Home

Galveston District

Run scraper

Vopak Terminal Deer Park (Houston Ship Channel)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to perform intermittent silt blade maintenance dredging over a 17.0 acre area to previously authorized depths per Department of the Army Permit SWG-2007-00247 (formerly 12314(10)) at Docks 1-5 within Buffalo Bayou.

Full Public Notice Project Plans Project Description. The applicant proposes to perform intermittent silt blade maintenance dredging over a 17.0 acre area to previously authorized depths per Department of the Army Permit SWG-2007-00247 (formerly 12314(10)) at Docks 1-5 within Buffalo Bayou. An estimated 6,925 cubic yards of material will be spread away from the breasting line of Dock 2 and away from the adjacent Federal channel. An estimated 7,801 cubic yards of material will be spread towards the breasting line of Dock 1. An estimated 4,278 cubic yards of material will be spread away from the breasting line of Docks 3, 4, and 5. The total impacts, dredging and placement of material, to waters of the U.S. is 17.0 acres.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas