles;
b. Small mooring dolphins (limited to one cluster of 4 or fewer pilings);
c. Non-commercial information signage;
d. Boat lifts, hoists, davits; and,
e. Other minor structures that would have less environmental impact than a small dock.
2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should be avoided.
3. Project construction will take place from uplands or from floating equipment (e.g. barge); prop or wheel-washing is prohibited.
4. A structure which by its size or location may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall not be authorized by this general permit.
5. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
F. CONDITIONS FOR STORM WATER OUTFALLS:
1. Structures authorized under this general permit are storm water outfalls and appurtenances.
2. Authorization is contingent upon issuance of lawfully required National Pollutant Discharge Elimination System permits (Section 402 of the Clean Water Act) from the U.S. Environmental Protection Agency, Florida Department of Environmental Protection, State Water Management District, or their legally authorized delegate.
3. This general permit authorizes dredging at storm water outfalls. Maintenance dredging is authorized as long as it within the previously authorized dredge foot print and to the previously USACE authorized depth. No additional dredging is authorized under this general permit other than that which would be necessary to restore the discharge structure to its original permitted excavated depth. In addition, if only shallow euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of all red mangrove prop roots. Muck dredging (dredging or removal of accumulated organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW).
4. Excavated spoil material shall be deposited at self-contained upland areas that will prevent spoil material and/or return water from reentering any water of the United States (including wetlands) or interfering with natural drainage.
5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches, but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be placed on the accessible end(s) to restrict manatee access. The installation of grates applies to submerged or partially submerged pipes and culverts reasonably accessible to manatees.
6. All outfall discharge shall be designed and implemented to prevent erosion and scour.
7. In addition to the above conditions, the permittee must abide by all of the Special Conditions in Part G (“Special Conditions for All Work) and the attached General Conditions. These Special and General conditions are applicable to all structures and/or work authorized under this general permit.
G. SPECIAL CONDITIONS FOR ALL WORK:
1. No activities (Activities A-F above) are authorized within the smalltooth sawfish limited exclusion zones (Attachment 2).
2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4).
3. All project involving the installation of piles or sheet piles shall follow the PDCs for In-Water Noise from Pile and Sheet Pile Installation (Attachment 5).
4. All activities must be completed during daylight hours.
5. No work shall be performed until the permittee submits satisfactory plans, and surveys, if necessary, for the proposed activity and receives written authorization from the City of Cape Coral. (For example: Vegetation surveys which clearly depict what type of vegetation is present on the site, including mangrove species, location of the Mean High Water Line, and the location of wetlands and uplands.)
6. The work authorized herein is limited to existing canals within the City of Cape Coral and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve, smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways.
7. No activity shall be authorized under this general permit that may adversely affect water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or submerged aquatic vegetation.
9. No work shall be performed until after the permittee provides notification to the owner(s) or operator(s) of any marked utilities in the work area.
10. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant’s/Permittee’s behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://www.cr.nps.gov/nr/research/.
If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7.
In the unlikely event that human remains are identified, they will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, the State Archaeologist (850-245-6444), and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps.
11. Conformance with descriptions and quantities contained herein does not necessarily guarantee authorization under this general permit and the District Engineer reserves the right to evaluate any proposed work in waters of the United States as a Standard Permit.
12. Any structure or work authorized under this general permit must not interfere with general navigation.
13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key entitled “The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida – March 2011”, will be used to determine potential manatee impacts. Projects judged as a “may affect” to the manatee are not authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife Service by the Corps in accordance with the Endangered Species Act. Projects judged as a “may affect not likely to adversely affect” must follow all additional, specific conditions related to the pertinent activities as outlined in the Key and its associated maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.
14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the “Standard Manatee Conditions for In-Water Work, 2011” (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/Manatee/2011_StandardConditionsForIn-waterWork.pdf)
15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha Pass Aquatic Preserve, the permittee will utilize the “Sea Turtle and Smalltooth Sawfish Construction Conditions” (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/sea_turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate for the proposed activity. Note: These conditions may be subject to revision at any time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application.
16. Turbidity control measures will be used to control water quality and the work must be in accordance with State Water Quality Standards as outlined in Florida Statute 62.302. Turbidity control measures may include but are not limited to, turbidity control curtains, the exclusive use of suction dredging, the exclusive use of closed “clam shell” dredging, or any other technique necessary to reduce turbidity to no more than background turbidity. The Florida Department of Environmental Protection (FDEP) may require the applicant to submit a daily turbidity report which may be verified by state or local government inspectors.
17. No activity shall be authorized under this general permit which is likely to adversely affect a Federally-listed threatened or endangered species or a species proposed for such designation, or destroy or adversely modify its designated critical habitat.
19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise
Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the
installation of metal or sheet piles installed by impact hammer. They also require the
use of noise abatement measures if 5 or more concrete piles are installed by impact
hammer in a confined space as defined in Appendix C. No project shall be authorized
that results in noise in excess of the established thresholds for physical injury (single
strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic,
Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic
surveys, low frequency sonar, explosions, and seismic air guns typically towed
underwater by vessels to locate oil and gas deposits.
20. This PGP does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species.
21. Activities qualifying for this programmatic general permit (PGP) must be authorized by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any authorization required to use or occupy state-owned submerged lands (SSL) under Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the Department of Environmental Protection, a water management district under s. 373.069, F.S., or a local government with delegated authority under s. 373.441, F.S., will provide the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone Consistency Concurrence (CZCC). WQC is waived for activities authorized under this PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as
applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or any designated Federal, State, or local agency administering general permits on behalf of the Corps under shall not be precluded from acting on a request to use this PGP before the applicable SSL authorization is granted.
22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable state lands authorizations under Chapter 253 of the Florida Statutes must be obtained from the State of Florida, the South Florida Water Management District (SFWMD), FDEP, or their authorized representatives, as appropriate.
23. For projects authorized under this permit in navigable waters of the U.S., the permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
24. This programmatic general permit will be valid for a period of 5 years from the date specified above unless suspended or revoked by the District Engineer prior to that date. If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization of activities that have commenced or are under contract to commence in reliance on SAJ-91 will remain in effect provided the activity is completed with 12 months of the date SAJ-91 expired or was revoked.
25. The General conditions attached hereto are made a part of this permit and must be attached to all authorizations processed under this permit.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341.
COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this permit is being coordinated via separate letter with the Florida Department of Environmental Protection (DEP) in accordance with the Coastal Zone Management Act, 16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart C.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being coordinated via separate letters with the U.S. Fish and Wildlife Service as required under Section 7 of the Endangered Species Act, and with the National Marine Fisheries Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery Conservation and Management Act. Additionally, the proposed reissuance of this permit is being coordinated with the Environmental Protection Agency under Section 404 of the Clean Water Act.
RESPONSE: Comments regarding the proposed reissuance of this Programmatic General Permit SAJ-91 should be submitted in writing to the District Engineer at the above address within 45 days from the date of this notice. The permit will be reissued without further notice if no adverse comments are received. If you have any questions concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead address or by electronic mail at Brianne.E.McGuffie@usace.army.mil.
GENERAL CONDITIONS
1. The time limit for completing the work authorized ends on ______________
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of this authorization.
6. You must allow a representative from the Corps or its delegated authority to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal
projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this permit verification is not contrary to the public interest was made in reliance on the information you provided.
5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision on this permit verification at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in reaching
the original public interest decision.
Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified .in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
1520 ROYAL PALM SQUARE BOULEVARD, SUITE 310
FORT MYERS, FLORIDA 33919
REPLY TO
ATTENTION OF
September 25, 2017
Regulatory Division
Fort Myers Permits Section
PUBLIC NOTICE
Programmatic General Permit SAJ-91
SAJ-2005-08775 (BEM)
BULKHEADS AND BACKFILL, AERIAL TRANSMISSION LINES, SUBAQUEOUS
UTILITY AND TRANSMISSION LINES, PRIVATE SINGLE-FAMILY DOCKS AND
APPURTENANCES, MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY
DOCKS, AND STORMWATER OUTFALLS LOCATED WITHIN THE CITY OF CAPE
CORAL, LEE COUNTY, FLORIDA.
BACKGROUND: In order to simplify and speed processing of Department of the Army
permits, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued the
above programmatic general permit on February 28, 2013 for bulkheads, backfill and
riprap revetments, aerial transmission lines, subaqueous utility and transmission lines,
private single-family docks and appurtenances, private single-family docks and
appurtenances, other minor structures, and storm water outfalls located within the City
of Cape Coral, Lee County, Florida. During the time period of February 28, 2008
through the date of this public notice, the City of Cape Coral has reviewed the SAJ-91
approximately 1,033 times.
PROPOSAL: The above-listed general permit is under review for the purposes of
updating and reissuance. The permit has been revised to include the Project Design
Criteria (PDCs) as contained in the draft Jacksonville Biological Opinion (Opinion), as
well as provide the species names for mangroves that are prohibited from removal. A
draft of the general permit as proposed for reissuance follows:
DEPARTMENT OF THE ARMY
PROGRAMMATIC GENERAL PERMIT SAJ-91
Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers
and Harbors Act of 1899 and Section 404 of the Clean Water Act, general authority is
hereby given to the City of Cape Coral to administer this permit for bulkheads, backfill
and riprap revetments, aerial transmission lines, subaqueous utility and transmission
lines, private single-family docks and appurtenances, private single-family docks and
appurtenances, other minor structures, and storm water outfalls located in waters of the
United States within the City of Cape Coral, Lee County, Florida (Attachment 1). This
permit does not authorize any work or structure within the Caloosahatchee River,
Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth
sawfish limited exclusion zones (Attachment 2).
This programmatic general permit is subject to the following conditions:
A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL
CANALS
1. The work herein authorized includes the construction, repair or maintenance of
seawalls (bulkheads) and associated backfill in residential canals.
2. The seawall shall not exceed 500 feet in length and not extend any farther
waterward than 18" from the existing seawall or Mean High Water Line (MHWL) and
shall connect with adjacent seawalls to the maximum extent practicable.
3. The backfill must be from upland sources and consist of suitable clean fill material
free from toxic pollutants in other than trace quantities. The amount of backfill shall not
exceed one (1) cubic yard per running foot below the plane of the MHWL.
4. This permit does not authorize any filling, except for backfill behind the seawall. New
riprap may be placed at the toe of the existing or replacement seawall when the toe of
the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement
riprap can only be added within the same footprint of existing riprap (i.e. no waterward
expansion or lateral expansion of riprap beyond the previous footprint) in depths less
than or equal to -3 feet MLLW.
5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora
mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia
racemosa)].
6. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
B. CONDITIONS FOR AERIAL TRANSMISSION LINES:
1. The work herein authorized includes the installation of aerial transmission lines and
associated structures.
2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance
criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does
not apply in the case of a lift bridge. Minimum clearance for lift bridges will be
determined on a case-by-case basis.
2
a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or
any lines not transmitting electrical power, will be ten (10) feet above the clearance
required for nearby stationary bridges as established by the U.S. Coast Guard (USCG).
In the event the USCG has not established a bridge clearance, minimum vertical
clearances for power and aerials lines will not be less than required by Section 23, Rule
232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances
will not be less than shown in Table 232-1, Item 7, ANSI C2.
b. The minimum clearance* for an aerial line, transmitting electrical power, is
based on the low point of the line under conditions that produce the greatest sag, taking
consideration temperature, load, wind, length or span and the type of supports. The
minimum clearance for an aerial electrical power transmission line crossing navigable
waters of the U.S. shall be governed by the system voltage, as indicated below:
Nominal System
Voltage, kilovolt
Minimum Clearance
Above Bridge Clearance (as established by the USCG)
115 and below
138
161
230
350
500
700
750-765
20 feet
22
24
26
30
35
42
45
*NOTE: Minimum clearance is the distance measured between the lowest point of a
stationary bridge, including any infrastructure attached to underside of the bridge, and
the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge.
c. On navigable waters of the U.S., including all federal navigation project,
whether there is no bridge for reference for minimum clearance, the proposed project
will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the
minimum clearance between the line and MHW necessary to protect navigational
interests.
3. The construction of aerial transmission lines does not involve the dredging or filling
of navigable waters or waters of the United States.
4. Where the proposed aerial transmission line is to be installed in navigable waters of
the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must
notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office
writing that the work is commencing, and again upon completion of the work. The
permittee shall notify the District Engineer at the letterhead address, attention
Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315
East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov.
3
This notification will include "As-Built plans" signed by a registered surveyor/engineer
licensed in the State of Florida, that certify the project is constructed as authorized and
must include an accurate (within plus or minus 1 foot) depiction of the location and
configuration of the completed activity in relation to the MHW of the navigable water.
5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in
areas where the essential features are present.
6. The permittee shall defend and hold the U.S. Government harmless from any and all
claims by reason of the placement and installation of the transmission lines authorized
by this permit.
7. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES:
1. The work herein authorized includes the installation and maintenance of subaqueous
utility and transmission lines placed on, under or embedded in the bottom of navigable
waters of the United States within the City of Cape Coral. The installation of utility and
transmission lines by directional bore is authorized if the drilling originates and
terminates on the uplands (i.e. no in-water work). The permittee must provide the City
of Cape Coral with a frac-out contingency plan prior to verification of this General Permit
(Attachment 3)
2. Directional boring vaults, junction boxes, and/or pads will not be constructed within
50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling
pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be
set back from the water (river/stream) bank by a minimum of 50 feet. Excavated
materials and drilling mud must be stockpiled on non-wetland areas.
3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet
below the bottom contour of any water of the U.S. The 6-foot criterion applies to the
entire authorized width of the crossing, plus a minimum of 10 feet on each side of the
crossing.
4. Subaqueous utility and transmission lines may be installed (including as part of a
repair/replacement project) by trenching. When excavating the trench, the bottom
sediments may be temporarily sidecast into areas devoid of submerged aquatic
vegetation and mangroves. Immediately upon completing the excavation and placing
the transmission or utility line into the trench, the trench must be filled and the bottom
contours must be restored to pre-construction conditions.
4
5. New subaqueous transmission and utility lines cannot be placed on the canal
substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines
may be repaired or replaced above the substrate by pinning or anchoring the new
section of line in place to ensure that it does not move and damage surrounding
seagrasses and mangrove habitat.
6. When repairing existing transmission or utility lines, riprap and articulated mats may
be placed on subaqueous lines that are buried in trenches or on lines that are attached
to the substrate (in accordance with special condition #3 above) to stabilize the line.
Riprap and articulated mats may also be used to stabilize new subaqueous lines placed
in high erosion areas. These stabilization materials are limited to the minimum amount
necessary to stabilize and protect the lines existing lines (which may have been
exposed by scouring) and cannot be placed on seagrasses or mangrove habitat.
7. The permittee will install signs at the shoreline to notify navigational interests of the
location of subaqueous utility and transmission lines.
8. The permittee shall defend and hold the U.S. Government harmless from any and all
claims by reason of the placement and installation of the transmission lines authorized
by this permit.
9. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES:
1. Structures authorized under this general permit are private single-family piers not to
exceed 4 slips. This would include normal appurtenances such as boat hoists, boat
shelters with open sides, stairways, walkways, mooring piles, dolphins, and
maintenance of these appurtenances. Upland-cut boat slips are not authorized by this
general permit.
2. Project construction will take place from uplands or from floating equipment (e.g.
barge); prop or wheel-washing is prohibited.
3. No living, fueling, or storage facilities over navigable waters of the United States are
authorized under this general permit.
4. The structure shall be consistent with other structures in the area.
5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should
be avoided.
5
6. A structure which by its size or location may adversely affect water quality, fish and
wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall
not be authorized by this general permit.
7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora
mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia
racemosa)].
8. No activity may cause more than a minimal adverse effect on navigation. Any safety
lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise,
must be installed and maintained at the permittee's expense on authorized facilities in
navigable waters of the United States.
9. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY
DOCKS:
1. The work herein authorized will be for minor structures to include:
a. Single mooring piles;
b. Small mooring dolphins (limited to one cluster of 4 or fewer
pilings);
c. Non-commercial information signage;
d. Boat lifts, hoists, davits; and,
e. Other minor structures that would have less environmental impact than
a small dock.
2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should
be avoided.
3. Project construction will take place from uplands or from floating equipment (e.g.
barge); prop or wheel-washing is prohibited.
4. A structure which by its size or location may adversely affect water quality, fish and
wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall
not be authorized by this general permit.
6
5. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
F. CONDITIONS FOR STORM WATER OUTFALLS:
1. Structures authorized under this general permit are storm water outfalls and
appurtenances.
2. Authorization is contingent upon issuance of lawfully required National Pollutant
Discharge Elimination System permits (Section 402 of the Clean Water Act) from the
U.S. Environmental Protection Agency, Florida Department of Environmental Protection,
State Water Management District, or their legally authorized delegate.
3. This general permit authorizes dredging at storm water outfalls. Maintenance
dredging is authorized as long as it within the previously authorized dredge foot print
and to the previously USACE authorized depth. No additional dredging is authorized
under this general permit other than that which would be necessary to restore the
discharge structure to its original permitted excavated depth. In addition, if only shallow
euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no
mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red
mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of
all red mangrove prop roots. Muck dredging (dredging or removal of accumulated
organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW).
4. Excavated spoil material shall be deposited at self-contained upland areas that will
prevent spoil material and/or return water from reentering any water of the United States
(including wetlands) or interfering with natural drainage.
5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic
Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and
drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches,
but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be
placed on the accessible end(s) to restrict manatee access. The installation of grates
applies to submerged or partially submerged pipes and culverts reasonably accessible
to manatees.
6. All outfall discharge shall be designed and implemented to prevent erosion and
scour.
7. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
7
G. SPECIAL CONDITIONS FOR ALL WORK:
1. No activities (Activities A-F above) are authorized within the smalltooth sawfish
limited exclusion zones (Attachment 2).
2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4).
3. All project involving the installation of piles or sheet piles shall follow the PDCs for
In-Water Noise from Pile and Sheet Pile Installation (Attachment 5).
4. All activities must be completed during daylight hours.
5. No work shall be performed until the permittee submits satisfactory plans, and
surveys, if necessary, for the proposed activity and receives written authorization from
the City of Cape Coral. (For example: Vegetation surveys which clearly depict what
type of vegetation is present on the site, including mangrove species, location of the
Mean High Water Line, and the location of wetlands and uplands.)
6. The work authorized herein is limited to existing canals within the City of Cape Coral
and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve,
smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways.
7. No activity shall be authorized under this general permit that may adversely affect
water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or
submerged aquatic vegetation.
9. No work shall be performed until after the permittee provides notification to the
owner(s) or operator(s) of any marked utilities in the work area.
10. No structure or work shall adversely affect or disturb properties listed in the
National Register of Historic Places or those eligible for inclusion in the National
Register. Prior to the start of work, the Applicant/Permittee or other party on the
Applicant's/Permittee's behalf, shall conduct a search of known historical properties by
contracting a professional archaeologist, contacting the Florida Master Site File at 850245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites
in the National Register Information System (NRIS). Information can be found at
http://www.cr.nps.gov/nr/research/.
If, during the initial ground disturbing activities and construction work, there are
archaeological/cultural materials unearthed (which shall include, but not be limited to:
pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal
implements, dugout canoes or any other physical remains that could be associated with
8
Native American cultures or early colonial or American settlement), the permittee shall
immediately stop all work in the vicinity and notify the Compliance and Review staff of
the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory
Project Manager to assess the significance of the discovery and devise appropriate
actions, including salvage operations. Based, on the circumstances of the discovery,
equity to all parties, and considerations of the public interest, the Corps may modify,
suspend or revoke the permit in accordance with 33 CFR Part 325.7.
In the unlikely event that human remains are identified, they will be treated in
accordance with Section 872.05, Florida Statutes; all work in the vicinity shall
immediately cease and the local law authority, the State Archaeologist (850-245-6444),
and the Corps Regulatory Project Manager shall immediately be notified. Such activity
shall not resume unless specifically authorized by the State Archaeologist and the
Corps.
11. Conformance with descriptions and quantities contained herein does not
necessarily guarantee authorization under this general permit and the District Engineer
reserves the right to evaluate any proposed work in waters of the United States as a
Standard Permit.
12. Any structure or work authorized under this general permit must not interfere with
general navigation.
13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key
entitled "The Corps of Engineers, Jacksonville District, and the State of Florida Effect
Determination Key for the Manatee in Florida March 2011", will be used to determine
potential manatee impacts. Projects judged as a "may affect" to the manatee are not
authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife
Service by the Corps in accordance with the Endangered Species Act. Projects judged
as a "may affect not likely to adversely affect" must follow all additional, specific
conditions related to the pertinent activities as outlined in the Key and its associated
maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most
recent version of this technical tool will be utilized during the evaluation of the permit application.
14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, the permittee will utilize the "Standard Manatee Conditions for
In-Water Work, 2011" (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec
ies/Manatee/2011 StandardConditionsForIn-waterWork.pdf)
15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, the permittee will utilize the "Sea Turtle and Smalltooth Sawfish
Construction Conditions" (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec
ies/sea turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate
for the proposed activity. Note: These conditions may be subject to revision at any
9
time. It is our intention that the most recent version of these conditions will be utilized
during the evaluation of the permit application.
16. Turbidity control measures will be used to control water quality and the work must
be in accordance with State Water Quality Standards as outlined in Florida Statute
62.302. Turbidity control measures may include but are not limited to, turbidity control
curtains, the exclusive use of suction dredging, the exclusive use of closed "clam shell"
dredging, or any other technique necessary to reduce turbidity to no more than
background turbidity. The Florida Department of Environmental Protection (FDEP) may
require the applicant to submit a daily turbidity report which may be verified by state or
local government inspectors.
17. No activity shall be authorized under this general permit which is likely to adversely
affect a Federally-listed threatened or endangered species or a species proposed for
such designation, or destroy or adversely modify its designated critical habitat.
19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise
Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the
installation of metal or sheet piles installed by impact hammer. They also require the
use of noise abatement measures if 5 or more concrete piles are installed by impact
hammer in a confined space as defined in Appendix C. No project shall be authorized
that results in noise in excess of the established thresholds for physical injury (single
strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic,
Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic
surveys, low frequency sonar, explosions, and seismic air guns typically towed
underwater by vessels to locate oil and gas deposits.
20. This PGP does not include conditions that would prevent the `take' of a state-listed
fish or wildlife species. These species are protected under sec. 379.411, Florida
Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish
and wildlife species designated as species of special concern or threatened by the State
of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife
Conservation Commission (FWC). You can visit the FWC license and permitting
webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list
of those fish and wildlife species designated as species of special concern or
threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains
updated lists, by county, of documented occurrences of those species.
21. Activities qualifying for this programmatic general permit (PGP) must be authorized
by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any
authorization required to use or occupy state-owned submerged lands (SSL) under
Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the
Department of Environmental Protection, a water management district under s. 373.069,
F.S., or a local government with delegated authority under s. 373.441, F.S., will provide
the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone
Consistency Concurrence (CZCC). WQC is waived for activities authorized under this
10
PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of
Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The
Corps, or any designated Federal, State, or local agency administering general permits
on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above
exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the
applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as
applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or
any designated Federal, State, or local agency administering general permits on behalf
of the Corps under shall not be precluded from acting on a request to use this PGP
before the applicable SSL authorization is granted.
22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable
state lands authorizations under Chapter 253 of the Florida Statutes must be obtained
from the State of Florida, the South Florida Water Management District (SFWMD),
FDEP, or their authorized representatives, as appropriate.
23. For projects authorized under this permit in navigable waters of the U.S., the
permittee understands and agrees that, if future operations by the United States require
the removal, relocation, or other alteration, of the structures or work herein authorized,
or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the
navigable waters, the permittee will be required, upon due notice from the Corps of
Engineers, to remove, relocate, or alter the structural work or obstructions caused
thereby, without expense to the United States. No claim shall be made against the
United States on account of any such removal or alteration.
24. This programmatic general permit will be valid for a period of 5 years from the date
specified above unless suspended or revoked by the District Engineer prior to that date.
If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization
of activities that have commenced or are under contract to commence in reliance on
SAJ-91 will remain in effect provided the activity is completed with 12 months of the
date SAJ-91 expired or was revoked.
25. The General conditions attached hereto are made a part of this permit and must be
attached to all authorizations processed under this permit.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
11
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being
coordinated via separate letter with the Florida Department of Environmental Protection
(DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341.
COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this
permit is being coordinated via separate letter with the Florida Department of
Environmental Protection (DEP) in accordance with the Coastal Zone Management Act,
16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart
C.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being
coordinated via separate letters with the U.S. Fish and Wildlife Service as required
under Section 7 of the Endangered Species Act, and with the National Marine Fisheries
Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery
Conservation and Management Act. Additionally, the proposed reissuance of this permit
12
is being coordinated with the Environmental Protection Agency under Section 404 of the
Clean Water Act.
RESPONSE: Comments regarding the proposed reissuance of this Programmatic
General Permit SAJ-91 should be submitted in writing to the District Engineer at the
above address within 45 days from the date of this notice. The permit will be reissued
without further notice if no adverse comments are received. If you have any questions
concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead
address or by electronic mail at Brianne.E.McGuffie@usace.army.mil.
GENERAL CONDITIONS
1. The time limit for completing the work authorized ends on ______________
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this office, which
may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and state coordination
required to determine if the remains warrant a recovery effort of if the site is eligible for
listing in the National Register of Historic Places. 4. If you sell the property associated
with this permit you must obtain the signature of the new owner in the space provided
and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal
Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of
this authorization.
6. You must allow a representative from the Corps or its delegated authority to inspect
the authorized activity at any time deemed necessary to ensure that it is being or has
been accomplished in accordance with the terms and conditions of your permit.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity
described above pursuant to:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413).
13
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal
projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not
assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this
permit verification is not contrary to the public interest was made in reliance on the
information you provided.
5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision
on this permit verification at any time the circumstances warrant. Circumstances that
could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in reaching
the original public interest decision.
14
Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative order
requiring you comply with the terms and conditions of your permit and for the initiation of
legal action where appropriate. You will be required to pay for any corrective measures
ordered by this office, and if you fail to comply with such directive, this office may in
certain situations (such as those specified .in 33 CFR 209.170) accomplish the
corrective measures by contract or otherwise and bill you for the cost.
15
permit does not authorize any work or structure within the Caloosahatchee River,
Matlacha Pass Aquatic Preserve, Cape Coral Spreader Waterways, or smalltooth
sawfish limited exclusion zones (Attachment 2).
This programmatic general permit is subject to the following conditions:
A. CONDITIONS FOR BULKHEADS, BACKFILL, AND RIPRAP IN RESIDENTIAL
CANALS
1. The work herein authorized includes the construction, repair or maintenance of
seawalls (bulkheads) and associated backfill in residential canals.
2. The seawall shall not exceed 500 feet in length and not extend any farther
waterward than 18" from the existing seawall or Mean High Water Line (MHWL) and
shall connect with adjacent seawalls to the maximum extent practicable.
3. The backfill must be from upland sources and consist of suitable clean fill material
free from toxic pollutants in other than trace quantities. The amount of backfill shall not
exceed one (1) cubic yard per running foot below the plane of the MHWL.
4. This permit does not authorize any filling, except for backfill behind the seawall. New
riprap may be placed at the toe of the existing or replacement seawall when the toe of
the seawall is deeper than -3 feet Mean Lower Low Water (MLLW). Also, replacement
riprap can only be added within the same footprint of existing riprap (i.e. no waterward
expansion or lateral expansion of riprap beyond the previous footprint) in depths less
than or equal to -3 feet MLLW.
5. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora
mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia
racemosa)].
6. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
B. CONDITIONS FOR AERIAL TRANSMISSION LINES:
1. The work herein authorized includes the installation of aerial transmission lines and
associated structures.
2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance
criteria as described in 33 CFR, Part 322.5(i)(1), (2), (3), and (4). This clearance does
not apply in the case of a lift bridge. Minimum clearance for lift bridges will be
determined on a case-by-case basis.
2
a. The minimum clearance* (see NOTE in b.) for aerial communication lines, or
any lines not transmitting electrical power, will be ten (10) feet above the clearance
required for nearby stationary bridges as established by the U.S. Coast Guard (USCG).
In the event the USCG has not established a bridge clearance, minimum vertical
clearances for power and aerials lines will not be less than required by Section 23, Rule
232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances
will not be less than shown in Table 232-1, Item 7, ANSI C2.
b. The minimum clearance* for an aerial line, transmitting electrical power, is
based on the low point of the line under conditions that produce the greatest sag, taking
consideration temperature, load, wind, length or span and the type of supports. The
minimum clearance for an aerial electrical power transmission line crossing navigable
waters of the U.S. shall be governed by the system voltage, as indicated below:
Nominal System
Voltage, kilovolt
Minimum Clearance
Above Bridge Clearance (as established by the USCG)
115 and below
138
161
230
350
500
700
750-765
20 feet
22
24
26
30
35
42
45
*NOTE: Minimum clearance is the distance measured between the lowest point of a
stationary bridge, including any infrastructure attached to underside of the bridge, and
the Mean High Water (MHW) of the navigable waters of the U.S. beneath the bridge.
c. On navigable waters of the U.S., including all federal navigation project,
whether there is no bridge for reference for minimum clearance, the proposed project
will need to be reviewed by the U.S. Army Corps of Engineers in order to determine the
minimum clearance between the line and MHW necessary to protect navigational
interests.
3. The construction of aerial transmission lines does not involve the dredging or filling
of navigable waters or waters of the United States.
4. Where the proposed aerial transmission line is to be installed in navigable waters of
the U.S., at least 2 weeks prior to the start of the authorized work, the permittee must
notify the National Oceanic Atmospheric Administration (NOAA) and the Corps office
writing that the work is commencing, and again upon completion of the work. The
permittee shall notify the District Engineer at the letterhead address, attention
Regulatory Division, and NOAA, at Nautical Data Branch N/CS26, Station 7317, 1315
East-West Highway, Silver Spring, MD 20910-3282, or by e-mail to ocs.nbd@noaa.gov.
3
This notification will include "As-Built plans" signed by a registered surveyor/engineer
licensed in the State of Florida, that certify the project is constructed as authorized and
must include an accurate (within plus or minus 1 foot) depiction of the location and
configuration of the completed activity in relation to the MHW of the navigable water.
5. Transmission line poles cannot be placed in smalltooth sawfish critical habitat in
areas where the essential features are present.
6. The permittee shall defend and hold the U.S. Government harmless from any and all
claims by reason of the placement and installation of the transmission lines authorized
by this permit.
7. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
C. CONDITIONS FOR SUBAQUEOUS AND TRANSMISSION LINES:
1. The work herein authorized includes the installation and maintenance of subaqueous
utility and transmission lines placed on, under or embedded in the bottom of navigable
waters of the United States within the City of Cape Coral. The installation of utility and
transmission lines by directional bore is authorized if the drilling originates and
terminates on the uplands (i.e. no in-water work). The permittee must provide the City
of Cape Coral with a frac-out contingency plan prior to verification of this General Permit
(Attachment 3)
2. Directional boring vaults, junction boxes, and/or pads will not be constructed within
50 feet of the top of the bank of waters (rivers/streams). Horizontal directional drilling
pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be
set back from the water (river/stream) bank by a minimum of 50 feet. Excavated
materials and drilling mud must be stockpiled on non-wetland areas.
3. All subaqueous utility and/or transmission lines must be installed a minimum of 6 feet
below the bottom contour of any water of the U.S. The 6-foot criterion applies to the
entire authorized width of the crossing, plus a minimum of 10 feet on each side of the
crossing.
4. Subaqueous utility and transmission lines may be installed (including as part of a
repair/replacement project) by trenching. When excavating the trench, the bottom
sediments may be temporarily sidecast into areas devoid of submerged aquatic
vegetation and mangroves. Immediately upon completing the excavation and placing
the transmission or utility line into the trench, the trench must be filled and the bottom
contours must be restored to pre-construction conditions.
4
5. New subaqueous transmission and utility lines cannot be placed on the canal
substrate (i.e., pinned or anchored and not buried). Sections of existing buried lines
may be repaired or replaced above the substrate by pinning or anchoring the new
section of line in place to ensure that it does not move and damage surrounding
seagrasses and mangrove habitat.
6. When repairing existing transmission or utility lines, riprap and articulated mats may
be placed on subaqueous lines that are buried in trenches or on lines that are attached
to the substrate (in accordance with special condition #3 above) to stabilize the line.
Riprap and articulated mats may also be used to stabilize new subaqueous lines placed
in high erosion areas. These stabilization materials are limited to the minimum amount
necessary to stabilize and protect the lines existing lines (which may have been
exposed by scouring) and cannot be placed on seagrasses or mangrove habitat.
7. The permittee will install signs at the shoreline to notify navigational interests of the
location of subaqueous utility and transmission lines.
8. The permittee shall defend and hold the U.S. Government harmless from any and all
claims by reason of the placement and installation of the transmission lines authorized
by this permit.
9. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
D. CONDITIONS FOR PRIVATE SINGLE FAMILY DOCKS AND APPURTENANCES:
1. Structures authorized under this general permit are private single-family piers not to
exceed 4 slips. This would include normal appurtenances such as boat hoists, boat
shelters with open sides, stairways, walkways, mooring piles, dolphins, and
maintenance of these appurtenances. Upland-cut boat slips are not authorized by this
general permit.
2. Project construction will take place from uplands or from floating equipment (e.g.
barge); prop or wheel-washing is prohibited.
3. No living, fueling, or storage facilities over navigable waters of the United States are
authorized under this general permit.
4. The structure shall be consistent with other structures in the area.
5. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should
be avoided.
5
6. A structure which by its size or location may adversely affect water quality, fish and
wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall
not be authorized by this general permit.
7. The removal of mangroves is prohibited [specifically, red mangroves (Rhizophora
mangle), black mangroves (Avicennia germinans), and white mangroves (Laguncularia
racemosa)].
8. No activity may cause more than a minimal adverse effect on navigation. Any safety
lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise,
must be installed and maintained at the permittee's expense on authorized facilities in
navigable waters of the United States.
9. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
E. CONDITIONS FOR MINOR STRUCTURES ASSOCIATED WITH SINGLE-FAMILY
DOCKS:
1. The work herein authorized will be for minor structures to include:
a. Single mooring piles;
b. Small mooring dolphins (limited to one cluster of 4 or fewer
pilings);
c. Non-commercial information signage;
d. Boat lifts, hoists, davits; and,
e. Other minor structures that would have less environmental impact than
a small dock.
2. Where practicable, unless sealed, or wrapped, the use of CCA-treated wood should
be avoided.
3. Project construction will take place from uplands or from floating equipment (e.g.
barge); prop or wheel-washing is prohibited.
4. A structure which by its size or location may adversely affect water quality, fish and
wildlife habitat, wetlands, including mangroves, or submerged aquatic vegetation shall
not be authorized by this general permit.
6
5. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
F. CONDITIONS FOR STORM WATER OUTFALLS:
1. Structures authorized under this general permit are storm water outfalls and
appurtenances.
2. Authorization is contingent upon issuance of lawfully required National Pollutant
Discharge Elimination System permits (Section 402 of the Clean Water Act) from the
U.S. Environmental Protection Agency, Florida Department of Environmental Protection,
State Water Management District, or their legally authorized delegate.
3. This general permit authorizes dredging at storm water outfalls. Maintenance
dredging is authorized as long as it within the previously authorized dredge foot print
and to the previously USACE authorized depth. No additional dredging is authorized
under this general permit other than that which would be necessary to restore the
discharge structure to its original permitted excavated depth. In addition, if only shallow
euryhaline (MHW to -3 feet MLLW) water essential feature is present (i.e. no
mangroves), dredged depth are limited to a maximum depth of -3 feet MLLW. If red
mangroves are present, dredging, excavation, or disposal is not allowed within 5 feet of
all red mangrove prop roots. Muck dredging (dredging or removal of accumulated
organics) is not allowed in shallow, euryhaline habitat (MHW to -3 feet MLLW).
4. Excavated spoil material shall be deposited at self-contained upland areas that will
prevent spoil material and/or return water from reentering any water of the United States
(including wetlands) or interfering with natural drainage.
5. In canals with open access to the Caloosahatchee River or Matlacha Pass Aquatic
Preserve, grating shall be installed over the outfall to reduce the risk of entrapment and
drowning of manatees. Grating shall be installed over pipes greater than eight 8 inches,
but smaller than 8 feet in diameter. Bars or grates no more than 8 inches apart shall be
placed on the accessible end(s) to restrict manatee access. The installation of grates
applies to submerged or partially submerged pipes and culverts reasonably accessible
to manatees.
6. All outfall discharge shall be designed and implemented to prevent erosion and
scour.
7. In addition to the above conditions, the permittee must abide by all of the Special
Conditions in Part G ("Special Conditions for All Work) and the attached General
Conditions. These Special and General conditions are applicable to all structures
and/or work authorized under this general permit.
7
G. SPECIAL CONDITIONS FOR ALL WORK:
1. No activities (Activities A-F above) are authorized within the smalltooth sawfish
limited exclusion zones (Attachment 2).
2. The permittee must agree to adhere to PDCs for In-Water Activities (Attachment 4).
3. All project involving the installation of piles or sheet piles shall follow the PDCs for
In-Water Noise from Pile and Sheet Pile Installation (Attachment 5).
4. All activities must be completed during daylight hours.
5. No work shall be performed until the permittee submits satisfactory plans, and
surveys, if necessary, for the proposed activity and receives written authorization from
the City of Cape Coral. (For example: Vegetation surveys which clearly depict what
type of vegetation is present on the site, including mangrove species, location of the
Mean High Water Line, and the location of wetlands and uplands.)
6. The work authorized herein is limited to existing canals within the City of Cape Coral
and does not include the Caloosahatchee River, Matlacha Pass Aquatic Preserve,
smalltooth sawfish limited exclusion zones, and the Cape Coral Spreader waterways.
7. No activity shall be authorized under this general permit that may adversely affect
water quality, fish and wildlife habitat, wetlands, including mangroves, or emergent or
submerged aquatic vegetation.
9. No work shall be performed until after the permittee provides notification to the
owner(s) or operator(s) of any marked utilities in the work area.
10. No structure or work shall adversely affect or disturb properties listed in the
National Register of Historic Places or those eligible for inclusion in the National
Register. Prior to the start of work, the Applicant/Permittee or other party on the
Applicant's/Permittee's behalf, shall conduct a search of known historical properties by
contracting a professional archaeologist, contacting the Florida Master Site File at 850245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites
in the National Register Information System (NRIS). Information can be found at
http://www.cr.nps.gov/nr/research/.
If, during the initial ground disturbing activities and construction work, there are
archaeological/cultural materials unearthed (which shall include, but not be limited to:
pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal
implements, dugout canoes or any other physical remains that could be associated with
8
Native American cultures or early colonial or American settlement), the permittee shall
immediately stop all work in the vicinity and notify the Compliance and Review staff of
the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory
Project Manager to assess the significance of the discovery and devise appropriate
actions, including salvage operations. Based, on the circumstances of the discovery,
equity to all parties, and considerations of the public interest, the Corps may modify,
suspend or revoke the permit in accordance with 33 CFR Part 325.7.
In the unlikely event that human remains are identified, they will be treated in
accordance with Section 872.05, Florida Statutes; all work in the vicinity shall
immediately cease and the local law authority, the State Archaeologist (850-245-6444),
and the Corps Regulatory Project Manager shall immediately be notified. Such activity
shall not resume unless specifically authorized by the State Archaeologist and the
Corps.
11. Conformance with descriptions and quantities contained herein does not
necessarily guarantee authorization under this general permit and the District Engineer
reserves the right to evaluate any proposed work in waters of the United States as a
Standard Permit.
12. Any structure or work authorized under this general permit must not interfere with
general navigation.
13. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, prior to verification of authorization, the dichotomous key
entitled "The Corps of Engineers, Jacksonville District, and the State of Florida Effect
Determination Key for the Manatee in Florida March 2011", will be used to determine
potential manatee impacts. Projects judged as a "may affect" to the manatee are not
authorized by this general permit and will be coordinated with the U.S. Fish and Wildlife
Service by the Corps in accordance with the Endangered Species Act. Projects judged
as a "may affect not likely to adversely affect" must follow all additional, specific
conditions related to the pertinent activities as outlined in the Key and its associated
maps. Note: The manatee key may be subject to revision at any time. It is our intention that the most
recent version of this technical tool will be utilized during the evaluation of the permit application.
14. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, the permittee will utilize the "Standard Manatee Conditions for
In-Water Work, 2011" (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec
ies/Manatee/2011 StandardConditionsForIn-waterWork.pdf)
15. In canals with open, lift, or lock access to the Caloosahatchee River or Matlacha
Pass Aquatic Preserve, the permittee will utilize the "Sea Turtle and Smalltooth Sawfish
Construction Conditions" (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered spec
ies/sea turtles/inwaterWorkSeaTurtle032306.pdf ) and/or requirements, as appropriate
for the proposed activity. Note: These conditions may be subject to revision at any
9
time. It is our intention that the most recent version of these conditions will be utilized
during the evaluation of the permit application.
16. Turbidity control measures will be used to control water quality and the work must
be in accordance with State Water Quality Standards as outlined in Florida Statute
62.302. Turbidity control measures may include but are not limited to, turbidity control
curtains, the exclusive use of suction dredging, the exclusive use of closed "clam shell"
dredging, or any other technique necessary to reduce turbidity to no more than
background turbidity. The Florida Department of Environmental Protection (FDEP) may
require the applicant to submit a daily turbidity report which may be verified by state or
local government inspectors.
17. No activity shall be authorized under this general permit which is likely to adversely
affect a Federally-listed threatened or endangered species or a species proposed for
such designation, or destroy or adversely modify its designated critical habitat.
19. All projects shall follow the Best Management Practices (BMPs) defined in the Noise
Effects Matrix and BMPs provided in Attachment 5. These BMPs do not include the
installation of metal or sheet piles installed by impact hammer. They also require the
use of noise abatement measures if 5 or more concrete piles are installed by impact
hammer in a confined space as defined in Appendix C. No project shall be authorized
that results in noise in excess of the established thresholds for physical injury (single
strike and cumulative exposure) for ESA listed sea turtles, smalltooth sawfish, Atlantic,
Gulf and shortnose sturgeon. This includes, but is not limited to, the use of seismic
surveys, low frequency sonar, explosions, and seismic air guns typically towed
underwater by vessels to locate oil and gas deposits.
20. This PGP does not include conditions that would prevent the `take' of a state-listed
fish or wildlife species. These species are protected under sec. 379.411, Florida
Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish
and wildlife species designated as species of special concern or threatened by the State
of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife
Conservation Commission (FWC). You can visit the FWC license and permitting
webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list
of those fish and wildlife species designated as species of special concern or
threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains
updated lists, by county, of documented occurrences of those species.
21. Activities qualifying for this programmatic general permit (PGP) must be authorized
by the applicable permit or exemption under Part IV of Chapter 373, F.S., and by any
authorization required to use or occupy state-owned submerged lands (SSL) under
Chapter 253, F.S., and, as applicable Chapter 258 F.S. Such permit, issued by the
Department of Environmental Protection, a water management district under s. 373.069,
F.S., or a local government with delegated authority under s. 373.441, F.S., will provide
the applicable Water Quality Certification (WQC) or waiver thereto, and Coastal Zone
Consistency Concurrence (CZCC). WQC is waived for activities authorized under this
10
PGP that qualify for an exemption under s. 403.813(1) or 373.406, F.S., or the rules of
Florida Administrative Code (F.A.C.) adopted under Part IV of Chapter 373, F.S. The
Corps, or any designated Federal, State, or local agency administering general permits
on behalf of the Corps under C.F.R. § 325.2(b)(2) may presume CZCC for the above
exempt activities by operation of s. 380.23(7), F.S., provided the activity receives the
applicable authorization to use and occupy SSL under Chapter 253, F.S., and, as
applicable, Chapter 258, F.S., and the rules F.A.C. adopted thereunder. The Corps, or
any designated Federal, State, or local agency administering general permits on behalf
of the Corps under shall not be precluded from acting on a request to use this PGP
before the applicable SSL authorization is granted.
22. Applicable permits under IV of Chapter 373 of the Florida Statutes, and applicable
state lands authorizations under Chapter 253 of the Florida Statutes must be obtained
from the State of Florida, the South Florida Water Management District (SFWMD),
FDEP, or their authorized representatives, as appropriate.
23. For projects authorized under this permit in navigable waters of the U.S., the
permittee understands and agrees that, if future operations by the United States require
the removal, relocation, or other alteration, of the structures or work herein authorized,
or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the
navigable waters, the permittee will be required, upon due notice from the Corps of
Engineers, to remove, relocate, or alter the structural work or obstructions caused
thereby, without expense to the United States. No claim shall be made against the
United States on account of any such removal or alteration.
24. This programmatic general permit will be valid for a period of 5 years from the date
specified above unless suspended or revoked by the District Engineer prior to that date.
If SAJ-91 expires or is revoked prior to completion of the authorized work, authorization
of activities that have commenced or are under contract to commence in reliance on
SAJ-91 will remain in effect provided the activity is completed with 12 months of the
date SAJ-91 expired or was revoked.
25. The General conditions attached hereto are made a part of this permit and must be
attached to all authorizations processed under this permit.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
11
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
WATER QUALITY CERTIFICATION: The proposed reissuance of this permit is being
coordinated via separate letter with the Florida Department of Environmental Protection
(DEP) in accordance with Section 401 of the Clean Water Act, 33 U.S.C. §1341.
COASTAL ZONE MANAGEMENT CONSISTENCY: The proposed reissuance of this
permit is being coordinated via separate letter with the Florida Department of
Environmental Protection (DEP) in accordance with the Coastal Zone Management Act,
16 U.S.C. §1451-1465 (CZM), and its implementing regulation, 15 C.F.R. 930, Subpart
C.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
OTHER AGENCY COORDINATION: The proposed reissuance of this permit is being
coordinated via separate letters with the U.S. Fish and Wildlife Service as required
under Section 7 of the Endangered Species Act, and with the National Marine Fisheries
Service for Essential Fish Habitat as required under the Magnusson-Stevens Fishery
Conservation and Management Act. Additionally, the proposed reissuance of this permit
12
is being coordinated with the Environmental Protection Agency under Section 404 of the
Clean Water Act.
RESPONSE: Comments regarding the proposed reissuance of this Programmatic
General Permit SAJ-91 should be submitted in writing to the District Engineer at the
above address within 45 days from the date of this notice. The permit will be reissued
without further notice if no adverse comments are received. If you have any questions
concerning this proposal, you may contact Ms. Brianne McGuffie at the letterhead
address or by electronic mail at Brianne.E.McGuffie@usace.army.mil.
GENERAL CONDITIONS
1. The time limit for completing the work authorized ends on ______________
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this office, which
may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and state coordination
required to determine if the remains warrant a recovery effort of if the site is eligible for
listing in the National Register of Historic Places. 4. If you sell the property associated
with this permit you must obtain the signature of the new owner in the space provided
and forward a copy of the permit to the Fort Myers Regulatory Office at 1520 Royal
Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 to validate the transfer of
this authorization.
6. You must allow a representative from the Corps or its delegated authority to inspect
the authorized activity at any time deemed necessary to ensure that it is being or has
been accomplished in accordance with the terms and conditions of your permit.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity
described above pursuant to:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413).
13
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal
projects.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not
assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this
permit verification is not contrary to the public interest was made in reliance on the
information you provided.
5. Reevaluation of Permit Verification Decision: This office may reevaluate its decision
on this permit verification at any time the circumstances warrant. Circumstances that
could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 4 above).
c. Significant new information surfaces which this office did not consider in reaching
the original public interest decision.
14
Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative order
requiring you comply with the terms and conditions of your permit and for the initiation of
legal action where appropriate. You will be required to pay for any corrective measures
ordered by this office, and if you fail to comply with such directive, this office may in
certain situations (such as those specified .in 33 CFR 209.170) accomplish the
corrective measures by contract or otherwise and bill you for the cost.
15
-
~
-
- . _ . ,u l o - - - ~
~
-
·
-~
w w u
-
~
-
~
!-----; I -
w w
~
--ir----i
UL.I
..a.l
-
--·
I.A)
W
-----..,~ ~
l.V
l.).j
_
I.I.)
i.:, _ _ ._ _ _
IJO
1..v
:;;.,-~---e ~ ·- -- ~- ,.,- ---
W
I.JU
W
l.IU
tM.J
---==,· ~,, r-- , ~
uu
..U
00
--4 ,_,.,__. __
~
95
127
l.AJ
96
LE IGH
AC ~S
128
112
192
Limited Exclusion Zones in Smalltooth Sawfish Critical Habitat
Longitude
Name
Latitude
U.S. 41 Bridges (the area between the following coordinates)
U.S. 41 NW
26.660413°N
81.885243°W
81.872966°W
U.S. 41 NE
26.666827°N
U.S. 41 SW
26.642991 °N
81.873880°W
U.S. 41 SE
81 .861605°W
26.649405°N
Iona Cove (the area between the following coordinates)
ICNW
26.521437°N
81.991586°W
IC NE
26.521212°N
81.976191 °W
ICSW
26 .511762°N
81 .991762°W
ICSE
26.511537°N
81.976368°W
Glover Bight (the area between the following coordinates)
GBNW
26.542971 °N
81.997791 °W
GB NE
26.542678°N
81.977745°W
GBSW
26.529478°N
81.998035°W
GB SE
26.529185°N
81.977992°W
Cape Coral (the area between the following coordinates)
cc 1
26.551662°N
81.947412°W
26.551561 °N
CC2
81 .940683 °W
CC3
26.539075°N
81 .940916°W
CC4
26.539205°N
81.951049°W
81.951047°W
CC5
26.542181 °N
CC6
26.542133°N
81.947776°W
Figure 2. Smalltooth sawfish limited exclusion zones
The locations of very small juveniles shown as red dots (©2012 Google; red dots based
on the National Sawfish Encounter Database, May 2011)
ATTACHMENT 27 TO SPGP V
PAGE 1OF 3
15 A ppendix B: frnc-Out Pfan Example
Pmpos.ed Methods for Protectio11 of Water QuaUty for Directional Bored Water Crossings
(BMPs and Frac-out Plan)
BMPs
[TI1e APl)LICANT) and (the C@tractor] will implement the followiug Best Manageme.ut
Practices (BMPs) to minimize the potential for a.dverse e11viro111nep1=<'ll itnpact.~ during horizontal
directinnal driJling activities:
D BMPs for erosion col1trol w1thm the stag.il1g area shall be implemented and maintained at all
times during the drilling illld back-reaming oper;itions to prevent siltatiou and turbid
discharges in excess ofState Water Quality StMdards pursuant to Rule 62-302, F.AC.
lv.lethods shaJ.1 il1.dude, but ar~ not limited to the jmmediate. placement ofturbidity
containment devices such as turbidity seree11, silt co11tairu11ent fonce, J1ay bales, and earthen
berms, e1c. to contait1 the drilling rnud. Earthen betrns shall not be utilized as lo impact
wetfonds ~r otluir surface waters_
F rac-out Plan
To provide an additional level of resource prntection, the followmg rueasun::s shall be t·aken to
.monitor any potential releases of drilling fll\id:
D Measures used to prevent .fra&out during the
the bottom of the waterway wilt be _.I#]_ foet as shown on the cross sect ion. This is
suspe<-ied h) be $Ltfficie1\t to prevent frac-ont when drilling 1mder the waterway.
0
Nontoxic fluoresce.ot dyes wlll be added lo the, drilling lubricant D The voltune of bentonJe in the clral string will be monitored .at all times duriug the directional
drilling opernlion. Should a.dr-0v in volume ofbenwuite occur, immediately ~ondt~.::t a vi~ual
inspection ofboth te1Testrial anq subaqueous portions of the. horizontal directional drilling
conidor.
D Should the detection of dye or a dro p in voltune of bmtonite occu~~ the Contractor will follnw
the Release Procedures ou:tbiled below.
D The Contractor will tdentify pnQr. to con1111e11cement of consttl1ct.i.011an en nl'onme.ntal
,scientist/ biologist wilh expe.rienc.:> in-water quatdy monitoEing aud l1abi1at protection to be
nsed in t.he event -0f ;i frac-out. The bio l11gist wiH supervise t:he in1pte1nema1io11 (lftb.e Frac-Out Plan, Re lease Procedure, and Contaiume11t Plan outlined below. Divers shall. be present
dudng drilling operations in order to respond to a potential !he-out release.
ATTACHMENT 27 TO SPGP V
PAGE 2 OF 3
ATIACHMENT 27 TO SPGP V
PAGE 3 OF 3
0
01ice the split is ccntamed. Lheescap.:cl drill lug lubriciml shit I I be properly disposed of iu an
approved llplai1d di~p0$3 r si~e
0
Clean-up w~h a vacuu m system shall conunence within 24 hours.
0 Alter oontain.mi:mtirecover)· of the drilling materia llresou(ces, a detailed written rt'i})Ort shallbe
submitted to the USA.CE, wjthiu 10 busi.ness da ys, iodi.::atingthe lo0ation ofthedl:ac-ont.
amoui1t ofdrilling llll}krial d isch arged mid the <1monnt of drilling mud recovered, the process
in which. the drillit1g mud was recovered. and the. area that was :tf.th~ted by the drilling
d is ch arge.
254
FIGURE 3
PDCs for In-Water Activities
For an activity to be covered under this Opinion, the USACE authorization must include
the following conditions. Failure to comply with these conditions could result in
enforcement action by the USACE and/or NMFS.
AP.1. Education and Observation: The permittee must ensure that all personnel
associated with the project are instructed about the potential presence of species
protected under the ESA and the Marine Mammal Protection Act (MMPA). All
on-site project personnel are responsible for observing water-related activities for
the presence of protected species. All personnel shall be advised that there are
civil and criminal penalties for harming, harassing, or killing ESA-listed species or
marine mammals. To determine which species may be found in the project area,
please review the relevant Protected Species List at:
http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangere
d/index.html
AP.2. Reporting of interactions with protected species:
a) Any collision(s) with and/or injury to any sea turtle, sawfish, whale, or sturgeon
occurring during the construction of a project, shall be reported immediately to
NMFS's Protected Resources Division (PRD) at (1-727-824-5312) or by email to
takereport.nmfsser@noaa.gov and CESAJ-ComplyDocs@usace.army.mil.
b) Smalltooth sawfish: Report sightings to 1-844-SAWFISH or email
Sawfish@MyFWC.com
c) Sturgeon: Report dead sturgeon to 1-844-STURG 911 (1-844-788-7491) or email
nmfs.ser.sturgeonnetwork@noaa.gov
d) Sea turtles and marine mammals: Report stranded, injured, or dead animals to 1
877-WHALE HELP (1-877-942-5343).
e) North Atlantic right whale: Report injured, dead, or entangled right whales to the
USCG via VHF Channel 16.
AP.3. Vessel Traffic and Construction Equipment: All vessel operators must watch
for and avoid collision with species protected under the ESA and MMPA. Vessel
operators must avoid potential interactions with protected species and operate in
accordance with the following protective measures:
a) Construction Equipment:
i) All vessels associated with the construction project shall operate at "Idle
Speed/No Wake" at all times while operating in water depths where the draft
of the vessel provides less than a 4-foot (ft) clearance from the bottom, and
after a protected species has been observed in and has departed the area.
ii) All vessels will follow marked channels and/or routes using the maximum
water depth whenever possible.
iii) Operation of any mechanical construction equipment, including vessels, shall
cease immediately if a listed species is observed within a 50-ft radius of
construction equipment and cannot resume until the species has departed the
area of its own volition.
iv) If the detection of species is not possible during certain weather conditions
(e.g., fog, rain, wind), then in-water operations will cease until weather
conditions improve and detection is again feasible.
b) All Vessels:
i) Sea turtles: Maintain a minimum distance of 150 ft.
ii) North Atlantic right whale: Maintain a minimum 1,500-ft distance (500 yards).
iii) Vessels 65 ft in length or longer must comply with the Right Whale Ship Strike
Reduction Rule (50 CFR 224.105) which includes reducing speeds to 10
knots or less in Seasonal Management Areas
(http://www.fisheries.noaa.gov/pr/shipstrike/).
iv) Mariners shall check various communication media for general information
regarding avoiding ship strikes and specific information regarding right whale
sightings in the area. These include National Oceanic and Atmospheric
Administration (NOAA) weather radio, USCG NAVTEX broadcasts, and
Notices to Mariners.
v) Marine mammals (i.e., dolphins, whales [other than North Atlantic right
whales], and porpoises): Maintain a minimum distance of 300 ft.
vi) When these animals are sighted while the vessel is underway (e.g., bowriding), attempt to remain parallel to the animal's course. Avoid excessive
speed or abrupt changes in direction until they have left the area.
vii) Reduce speed to 10 knots or less when mother/calf pairs or groups of marine
mammals are observed, when safety permits.
AP.4. Turbidity Control Measures during Construction: Turbidity must be monitored
and controlled. Prior to initiating any of the work covered under this Opinion, the
Permittee shall install turbidity curtains as described below. In some instances,
the use of turbidity curtains may be waived by the USACE project manager if the
project is deemed too minimal to generate turbidity (e.g., certain ATON
installation, scientific survey device placement, marine debris removal) or if the
current is too strong for the curtains to stay in place. Turbidity curtains
specifications:
a) Install floating turbidity barriers with weighted skirts that extend to within 1 ft of
the bottom around all work areas that are in, or adjacent to, surface waters.
b) Use these turbidity barriers throughout construction to control erosion and
siltation and ensure that turbidity levels within the project area do not exceed
background conditions (i.e., the normal water quality levels from natural turbidity).
c) Position turbidity barriers in a way that does not block species' entry to or exit
from designated critical habitat.
d) Monitor and maintain turbidity barriers in place until the authorized work has been
completed and the water quality in the project area has returned to background
conditions.
e) In the range of corals (St. Lucie Inlet, Martin County south to the Dry Tortugas
and the U.S. Caribbean) and Johnson's seagrass (Turkey Creek/Palm Bay south
to central Biscayne Bay in the lagoon systems on the east coast of Florida):
· Projects that include upland earth moving (e.g., grading to install a building or
parking lot associated with a dock and seawall project), must install sediment
control barriers to prevent any upland sediments from reaching estuarine or
marine waters.
· The turbidity curtain requirement cannot be waived for any project that moves
or removes sediment (e.g., dredging, auger to create a pile, trenching to
install a cable line). If turbidity curtains are not feasible in an area based on
site conditions such as water current, high wave action, or stormy conditions,
the project must undergo individual Section 7 consultation and is not covered
under this Programmatic Opinion.
AP.5. Entanglement: All turbidity curtains and other in-water equipment must be
properly secured with materials that reduce the risk of entanglement of marine
species (described below). Turbidity curtains likewise must be made of materials
that reduce the risk of entanglement of marine species.
a) In-water lines (rope, chain, and cable, including the lines to secure turbidity
curtains) must be stiff, taut, and non-looping. Examples of such lines are heavy
metal chains or heavy cables that do not readily loop and tangle. Flexible inwater lines, such as nylon rope or any lines that could loop or tangle, must be
enclosed in a plastic or rubber sleeve/tube to add rigidity and prevent the line
from looping and tangling. In all instances, no excess line is allowed in the water.
b) Turbidity curtains and other in-water equipment must be placed in a manner that
does not entrap species within the construction area or block access for them to
navigate around the construction area.
16 Appendix C: SWPBO Noise Effects Matrix and BMPs
This Appendix summarizes the potential noise effects to sea turtles, smalltooth sawfish, and
sturgeon from activities analyzed under the SWPBO. The analysis of noise for activities
analyzed under the SWPBO, noise effects matrix, and BMPs is based on the noise analysis
conducted in support of the USACE's General Permit SAJ-82 Programmatic Opinion (NMFS
2014b). The tables that follow are formatted as described below:
1. Species: We first consider which species may be affected (sea turtles and smalltooth
sawfish).
2. Noise Metric: In order to understand how noise affects species, it is important to know
how noise is measured and what noise levels affect species. Noise is measured in 3
different ways and each is expressed in its own units of measurement.
a. Single-Strike Injury- This measurement is used to determine if injury would
occur from impact hammer installation. This is measured in units of sSEL or
peak pressure. If either peak pressure or sSEL are exceeded, then injury occurs.
b. One-Second Injury Exposure- This measurement is used to determine if injury
would occur from one second of exposure to non-impact hammer source like
vibratory or auger installation. This is measured in units of peak pressure.
c. Daily Cumulative Noise Exposure- This measurement (cSEL) determines if the
noise produced over the course of the day of construction can cause injury. Note
that the source level and calculations for cumulative noise exposure are adjusted
with each pile strike or with time for vibratory installation to account for
accumulated exposure, as described in Appendix B of SAJ-82.
d. Behavioral Response- This measurement (RMS) determines if the noise will
result in a behavioral response such as a change in feeding or sheltering.
3. Source Levels: For each construction activity, we provide the noise levels provided in
literature of the noise produced during the installation of the pile, back-calculated to the
actual source using the 15 logR spreading model, if the literature values are reported at
some greater distance from the source, as explained in Appendix B of SAJ-82.
4. Threshold: For each noise metric, we provide the noise level from the literature at which
the onset of impacts to species occurs.
5. Impact Radius: The distance from the source at which species are effected by noise
above the corresponding threshold level. Because the daily cumulative noise exposure
source levels change with every strike/over time, the impact radius also changes. The
table shows the change as more piles are installed (e.g., the impact radius for 1 pile
versus 10 piles), as described in more detail in Appendix B of SAJ-82.
255
6. Possible Species Responses: If species can be affected within a given impact radius, we
then consider all of the possible species responses (both injurious and behavioral) that
may occur within that radius from the pile.
7. Required BMPs: This column directs you to the BMP Plan required under SAJ-82 based
on the type of pile and installation method used. The BMP Plans are provided
immediately following the tables.
8. Effects Determination: This is the determination that NMFS made on what effect we
believe the noise generated from the pile installation will have on sea turtle and
smalltooth sawfish from activities analyzed under SAJ-82. The effects determinations
include:
a. NE: No Effect means that we do not believe the pile type and installation method
will result in an effect to the species.
b. NLAA: Not likely to Adversely Affect means that we believe the effect will be
discountable or insignificant, as described in more detail in Section 3.1.4.
c. LAA: Likely to Adversely Affect means that we believe the pile type and
installation method is likely to have detrimental effects to the species. Activities
that are LAA were not analyzed under SAJ-82.
256
e
2:
I~
-i::·
~c]
-
Sea Turtles
. s t aII th epile.
-pressure wa t er 1s usedto creatth
e o e an d some times t o sunu ItaneousIy m
e epilhl
Route of
Effect
Thl'eshold
(Iii oise level
that causes a
response)
Impact
Radius
P ossible
Species
R esponse
Required
BMPs
underSAJ 82
Effects
Determination
One-second
Injury
Exposw-e
206 (peak
pressure)
0
NIA
Daily
Cumulative
Noise
Exposure
Tiueshold
levels for noise
sources ~ 167
dB SELwere
not calculated
0
NIA
160 dB (RMS)
0
NfA
NE
206 (peak
pressure)
0
NfA
NE
Tiueshold
levels for noise
SOlU'Ces ~ 167
dB SEL were
not calculated
0
NIA
150 dB (RMS)
0
NIA
Behavioral
Response
One-second
hljury
Exposure
Smalltooth
Saw.fish
and
Sturgeon
Som·ce Level
(Noise generated by
activity)
Daily
Cumulative
Noise
Exposm-e
Behavioral
Response
Jetting smu·c.e levels ru:e
unknown but result in much
lower noise levels than either
impact or vibratory pile
driving alone while
minimizing the amotmt of
hammering necessary. Noise
measurements taken with
water jetting ttuned on or off
during pile driving resulted in
no additional noise recorded
a hove that of the pile-driving
noise (CALTRANS 2007).
257
NE
BMPPlanA
BMPPlan A
NE
NE
NE
Drop punch: Drop punching is a method that uses a 12- to 24-inch-diameter steel punch that is repeatedly gravityd:ropped from a barge-mounted crane to create the hole to install a pile.
..
Jr · ;..;'~ ·
l!lr..
..
Ji#,..
I
! ·-
Ro ute of
Effect
---- -
-
SotU"ce Lt>"eJ
(Noise generated hr
ncthity)
Single-Strike
Injury
Sea Ttutles
Daily
Cnmu.Jative
Noise
Exposure
Beba\ioral
Response
Single-Strike
Injury
Small tooth
Sawfish
and
Srurgeon
Daily
C' wuulative
Noise
Exposure
Behavioral
Response
The best available
information on a drop
ptmch is a bucket dredge
strikiug the sea bottom.
The noise produced from
the heavy bucket dropped
onto the channel bottom
was measured to be 124 dB
re l ftPa (RMS) at 150 m
from the work site
(Dickerson et al 1001 ).
Back-calculating the noise
attenuation 150 m results iu
a potential source le,·el of
156 dB re l fl.Pa (RMS).
Th resbold
{I'oise leiel
rhar csuse~ "
Impacl
RAdins
re~lJOllSe)
'.W6 dB (peak
pressure) or
I 87 dB (sSEL)
Threshold
levels for uoise
sources s 167
dB SEL were
not calculated
Possibt.
Spedes
Respons.
lhqalnd
BMPs
muler
Ell'«n
Detennia11doa
SAJ-82
0
NIA
0
NIA
160 dB (RMS)
0
NIA
NE
206 dB (peal;
pressure) OJ'
187 dB (sSEL)
0
N IA
NE
"Threshold
levels for nois e
sources 5 167
dB SEL were
not calculated
0
NIA
258
BMPPlan
A
NE
NE
HtvfPPlan
A
Disrupted
feeding,
150 dB (RMS)
NE
2.Sm
(8 ft)
sheltering.
pupping. or
potential
increase in risk
to predation
NE. impact
radii1s 1s so
small that
ad\·erse effects
are implausible
. t a II a p iie.
Au2er: A n aue;er ts usedto creat e th e h oIe t 0 IDS
1.-....... _...
It
~:
~
Route of Effect
Soune Level
(Noise generated
by activity)
Possible
Species
Response
Impact
Radius
206 dB (peak
pressure)
0
NIA
1breshold levels for
noise sources :::; 167
dB SEL were not
calculated
0
N IA
160 dB (RMS)
0
N IA
NE
206 dB (peak
pressure)
0
N IA
NE
1breshold levels for
noise sources :::; 16(
dB SEL were not
calculated
0
N IA
NE
150 dB (RMS)
0
N IA
NE
I
One-second
Injmy Exposm·e
Sea Tllltles
Daily
Cumulative
Noise Exposure
Behavioral
Response
One-second
Injury Exposure
Smalltooth
Sawfish
and
Sturgeon
Daily
Cwnulative
Noise Exposure
Behavioral
Response
Noise levels from
small-scale drilling
operations that are
representative of
dock construction
methods such as
auguring have been
measured to be no
more than 107 dB
1·e 1 µPa (0-peak)
at 7.5 m from the
sow·ce (Willis et al.
2010). Olll· backcalculation resulted
in an approximate
source level no
greater than 120 dB
re 1 ~tPa (0-peak).
Required
BMPs
under SAJ-
T hreshold
(Noise level that
causes a response)
E fferts
Determination
82
NE
BMPPlan A
NE
BMPPlan A
259
Vibratory Hammer for Installation of Vinyl Sheet Pile 01· Wood, Concrete, or Metal Piles 13 inches in Diameter or Fewer
1·;;:- -.
It
·: ~'
,.r·1. ,
I
~--"'··
Requir ed
BMPs
UDder SA.J-
Sow-ce Level
(Noise generated by
acthity)
T b1·eshold
(?' oise level that
causes a response)
Impact
Radius
(m)
P ossible Species
Response
186 dB (peak
pressw-e),
170 dB (SEL)
206 dB (peak
pressure)
0
NIA
The source level is
adjusted over time to
reflect accumulated
exposure.
234 dB (cSEL)
0
NIA
Behavioral
Response
170 dB (RMS)
160 dB (RMS)
5m
(16 ft)
Di<>rupted feeding,
sheltering
NLAA
One-second
Injury
Exposure
186 dB (peak
pressure), 170 dB
(SEL)
0
NIA
NE
Daily
Ctuuulative
Noise
Expos1ue
The source level is
adjusted over time to
reflect accumulated
exposure.
0
N/A
NE
R oute of
Effect
Effects
Determination
82
"'
Sea
Ttniles
Small tooth
Sawfish
and
Stmgeon
One-second
Injw·y
Exposure
Daily
Cumulative
Noise
Exposure
Behavioral
Response
170 dB (RMS)
206 dB (peak
pressure)
234 dB (cSEL)
NE
BMPPlanA
NE
BMPPlanA
150 dB (RMS)
22m
(72 ft)
260
Disrupted feeding,
sheltering,
pupping, or
potential increase
in risk to
predation
NLAA
Vibratory Hammer for Installation of 2 Metal Boatlift I-beams
- ~
--=·,...
,... -
II11';~
-
,.,
[ii
Route of
Effect
Source Level
(Noise generated
by acthity)
Threshold
(Noise level that
causes a response)
Impact
Radius
Possible
Species
R esponse
One-second
Injury
Exposme
165 dB (peak
pressme), 150 dB
(SEL)
206 dB (peak
pressme)
0
NIA
Daily
Cunmlative
Noise
Exposure
TI1e source level is
adjusted over time
to reflect
accumulated
exposure.
234 dB (cSEL)
0
NIA
Behavioral
Response
150 dB (RMS)
160 dB (RMS)
0
NIA
NE
One-second
Injury
Exposme
165 dB (peak
pressure), 150 dB
(SEL)
206 dB (peak
pressure)
0
NIA
NE
Daily
Cumulative
Noise
Exposure
The source level is
adjusted over time
to reflect
accumulated
exposure.
234 dB (cSEL)
0
NIA
Behavioral
Response
150 dB (RMS)
150 dB (RMS)
0
NIA
R equired
BMPsunder
SAJ-82
Effects Determination
- 11?
Sea Turtles
Smalltooth
Sawfisli
and
Sturgeon
261
NE
BMPPlanA
BMPPlan A
NE
NE
NE
Vibratory H ammer for Installation of 24-inch-wide Metal Slteet Pile
1;
Sow·ce Level
(Noise generated
by activity)
Threshold
(Noise leYel t hat
causes a
response)
Impact
Radius
One-second
Injmy
Exposure
192 dB (peak
pressure).
178 dB (SEL)
206 dB (peak
pressure)
0
N IA
Daily
Cumulative
Noise
Exposure
The source level is
adjusted over time
to reflect
accumulated
exposure.
234 dB (cSEL)
0
N IA
Behavioral
Response
178 dB (RMS)
160 dB (RMS)
16 m
(52 ft)
Disrupted feeding,
sheltering
NLAA
One-second
Injtuy
Exposure
192 dB (peak
pressure),
178 dB (SEL)
206 dB (peak
pressure)
0
NIA
NE
Daily
Cumulative
Noise
Exposure
The source level is
adjusted over time
to reflect
a ccumulated
exposure.
234 dB (cSEL)
0
N IA
150 dB (RMS)
74 m
(243 ft)
Disrupted feeding,
Sheltering, pupping,
or potential increase
in risk to predation
---
11.~~~d
-..- .
~
'4
Route of
Effect
~
Sea Twtles
Small tooth
Sawfi.sh
and
Sturgeon
Behavioral
Response
178 dB (RMS)
P ossible Species
Response
R equired
BMPs
under
Effects
Determination
S.AJ-82
262
NE
BMPPlan
A
BMPPlan
A
NE
NE
NLAA
. h - d"tame ter W 00d Pile
I mpac tH ammer I nstllti
a a on orv·m y I SheetPile or up t oa 14-me
11'
""'·"
1 ~·
Route of
Effect
Source Level
(Noise
generated by
activity)
Threshold (Noise
level that causes a
response)
Impact
Radius
Possible Species
Response
SingleStrike Injury
195 dB (peak
pressure). 175 dB
(sSEL)
206 dB (peak
pressure) or
187 dB (sSEL)
0
N IA
Daily
Cumulative
Noise
Exposure
The source level
is adjusted for
total pile strikes
to reflect
accumulated
exposw·e.
187 dB (cSEL)
1pile=2
m (7 ft).
10 piles= 9
m (30 ft)
Onset of auditory
injury
Behavioral
Response
185 dB (RMS)
160 dB (RMS)
46m
(150 ft)
Disrupted feeding,
sheltering
NLAA
SingleStrike Injmy
195 dB (peak
pressure) . 175 dB
(sSEL)
206 dB (peak
pressure) or
187 dB (sSEL)
0
NI A
NE
Daily
Cwnulative
Noise
Exposure
TI1e source level
is adjusted for
total pile strikes
to reflect
accumulated
exposure.
206 dB (peak
pressure) OJ'
187 dB (cSEL)
1 pile=
2 111 (7 ft) .
lOpiles =
9 Ill (30 ft)
Onset of auditory
illjllly
150 dB (RMS)
215m
(705 ft)
Disrupted feeding,
sheltering, pupping.
or potential increase
in risk to predation
rt_
Sea Turtles
Smalltooth
Sawfish
and
Sturgeon
Behavioral
Response
185 dB (RMS)
263
Required
BMPs
under
SAJ-82
Effects
Determination
NE
BMPPlan
A
BMPPlan
A
NL.AA
NLAA
NL.AA
. 0 f up to a 2 4-Inc
. hd
- iarneter c oocrete Pile
H a mm er In sta 0!ltiOD
Im
~
.-.:
Route ur
Erreel
Smgle-Stri.ke
Injury
Doily
Cumul ntive
Noise
Exposlll'e
Source Lenl
(Soise
generiued by
actMty)
200 dB (peak
pressure) . 175
dB (sSEL)
The source 1eYel
is adjusted for
total pile strikes
to reflect
accumulated
eiq)osure.
Thres hold
C'\oise leul
that causes
11
lmp11cl
RadJlll
Possibl· Sptdes
RHpoaw
0
NIA
106 dB (peak
pressure) or
187 dB (sSEL)
0.tft"miaattoa
B MP Plan A ..L B
I pile =- 5 w
( 15 ft )
206 dB (peak
pressure) or
187 dB (cSEL)
5 piles"" 1-1
m (50 ft)
illjtU)'
-16 w
( 150 ft )
264
NE
NLAA
If the project is
located in a
confined space, up
to S concrete piles
may be installed
per day.
LO piles= 22
111 (71 ft)
160 dB (RMS)
including:
If the project 1s
located in open
water. up to 10
concrete piles
may be installed
Onset of auditory
per day.
Sea
I85 dB (Ri"IS)
Dl'Kl'l
DDderS.U'-82
respouse)
Turtles
Beba\1oral
Response
JWquiftd BMPs
D isrupted
feedmg.
sb eItering.
If more than 5
piles IDil be
installed in a day.
noise abatement
measw-es are
required for all of
the concrete piles
mstalled that day
with a maximum
of 10 piles
installed per day.
NLAA
to a 14-incb-diameter Concrete Pile
Source Lern
Threshold
~OiSf'
C\oiw- If\ el
generated by
11rthi ty)
that cause" a
response)
SingleStnke
lnJlU")'
:!00 dB (peak
pressure) .
l -5 dB (sSEL)
206 dB {peak
Daily
Cu111uhlti ve
Noise
Exposw·e
The source
le\'el is adjusted
for total pile
s trikes to 1·eflect
accumulated
exposure.
Route or
f.'.trecc
Smalhoo1h
Saw6sh
pr~e) or
is- dB (sSEL)
I mpart
Radiu'
r.sa.a. Sp«iH
RMpoew
NA
0
5 piles= 14
Ill (50 ft)
injury
I 0 piles -= 22
m (71 ft)
Stw!leou
185 dB ~fS)
ISO dB (RMSl
115 Ul
c-os
ft)
265
B~fP Plan A
including:
+
Eaten
o.c...lllht·tlo·
B
O nset of auditory
.tnd
BewmoraJ
Rbpon e
mut.rs.u.a2
NE
If the project is
located in open
water. up to 10
concrete ptles
may be ins talled
per day.
1 pile = 5 Ill
( 15 ft)
206 dB (peak
pressure) or
187 dB (cSEL)
·quindBMPt
Disrupted
feedin,g..
<;hehering.
puppUl!!- or
potential
increase m risk
lo p1 edation
If the project is
located in a
confined space. up
to 5 concrete piles
may be iru.talled
per day.
Ifmore than 5
piles v.nl be
installed m a day.
noise abaterueo1
measures are
required for all of
the concrete piles
installed that d.1y
v.ith a maximt Wl
of IO piles
installed per clay
NLAA
I mpac tHa mmer I nst a IIat"IOll 0 f 2 lVI ea
t I B oatr1ft I -b ea ms
u
-
.r::l
......
--¥=
0
Sea
Turtles
Small tooth
Sawfish
and
Sturgeon
Requir~d
Route of
Effect
Source Level
(Noise
generated by
activity)
Threshold
(Noise level
that causes a
resoonse)
Impact
Radius
Possible Species
Response
SingleStrike Injury
205 dB (peak
pressure).
175 dB (sSEL)
206 dB (peak
pressure) or
187 dB (sSEL)
0
NIA
Daily
Cumulative
Noise
Exposure
TI1e somce
level is adjusted
for total pile
strikes to reflect
accumulated
exposure.*
187 dB (cSEL)
1pile=13 m
(43 ft)
2 piles= 20
m (66 ft)*
Onset of auditory injwy
Behavioral
Response
190 dB (RMS)*
160 dB (RMS)
lOOm
(328 ft)
Disrupted feeding,
sheltering
NLAA
SingleStrike Injury
205 dB (peak
pressure), 1 75
dB (sSEL)*
206 dB (peak
pressure) or 187
dB (sSEL)
0
NIA
NE
Daily
Cumulative
Noise
Exposme
TI1e source
level is adjusted
for total pile
strikes to reflect
accumulated
exposure.*
206 dB (peak
presslU'e) or
187 dB (cSEL)
1pile=13 m
(43 ft)
2 piles= 20
Ill (66 ft) *
Onset of auditory injury
150 dB (RMS)
465m
(1,525 ft)*
Disrupted feeding.
sheltering, pupping, or
potential increase in
risk to predation
~---
Behavioral
Response
190 dB (RMS)*
BMPs
unde1·
SAJ--82
Effects
Determination
NE
BMP Plan
A
BMPPlan
NLAA
NLAA
A
NLAA
*Noise levels not believed to be accurate based on the installation method used. Boatlift I-beams only penetrate loose sediment tmti1 they reach the top of or
first few inches of. hard substrate to stabilize the structure on the hard substrate versus penetrating it.
266
act Hammer In taUation of 24-inch-l\ide !\tetnl beet Pile ( '\"'01 unnl\"lt>d under SWPBO)
Routt- of
Erfttt
Sinttfe- Stnke
lnJW")
Dnily
Sea
Tunic
C1u11111ntive
Noise
Expo!>ure
Source U>~l
(Soise
generated by
Thno~hold
:iicthitY
(Soise le\PI
1Juu ciu1se'i A
ttS oose
:no dB (peak
pressure).
19-t dB (sSEL}
206 dB (peak
pressure) or
187 dB {sSEL)
The source
level is
adjusted for
total p ile
strikes to
reflect
206 dB (penk
press1u·e) or
187 dB (cSEL)
Rnpoaw
B.\IP.i
_.r
S.\J-12
9m
(30 ft)
Physical or auditory
lllJUfY
LAA
(73 1 fl)
On,c;et of auditory injury
10 pile~ =
8.58 Ol
(2.81.5 ft)
e~i><>sure.
20-t dB (RMS)
, . . . . . SpKits
I pile =
223 Ill
8CC\W1Ulated
Belia\!toral
Response
Reqldnd
Impart
RAdJu'
160dB (RMS)
18.5 m
(601 ft)
267
Disrupted feeding or
shehering. poteruial
increase m risk to
predauon. potential
ehered reproduction
(mating and acce5£ to
11e:.tmg beachel>).
po1enuaJ for noiserelated mjury if species
remaw in impact
radius
Not
analyzed
onder SAJ82
LAA
NL.AA or LAA
dependm~ on
the localton and
tin1e of year
act Hammer Io-,tnUatioo of 24-inch-wide Metal beet Pile (~01 uonhpurl under S\YPBO)
Soune U'f°el
Roufe of
~Oise
E(ff(f
generated by
acrhitY
Sw1deSmke lnJury
Daily
C1111111l11tive
Smolllooth
Noi~e
Sawlish
aud
Exposure
Srurgeon
~:10
dB (peak
pressure).
194 dB (sSEL)
The source
level is
adjusted for
total pile
strikes to
reflect
accumulated
ex
Beh:l\1oral
Rel.pouse
Thre\hold
le\el
~oise
tJuU CllllWS
n
E&d(1)to
IUdiu~
Rf.spoase
btdhidaal
Phyr;.1cal or mulitory
mjury
Temporary
a.-oidance of
area and
potennal
noise-related
injuries
0 11set of auditoTemporary
avoidance of
area and
potential
noise-related
injuries
9 m (J0 ft)
1 pt.le =
206 dB (peok
223 m
(731 fi )
pressure) or
187 dB (cSEL)
10 piles=
858 Ill
(2.S 1.5 ft)
ure.
'.!0-l dB (RMS)
~. . . Sptrift
res oose
1.06 dB (peal
pressure) 01
187 dB (sSEL)
150dB lRMSl
......
~
lmp11rf
858 sn
{2.8 15 ft)
·A.J-ll
·r
Not
Elf"h
O.tttada.adoll
LAA
annlyzed
under SAJ-
81
Disrupted feeding or
:J1ehenn~. pupping_.
potcnnal wc::rease in
n k Lo predation.
potential for noiserelated mjury if species
ttmalll 'i ID impact
radms
268
BMh
Temporary
a\·01da:ncc of
area and
potential
noise-related
injunes
NlAAorLAA
depend in 2 OU
the local!OO and
tune of year
16.1 Noise Best Management Practices (BMPs) for SWPBO
The following best management practices key is for reducing the exposure to sea turtles,
smalltooth sawfish, and sturgeon to potential harmful daily noise exposure levels associated with
pile driving during dock and seawall construction activities.
16.1.1 Noise BMP Plan A: Sea Turtle, Smalltooth Sawfish, and Sturgeon Construction
Conditions
The permittee shall comply with the following protected species construction conditions:
a. All construction personnel are responsible for observing water-related activities to detect
the presence of these species.
b. The permittee shall advise all construction personnel that there are civil and criminal
penalties for harming, harassing, or killing species protected under the Endangered
Species Act of 1973.
c. Siltation barriers shall be made of material in which protected species cannot become
entangled, be properly secured, and be regularly monitored to avoid protected species'
entrapment. Barriers may not block protected species entry to or exit from designated
critical habitat without prior agreement from the National Marine Fisheries Service's
Protected Resources Division, St. Petersburg, Florida.
d. If a protected species is seen within 100 yd of the active daily construction/dredging
operation or vessel movement, all appropriate precautions shall be implemented to ensure
its protection. These precautions shall include cessation of operation of any moving
equipment closer than 50 ft of a protected species. Operation of any mechanical
construction equipment shall cease immediately if a protected species is seen within a 50
ft radius of the equipment. Activities may not resume until the protected species has
departed the project area of its own volition.
e. Any injury to a protected species shall be reported immediately to the National Marine
Fisheries Service's Protected Resources Division (727-824-5312) and the local
authorized sea turtle stranding/rescue organization.
f. All work must occur during daylight hours.
16.1.2 Noise BMP Plan B: Impact Pile-Driving Construction Conditions for the
Installation of 6 or More Concrete Piles per Day
1. The permittee shall follow all conditions defined in the Noise BMP Plan A above plus the
conditions provided below:
269
2. It must be determined if the project occurs in open water or a confined space. This
differentiation is important because if a project occurs in a confined space, an animal may
not move through or past a noise source to escape it. A confined space is defined as any
area that has a solid object (e.g., shoreline, seawall, jetty) or structure within 150 feet (ft)
of the pile installation site that would effectively serve as a barrier or otherwise prevent
animals from moving past it to exit the area. This does not include objects such as docks
or other pile-supported structures that would not stop animal movement or significantly
reflect noise.
3. If the project is located in open water, up to 10 concrete piles measuring up to 24-in
diameter may be installed per day.
4. If the project is located in a confined space, up to 5 concrete piles measuring up to 24-in
diameter may be installed per day.
If more than 5 piles will be installed in a day, noise abatement measures are required for
all of the concrete piles installed that day with a maximum of 10 piles installed per day.
Noise Abatement Measures: Approved noise abatement measures include noise
attenuation piles (TNAP) and/or bubble curtains. The TNAP design must be constructed
of a double-walled tubular casing (a casing within a larger casing), with at least a 5-in
wide hollow space completely filled with closed-cell foam or other noise dampening
material between the walls. The TNAP must be long enough to be seated firmly on the
sea bottom, fit over the pile being driven, and extend at least 3 ft above the surface of the
water. The bubble curtain design must adhere to the guidelines for unconfined and
confined bubble curtains defined below, and be followed as detailed in the USACE
permit application. The use of any other alternative noise control method must receive
prior approval by NMFS and the USACE.
If the required noise abatement measure discussed above cannot be used, then the pile
must be installed by a different method using the appropriate noise BMPs defined in this
Opinion (e.g., concrete piles may be installed by vibratory hammer instead, following
BMP Plan A).
16.1.3 Bubble Curtain Specifications for Pile Driving
When using an impact hammer to drive or proof concrete piles, use one of the following sound
attenuation methods:
1) If water velocity is equal to or less than 1.6 ft per second (1.1 miles per hour) for the
entire installation period, surround the pile being driven by a confined or unconfined
bubble curtain that will distribute small air bubbles around 100% of the pile perimeter for
the full depth of the water column.
a) General - An unconfined bubble curtain is composed of an air compressor(s),
supply lines to deliver the air, distribution manifolds or headers, perforated
270
aeration pipe, and a frame. The frame facilitates transport and placement of
the system, keeps the aeration pipes stable, and provides ballast to counteract
the buoyancy of the aeration pipes in operation.
b) The aeration pipe system shall consist of multiple layers of perforated pipe
rings, stacked vertically in accordance with the following:
Water Depth (m)
0 to less than 5
5 to less than 10
10 to less than 15
15 to less than 20
20 to less than 25
No. of Layers
2
4
7
10
13
c) The pipes in all layers shall be arranged in a geometric pattern which shall
allow for the pile being driven to be completely enclosed by bubbles for the
full depth of the water column and with a radial dimension such that the rings
are no more than 0.5 m from the outside surface of the pile.
i.
The lowest layer of perforated aeration pipe shall be designed to
ensure contact with the substrate without burial and shall
accommodate sloped conditions.
ii.
Air holes shall be 1.6 millimeter (mm) (1/16-in) in diameter and
shall be spaced approximately 20 mm (3/4 in) apart. Air holes
with this size and spacing shall be placed in 4 adjacent rows along
the pipe to provide uniform bubble flux.
iii.
The system shall provide a bubble flux 3.0 m³ per minute per linear
meter of pipe in each layer (32.91 ft³ per minute per lin ft of pipe
in each layer). The total volume of air per layer is the product of
the bubble flux and the circumference of the ring:
V = 3.0 m³/min/m * Circumference of the aeration ring in m
t
or
V = 32.91 ft³/min/ft * Circumference of the aeration ring in ft
t
iv.
Meters shall be provided as follows:
x
Pressure meters shall be installed at all inlets to aeration
pipelines and at points of lowest pressure in each branch of
the aeration pipeline.
271
x
Flow meters shall be installed in the main line at each
compressor and at each branch of the aeration pipelines at
each inlet. In applications where the feed line from the
compressor is continuous from the compressor to the
aeration pipe inlet, the flow meter at the compressor can be
eliminated.
Flow meters shall be installed according to the
manufacturer's recommendation based on either laminar
flow or non-laminar flow.
2) If water velocity is greater than 1.6 ft per second (1.1 miles per hour) at any point during
installation or if constructing a seawall, surround the pile or area being driven by a
confined bubble curtain (e.g., a bubble ring surrounded by a fabric or non-metallic
sleeve). The confined bubble curtain will distribute air bubbles around 100% of the pile
perimeter for the full depth of the water column, according to specifications below.
a) General - A confined bubble curtain is composed of an air compressor(s),
supply lines to deliver the air, distribution manifolds or headers, perforated
aeration pipe(s), and a means of confining the bubbles.
b) The confinement shall extend from the substrate to a sufficient elevation
above the maximum water level expected during pile installation such that
when the air delivery system is adjusted properly, the bubble curtain does
not act as a water pump (i.e., little or no water should be pumped out of
the top of the confinement system).
c) The confinement shall contain resilient pile guides that prevent the pile
and the confinement from coming into contact with each other and do not
transmit vibrations to the confinement sleeve and into the water column
(e.g., rubber spacers, air-filled cushions).
d) In-water less than 15 m deep, the system shall have a single aeration ring
at the substrate level. In-waters greater than 15 m deep, the system shall
have at least 2 rings: 1 at the substrate level and the other at mid-depth.
e) The lowest layer of perforated aeration pipe shall be designed to ensure
contact with the substrate without sinking into the substrate and shall
accommodate for sloped conditions.
f) Air holes shall be 1.6 mm (1/16-in) in diameter and shall be spaced
approximately 20 mm (3/4 in) apart. Air holes with this size and spacing
shall be placed in 4 adjacent rows along the pipe to provide uniform
bubble flux.
272
g) The system shall provide a bubble flux of 2.0 m³ per minute per linear
meter of pipe in each layer (21.53 ft³ per minute per lin ft of pipe in each
layer). The total volume of air per layer is the product of the bubble flux
and the circumference of the ring:
Vt = 2.0 m3/min/m * Circumference of the aeration ring in m
or
Vt = 21.53 ft3/min/ft * Circumference of the aeration ring in ft
(h) Flow meters shall be provided as follows:
i.
Pressure meters shall be installed at all inlets to aeration pipelines
and at points of lowest pressure in each branch of the aeration
pipeline.
ii.
Flow meters shall be installed in the main line at each compressor
and at each branch of the aeration pipelines at each inlet. In
applications where the feed line from the compressor is continuous
from the compressor to the aeration pipe inlet, the flow meter at
the compressor can be eliminated.
iii.
Flow meters shall be installed according to the manufacturer's
recommendation based on either laminar flow or non-laminar flow.
273